Loading...
HomeMy WebLinkAboutWQ0042130_Application (FTSE)_20201119vJ4 W4a 1?6 oBaldwm*Design Consultants, PA ENGINEERING - SURVEYING - PLANNING 1700-D East Arlington Blvd • Greenville, NC 27858 252-756-1390. 252-321-1412 (fax) To: NCDEQ - Water Resources 943 Washington Square Mall Washington, NC 27889 Date: Job No: 11 /16/2020 20-002 Attention: Robert Tankard Re: Allen Park, Section 2 We are sending you: �� Attached ❑ Under separate cover via Drawings XLetter 2 1 2 2 5 2 ❑ Plans 09/23/2020 09/24/2020 11 /13/2020 10/12/2020 11 /16/2020 09/10/2020 j Package 1161 the following: _I Prints Pay Request/ (Specifications Invoice Fx I Other Letters Referencing Fast Track Application Check for $480.00 for Sewer Permit Fee Fast Track Sewer Applications Flow Tracking Application Maps of Project Site (each one w/ markings) Letter of Acceptance from Contentnea Metropolitan Sew;e ge District for Additional Flow Transmitted as checked below: L For approval ❑ Approved as noted ❑ Resubmit - copies for approval For your use ❑ Approved as submitted ❑ Submit copies for distribution x] As requested ❑ Returned for corrections ❑ Return corrected copies For review Other Remarks: CAMO REAL ESTATE INC 1700 TOTiENHAM CT WINTERVILLE, NC 28590 H \ BRANCH B,11111 All, -.',US-, i. 1-N, i-BOQ-BANK 86T BBT.com �� �•-1 cry �- -�T 1:0 5 3 10 L L 2 0:000 5 20 7 3 308 78i1'0 I L 6 L C-e 1161 66-112/531 ��O d NP State of North Carolina FIDepartment of Environmental Quality WRDivision of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION This application is for sewer extensions involving gravity sewers, pump stations and force mains, or any combination that has been certified by a professional engineer and the applicant that the project meets the requirements of 15A NCAC 02T and the Division's Minimum Design Criteria and that plans, specifications and supporting documents have been prepared in accordance with, 15A NCAC 02T, 15A NCAC 02T .0300, Division policies and good engineering practices. While no upfront engineering design documents are required for submittal, in accordance with 15A NCAC 02T .0305(b), design documents must be prepared prior to submittal of a fast track permit application to the Division. This would include plans, design calculations, and project specifications referenced in 15A NCAC 02T .0305 and the applicable minimum design criteria. These documents shall be available upon request by the Division. Projects that are deemed permitted (do not require a permit from the Division) are explained in 1.5A NCAC 02T.0303. Projects not eligible for review via the fast track process (must be submitted for full technical review): ➢ Projects that require an environmental assessment in accordance with 15A NCAC 1C .0100; ➢ Projects that do not meet any part of the minimum design criteria (MDC) document; ➢ Projects that involve a variance from the requirements of 15A NCAC 2T; *OP ➢ Pressure sewer systems utilizing septic tank -effluent pumps (STEPS) or simplex grinder puii .,: f� ➢ STEP or simplex grinder pumps connecting to pressurized systems (e.g. force mains); ty�ly� 1� ➢ Vacuum sewer systems. General — When submitting an application, please use the following instructions as a checklist in order to ` all required items are submitted. Adherence to these instructions and checking the provided boxes will help produce a qui r review time and reduce the amount of requested additional information. Failure to submit all required items will necessitate additional processing and review time, and may result in return of the application. Unless otherwise noted, the Applicant shall submit one original and one copy of the application and supporting documentation. A. One Original and One Copy of Application and Supporting Documents ® Required unless otherwise noted B. Cover Letter (Required for All Application Packages): ® List all items included in the application package, as well as a brief description of the requested permitting action. ➢ Be specific as to the system type, number of homes served, flow allocation required, etc. ➢ If necessary for clarity, include attachments to the application form. C. Application Fee (Ail New and Major Modification Application Packages): ® Submit a check or money order in the amount of $480.00 dated within 90 days of application