Loading...
HomeMy WebLinkAbout20090655 Ver 3_Email_20101215rage i at 1 Murray, Christopher A From: Patel, Sunil J Sent: Tuesday, June 15, 2010 4:38 PM To: Murray, Christopher A Subject: District Dr Project: Utility Buffer Disturbance Attachments: 41797_d 5ddc_dsn_uti lity_buffer_site_06.15.2010. pdf Chris, As per your request, here are the revised numbers for the subject project: BZ-1 Area= 1043 SF BZ-2 Area= 2509 SF SuniI Patel Assistant Division Design Engineer NCDOT-DON-Fifth Division (919) 220-4638 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 6/23/2010 Ridings', Rob From: Murray, Christopher A Sent: Thursday, May 20, 2010 9:52 AM To: Alsmeyer, Eric C SAW; Ridings, Rob Cc: Allen, Jeffrey D, Griffin, Benjamin R Subject: Construction activity on District Drive Extension in Wake County Attachments: Picture 009.jpg Eric and Rob. I wanted to inform you that construction of the structural steel pipe arch has commenced at this project. The contractor has successfully used a hoe ram to excavate the streambed to the proper grade and elevation. The Department proposes to bury the pipe structure in the streambed at the inlet and outlet per the permit condition. It will likely be buried up to a foot in the bed at the inlet. Note that this is necessary due to the change in the stream (actually the bedrock) across the stream. The contractor has installed portions of the riffle pool complex and bank stabilization at the outlet. This is depicted in the attached photograph. Please contact me if you wish to view the site. Chris Email correspondence to and from this sender is subject to the N.C, Public Records law and may be disclosed to third parties. _ ?.Q ??. Wis.: .