STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
Coastal Resources Commission La
MA I
Permit
Oft-WATEWAM
for
x X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
:y
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Hedgepeth Development Corp., 3824 Bruce Road, Chesapeake, VA 23321
Authorizing development in Currituck County at Currituck Sound, off Parkers Landing Drive, }
x Harbour Shores S/D, Point Harbour, as requested in the permittee's application dated 1/27/10, including the
attached workman drawings (2). both dated 4/14/08
This permit, issued on June 29, 2010 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
Bulkhead
1) The alignment of the permitted bulkhead shall be staked by the permittee and approved on site by a
Division of Coastal Management representative prior to initiation of construction.
2) The bulkhead shall be solid and constructed of treated wood, metal or vinyl sheet piles, or other
suitable materials approved by Department personnel.
3) The bulkhead shall be constructed prior to any backfilling activities.
4) The temporary placement or double handling of fill materials within waters or vegetated wetlands is
not authorized.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
July 4, 2014
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission.
James H. Gregson, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program. Signature of Permittee
Iiedgepeth Development Corp. Permit #75-10
Page 2 of 3 s
ADDITIONAL COND171 IONS
t
r
5) No fill material shall be placed at any time in any surrounding waters outside of the alignment of the fill
area indicated on the workplan drawings.
6) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the f
structure.
z
x
7) All backfill material shall be clean and free of any pollutants except in trace quantities.
8) No backfill material is to be placed within 30 feet of the normal water line, except that which will be
used to backfill the area behind the permitted bulkhead.
Sedimentation and Erosion Control
9) In order to protect water quality, ninoff from construction shall not visibly increase the amount of
suspended sediments in adjacent waters.
10) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence,
diversion swales or berms, etc.).
11) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of completion of
any phase of grading on cut or filled slopes. At a minimum, a silt fence shall be installed immediately
landward of the bulkhead cap immediately following completion of construction.
General
12) The permittee understands and agrees that, if future operations by the United States requires the
removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the
opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause
unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon
due notice from the Corps of Engineers, to remove, relocate or alter the work or obstructions caused
thereby, without expense to the United States or the state of North Carolina. No claim shall be made
against the United States or the state of North Carolina on account of any such removal or alteration.
13) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
NOTE: This permit does not convey any rights, either in real estate or material.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required, including but not limited to a Stormwater
Management Permit from the Division of Water Quality.
iledgepeth Development Corp.
Y
ADDITIONAL CONDITIONS
P,2rmit #i75-10
Page 3 of 3
} NOTE: The N.C. Division of Water Quality has authorized the proposed project under DWQ Project No.
10-0174.
NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No.
SAW-2010-00432 which was issued on 6/29/10. }