Loading...
HomeMy WebLinkAbout20020158 Ver 3_Tab B - MP-2 Form Revised-082920_20201002Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Nearshore Placement Template Description Area Existing Avg.Depth _ Proposed Depth _ Length (fr) Width [ft] Side Slope (HA� Est Volume (CY)Material Source Nearshore Placement Site 9-$ to -13-$ SILW -6-$1fLtC (lfax) 2,000-$ 200-$ 3:1 40,500 CF S- Sink=_ - Creek IOI. L 2,000-ft 200-ft 3:01 40,500 CY S. Jinks Creek 1. EXCAVATION ❑This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. sand 40,500 CY for Nearshore Placement C. (i) Does the area to be excavated include coastal wetlands/marsh d. High -ground excavation in cubic yards. (CW), submerged aquatic vegetation (SAV), shell bottom (SB), 0 CY or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ®None (ii) Describe the purpose of the excavation in these areas: 2. DISPOSAL OF EXCAVATED MATERIAL El This section not applicable a. Location of disposal area. b. Dimensions of disposal area. Nearshore placement - 3rd to 131h St. on Sunset Beach. 9.2 Ac - Nearshore placement site C. (i) Do you claim title to disposal area? d. (i) Will a disposal area be available for future maintenance? ❑Yes ®No ❑NA ®Yes ❑No ❑NA (ii) If no, attach a letter granting permission from the owner. (ii) If yes, where? Same location e. (i) Does the disposal area include any coastal wetlands/marsh f. (i) Does the disposal include any area in the water? (CW), submerged aquatic vegetation (SAV), shell bottom (SIB), ®Yes [-]No ❑NA or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. (ii) If yes, how much water area is affected? ❑CW ❑SAV ❑SB 9.2 Ac- Nearshore material placement (below MHW) ❑WL ®None (ii) Describe the purpose of disposal in these areas: 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised:12/26/06 Form DCM MP-2 (Excavation and Fill, Page 2 of 2) 3. SHORELINE STABILIZATION ❑This section not applicable (If development is a wood groin, use MP-4 — Structures) a. Type of shoreline stabilization: ❑Bulkhead ❑Riprap ❑ Brea kwater/Sill ®Other: Nearshore Placement c. Average distance waterward of NHW or NWL: 100 e. Type of stabilization material: Sand g. Number of square feet of fill to be placed below water level. Bulkhead backfill Riprap Breakwater/Sill Other i. Source of fill material. S. Jinks Creek Navigation Channel b. Length: 2,000 ft Width: 200 ft d. Maximum distance waterward of NHW or NWL: 600 ft to 800 ft f. (i) Has there been shoreline erosion during preceding 12 months? ❑Yes ❑No El NA (ii) If yes, state amount of erosion and source of erosion amount information. h. Type of fill material. Sand 4. OTHER FILL ACTIVITIES ®This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? ❑Yes ❑No DNA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), If yes, submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the n Amount of material to be laced in the water () p number of square feet affected. (iii) Dimensions of fill area ❑CW ❑SAV ❑SB (iv) Purpose of fill ❑WL ❑None (ii) Describe the purpose of the fill in these areas: 5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? Material will be placed directly in open water via hydraulic pipeline. Hydraulic dredge for nearshore placement and work barge. The pipe will be manvered to keep the beach material within the authorized nearshore placement site. C. (i) Will navigational aids be required as a result of the project? d. (i) Will wetlands be crossed in transporting equipment to project ®Yes [:]No ❑NA site? ❑Yes NNo DNA (ii) If yes, explain what type and 'how they will be implemented. (ii) If yes, explain steps that will be taken to avoid or minimize Temporary aids (lights) will be provided by the Contractor during environmental impacts. construction and will be placed on the construction equipment (Dredge, barge, and pipeline) August 28, 2020 Lisa Anglin Date Applican ame Sunset Beach Navigation Project - Maintenance Dredging of South Jinks Creek, the Bay Area and the Feeder Channel Project Name Applicant Signature 25"-3n8-2UF� :: L :: revised: 12/26/06