Loading...
HomeMy WebLinkAbout20020158 Ver 3_Tab E - Permit Drawings Revised 090920_202010021"mv%jr- f I HPSCH VICINITY MAP PR0✓ECT TITLE- TOWN OF SUNSET BEACH NAVIGATION PROJECT: MAINTENANCE DREDGING OF SOUTH JINKS CREEK THE BAY AREA AND THE FEEDER CHANNEL DA TUM.• MLW PREPARED BY- MOFFATT & NICHOL BRUNSWICK COUNTY SUNSET BEACH �J HOLDEN BEACH � 1IOODS SHALLOTTE LOC Y INLET FOLLY INLET INLET OCEAN ISLE BEACH S TUBBS LONG BAY INLET PROJECT AREA 0 10 20 5 15 25 SCALE IN MILES PREPARED FOR: TOWN OF SUNSET BEACH NORTH CAROLINA DATE.- SEPTEMBER 9, 2020 1 SOvTNpORT SUppLI SOUTHP OAK ISLAND CASWELL BEACH A TLAN T I C O CEAN LOCATION MAP SHEET TITLE - VICINITY AND LOCATION MAPS 4 .OW BAY 0 2 4 1 3 5 SCALE IN MILES SHEET 1 of- 7 2016 AERIALS BY NC ONEMAP PR0✓ECT TITLE.- TOWN OF SUNSET BEACH NAVIGATION PROJECT: MAINTENANCE DREDGING OF SOUTH JINKS CREEK THE BAY AREA AND THE FEEDER CHANNEL DA TUM.• MLW PREPARED BY.• MOFFATT & NICHOL PREPARED FOR: TOWN OF SUNSET BEACH NORTH CAROLINA DATE.• SEPTEMBER 9, 2020 110 0 1 NOTES:(NORTHSHORE PLACEMENT) • THE HYDRAULIC PIPELINE USED TO TRANSFER THE DREDGE MATERIAL SHALL BE POSITIONED WITHIN 20-FT OF THE DUNE TOE ADJACENT TO THE VEGETATION LINE WHILE TRAVERSING THE BEACH. THE PIPELINE SHALL HAVE A MINIMUM OF ONE SAND RAMP CROSSING POSITIONED TO FACILITATE PEDESTRIAN ACCESS WHERE THE PIPELINE CROSSES THE SANDY BEACH TO ENTER THE ATLANTIC OCEAN. • THE CONTRACTOR SHALL INSPECT THE PIPELINE A MINIMUM OF ONCE EVERY 4 HOURS OF OPERATION FOR LEAKS OR MATERIAL SPILLS. WHEN A LEAK IS DISCOVERED ALL OPERATIONS SHALL CEASE UNTIL REPAIRS ARE COMPLETED TO STOP THE MATERIAL SPILLAGE. • ALONG NAVIGABLE WATERWAYS, OR BAY SIDE OF SUNSET BEACH, THE PIPELINE SHALL BE POSITIONED ABOVE MHW AND AS LANDWARD AS POSSIBLE WITHOUT TRAVERSING OVER VEGETATION OR THE DUNE FEATURE. • IF THE PIPELINE CANNOT BE POSITIONED ABOVE MHW DUE TO DOCKS OR OTHER STRUCTURES, THE PIPELINE SHALL BE MARKED WITH BUOYS AND LIGHTS A MINIMUM OF EVERY 500-FT, OR AS RECOMMENDED BY THE USCG. • THE PIPELINE WILL CROSS ALL NAVIGABLE WATERWAYS PERPENDICULAR TO THE DIRECTIONS OF TRAVEL TO MINIMIZE THE PIPELINE LENGTH WITHIN THE NAVIGATION CHANNEL. THE PIPELINE WILL BE ANCHORED IN THE DEEPEST DEPTH AVAILABLE TO NOT BLOCK NAVIGATION AND WILL HAVE BUOYS ATTACHED APPROXIMATELY EVERY 25-FEET ALONG EACH CROSSING TO IDENTIFY ITS PRESENCE. THE PIPELINE SHALL NOT BE ALLOWED TO CROSS NAVIGABLE WATERS WITH LESS THAN FOUR (4) FEET OF DRAFT REMAINING OVER THE SUBMERGED LINE. • SIGNAGE SHALL ALSO BE PROVIDED AND VISIBLE FROM BOTH DIRECTIONS OF TRAVEL TO MARK ALL NAVIGATION CROSSINGS. LEGEND -MHW MEAN HIGH WATER ------- APPROXIMATE PIPELINE CORRIDOR — — — — — — — DREDGE FOOTPRINT ►�i�i�i�i�i�i�i�i�i�i�i�i� � ' •' ..