HomeMy WebLinkAbout310050_30 day poa_20201116PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 UAY DRAW DOWN PERIOD
1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
t_Structure Name/Identifier QU)_ BJOt2
2 Current liquid volume in 25 yr /24 M1r_ storm storage 8. structural Freeboard
a_ current liquid level according to marKer � 3.O cM1es
b_ designed 25 yr /24 M1r_ storm 8. structural Freeboard � 9.O cM1es
c_ line b - line a (inc M1es in red zo e) = 6.O inc M1es
d_ top of diKe surtace area according to design
(a ea at below structural Freeboard elevation) 84600 its
e_ line c/t 2 x line d x 7 48 gallons/R 3 3t 6404 gallons
3 Projected volume of waste liquid produced during draw down period
F_ temporary storage period according to structural design
t801days
g_ volume of waste produced according to structural design
OTt3
M1_ current M1erd # 2880 certified M1erd # 2880
actual waste produced = cur nt M1erd # line g =
R3
certified M1erd #
�_ volume of wasM1 water according to structural design
94948
R3
j_ excess ramFall over a aporation according to design
49350 R3
K_ Qines M1 + � + j) x 7 48 x 30 days/line F=
� 79892 gallons
4_ Total PAN to be land applied during draw down period
L current waste analysis dated 0
t_t7 lbs/t0009aL
m_ (Qines e + K)/� 000) x line I =
580.7 Ibs_ PAN
REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE.
(CIicK on iM1e nazi Sirudure iab sM1own below)
POA (30 Uay) 2/2t/00
11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD ANU/OR 25 YRJ24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
� _
Structure IU= BJOt �
line m —
4t 0.6 Ib PAN
2
Structure IU= BJOt2
line m —
580.7 Ib PAN
3
Structure IU=
line m —
Ib PAN
4_
Structure IU=
line m —
Ib PAN
S
Structure IU=
line m —
Ib PAN
6_
Structure IU=
line m —
Ib PAN
n. lines '1 � 2 � 3 � 4 � 5 � 6 99t 3 Ib PAN
111. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 UAY DRAW DOWN
'State c nt c op ending apphcabon date o ext crop apphcabon begmnmg date Tor ava Jable
recery rig c ops during 30 day dmw down period_
v. Total PAN a ails ble for all Tields (sum oT column i) 8778.2 Ib. PAN
IV. FACILITY'S POA OVERALL PAN BALANCE
w. Total PAN io be land applied (line n from section 11) 99t 3 Ib. PAN
POA (30 Uay) 2/2t/00
Cro p"s r rig PAN balance (line v Trom section 111) 8778.2 Ib. PAN
y. Overall PAN,bala rice (w - z) -7787 Ib. PAN
Line y m st sM1ow a a deFcit IF line y does not sM1ow a a deFcit, list c of action M1ere i eluding pump and
M1aul, depopulation, M1erd reduction, etc_ For pump 8. M1aul and M1erd reduction options, r alculate n w PAN based
nForm anon_ IF n w Felds a e to be i eluded a option For lowering lagoon level, add tM1ese Felds to tM1e
PANobalance table and r alculate tM1e o mll PAN balance_ IF a al waste is to be M1auled to a otM1er permitted
Tacility, provide inForm anon regarding tM1e M1erd population and lagoon Freeboard levels at tM1e recery rig Tacility_
NARRATI V E
Irrigation to begin as conditions permit Additional acres available on tM1is site iF needed For waste application_ _
PAN used above For Fescue pulls is portion of remain rig PAN For tM1ese pulls_
Samples Dated 9-25-2020 BJO tt t_04 BJO 2t t_t5
POA (30 Day) 2/2'I /00
PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 UAY DRAW DOWN PERIOD
1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
t_Structure Name/Identifier QU)_ BJOtt
2 Current liquid volume in 25 yr /24 M1r_ storm storage 8. structural Freeboard
a_ current liquid level according to marKer � 6.O cM1es
b_ designed 25 yr /24 M1r_ storm 8. structural Freeboard � 9.O cM1es
c_ line b - line a (inc M1es in red zo e) = 3.O inc M1es
d_ top of diKe surtace area according to design
(a ea at below structural Freeboard elevation) 84000 its
e_ line c/t 2 x line d x 7 48 gallons/R 3 � 57080 gallons
3 Projected volume of waste liquid produced during draw down period
F_ temporary storage period according to structural design
t801days
g_ volume of waste produced according to structural design
94978
R3
M1_ current M1erd # 2880 certified M1erd # 2880
actual waste produced = cur nt M1erd # line g =
94978 R3
certified M1erd #
�_ volume of wasM1 water according to structural design
ORa
j_ excess ramFall over a aporation according to design
49000 R3
K_ Qines M1 + � + j) x 7 48 x 30 days/line F=
� 79493 gallons
4_ Total PAN to be land applied during draw down period
L current waste analysis dated 0
� 22 Ibs/� 000 9aL
m_ (Qines e + K)/� 000) x line I =
4'10.6 Ibs_ PAN
REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE.
(CIicK on iM1e nazi Sirudure iab sM1own below)
POA (30 Uay) 2/2t/00
PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 UAY DRAW DOWN PERIOD
1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
t_Structure Name/Identifier QU)_ BJOt2
2 Current liquid volume in 25 yr /24 M1r_ storm storage 8. structural Freeboard
a_ current liquid level according to marKer � 3.O cM1es
b_ designed 25 yr /24 M1r_ storm 8. structural Freeboard � 9.O cM1es
c_ line b - line a (inc M1es in red zo e) = 6.O inc M1es
d_ top of diKe surtace area according to design
(a ea at below structural Freeboard elevation) 84600 its
e_ line c/t 2 x line d x 7 48 gallons/R 3 3t 6404 gallons
3 Projected volume of waste liquid produced during draw down period
F_ temporary storage period according to structural design
t801days
g_ volume of waste produced according to structural design
OTt3
M1_ current M1erd # 2880 certified M1erd # 2880
actual waste produced = cur nt M1erd # line g =
R3
certified M1erd #
�_ volume of wasM1 water according to structural design
94948
R3
j_ excess ramFall over a aporation according to design
49350 R3
K_ Qines M1 + � + j) x 7 48 x 30 days/line F=
� 79892 gallons
4_ Total PAN to be land applied during draw down period
L current waste analysis dated 0
t_t7 lbs/t0009aL
m_ (Qines e + K)/� 000) x line I =
580.7 Ibs_ PAN
REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE.
(CIicK on iM1e nazi Sirudure iab sM1own below)
POA (30 Uay) 2/2t/00
PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number 31-50
County Duplin
Facility Name BJD Farm #1
Certified Operator Name Bizzell Davis Operator Number 18035
1 Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways, and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways
Lagoon Name/ID
Spillway(Y or N)
Level(inches)
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
BJD11 BJD12 BJD13
16 13 23
2 Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures
Five and 30 day Plans of Action are attached Hydraulic and agronomic balances are
within acceptable ranges
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures A
30 day Plan of Action is attached Agronomic balance is within acceptable range
Waste is to be pumped and hauled to off site locations Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP
Operation will be partially or fully depopulated
"Attach a complete schedule with corresponding animal units and dates for depopulation
"if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3 Earliest possible date to begin land application of waste 11/16/2020
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Bizzell Davis Phone 910-284-0078
Facility Owner/Manager (print)
Date 11/15/2020
Facility Owner/Manager (siqnature)