HomeMy WebLinkAbout20020158 Ver 3_Tab E - Permit Drawings Revised 090920_202010021"mv%jr- f I HPSCH
VICINITY MAP
PR0✓ECT TITLE- TOWN OF SUNSET BEACH NAVIGATION PROJECT:
MAINTENANCE DREDGING OF SOUTH JINKS CREEK
THE BAY AREA AND THE FEEDER CHANNEL
DA TUM.• MLW
PREPARED BY- MOFFATT & NICHOL
BRUNSWICK COUNTY
SUNSET BEACH �J HOLDEN BEACH
� 1IOODS
SHALLOTTE LOC Y INLET FOLLY INLET
INLET
OCEAN ISLE
BEACH
S TUBBS LONG BAY
INLET PROJECT AREA
0 10 20
5 15 25
SCALE IN MILES
PREPARED FOR: TOWN OF SUNSET BEACH
NORTH CAROLINA
DATE.- SEPTEMBER 9, 2020
1
SOvTNpORT SUppLI
SOUTHP
OAK ISLAND
CASWELL BEACH
A TLAN T I C O CEAN
LOCATION MAP
SHEET TITLE -
VICINITY AND LOCATION MAPS
4
.OW BAY
0 2 4
1 3 5
SCALE IN MILES
SHEET
1
of-
7
2016 AERIALS BY NC ONEMAP
PR0✓ECT TITLE.- TOWN OF SUNSET BEACH NAVIGATION PROJECT:
MAINTENANCE DREDGING OF SOUTH JINKS CREEK
THE BAY AREA AND THE FEEDER CHANNEL
DA TUM.• MLW
PREPARED BY.• MOFFATT & NICHOL
PREPARED FOR: TOWN OF SUNSET BEACH
NORTH CAROLINA
DATE.• SEPTEMBER 9, 2020
110
0
1
NOTES:(NORTHSHORE PLACEMENT)
• THE HYDRAULIC PIPELINE USED TO TRANSFER THE
DREDGE MATERIAL SHALL BE POSITIONED WITHIN 20-FT
OF THE DUNE TOE ADJACENT TO THE VEGETATION LINE
WHILE TRAVERSING THE BEACH. THE PIPELINE SHALL
HAVE A MINIMUM OF ONE SAND RAMP CROSSING
POSITIONED TO FACILITATE PEDESTRIAN ACCESS WHERE
THE PIPELINE CROSSES THE SANDY BEACH TO ENTER THE
ATLANTIC OCEAN.
• THE CONTRACTOR SHALL INSPECT THE PIPELINE A
MINIMUM OF ONCE EVERY 4 HOURS OF OPERATION FOR
LEAKS OR MATERIAL SPILLS. WHEN A LEAK IS
DISCOVERED ALL OPERATIONS SHALL CEASE UNTIL
REPAIRS ARE COMPLETED TO STOP THE MATERIAL
SPILLAGE.
• ALONG NAVIGABLE WATERWAYS, OR BAY SIDE OF SUNSET
BEACH, THE PIPELINE SHALL BE POSITIONED ABOVE MHW
AND AS LANDWARD AS POSSIBLE WITHOUT TRAVERSING
OVER VEGETATION OR THE DUNE FEATURE.
• IF THE PIPELINE CANNOT BE POSITIONED ABOVE MHW DUE
TO DOCKS OR OTHER STRUCTURES, THE PIPELINE SHALL
BE MARKED WITH BUOYS AND LIGHTS A MINIMUM OF
EVERY 500-FT, OR AS RECOMMENDED BY THE USCG.
• THE PIPELINE WILL CROSS ALL NAVIGABLE WATERWAYS
PERPENDICULAR TO THE DIRECTIONS OF TRAVEL TO
MINIMIZE THE PIPELINE LENGTH WITHIN THE NAVIGATION
CHANNEL. THE PIPELINE WILL BE ANCHORED IN THE
DEEPEST DEPTH AVAILABLE TO NOT BLOCK NAVIGATION
AND WILL HAVE BUOYS ATTACHED APPROXIMATELY
EVERY 25-FEET ALONG EACH CROSSING TO IDENTIFY ITS
PRESENCE. THE PIPELINE SHALL NOT BE ALLOWED TO
CROSS NAVIGABLE WATERS WITH LESS THAN FOUR (4)
FEET OF DRAFT REMAINING OVER THE SUBMERGED LINE.
