Loading...
HomeMy WebLinkAbout20201784 Ver 1_Meeting Request Review_20201120 tie DWR Pre-Filing Meeting Request Form NORTH CAROLINA Environmental Qunfuy ID#* 20201784 Version* 1 Regional Office* Winston-Salem Regional Office-(336)776-9800 Reviewer List* Dave Wanucha Pre-Filing Meeting Request submitted 11/20/2020 ........................................................................................................................................................................................................................................................................................................................................................................................................................................................ Contact Name* Jerry Parker Contact Email Address* jparker@ncdot.gov Project Name* New Hope Rd Bridge Replacement Project Owner* NCDOT Project County* Orange Owner Address: Street Address P.O. Box 14996 Address Line 2 aty State/Bovine/Region Greensboro NC Fbstal/Zip Code Country 27415-4996 USA Is this a transportation project?* r Yes r No Type(s)of approval sought from the DWR: i7 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express I— Individual Permit I— Modification 1 Shoreline Stabilization Does this project have an existing project ID#?* (' Yes r No Please list all existing project ID's associated with this projects.* WBS 17BP.7.R.111 Do you know the name of the staff member you would like to request a meeting with? David Wanucha Please give a brief project description below.* The North Carolina Department of Transportation (NCDOT) is proposing to replace Orange County Bridge#99 on New Hope Church Road(SR 1732) over New Hope Creek.The existing structure is a three span bridge(3@35') and is a reinforced concrete deck on I-Beams.The end bents are reinforced concrete caps on timber piles and the interior bents are reinforced concrete posts and beams.The proposed structure is a single span (1 @105'), 39"precast concrete box beam with 4'deep caps.This structure has been designed to have as little environmental and surface water impacts as possible.2 Please give a couple of dates you are available for a meeting. 12/3/2020 12/3/2020 Please attach the documentation you would like to have the meeting about. Bridge#99 Permit&Stormwater Plans.pdf 3.41MB pdf only By digitally signing below,I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature 9tikj_20.414 Submittal Date 11/20/2020 Reviewer Meeting Request Decision ......................................................................................................................................................................................................................................................................................................................................................................................................................................................... Has a meeting been scheduled?* C Yes t: No