HomeMy WebLinkAbout310761_30 day poa_2020111611. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD ANU/OR 25 YRJ24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
�_
Structure IU= 3t-76t EU Farm �
line m —
897.5 Ib PAN
2
Structure IU=
line m —
Ib PAN
3
Structure IU=
line m —
Ib PAN
4_
Structure IU=
line m —
Ib PAN
S
Structure IU=
line m —
Ib PAN
6_
Structure IU=
line m —
Ib PAN
n. '14 897.5 Ib PAN
111. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 UAY DRAW DOWN
'State c nt c op ending apphcabon date o ext crop apphcabon begmnmg date Tor ava Jable
recery rig c ops during 30 day dmw down period_
v. Total PAN a ails ble for all Tields (sum oT column i) _ � 248.7 Ib. PAN
IV. FACILITY'S POA OVERALL PAN BALANCE
w. Total PAN io be land applied (line n from section 11) 897.5
POA (30 Uay) 2/2t/00
Cro p"s r rig PAN balance (line v Trom section 111) _ � 248.7 Ib. PAN
y. Overall PAN,bala rice (w - z) _ -35'1 Ib. PAN
Line y m st sM1ow a a deFcit IF line y does not sM1ow a a deFcit, list c of action M1ere i eluding pump and
M1aul, depopulation, M1erd reduction, etc_ For pump 8. M1aul and M1erd reduction options, r alculate n w PAN based
nForm anon_ IF n w Felds a e to be i eluded a option For lowering lagoon level, add tM1ese Felds to tM1e
PANobalance table and r alculate tM1e o mll PAN balance_ IF a al waste is to be M1auled to a otM1er permitted
Tacility, provide inForm anon regarding tM1e M1erd population and lagoon Freeboard levels at tM1e recery rig Tacility_
NARRATI V E
Irrigation to begin as conditions permit _
Samples Dated 9-25-2020 Lt t2t
POA (30 Day) 2/2'I /00
PLAN OF ACTION (POA) FOR HIGH FREEBOARB AT ANIMAL FACILITIES
30 BAY BRAW BOWN PERIOB
1. TOTAL PAN TO BE LA 3t-76t
�_ Structure Name/Identifier QBp EB �
2 Current liquid volume in 25 yr /24 M1r_ storm storage 8. structural Freeboard
a_ current liquid level according to marKer t4.O cM1es
b_ designed 25 yr /24 M1r_ storm 8. structural Freeboard � 9.O cM1es
c_ line b - line a (inc M1es in red zo e) = SO inc M1es
d_ top of diKe surtace area according to design
� 34000 its
e_ line c/t 2 x line d x 7 48 gallons/R 3 4t 7633 gallons
3 Projected volume of waste liquid produced during draw down period
F_ temporary storage period according to structural design
t801days
g_ volume of waste produced according to structural design
2t 0994
R3
M1_ current M1erd # 6400 certified M1erd # 6400
actual waste produced = cur nt M1erd # line g =
2t 0994 R3
certified M1erd #
�_ volume of wasM1 water according to structural design
ORa
j_ excess ramFall over a aporation according to design
49000 R3
K_ Qines M1 + � + j) x 7 48 x 30 days/line F=
324t 26 gallons
4_ Total PAN to be land applied during draw down period
� � /� 6/2020
L current waste analysis dated 9/25/2020
� 2t Ibs/� 000 gaL
m_ (Qines e + K)/� 000) x line I =
897.5 Ibs_ PAN
REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE.
(CIicK on iM1e nazi Sirudure iab sM1own below)
POA (30 Bay) 2/2t/00
Esx�..,axea
Esx�..,axea
Esx�..,axea
POA (30 oay� vziioo
PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number 31-761
County Duplin
Facility Name ED Farm 1
Certified Operator Name Earl Davis Operator Number
1 Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways, and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways
Lagoon Name/ID
Spillway(Y or N)
Level(inches)
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
ED 1
14
2 Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures
Five and 30 day Plans of Action are attached Hydraulic and agronomic balances are
within acceptable ranges
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures A
30 day Plan of Action is attached Agronomic balance is within acceptable range
Waste is to be pumped and hauled to off site locations Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP
Operation will be partially or fully depopulated
"Attach a complete schedule with corresponding animal units and dates for depopulation
"if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3 Earliest possible date to begin land application of waste 11/16/2020
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Facility Owner/Manager (print)
fr,-�°l%rMs
Facility Owner/Manager (siqnature)
910-284-0285
Date 11/13/2020