submittal. ➢ Payable to North Carolina Department of Environmental Quality (NCDEQ) D. Fast Track (Form: FTA 04-16) Application (Required for All Application Packages): ® Submit the completed and appropriately executed application. ➢ If necessary for clarity or due to space restrictions, attachments to the application may be made. ❑ If the Applicant Type in Item I.2 is a corporation or company, provide documentation it is registered for business with the North Carolina Secretary of State. ❑ If the Applicant Type in Item I.2 is a partnership or d/b/a, enclose a copy of the certificate filed with the Register of Deeds in the county of business. ® The Project Name in Item 11.1 shall be consistent with the project name on the flow acceptance letters, agreements, etc. ® The Professional Engineer's Certification on Page 5 of the application shall be signed, sealed and dated by a North Carolina licensed Professional Engineer. ® The Applicant's Certification on Page 5 of the application shall be signed in accordance with 15A NCAC 02T .0106(b). Per 15A NCAC 02T .0106(c), an alternate person may be designated as the signing official if a delegation letter is provided from a person who meets the criteria in 15A NCAC 02T .0106(b). INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page 1 of 3 E. Flow Tracking/Acceptance Form (Form: FTSE 04-16) (If Applicable): ® Submit the completed and executed FTSE form from the owners of the downstream sewers and treatment facility. ➢ Multiple forms maybe required where the downstream sewer owner and wastewater treatment facility are different. ➢ The flow acceptance indicated in form FTSE must not expire prior to permit issuance and must be dated less than one year prior to the application date. ➢ Submittal of this application and form FTSE indicates that owner has adequate capacity and will not violate G.S. 143- 215.67 a . ➢ Intergovernmental agreements or other contracts will not be accepted in lieu of a project -specific FTSE. F. Site Maps (All Application Packages): ® Submit an 8.5-inch x 11-inch color copy of a USGS Topographic Map of sufficient scale to identify the entire project area and closest surface waters. ➢ Location of the project (gravity sewer, pump stations & force main) ➢ Downstream connection points and permit number (if known) for the receiving sewer ® Include a street level map (aerial) showing general project area so that Division staff can easily locate it in the field. G. Existing Permit (All Modification Packages): ❑ Submit the most recently issued existing permit. ❑ Provide a list of any items within the permit the Applicant would like the Division to address during the permit modification (i.e., permit description, flow allocation, treatment facility, etc.). H. Power Reliability Plan (Required if portable reliability option utilized for Pump Station): ❑ Per 15A NCAC 02T .0305(h)(1), submit documentation of power reliability for pumping stations. ➢ This alternative is only available for average daily flows less than 15,000 gallons per day ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant and is compatible with the station. The Division will accept a letter signed by the applicant (see 15A NCAC 02T .0106(b)) or proposed contractor, stating that "the portable power generation unit or portable, independently -powered pumping units, associated appurtenances and personnel are available for distribution and operation of this pump station." ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. (Required at time of certification) I. Certificate of Public Convenience and Necessity (All Application Packages for Privately -Owned Public Utilities): ❑ Per 15A NCAC 02T .0115(a)(l) provide the Certificate of Public Convenience and Necessity from the North Carolina Utilities Commission demonstrating the Applicant is authorized to hold the utility franchise for the area to be served by the sewer extension, or ❑ Provide a letter from the North Carolina Utilities Commission's Water and Sewer Division Public Staff stating an application for a franchise has been received and that the service area is contiguous to an existing franchised area or that franchise approval is expected. J. Operational Agreements (Applications from HOA/POA and Developers for lots to be sold): ❑ Home/Property Owners' Associations ❑ Per 15A NCAC 02T .0115(c), submit the properly executed Operational Agreement (FORM: HOA). ❑ Per 15A NCAC 02T .0115(c), submit a copy of the Articles of Incorporation, Declarations and By-laws. ❑ Developers of lots to be sold ❑ Per 15A NCAC 02T .0115(b), submit the properly executed Operational Agreement (FORM: DEV). For more information, visit the Division's collection systems website INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page 2 of 3 9 THE COMPLETED APPLICATION PACKAGE INCLDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE: REGIONAL OFFICE ADDRESS COUNTIES SERVED Asheville Regional Office 2090 US Highway 70 Avery, Buncombe, Burke, Caldwell, Cherokee, Water Quality Section Swannanoa, North Carolina 28778 Clay, Graham, Haywood, Henderson, Jackson, (828) 296-4500 Macon, Madison, McDowell, Mitchell, Polk, (828) 299-7043 Fax Rutherford, Swain, Transylvania, Yancey Fayetteville Regional Office 225 Green Street Suite 714 Anson, Bladen, Cumberland, Harnett, Hoke, Water Quality Section Fayetteville, North Carolina 28301-5094 Montgomery, Moore, Robeson, Richmond, (910) 433-3300 Sampson, Scotland (910) 486-0707 Fax Mooresville Regional Office 610 E. Center Avenue Alexander, Cabarrus, Catawba, Cleveland, Water Quality Section Mooresville, North Carolina 28115 Gaston, Iredell, Lincoln, Mecklenburg, Rowan, (704) 663-1699 Stanly, Union (704) 663-6040 Fax Raleigh Regional Office 1628 Mail Service Center Chatham, Durham, Edgecombe, Franklin, Water Quality Section Raleigh, North Carolina 27699-1628 Granville, Halifax, Johnston, Lee, Nash, (919) 791-4200 Northampton, Orange, Person, Vance, Wake, (919) 788-7159 Fax Warren, Wilson Washington Regional Office 943 Washington Square Mall Beaufort, Bertie, Camden, Chowan, Craven, Water Quality Section Washington, North Carolina 27889 Currituck, Dare, Gates, Greene, Hertford, Hyde, (252) 946-6481 Jones, Lenoir, Martin, Pamlico, Pasquotank, (252) 975-3716 Fax Perquimans, Pitt, Tyrrell, Washington, Wayne Wilmington Regional Office 127 Cardinal Drive Extension Brunswick, Carteret, Columbus, Duplin, New Water Quality Section Wilmington, North Carolina 28405 Hanover, Onslow, Pender (910) 796-7215 (910) 350-2004 Fax Winston-Salem Regional Office 450 W. Hanes Mill Road Alamance, Alleghany, Ashe, Caswell, Davidson, Water Quality Section Suite 300 Davie, Forsyth, Guilford, Rockingham, Randolph, Winston-Salem, North Carolina 27105 Stokes, Surry, Watauga, Wilkes, Yadkin (336) 776-9800 INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page 3 of 3 State of North Carolina Department of Environmental Quality DW Division of Water Resources ,R_-, 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Town of Ayden (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ® Municipal ❑ Other 3. Signature authority's name: Matthew S. Livingston per 15A NCAC 02T .0106(b) Title: Town Manager 4. Applicant's mailing address: 4144 N West Ave City: Auden State: NC Zip: 28513- 5. Applicant's contact information: Phone number: L2) 481-5826 Email Address: mlivingston@ayden.com II. PROJECT INFORMATION: I . Project name: Allen Park, Section 2 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Pitt 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.455373' Longitude:-77.390839' 5. Parcel ID (if applicable): 86009 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Igor Palyvoda License Number: 043249 Firm: Baldwin Design Consultants, PA Mailing address: 1700-D East Arlington Boulevard City: Greenville State: NC Zip: 27858- Phone number: 2( 52)156-1390 Email Address: ipalyvoda@baldwindesi,gnconsultants.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Contentnea Metropolitan Sewer District Permit Number: NCO032077 Owner Name: Contentnea Metropolitan Sewer District V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQ Downstream (Receiving) Sewer Size: 10 inch System Wide Collection System Permit Number(s) (if applicable): WQCS00269 Owner Name(s): Town of Ayden FORM: FTA 04-16 Page 1 of 5 61 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes [:]No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? [-]Yes [:]No ®N/A 3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply): ® Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic/Commercial % Commercial _ % Industrial (See 15A NCAC 02T .0103(20)) �. Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Has a flow reduction been approved under 15A NCAC 02T .0114(fl? ❑ Yes ® No ➢ If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 021.0114(f)) Daily Design Flow a.b No. of Units Flow Residential 360 gal/3-bedroom house 22 7,920 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 7,920 GPD a See 15A NCAC 02T .0114(b). (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 7,920 GPD (per 15A NCAC 02T .01 14) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 10 476 PVC 8 265 PVC ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & NIDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - ° 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B)_ ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(i)): 1. Does the project comply with all separations found in 15A NCAC 02T .0305(t) & (g) ➢ 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewers stems. ® Yes ❑ No Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains vertical -water over sewer including in benched trenches) 18 inches Water mains (horizontal) 10 feet Reclaimed water lines vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(t) cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications weboase ➢ If noncompliance with 02T.0305(f) or (g). see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) [:]Yes [-]No ® N/A, ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ® Yes ❑ No ❑ N/A ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or ❑ Yes ® No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes [-]No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ® No ❑ N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. 2. Professional Engineer's Certification: I, that this application for J(Professional ingineer's name from Application Item III.1.) jl•eY, PA>r x , s-C ( do 2 has been revie ed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. 0 NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: ORTI OF 9'9� S <Z 0,1 Fq< v 0 ?�i 420 A ... 3. Applicant's Certification per 15A NCAC 02T .0106(b): I, fn &4-+k evJ S . -town i`Ar�!�. er attest that this application for (Signature Authority's nanfe & title from Application Item I.3.) Al(tn fp,rx,, Secbovi Z has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: Date: l) �J✓ �` FORM: FTA 04-16 Page 5 of 5 BaldwinDesign Page 1 of 1 Consultants^ g ENGINEERING • SURVEYING • PLANNING 9 September 23, 2020 'yDG ti Washington Regional Office Water Quality Section�� 943 Washington Square Mail`y Washington, North Carolina 27889 , REF: Fast Track Sewer Application Narrative for Allen Park, Section 2 To Whom It May Concern: The project site is located off of the western right-of-way of NCSR 1723 - Ayden Golf Club Road approximately 1,900 feet south of NCSR 1723 - Ayden Golf Club Road and Fairview Road intersection in Ayden Township, Pitt County, North Carolina. The existing project site is currently undeveloped and consists of farmland. The proposed sewer main extension project will consist of the installation of 3 new manholes. The project needs to be permitted for the installation of 476 LF of 10" PVC sanitary sewer main and 265 LF of 8" PVC sanitary sewer main. Per 15A NCAC 02T.0114(b), the minimum daily design flow for one -bedroom dwelling unit should be at least 240 gpd. The daily design flow for dwelling units with more than two bedrooms should have the daily design flow increased by 120 gpd per each additional bedroom. There will be 22 residential lots within this proposed subdivision and the developer intends on building 3-bedroom houses in all residential lots. Therefore, the daily design flow that needs to be permitted for this project is 360 gpd/lot x 22 lots = 7,920 gpd. If there are any questions or concerns please contact me at (252) 756-1390 or email me at ipalyvoda@baldwindesignconsultants.com. Sincerely, � � 1 . •�� % 1700-D EAST ARLINGTON BOULEVARD, GREENVILLE, NORTH CAROLINA 27858 NCBELS Lic, No. C-3498 TEL 252.756.1390 FAx 252.321.1412 www.BALDWINDESIGNCONSULTANTS.com 0 BaldwinDesign Page 1 of 1 Consultants, PA ENGINEERING • SURVEYING • PLANNING September 23, 2020 9F FOB Washington Regional Office Water Quality Section 943 Washington Square Mall �,�d�19 Washington, North Carolina 27889 'i REF: Fast Track Sewer Application Narrative for