HomeMy WebLinkAbout20201786 Ver 1_17BP.6.R.73 Permit Drawings Final_202011200
0
0
PROFILE (HORIZONTAL)
PROJECT LENGTH
RIGHT OF WAY DATE:
LETTING DATE:
STATE STATE PROJECT REFERENCE NO.
F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
1
DESIGN DATA Prepared in the Office of:DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
P.E.
SIGNATURE:
P.E.
P.E.
PROJECT DESIGN ENGINEER
GRAPHIC SCALES
PLANS
PROFILE (VERTICAL)
HYDRAULICS ENGINEER
ENGINEER
ROADWAY DESIGN09/08/99STATE OF NORTH CAROLINA
DIVISION OF HIGHWAYS
0
00
$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$STATE HIGHWAY DESIGN ENGINEERDEPARTMEN
T
O
F
TRA N S PORTATIONSTATE O F NORT
H CAR
O
LI
NAADT =
=
=
=
=
0
0
0 PROJECT ENGINEER
NCDOT CONTACTCONTRACT:W.B.S. NO.
SIGNATURE:
VICINITY MAP
2012 STANDARD SPECIFICATIONS
4
MPH17BP.6.R.7317BP.6.R.73
2016 420
45
BRUCE PAYNE, P.E.
CHRISTY WRIGHT HUFF, P.E.
LOCATION
PROJECT
POND
SINGLETARY
BOOTS
S
WAMP
NC-131 HWYROADCABBAGEMILL
POND
RD
SINGLETARY
CHURCH ROAD
ZION HILL
S
WAMP
C
R
AWLE
Y
ROADCENTER
R
OADC
E
NT
E
R
ROAD
HICKMAN
0.071 MILES
0.017 MILES
0.088 MILES
NATHAN CHAPMAN, P.E.
20 401020 (919) 876-6888 NCBEES #F-0326
RALEIGH, NORTH CAROLINA 27609
1616 E. MILLBROOK ROAD, SUITE #160
LENGTH ROADWAY PROJECT 17BP.6.R.73
LENGTH STRUCTURES PROJECT 17BP.6.R.73
TOTAL LENGTH PROJECT 17BP.6.R.73
=TTST
=
3%
DUALS 3%
GUIDELINES
SUB-REGIONAL TIER
LOCAL
FUNC CLASS = RURAL
OFF-SITE DETOUR
PROJECT:4 824
20 401020
17BP.6.R.73 PE
R/W, UTIL.
CONSTR.
17BP.6.R.73
17BP.6.R.73
SR
1124
SR
1
1
2
2
SR 1100
S
R 1
1
0
0
SR 1126
SR 1121
*V
TYPE OF WORK: WIDENING, GRADING, PAVING, DRAINAGE, AND STRUCTURE
BLADEN COUNTY
BRIDGE NO. 080175 SINGLETARY MILL POND ROAD (SR 1124)
WETLAND AND SURFACE WATER IMPACTS PERMIT
LOCATION:
STA 13+12.52 -L-
BEGIN BRIDGE
BEGIN PROJECT 17BP.6.R.73
STA 11+25.00 -L-
STA 14+04.92 -L-
END BRIDGE
END PROJECT 17BP.6.R.73
STA 15+90.00 -L-
N
C
-131
H
W
YTO
7
BOOTS SWAMPBOOTS SWAMPSHEET 1 OF 7
PERMIT DRAWING
OVER BOOTS SWAMP
(SR 1122)CABBAGE RD TO
JULY 27, 2018
JANUARY 16, 2019
PER UTILITY COMPANY, THERE WILL BE NO UTILITY IMPACTS IN ANY WETLANDS ON THIS PROJECT.