-.-.-.-.-. SHEET TITLE - SITE & KEY PLAN 500' o' 500' 1000' SCALE: 1 "=1000' SHEET 2 of- 7 11 SOUTH JINKS CREEK 5:1 SIDE SLOPES ;\ BOTTOM EL -5.0 61'�()0 DF6GE /LI M I TS, TYP ' _s \1 \ \ BEACH PLACEMENT= PIPELINE, TYP I i \ 4i I 2016 AERIALS BY NC ONEMAP PRO✓ECT TITLE TOWN OF SUNSET BEACH NAVIGATION PROJECT: MAINTENANCE DREDGING OF SOUTH JINKS CREEK THE BAY AREA AND THE FEEDER CHANNEL DA TUM.• MLW PREPARED BY.- MOFFATT & NICHOL \ ( 1 � � I \\ w 7 Li E MAIN ST I = PREPARED FOR: TOWN OF SUNSET BEACH NORTH CAROLINA DATE- SEPTEMBER 9, 2020 N LEGEND MAJOR CONTOUR MINOR CONTOUR NOTES: 1. MAJOR CONTOURS PROVIDED ARE ON A 5' INTERVAL. 2. MINOR CONTOURS PROVIDED ARE ON A 1' INTERVAL. 3. CONTOURS ARE BASED ON 2016 CONDITIONS. SHEET TITLE - DREDGE AREA WORK PLAN - SHEET 1 OF 4 50' 0' 50' 100' SCALE: 1 "=100' SHEET 3 OF 7 2016 AERIALS BY NC ONEMAP PRO✓ECT TITLE.- TOWN OF SUNSET BEACH NAVIGATION PROJECT: MAINTENANCE DREDGING OF SOUTH JINKS CREEK THE BAY AREA AND THE FEEDER CHANNEL DA TUM.• MLW PREPARED BY MOFFATT & NICHOL 2O, C �I FINAL PIPELINE PLACEMENT WILL BE COORDINATED WITH NCWRC & USFWS pw �- -V NI k O PREPARED FOR: TOWN OF SUNSET BEACH NORTH CAROLINA DATE.- SEPTEMBER 9, 2020 LEGEND —OO — — MAJOR CONTOUR MINOR CONTOUR NOTES: 1. MAJOR CONTOURS PROVIDED ARE ON A 5' INTERVAL. 2. MINOR CONTOURS PROVIDED ARE ON A 1' INTERVAL. 3. CONTOURS ARE BASED ON 2016 CONDITIONS. SHEET TITLE - DREDGE AREA WORK PLAN - SHEET 2 OF 4 100' 0' 100' 200' SCALE: 1 "=200' SHEET 4 of- 7 �E N ��� * 5��' z �`; _ a w..'yin;.,, .t �. .. ^• _ �v n zm 2016 AERIALS BY NC ONEMAP PRO✓ECT TITLE.- TOWN OF SUNSET BEACH NAVIGATION PROJECT: MAINTENANCE DREDGING OF SOUTH MINKS CREEK THE BAY AREA AND THE FEEDER CHANNEL DA TUM.• MLW PREPARED BY MOFFATT & NICHOL PROPOSED CORRIDOR LIMITS LEGEND OO — MAJOR CONTOUR — — — — — — — MINOR CONTOUR NOTES: 1. MAJOR CONTOURS PROVIDED ARE ON A 5' INTERVAL. 2. MINOR CONTOURS PROVIDED ARE ON A 1' INTERVAL. 3. CONTOURS ARE BASED ON 2016 CONDITIONS. .. w w_ co LL' FINAL PIPELINE _ — — — PLACEMENT WILL BE �� Q COORDINATED WI NCWRC & USFWE I N 3 PREPARED FOR: TOWN OF SUNSET BEACH NORTH CAROLINA DATE.- SEPTEMBER 9, 2020 ATLANTIC OCEAN SHEET TITLE - DREDGE AREA WORK PLAN - SHEET 3 OF 4 100' 0' 100' 200' SCALE: 1 "=200' SHEET 5 of- 7 - - - N 10 ------------- -- _ ----- \� -----i=------------- == - __ _- \'--- c- `------_-__-_----- '\/i-- — _� ------------------------------_------. _- - - - - - - - - - - - - - - - - - - - - - - - - - - -1 - - - - - - - - - - _ - -- - - - - - _ - �- - - - - - - - _ - - - - - - - - - - - - � _--_--- -- r ` — = — ---- ------------------------------�-� - -- — ----- -- -- -- — -- LEGEND - -CD- - MAJOR CONTOUR - - - - - - - MINOR CONTOUR ® FILL AREA NOTES: 1. MAJOR CONTOURS PROVIDED ARE ON A 5' INTERVAL. 