Allen Park, Section 2 To Whom It May Concern: The project site is located off of the western right-of-way of NCSR 1723 - Ayden Golf Club Road approximately 1,900 feet south of NCSR 1723 - Ayden Golf Club Road and Fairview Road intersection in Ayden Township, Pitt County, North Carolina. The existing project site is currently undeveloped and consists of farmland. The proposed sewer main extension project will consist of the installation of 3 new manholes. The project needs to be permitted for the installation of 476 LF of 10" PVC sanitary sewer main and 265 LF of 8" PVC sanitary sewer main. Per 15A NCAC 02T.0114(b), the minimum daily design flow for one -bedroom dwelling unit should be at least 240 gpd. The daily design flow for dwelling units with more than two bedrooms should have the daily design flow increased by 120 gpd per each additional bedroom. There will be 22 residential lots within this proposed subdivision and the developer intends on building 3-bedroom houses in all residential lots. Therefore, the daily design flow that needs to be permitted for this project is 360 gpd/lot x 22 lots = 7,920 gpd. If there are any questions or concerns please contact me at (252) 756-1390 or email me at ipalyvoda@baldwindesignconsultants.com. Sincerely, •o;alyvoda, PE I 1700-D EAST ARLINGTON BOULEVARD, GREENVILLE, NORTH CAROLINA 27858 NCBELS Lic. No. C-3498 TEL 252.756.1390 FAx 252.321.1412 www.BALDWINDESIGNCONSULTANTS.com U.S. DEPARTMENT OF THE INTERIOR ti AYDEN xQ GAD« OGLE U.S. GEOLOGICAL SURVEY V'P • US Topo ).SxlxulE YI116 •�.IAE�x ,r .ux. rr�rw Il IS 79 80 SI B3 el M ,..mm is sar: __. __• � - _ _.... _.._ JI KINMRN'ILLF. 1a — �I - 1 + �� ��� jl - .. .- e • Reddli. � � I . k M i ,e 24 23 - r -- ¢ I J 3 / � 1 J J. nt D 14 11 m 11 m n m et Fm�oC MRn U,ib!f1Y•G..Igk.lTvry X E1:NM wrrwr+mnvn '� wuArrArww•nwc nn•r.• • � .., u.eu � — 4� � uwo�n.� ^ rw.w.A.r••w•x�.w...�.ym 4 ... � ... .. -� - � [�� A�An+'.r � wAv s ns n•nM uw •n i �� . -. ~ Am Awx w ^ .. .�.,...,....m.AYDEN. NC s ne..n..... mn ! Divislors of Water pc soumc.es State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Town of Ayden Project Name for which flow is being requested: Allen Park, Section 2 More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pomp stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: _ b. WWTP Facility Permit #: Fo 0 All flows are in M( c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / pf), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** PS 19 N/A 0.461 0.184 0.015 0.075 0.090 0.094 PS 20 N/A 0.259 0.104 0.001 0.029 0.030 0.074 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Town of Ayden Downstream Permit Number: Not Available Page 1 of 6 FTSE 10-18 IM III. Certification Statement: I David Jones certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. la 1A -a G U Signature Date Colltchoy, /(> sw, 1,2 -,rn-_-- Title of Signing Official Page 2 of 6 FTSE 10-18 ' ` - ' ` _� \ '/` '' ` \ � /'�r ` � � /' _ ~ �� � `. ' L/ ~�7`-- �`` '/� ./ '_~'_'/~-``^` \j ' ~���~ /� , ��' 4545 Ayden Golf Club Rd - Google Maps https://www.google.com/maps/place/4545+Ayden+Golf+Club+Rd... Goa gle Maps 4545 Ayden Golf Club Rd Imagery ©2020 Maxar Technologies, USDA Farm 4545 Ayden Golf Club Rc Ayden, NC 28513 0 Directions Save Nearby Send to your Share phone FJ46+M3 Ayden, North Carolina Agency, Map data ©2020 200 ft Dovms�ov,e cowcti' on G PS C 0 of- 11 n o,+Q,s 33.4553-73) —7-7. - 9v &39' 1 of 2 7/29/2020, 9:43 AM eigC/ee�zopohAw deiweAqye �Ohtuct CMSD POST OFFICE BOX 477 GRIFTON, NORTH CAROLINA 28530 CHARLES M. SMITHWICK, JR. DISTRICT MANAGER August 10, 2020 Mr. Igor Palyvoda, PE Baldwin Design Consultants 1700-D East Arlington Blvd Greenville, NC 27858 Re: Allen Park, Section 2 Dear Mr. Palyvoda: I am in receipt of your request for the Contentnea Metropolitan Sewerage District (CMSD) to accept the additional flow of 7,920 gpd of wastewater that will be generated by this project. By virtue of this letter, the CMSD will accept this additional flow. Please find the attached USE form and supporting documentation. Please advise if you have questions or comments. Sincerely, ( �/� W Charles M. Smithwick, Jr. District Manager, CMSD r, r! r �^ , r _ State of North Carolina Department of Environmental Quality Division of Water Resources Division of Water i8.r smirces Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Town of Ayden Project Name for which flow is being requested: Allen Park, Section 2 More than one FTSE may be regained for a single project if the owner of the WWTP is trot responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Contentnea Metropolitan Sewerage District b. WWTP Facility Permit #: NCO032077 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 3.5 .525 1.836 .00792 2.37 67.71 % Il. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: Pump Pump Station Station Firm (Name or Permit Capacity, Number) No, MGD S. Edge WQCS00080 2.4 (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Average Approx. Obligated, Total Daily Current Not Yet Current Flow Flow** Avg. Daily Tributary Plus (Firm / pf), Flow, Daily Flow, Obligated Available MGD MGD MGD Flow Capacity*** .962 .453 .096 .549 .413 Hwy 11 WQCS00080 7.5 3 1.266 .525 1.791 1.209 The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Contentnea Metropolitan Sewerage Distr. Downstream Permit Number: NCO032077 Page 1 of 6 FTSE 10-18 III. Certification Statement: I Charles M. Smithwick, Jr certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing Official Signature Title of Signing Official -'3�a 6 Date Page 2 of 6 FTSE 10-18 Wastewater Flow Tracking Flow Not Tributary to WWTP-Ayden January 2020 Ayden # Lots Point of Subdivision #Lots Platted #Lots w/Construction Remaining Entry Flow Not Tributary Springdale Townes 60 0 60 Hwy 11 21,600 Springdale Apart. 96 24 72 Hwy 11 25,920 Bel -Mar PI. Ph 2 37 9 28 S Edge 10,080 Pineview Sub. 5 3 2 720 The Arbors 128 20 108 Hwy 11 38,880 Stanfield Sub. 30 0 30 Hwy 11 10,800 Country Club Acres 99 11 88 S Edge 31,680 Ayden CC(pool/clubh) 53 10 43 S Edge 15,480 Pineview Sub. Sec 2 32 21 11 Hwy 11 3,960 Camdyn Place Sub 32 0 32 S Edge 11,520 Arbors (1 bedrm unit) 32 0 32 Hwy 11 7,680 Arbors (2 bedrm unit) 32 0 32 Hwy 11 7,680 Arbors (clubhouse) Hwy 11 360 South Country Sub Hwy 11 35,280 Allen Park Sub 43 0 43 S Edge 20,640 Montevallo(Sec1, Ph1) 18 0 18 S Edge 6,480 Leagacy Park 144 0 144 Hwy 11 34,560 Total Flow Obligated but Not Tributary to WWTP Ayden 283,320 Winterville 241,560 Total 524,880 283,320 "South Country Subdivision flow was approved by the CMSD on April 3, 2002. Currently there are six (6) duplexes on this site "This document was revised May 23, 2017 to add South Country Subdivision Date CMSD Accepted Yr/Month 2002-Apr 2004-Apr 2006-May 2011-Nov 2007-Mar 2007-May 2006-Feb 2008-Jan 2009-Apr 2002-Apr 2018-Aug 2020-May 2020-July Wastewater Flow Tracking Flow Not Tibutary to WWTP-Winterville January 2020 Winterville Date CMSD # Lots Point of Accepted Subdivision # Lots Platted # Lots w/Construction Remaining Entry Flow Not Tributary Yr/Month Canterbury Sec.6 63 60 3 Reedy Br 1080 2002-Feb Brookestone 74 18 56 Church St 20160 2006-Sept Summerwinds 68 68 0 Mag Rid. 0 2006-Dec Denali Sub 68 66 2 Reedy Br 720 2008-Mar Blackstone 27 16 11 Reedy Br 3960 2014-Oct Brookfield 76 73 3 Church St 1080 2008-Mar Cooper's Pointe Sec 8 23 23 0 Church St 0 2015-July Villa Grande Ph 1 & 2 36 3 Bedroom 0 36 Reedy Br 12960 Permit 72 4 Bedroom 35 37 Reedy Br 17760 Revision 13 5 Bedroom 0 13 Reedy Br 7800 2019-Sept Molly Grove Sub 62 0 62 Church St 29760 2018-July Copper Creek 40 0 40 Mag, Rid 14400 2018-May Brookfield Sec. 4 57 0 57 Church St 20520 2018 Oct Eli's Ridge 232 0 232 Church St 111360 2019-Aug Total Flow Not Tributary 241560 Note: Winterville Town Council "de -obligated" Laurie Meadows Ph. 3 (duplicate-10,800) gpd and Chapman Court (10,080 gpd) CMSD Wastewater Flows (August 2019 thru July 2020) 2019 August September October November December 2020 January February March April May June July Total/Average South Edge PS Total Average 8.887 0.287 14.579 0.486 7.488 0.242 8.125 0.271 9.622 0.311 11.573 0.373 22.288 0.769 18.21 0.587 15.597 0.52 20.789 0.671 18.18 0.606 9.559 0.308 164.897 0.45258 Hwy 11 PS Total Average 30.803 0.994 37.202 1.24 28.431 0.917 29.517 0.984 32.416 1.046 36.045 1.163 53.851 1.857 46.649 1.505 40.596 1.353 48.965 1.58 45.435 1.514 32.352 1.044 462.262 1.26642 Main Plant Total Average 43.376 1.399 54.02 1.801 39.007 1.258 41.151 1.372 46.396 1.497 51.478 1.66 77.347 2.667 66.123 2.133 57.996 1.933 74.813 2.413 70.45 2.348 47.941 1.546 670.098 1.83558 L