• SIGNAGE SHALL ALSO BE PROVIDED AND VISIBLE FROM
BOTH DIRECTIONS OF TRAVEL TO MARK ALL NAVIGATION
CROSSINGS.
LEGEND
-MHW MEAN HIGH WATER
------- APPROXIMATE PIPELINE CORRIDOR
— — — — — — — DREDGE FOOTPRINT
►�i�i�i�i�i�i�i�i�i�i�i�i� � ' •'
..-.-.-.-.-.
SHEET TITLE -
SITE & KEY PLAN
500' o' 500' 1000'
SCALE: 1 "=1000'
SHEET
2
of-
7
11
SOUTH JINKS CREEK
5:1 SIDE SLOPES
;\ BOTTOM EL -5.0
61'�()0 DF6GE
/LI M I TS, TYP
' _s
\1 \
\
BEACH PLACEMENT=
PIPELINE, TYP
I i
\ 4i
I
2016 AERIALS BY NC ONEMAP
PRO✓ECT TITLE TOWN OF SUNSET BEACH NAVIGATION PROJECT:
MAINTENANCE DREDGING OF SOUTH JINKS CREEK
THE BAY AREA AND THE FEEDER CHANNEL
DA TUM.• MLW
PREPARED BY.- MOFFATT & NICHOL
\ ( 1
� � I
\\ w
7
Li
E MAIN ST I =
PREPARED FOR: TOWN OF SUNSET BEACH
NORTH CAROLINA
DATE- SEPTEMBER 9, 2020
N LEGEND
MAJOR CONTOUR
MINOR CONTOUR
NOTES:
1. MAJOR CONTOURS PROVIDED
ARE ON A 5' INTERVAL.
2. MINOR CONTOURS PROVIDED
ARE ON A 1' INTERVAL.
3. CONTOURS ARE BASED ON 2016
CONDITIONS.
SHEET TITLE -
DREDGE AREA WORK PLAN - SHEET 1 OF 4
50' 0' 50' 100'
SCALE: 1 "=100'
SHEET
3
OF
7
2016 AERIALS BY NC ONEMAP
PRO✓ECT TITLE.- TOWN OF SUNSET BEACH NAVIGATION PROJECT:
MAINTENANCE DREDGING OF SOUTH JINKS CREEK
THE BAY AREA AND THE FEEDER CHANNEL
DA TUM.• MLW
PREPARED BY MOFFATT & NICHOL
2O,
C
�I
FINAL PIPELINE
PLACEMENT WILL BE
COORDINATED WITH
NCWRC & USFWS
pw
�- -V NI k
O
PREPARED FOR: TOWN OF SUNSET BEACH
NORTH CAROLINA
DATE.- SEPTEMBER 9, 2020
LEGEND
—OO — — MAJOR CONTOUR
MINOR CONTOUR
NOTES:
1. MAJOR CONTOURS PROVIDED
ARE ON A 5' INTERVAL.
2. MINOR CONTOURS PROVIDED
ARE ON A 1' INTERVAL.
3. CONTOURS ARE BASED ON 2016
CONDITIONS.
SHEET TITLE -
DREDGE AREA WORK PLAN - SHEET 2 OF 4
100' 0' 100' 200'
SCALE: 1 "=200'
SHEET
4
of-
7
�E N
���
* 5��' z
�`; _
a
w..'yin;.,, .t �. .. ^• _
�v n
zm
2016 AERIALS BY NC ONEMAP
PRO✓ECT TITLE.- TOWN OF SUNSET BEACH NAVIGATION PROJECT:
MAINTENANCE DREDGING OF SOUTH MINKS CREEK
THE BAY AREA AND THE FEEDER CHANNEL
DA TUM.• MLW
PREPARED BY MOFFATT & NICHOL
PROPOSED
CORRIDOR LIMITS
LEGEND
OO — MAJOR CONTOUR
— — — — — — — MINOR CONTOUR
NOTES:
1. MAJOR CONTOURS PROVIDED
ARE ON A 5' INTERVAL.
2. MINOR CONTOURS PROVIDED
ARE ON A 1' INTERVAL.
3. CONTOURS ARE BASED ON 2016
CONDITIONS.
