HomeMy WebLinkAbout20201784 Ver 1_Meeting Request Review_20201120 tie
DWR Pre-Filing Meeting Request Form
NORTH CAROLINA
Environmental Qunfuy
ID#* 20201784 Version* 1
Regional Office* Winston-Salem Regional Office-(336)776-9800
Reviewer List* Dave Wanucha
Pre-Filing Meeting Request submitted 11/20/2020
........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Contact Name* Jerry Parker
Contact Email Address* jparker@ncdot.gov
Project Name* New Hope Rd Bridge Replacement
Project Owner* NCDOT
Project County* Orange
Owner Address: Street Address
P.O. Box 14996
Address Line 2
aty State/Bovine/Region
Greensboro NC
Fbstal/Zip Code Country
27415-4996 USA
Is this a transportation project?* r Yes r No
Type(s)of approval sought from the DWR:
i7 401 Water Quality Certification- I— 401 Water Quality Certification-
Regular Express
I— Individual Permit I— Modification
1 Shoreline Stabilization
Does this project have an existing project ID#?*
(' Yes r No
Please list all existing project ID's associated with this projects.*
WBS 17BP.7.R.111
Do you know the name of the staff member you would like to request a meeting with?
David Wanucha
Please give a brief project description below.*
The North Carolina Department of Transportation (NCDOT) is proposing to
replace Orange County Bridge#99 on New Hope Church Road(SR 1732)
over New Hope Creek.The existing structure is a three span bridge(3@35')
and is a reinforced concrete deck on I-Beams.The end bents are
reinforced concrete caps on timber piles and the interior bents are
reinforced concrete posts and beams.The proposed structure is a single
span (1 @105'), 39"precast concrete box beam with 4'deep caps.This
structure has been designed to have as little environmental and surface
water impacts as possible.2
Please give a couple of dates you are available for a meeting.
12/3/2020
12/3/2020
Please attach the documentation you would like to have the meeting about.
Bridge#99 Permit&Stormwater Plans.pdf 3.41MB
pdf only
By digitally signing below,I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an
application.
Signature 9tikj_20.414
Submittal Date 11/20/2020
Reviewer Meeting Request Decision
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Has a meeting been scheduled?* C Yes t: No