HomeMy WebLinkAbout20201785 Ver 1_17BP.6.R.76_Permit Drawings_20201120SHEET 1 OF 6
PERMIT DRAWING
WETLAND AND SURFACE WATER IMPACTS PERMIT
SITE 2
SITE 2
SITE 1
0
0
0
PROFILE (HORIZONTAL)
PROJECT LENGTH
RIGHT OF WAY DATE:
LETTING DATE:
STATE STATE PROJECT REFERENCE NO.
F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
1
DESIGN DATA Prepared in the Office of:DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
P.E.
SIGNATURE:
P.E.
P.E.
PROJECT DESIGN ENGINEER
GRAPHIC SCALES
PLANS
PROFILE (VERTICAL)
HYDRAULICS ENGINEER
ENGINEER
ROADWAY DESIGN
LOCATION: 09/08/99STATE OF NORTH CAROLINA
DIVISION OF HIGHWAYS
0
00
09-JAN-2019 08:45R:\Hydraulics\PERMITS_Environmental\Drawings\17BP.6.R.76_prm_tsh.dgn$$$$USERNAME$$$$STATE HIGHWAY DESIGN ENGINEERDEPARTMEN
T
O
F
TRANSPORTATIONSTATE O F NORT
H CAR
O
LI
NAADT ==
=
=
0
0
0 PROJECT ENGINEER
NCDOT CONTACTCONTRACT:W.B.S. NO.
SIGNATURE:
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
TYPE OF WORK: WIDENING, GRADING, PAVING, DRAINAGE, AND STRUCTURE
4
17BP.6.R.76ROBESON COUNTY
17BP.6.R.76
2016
55 MPH
LENGTH ROADWAY T.I.P. PROJECT 17BP.6.R.76
LENGTH STRUCTURES T.I.P. PROJECT 17BP.6.R.76
TOTAL LENGTH T.I.P. PROJECT 17BP.6.R.76
SHOP ROAD
TO BARBER
BRIDGE NO. 770239 UNION CHAPEL ROAD (SR 1515) OVER BURNT SWAMP
BRUCE PAYNE, P.E.
IAN BERDEAU, P.E.
CHRISTY WRIGHT HUFF, P.E.
(919) 876-6888 NCBEES #F-0326
RALEIGH, NORTH CAROLINA 27609
1616 E. MILLBROOK ROAD, SUITE #160
4,100
AUGUST 15, 2018
APRIL 17, 2019
State Ro
a
d 1
5
2
1
Huggins Rd
St
at
e Ro
a
d
1
5
2
1
Ambay Rd
Solomn Dr Oak Grove Ch Rd
ELEMENTARY SCHOOL
TO UNION CHAPEL
LOCATION
PROJECT
1516State Road
1658
State Road
State Hi
g
h
wa
y
7
2 WE 4th
Ave
5
-L- STA 12+87.38
BEGIN BRIDGE
-L- STA 13+54.63
END BRIDGE
-L- STA 15+90.00
END PROJECT 17BP.6.R.76
-L- STA 10+90.00
BEGIN PROJECT 17BP.6.R.76
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II.
0.012 MILES
FUNC CLASS =
LOCAL
RURAL
=3%TTST
=3%DUALS
GUIDELINES
SUB-REGIONAL TIER
0.083 MILES
S
R 1
5
1
3
E
vergree
n
C
h
urc
h
R
d
S
R 1
5
1
3
E
vergree
n
C
h
urc
h
R
dSR 1513Evergreen Church RdSR 1318
Buie - Philadelphus Rd
SR 1520Barber Shop RdSR 1515Cha pel RdUni on SR 1515Union Chapel Rd
SR
1515
Un
ion
Chape
l Rd
UNION CHAPEL RD (SR 1515)-L-
20 10 20 40
20 10 20 40
OFF-SITE DETOUR
PROJECT:(NOT FLOWI
NG)BURNT SWAMP(NOT FLOWI
NG)BURNT SWAMP65% RIGHT OF WAY PLANS
PE
4 4 82
0.095 MILES
V =
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES
2018 STANDARD SPECIFICATIONS
R/W
CONSTRUCTION
AUGUST 30, 2018
17BP.6.R.76
17BP.6.R.76
17BP.6.R.76
WOODS
BRUSH LINE BRUSH LINE
WOODS
NA 2011
NAD 83 /
72
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
WETLAND
DENOTES FILL IN
TS TS
F F
SHEET 2 OF 6
PERMIT DRAWING
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
REVISIONS HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.09-JAN-2019 08:45R:\Hydraulics\PERMITS_Environmental\Drawings\17BP.6.R.76_prm_psh.dgn$$$$USERNAME$$$$8/17/99DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