..
w
w_
co
LL'
FINAL PIPELINE
_ — — — PLACEMENT WILL BE �� Q
COORDINATED WI
NCWRC & USFWE
I N 3
PREPARED FOR: TOWN OF SUNSET BEACH
NORTH CAROLINA
DATE.- SEPTEMBER 9, 2020
ATLANTIC OCEAN
SHEET TITLE -
DREDGE AREA WORK PLAN - SHEET 3 OF 4
100' 0' 100' 200'
SCALE: 1 "=200'
SHEET
5
of-
7
- - - N
10
------------- -- _ -----
\� -----i=------------- == - __ _- \'--- c- `------_-__-_----- '\/i--
—
_� ------------------------------_------.
_- - - - - - - - - - - - - - - - - - - - - - - - - - - -1 - - - - - - - - - - _ - -- - - - - - _ - �- - - - - - - - _ - - - - - - - - - - - - �
_--_--- -- r ` — = — ---- ------------------------------�-� - --
— ----- -- -- -- —
--
LEGEND
- -CD- - MAJOR CONTOUR
- - - - - - - MINOR CONTOUR
® FILL AREA
NOTES:
1. MAJOR CONTOURS PROVIDED
ARE ON A 5' INTERVAL.
2. MINOR CONTOURS PROVIDED
ARE ON A 1' INTERVAL.
3. CONTOURS ARE BASED ON 2016
CONDITIONS.
-- -- - - ---I` - -�-----'"---------------------------------------------------------------------------- f---- ,4HVV=--=======I
-- _---- --- ---- --- - ---------
--- -------------� _ __----------------- -- ----------f----- ---
-___-------� ;-------------- _ _ — — -�- �-------------
---------------------- f APPROX EX_ST1N�-------------_-;_-------------------- --- - - __ ----------I
-------------- - -- -- -
--�L�
------------------------
--------------------
_ \----- PROPOSED PIPELINE `�� ------
ATLANTIC OCEAN CORRIDOR LIMITS
---= ----I£---�--�---------- PLACEMENT WILL BE - -
--------------------------------- — _ — 480R$FNA4€DH —
----- — — — — ---
------- — ----
--------------�_------ — — — — --------------------
----------- —
---------------------
------
-----------------------------------
------------- -
----------------------------- -.- SLOPE, -- _ _ --
----
------- ----------
- ---------------------------------------
--------------------------------------------
-------ZQP_ DF-$E Ct-=O,-TYP--------------------------- —10 —0 o_�
__�I� o o -
------------- - -- - ---
------------T� 42354 _ - - - - - - - - - - -
-10 — -E- 2T5-0809 - - - - ----� -----
------------- - - - - _ - - - - - - - -
------------ - -
N 42833
-----------
--------------------------------------------
----------------------------------
2016 AERIALS BY NC ONEMAP
PR0✓ECT TITLE- TOWN OF SUNSET BEACH NAVIGATION PROJECT:
MAINTENANCE DREDGING OF SOUTH JINKS CREEK
THE BAY AREA AND THE FEEDER CHANNEL
DA TUIV: MLW
PREPARED BY- MOFFATT & NICHOL
PREPARED FOR: TOWN OF SUNSET BEACH
NORTH CAROLINA
DATE.- SEPTEMBER 9, 2020
SHEET TITLE:
DREDGE AREA WORK PLAN - SHEET 4 OF 4
200' 0' 100' 200'
SCALE: 1 "=200'
r
SHEET
6
OF-
7
SECTION H
30
30
..
20
20
BEACH FILL
150.00'
10
HW 4.73 10
z
APPROX.
EXIST. GRADE
NAVD 2.94
a
>
0
0
EL -6.0
-10
-10
-20
1 1 1
1 -20
-1+00
0+00
1+00 2+00
3+00 4+00 5+00
DISTANCE (FEET)
PR0✓ECT TITLE.- TOWN OF SUNSET BEACH NAVIGATION PROJECT:
MAINTENANCE DREDGING OF SOUTH JINKS CREEK
THE BAY AREA AND THE FEEDER CHANNEL
DA TUM.• MLW
PREPARED BY.• MOFFATT & NICHOL
PREPARED FOR: TOWN OF SUNSET BEACH
NORTH CAROLINA
DATE.• SEPTEMBER 9, 2020
L
SHEET TITLE.•
NEARSHORE PLACEMENT TYPICAL SECTION
50' 0' 50' 100'
SCALE: 1 "=100'
SHEET
7
of-
7