T
WOODS
4' WIRE
EXISTING R/W
"BENCHTIE NAIL SET IN 30" TWIN ELM TREE"
ELEV=112.08'
152.39'' RIGHT
-BL- STA. 20+54.12
BM
INV=103.30'36" RCP
(DIRECTION ONLY)
INVERT NOT LOCATED 14" D
IP4' W
IRE
/
1SBW EX
I
STIN
G
R/W
EX
IST
IN
G
R/
W
EXISTING R/W
EXISTING R/W
EXISTING R/W
#175
CONC BRIDGE
S
S
19' BST
SINGLETARY MILL POND RD
SR 1124
WOODS
WOODS
WOODS
WOODS
WOODS
19' BST
S
INGLETARY
M
ILL
POND
RD
SR
1124
)4211 .oN RSCN( daoR dnoP lliM yratelgniS
DESIGN DATA PROJECT LENGTH NA 2011NAD 83 /F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
ENGINEER
17BP.6.R.73
20'0'20'
GRAPHIC SCALE
$$$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$$$$
$$$$$$SYSTIME$$$$$
$$$$USERNAME$$$$
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
BETWEEN SR 1122 AND NC 131 HWY IN BLADEN COUNTY
BRIDGE OVER BOOTS SWAMP ON SR 1124 (SINGLETARY MILL POND ROAD)
13+00
12+00
14+00
15+00
100
104
108
112
116
100
104
108
112
116
-L- STA 13+12.52BEGIN BRIDGE -L- STA 14+04.92END BRIDGE PROPOSED GRADE
EXIST = (-)0.8476%
EXIST = (+)0.2384%
EXISTING GROUND
DS = 55 MPH
DS = 55 MPH
-L- POC STA 14+54.85
BEGIN MILLING
ELEV = 112.70
-L- POC STA 14+68.82
LOW POINT
ELEV = 112.75
-L- POC STA 15+10.00
END GRADE
-L- POC STA 15+90.00
END MILLING
END CONSTRUCTION
-L- POC STA 11+25.00
BEGIN MILLING
BEGIN CONSTRUCTION
ELEV = 114.01
-L- POC STA 11+65.00
BEGIN GRADE
-L- POC STA 12+62.59
END MILLING
PI = 12+35.00
EL = 113.35'
(-)0.9528%
(-)0.3000%
VC = 80'
K = 123
PI = 14+60.00
EL = 112.67'
(-)0.3000%(+)0.1636%
VC = 60'
K = 129
11+00 12+00 13+00 14+00 15+00 16+00
30" TWIN ELM TREE"
"BENCHTIE NAIL SET IN
ELEV=112.08'
147.66'' RIGHT
-L- STA. 13+02.87
BM
OFF=31'LT
STA.=11+49
OFF=48.75'LT
STA.=11=70
OFF=52'LT
STA.12+38 OFF=50'LT
STA.=12+75
OFF=45'LT
STA.=12+92
OFF=31'LT
STA.=11+58
OFF=50'LT
STA.=12+80
OFF=50'LT
STA.=14+80
OFF=50'LT
STA.=14+50
OFF=36'LT
STA.=14+95
OFF=40'LT
STA.=14+63
OFF=35'LT
STA.=14+82
OFF=38'RT
STA.=12+05
OFF=50'RT
STA.=12+35
OFF=49'RT
STA.=12+53
OFF=41'RT
STA.=12+84
SITE 6
SITE 1
SITE 3
SITE 4
SITE 2
WETLAND AND SURFACE WATER IMPACTS PERMIT
SITE 5
SHEET 2 OF 7
PERMIT DRAWING
2
ROADWAY DESIGN
R/W SHEET NO.
ENGINEER
HYDRAULICS
SHEET NO.PROJECT REFERENCE NO.NA 2011NAD 83 /WETLAND
DENOTES FILL INFF
CLEARING IN WETLANDS
DENOTES HAND
PROPOSED BRIDGE
TO BE REMOVED
EXISTING BRIDGE
CLASS 2 RIP RAP (TYP.)
BURY 3.5 FT NORMAL TO CAP
EXCAVATE TO ELEV. 106.5 (86 CY)BT-1 STA. 13+58.72 -L-EXCAVATE TO ELEV. 107.0 (81 CY)
STEEL PILES (TYP.)
HP 12x53
TS TS
Office of:
Prepared in the
(919) 981-0451 (FAX)
(919) 981-0310
Raleigh, NC 27607
4601 Lake Boone Trail Suite 3C
NC FIRM LICENSE No: C-1684
ALPHA & OMEGA GROUP
BOOTS SWAMPBOOTS SWAMPEL. = 105.6
SURFACE
NORMAL WATER
A&O PROJECT: 2017.025
EROSION CONTROL
CLEARING LIMITS FOR
-L-
11
'
8:1
8:1
8:1 8:111'
11'
11'
11'33'-10"
GREU
TL-3
GREU TL-3
2' FDPS
2
' FDPS
2' FDPS
2' FDPS9.7'
6'-4"6'-4"
4'-5"
TYPE III TYPE III
TYPE III
TYPE III
9.7'9.9'11
'
5'-6"5'-6"
6'-5"
7'-5"
7'-6"
6'-3"
6'-4"-L
-GREU TL-3
GREU TL-311'
11'
11'
11'
SBG SBG
MCF
T
WOODS
14"
D
IP4'
W
IR
E
/ 1SBW
EXISTING R/W
EXISTING R/W
#175
CONC BRIDGE
S
S
19' BST
SINGLETARY MILL POND RD
SR 1124
WOODS
WOODS
19' BST
S
INGLETARY
M
ILL
POND
RD
SR
1124
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F105
105105105105105105105110110110
110 110110110
110)4211 .oN RSCN( daoR dnoP lliM yratelgniS
17BP.6.R.73
20'0'20'
GRAPHIC SCALE
$$$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$$$$
$$$$$$SYSTIME$$$$$
$$$$USERNAME$$$$
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
BETWEEN SR 1122 AND NC 131 HWY IN BLADEN COUNTY
BRIDGE OVER BOOTS SWAMP ON SR 1124 (SINGLETARY MILL POND ROAD)
13+00
12+00
14+00
15+00
100
104
108
112
116
100
104
108
112
116
-L- STA 13+12.52BEGIN BRIDGE -L- STA 14+04.92END BRIDGE PROPOSED GRADE
EXIST = (-)0.8476%
EXIST = (+)0.2384%
EXISTING GROUND
DS = 55 MPH
DS = 55 MPH
-L- POC STA 14+54.85
BEGIN MILLING
ELEV = 112.70
-L- POC STA 14+68.82
LOW POINT
ELEV = 112.75
-L- POC STA 15+10.00
END GRADE
-L- POC STA 15+90.00
END MILLING
END CONSTRUCTION
-L- POC STA 11+25.00
BEGIN MILLING
BEGIN CONSTRUCTION
ELEV = 114.01
-L- POC STA 11+65.00
BEGIN GRADE
-L- POC STA 12+62.59
END MILLING
PI = 12+35.00
EL = 113.35'
(-)0.9528%
(-)0.3000%
VC = 80'
K = 123
PI = 14+60.00
EL = 112.67'
(-)0.3000%(+)0.1636%
VC = 60'
K = 129
11+00 12+00 13+00 14+00 15+00 16+00
30" TWIN ELM TREE"
"BENCHTIE NAIL SET IN
ELEV=112.08'
147.66'' RIGHT
-L- STA. 13+02.87
BM
OFF=31'LT
STA.=11+49
OFF=48.75'LT
STA.=11=70
OFF=52'LT
STA.12+38 OFF=50'LT
STA.=12+75
OFF=45'LT
STA.=12+92
OFF=31'LT
STA.=11+58
OFF=50'LT
STA.=12+80
OFF=50'LT
STA.=14+80OFF=50'LT
STA.=14+50
OFF=36'LT
STA.=14+95
OFF=40'LT
STA.=14+63
OFF=35'LT
STA.=14+82
OFF=38'RT
STA.=12+05
OFF=50'RT
STA.=12+35
OFF=49'RT
STA.=12+53
OFF=41'RT
STA.=12+84
SITE 6
SITE 1
SITE 3
SITE 4
SITE 2
WETLAND AND SURFACE WATER IMPACTS PERMIT
SITE 5
SHEET 3 OF 7
PERMIT DRAWING
3
R/W SHEET NO.NA 2011NAD 83 /WETLAND
DENOTES FILL INFF
CLEARING IN WETLANDS
DENOTES HAND
PROPOSED BRIDGE
TO BE REMOVED
EXISTING BRIDGE
CLASS 2 RIP RAP (TYP.)
BURY 3.5 FT NORMAL TO CAP
EXCAVATE TO ELEV. 106.5 (86 CY)BT-1 STA. 13+58.72 -L-EXCAVATE TO ELEV. 107.0 (81 CY)
STEEL PILES (TYP.)
HP 12x53
TS TS
Office of:
Prepared in the
(919) 981-0451 (FAX)
(919) 981-0310
Raleigh, NC 27607
4601 Lake Boone Trail Suite 3C
NC FIRM LICENSE No: C-1684
ALPHA & OMEGA GROUP
BOOTS SWAMPBOOTS SWAMPEL. = 105.6
SURFACE
NORMAL WATER
PROJECT REFERENCE NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
ENGINEER
HYDRAULICS
A&O PROJECT: 2017.025
EROSION CONTROL
CLEARING LIMITS FOR
-L-
11
'
8:1
8:1
8:1 8:111'
11'
11'
11'33'-10"
GREU
TL-3
GREU TL-3
2' FDPS
2
' FDPS
2' FDPS
2' FDPS9.7'
6'-4"6'-4"
4'-5"
TYPE III TYPE III
TYPE III
TYPE III
9.7'9.9'11
'
5'-6"5'-6"
6'-5"
7'-5"
7'-6"
6'-3"
6'-4"-L
-GREU TL-3
GREU TL-311'
11'
11'
11'
SBG SBG
MCF
T
WOODS
14"
D
IP4'
W
IR
E
/ 1SBW
EXISTING R/W
EXISTING R/W
#175
CONC BRIDGE
S
S
19' BST
SINGLETARY MILL POND RD
SR 1124
WOODS
WOODS
19' BST
S
INGLETARY
M
ILL
POND
RD
SR
112
4
)4211 .oN RSCN( daoR dnoP lliM yratelgniS
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
00
00
55
55
1010
1010
1515
1515
2020
2020
2525
2525
3030
3030
3535
3535
4040
4040
4545
4545
5050
5050
5555
5555
6060
6060
6565
6565
7070
7070
7575
7575
$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$PROJ. REFERENCE NO.SHEET NO.0
6/23/16105 105
110 110
115 115
120 120
100 100
11+50.00
105 105
110 110
115 115
120 120
100 100
11+75.00
105 105
110 110
115 115
120 120
100 100
12+00.00
X-217BP.6.R.73
-L-
2.5 5
BEGIN FILL IN WETLAND
BEGIN FILL IN WETLAND
SHEET 4 OF 7
PERMIT DRAWING
CLEARING IN WETLAND
LIMIT OF HAND
BEGIN HAND CLEARING
END FILL IN WELTLAND
CLEARING IN WETLAND
LIMIT OF HAND
BEGIN HAND CLEARING
END FILL IN WELTLAND
114.15
0.087
0.0613.59:1
4
.4
5
:1114.27113.91
4
.5
3
:1
3:1
0.085
0.061 113.94113.63
4
.6
3
:1
3:1
0.074
0.054 113.76
00
00
55
55
1010
1010
1515
1515
2020
2020
2525
2525
3030
3030
3535
3535
4040
4040
4545
4545
5050
5050
5555
5555
6060
6060
6565
6565
7070
7070
7575
7575
$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$PROJ. REFERENCE NO.SHEET NO.0
6/23/16105 105
110 110
115 115
120 120
100 100
12+25.00
105 105
110 110
115 115
120 120
100 100
12+50.00
105 105
110 110
115 115
120 120
100 100
12+75.00
X-317BP.6.R.73
-L-
2.5 5
BEGIN FILL IN WETLAND
BEGIN FILL IN WETLAND
BEGIN FILL IN WETLAND
SHEET 5 OF 7
PERMIT DRAWING
BEGIN HAND CLEARING
CLEARING IN WETLAND
LIMIT OF HAND
CLEARING IN WETLAND
LIMIT OF HAND
BEGIN HAND CLEARING
END FILL IN WELTLAND
BEGIN HAND CLEARING
CLEARING IN WETLAND
LIMIT OF HAND
CLEARING IN WETLAND
LIMIT OF HAND
BEGIN HAND CLEARING
END FILL IN WELTLAND
CLEARING IN WETLAND
LIMIT OF HANDBEGIN HAND CLEARING
CLEARING IN WETLAND
LIMIT OF HAND
BEGIN HAND CLEARING
END FILL IN WELTLAND
113.30 3:13:1
0.063
0.043 113.58112.95 3:13:1
0.052
0.040 113.43112.57 3:13:1
0.0410.040 113.32
00
00
55
55
1010
1010
1515
1515
2020
2020
2525
2525
3030
3030
3535
3535
4040
4040
4545
4545
5050
5050
5555
5555
6060
6060
6565
6565
7070
7070
7575
7575
$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$PROJ. REFERENCE NO.SHEET NO.0
6/23/16105 105
110 110
115 115
120 120
100 100
14+50.00
105 105
110 110
115 115
120 120
100 100
14+75.00
105 105
110 110
115 115
120 120
100 100
15+00.00
X-617BP.6.R.73
-L-
2.5 5
BEGIN FILL IN WETLAND
SHEET 6 OF 7
PERMIT DRAWING
BEGIN HAND CLEARING
END FILL IN WELTLAND
CLEARING IN WETLAND
LIMIT OF HAND
BEGIN HAND CLEARING
CLEARING IN WETLAND
LIMIT OF HAND
112.55 3.66:13:1
0.053
0.040 112.79112.65
4
.
1
3
:13:1
0.064
0.040 112.74112.73
6
.84
:1
3.98:1 0.070
0.038 112.74
HandExisting Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)111+49 LT TO 12+92 LT HAND CLEARING IN WETLANDS0.020211+58 LT to 12+80 LT FILL IN WETLANDS0.020313+45 LT TO 13+73 LTTEMPORARY STREAM IMPACTS0.020 35414+63 LT TO 14+82 LT FILL IN WETLANDS0.001514+50 LT TO 14+95 LTHAND CLEARING IN WETLANDS0.010612+05 RT TO 12+84 RTHAND CLEARING IN WETLANDS0.013TOTALS*: 0.021 0.043 0.020 35*Rounded totals are sum of actual impactsNOTES:Revised 2013 10 24SHEET 7 OF 7PERMIT DRAWINGJanuary 28, 2019BLADEN COUNTYNC DEPARTMENT OF TRANSPORTATION17BP.6.R.73 WETLAND PERMIT IMPACT SUMMARYSURFACE WATER IMPACTSWETLAND IMPACTSDIVISION OF HIGHWAYS