417BP6.R.76
PAVED SHOULDER
SEE SHEET S-1 THRU S-X FOR STRUCTURE PLANS
SEE SHEET 6 FOR PROFILE VIEW
IN WETLAND
DENOTES HAND CLEARING
00 20 401020
SCALE
00 20 401020
SCALE
WETLAND AND SURFACE WATER IMPACTS PERMIT
TYPE III
TYPE III TYPE III
TYPE III
-L- POT Sta. 10+00.00
-L- POT STA 13+65.50
END APPROACH SLAB
-L- POT STA 12+76.50
BEGIN APPROACH SLAB
-L- POT STA 12+87.38
BEGIN BRIDGE
4-5"
8:1
8:1
8:1
8:1
-L--L-
8:1
8:1
11'
11'
8:1
8:1
FDPS
4'
4' FDPS 4' FDPS
11'
11'11'
11'
FDPS
4'
11'
11'
4'-5"
30'-10"11'
11'
4' FDPS
11'
11'
4' FDPS
2' FDPS
2' FDPS
4' FDPS
4' FDPS
GREU TL-3
GREU TL-3
GREU TL-3
GREU TL-3
11'
11'
FDPS
4'
4' FDPS
4'-5" FDPS
4'-5" FDPS
4'-5" FDPS
4'-5" FDPS
11'
11'
-L- POT STA 11+88.50
BEGIN FULL DEPTH PAVING
END MILLING
-L- POT STA 14+53.50
BEGIN MILLING
END FULL DEPTH PAVING +07.25+07.25+34.75+34.75BEGIN MILLING
-L- POT STA 10+90.00
BEGIN PROJECT
-L- POT STA 13+54.63
END BRIDGE
SITE 2
SITE 2
SITE 1
60.00'S
S
S
S
-EL-
MTL
MTL
S
T
2 3 4
1
2
WW
WD
WW
WD
WW
WD
WW
WD
BURNT SWAMP
SR 1515 UNION CHAPEL RD 22' BST
WOODS
BRUSH LINE
BURNT SWAMP
"BENCHTIE NAIL SET IN 10" PINE TREE"
ELEV=153.51'
51.88'' RIGHT
-BL- STA. 22+24.08
BM#1
CL OF CREEK IS PROPERTY LINE
N 57°51'48" W56.09'
N 80°50'08" W
34.68'
(
N
O
T F
L
O
WI
N
G)
B
U
R
N
T S
WA
MPN
7
5
°
4
1'
2
7
" W5
2.
0
7'
BRUSH LINE
18.85'
S 63°25'41" E
(NOT FLOWI
NG)BURNT SWAMPS 66°18'00" E41.44'
16.50'
S 68°11'27" E
18.64'
S 80°32'01" E
S 39°47'46" E
23.93'
S 26°33'14" E
13.71'
CL OF CREEK IS PROPERTY LINE
AND BONNIE L. DEESE
RUDY LOCKLEAR, DIANE L. GOINS
JUDY L. LOCKLEAR, LINDA L. CLARK,
DB 735 PG 555
CAROLYN L. LOCKLEAR
PAISLEY DAVID LOCKLEAR ET UX,
DB 719 PG 303
N 85°57'38" W
36.43'
EXISTING R/W
EXISTING R/W
-BL-1
-BL-2
OFF 17.14' RT
+71.12
OFF 17.02' RT
+56.74
-BL-3
WOODS
BURNT SWAMP
CHARLES ANDREW SCOTT
DB 1858 PG 682
BURNT SWAMP
SR 1515 UNION CHAPEL RD 22' BST
CHARLES ANDREW SCOTT
DB 1858 PG 682
3
CHARLES ANDREW SCOTT
DB 1858 PG 682
3
NC GRID
NAD 83/ NA 2011
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
SHEET 3 OF 6
PERMIT DRAWING
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
WETLAND
DENOTES FILL IN
TS TS
F F
IN WETLAND
DENOTES HAND CLEARING
0
SITE 1
SITE 2
WETLAND AND SURFACE WATER IMPACTS PERMIT
WETLAND AND SURFACE WATER IMPACTS PERMIT
SCALESCALE
10 20510-L- STA 14+00MATCHLINE SEE SHEET 5SITE 2
09-JAN-2019 08:45R:\Hydraulics\PERMITS_Environmental\Drawings\17BP.6.R.76_prm_psh_enlarge.dgn$$$$USERNAME$$$$HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.5/14/99SHEET NO.PROJECT REFERENCE NO.
417BP.6.R.76
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
NC GRID
NAD 83/ NA 2011
TYPE III
TYPE III TYPE III
TYPE III
-L-
GREU TL-3
GREU TL-3
S
S
S
S
MTL
MTL
T
BURNT SWAMP
SR 1515 UNION CHAPEL RD 22' BST
WOODS
BRUSH LINE
BURNT SWAMP (
N
O
T F
L
O
WI
N
G)
B
U
R
N
T S
WA
MPN
7
5
°
4
1'
2
7
" W5
2.