2. MINOR CONTOURS PROVIDED ARE ON A 1' INTERVAL. 3. CONTOURS ARE BASED ON 2016 CONDITIONS. -- -- - - ---I` - -�-----'"---------------------------------------------------------------------------- f---- ,4HVV=--=======I -- _---- --- ---- --- - --------- --- -------------� _ __----------------- -- ----------f----- --- -___-------� ;-------------- _ _ — — -�- �------------- ---------------------- f APPROX EX_ST1N�-------------_-;_-------------------- --- - - __ ----------I -------------- - -- -- - --�L� ------------------------ -------------------- _ \----- PROPOSED PIPELINE `�� ------ ATLANTIC OCEAN CORRIDOR LIMITS ---= ----I£---�--�---------- PLACEMENT WILL BE - - --------------------------------- — _ — 480R$FNA4€DH — ----- — — — — --- ------- — ---- --------------�_------ — — — — -------------------- ----------- — --------------------- ------ ----------------------------------- ------------- - ----------------------------- -.- SLOPE, -- _ _ -- ---- ------- ---------- - --------------------------------------- -------------------------------------------- -------ZQP_ DF-$E Ct-=O,-TYP--------------------------- —10 —0 o_� __�I� o o - ------------- - -- - --- ------------T� 42354 _ - - - - - - - - - - - -10 — -E- 2T5-0809 - - - - ----� ----- ------------- - - - - _ - - - - - - - - ------------ - - N 42833 ----------- -------------------------------------------- ---------------------------------- 2016 AERIALS BY NC ONEMAP PR0✓ECT TITLE- TOWN OF SUNSET BEACH NAVIGATION PROJECT: MAINTENANCE DREDGING OF SOUTH JINKS CREEK THE BAY AREA AND THE FEEDER CHANNEL DA TUIV: MLW PREPARED BY- MOFFATT & NICHOL PREPARED FOR: TOWN OF SUNSET BEACH NORTH CAROLINA DATE.- SEPTEMBER 9, 2020 SHEET TITLE: DREDGE AREA WORK PLAN - SHEET 4 OF 4 200' 0' 100' 200' SCALE: 1 "=200' r SHEET 6 OF- 7 SECTION H 30 30 .. 20 20 BEACH FILL 150.00' 10 HW 4.73 10 z APPROX. EXIST. GRADE NAVD 2.94 a > 0 0 EL -6.0 -10 -10 -20 1 1 1 1 -20 -1+00 0+00 1+00 2+00 3+00 4+00 5+00 DISTANCE (FEET) PR0✓ECT TITLE.- TOWN OF SUNSET BEACH NAVIGATION PROJECT: MAINTENANCE DREDGING OF SOUTH JINKS CREEK THE BAY AREA AND THE FEEDER CHANNEL DA TUM.• MLW PREPARED BY.• MOFFATT & NICHOL PREPARED FOR: TOWN OF SUNSET BEACH NORTH CAROLINA DATE.• SEPTEMBER 9, 2020 L SHEET TITLE.• NEARSHORE PLACEMENT TYPICAL SECTION 50' 0' 50' 100' SCALE: 1 "=100' SHEET 7 of- 7