0
7'
18.85'
S 63°25'41" E
(NOT FLOWI
NG)BURNT SWAMPS 66°18'00" E41.44'
16.50'
S 68°11'27" E
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F F
LOWEST CHORD
CLASS II RIP RAP
NORMAL TO END CAP
BURY 3.5'
150.7' (24 CY)
EXCAVATE TO ELEV.
150.7' (25 CY)
EXCAVATE TO ELEV.
SHEET 4 OF 6
PERMIT DRAWING
10 11 12 13 14 15
150
10" PINE TREE"
"BENCHTIE NAIL SET IN
ELEV=153.51'
68.9928'' RIGHT
-L- STA. 12+93.97
BM
-L-
SEE SHEET 5 FOR PLAN VIEW
134
138
142
146
154
158 158
154
150
146
142
138
134
134
138
142
146
150
154
158
134
138
142
146
150
154
158
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED5/28/99SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
617BP.6.R.76
09-JAN-2019 08:45R:\Hydraulics\PERMITS_Environmental\Drawings\17BP.6.R.76_prm_pfl.dgn$$$$USERNAME$$$$DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
ELEV = 153.90-L- STA 14+50.00MATCHLINEELEV = 153.90-L- STA 14+50.00MATCHLINE15 16
STRUCTURE HYDRAULIC DATA
DESIGN DISCHARGE
DESIGN FREQUENCY
BASE DISCHARGE
CFS
YRS
YRS
BASE FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE CFS
CFS
YRS
FT
FT
FT
DESIGN HW ELEVATION
BASE HW ELEVATION
= 152.1
= 870
= 152.7
= 1300
= 152.3
= 870
= 25
= 100
= 25
-L-
SEE SHEET S-1 THRU S-X FOR STRUCTURE PLANS
SEE SHEET 4 FOR PLAN VIEW
ELEVATION=154.05'
SKEW 90"
24" CORED SLAB
I @ 65'
BRIDGE STA. 13+21.00 -L-
(6/27/2017)
OBSERVED WSEL. = 150.7'
PROPOSED GRADE
EXISTING GROUND
-L- UNION CHAPEL ROAD (SR 1515)
EXIST = (-)0.0905%
(+)0.4000%
VC = 95'
K = 81
(+)1.5755%
(+)0.3000%
VC = 80'
K = 63
(+)0.3000%
VC = 115'
K = 64DS = 45 MPH
DS = 45 MPH DS = 45 MPH
(-)1.5075%
EXISTING BRIDGE
ELEV. = 152.33
-L- POT STA. 15+90.00
END GRADE
PROPOSED GRADE
EXISTING GROUND
EXIST = (-)0.0845%
PI = 15+45.00
EL = 152.55'
(-)1.5075%
(-)0.5000%
VC = 90'
K = 89
DS = 45 MPH
09-JAN-2019 08:45R:\Hydraulics\PERMITS_Environmental\Drawings\17BP.6.R.76_prm_xsc.dgn$$$$USERNAME$$$$8/23/99PROJ. REFERENCE NO.SHEET NO.0 5 10
-L-
X-1
13+75.00
150
155
160
165
145
17BP.6.R.76
BEGIN FILL IN WETLAND
00 55 1010 1515 2020 2525 3030 3535 4040 4545 5050 5555 6060 6565 7070 7575
00 55 1010 1515 2020 2525 3030 3535 4040 4545 5050 5555 6060 6565 7070 7575
SITE 2
150
155
160
165
145
SHEET 5 OF 6
PERMIT DRAWING
150
155
160
165
145
150
155
160
165
145
12+00.00145
150
155
160
165
145
150
155
160
165
SITE 1
(WETLAND BOUNDARY)
BEGIN HAND CLEARING
END FILL IN WETLAND
BEGIN HAND CLEARING IN WETLAND
WAY)
(EXISTING RIGHT OF
CLEARING IN WETLAND
LIMIT OF HAND
WAY)
(EXISTING RIGHT OF
CLEARING IN WETLAND
LIMIT OF HAND
153.11 3:13:1 0.0250.025
153.79153.21 3:13:1 0.0250.025 154.21
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream
No.(From/To)Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp.Design
(ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft)
1 11+16 / 12+77
Clearing in Wetland 0.01
2 12+97 / 13+88 Temp. Stream Impacts,
Clearing in Wetland <0.01 0.01 <0.01 39
TOTALS:< 0.01 0.00 0.00 0.00 0.01 0.00 < 0.01 0 39 0
ATN Revised 3/31/05
WBS - 17BP.6.R.76 (SF-770239)
WETLAND PERMIT IMPACT SUMMARY
SURFACE WATER IMPACTSWETLAND IMPACTS
PERMIT DRAWING
SHEET 6 OF 6
ROBESON COUNTY
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS