Loading...
HomeMy WebLinkAbout310050_30 day poa_20201116PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 UAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE t_Structure Name/Identifier QU)_ BJOt2 2 Current liquid volume in 25 yr /24 M1r_ storm storage 8. structural Freeboard a_ current liquid level according to marKer � 3.O cM1es b_ designed 25 yr /24 M1r_ storm 8. structural Freeboard � 9.O cM1es c_ line b - line a (inc M1es in red zo e) = 6.O inc M1es d_ top of diKe surtace area according to design (a ea at below structural Freeboard elevation) 84600 its e_ line c/t 2 x line d x 7 48 gallons/R 3 3t 6404 gallons 3 Projected volume of waste liquid produced during draw down period F_ temporary storage period according to structural design t801days g_ volume of waste produced according to structural design OTt3 M1_ current M1erd # 2880 certified M1erd # 2880 actual waste produced = cur nt M1erd # line g = R3 certified M1erd # �_ volume of wasM1 water according to structural design 94948 R3 j_ excess ramFall over a aporation according to design 49350 R3 K_ Qines M1 + � + j) x 7 48 x 30 days/line F= � 79892 gallons 4_ Total PAN to be land applied during draw down period L current waste analysis dated 0 t_t7 lbs/t0009aL m_ (Qines e + K)/� 000) x line I = 580.7 Ibs_ PAN REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE. (CIicK on iM1e nazi Sirudure iab sM1own below) POA (30 Uay) 2/2t/00 11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD ANU/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY � _ Structure IU= BJOt � line m — 4t 0.6 Ib PAN 2 Structure IU= BJOt2 line m — 580.7 Ib PAN 3 Structure IU= line m — Ib PAN 4_ Structure IU= line m — Ib PAN S Structure IU= line m — Ib PAN 6_ Structure IU= line m — Ib PAN n. lines '1 � 2 � 3 � 4 � 5 � 6 99t 3 Ib PAN 111. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 UAY DRAW DOWN 'State c nt c op ending apphcabon date o ext crop apphcabon begmnmg date Tor ava Jable recery rig c ops during 30 day dmw down period_ v. Total PAN a ails ble for all Tields (sum oT column i) 8778.2 Ib. PAN IV. FACILITY'S POA OVERALL PAN BALANCE w. Total PAN io be land applied (line n from section 11) 99t 3 Ib. PAN POA (30 Uay) 2/2t/00 Cro p"s r rig PAN balance (line v Trom section 111) 8778.2 Ib. PAN y. Overall PAN,bala rice (w - z) -7787 Ib. PAN Line y m st sM1ow a a deFcit IF line y does not sM1ow a a deFcit, list c of action M1ere i eluding pump and M1aul, depopulation, M1erd reduction, etc_ For pump 8. M1aul and M1erd reduction options, r alculate n w PAN based nForm anon_ IF n w Felds a e to be i eluded a option For lowering lagoon level, add tM1ese Felds to tM1e PANobalance table and r alculate tM1e o mll PAN balance_ IF a al waste is to be M1auled to a otM1er permitted Tacility, provide inForm anon regarding tM1e M1erd population and lagoon Freeboard levels at tM1e recery rig Tacility_ NARRATI V E Irrigation to begin as conditions permit Additional acres available on tM1is site iF needed For waste application_ _ PAN used above For Fescue pulls is portion of remain rig PAN For tM1ese pulls_ Samples Dated 9-25-2020 BJO tt t_04 BJO 2t t_t5 POA (30 Day) 2/2'I /00 PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 UAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE t_Structure Name/Identifier QU)_ BJOtt 2 Current liquid volume in 25 yr /24 M1r_ storm storage 8. structural Freeboard a_ current liquid level according to marKer � 6.O cM1es b_ designed 25 yr /24 M1r_ storm 8. structural Freeboard � 9.O cM1es c_ line b - line a (inc M1es in red zo e) = 3.O inc M1es d_ top of diKe surtace area according to design (a ea at below structural Freeboard elevation) 84000 its e_ line c/t 2 x line d x 7 48 gallons/R 3 � 57080 gallons 3 Projected volume of waste liquid produced during draw down period F_ temporary storage period according to structural design t801days g_ volume of waste produced according to structural design 94978 R3 M1_ current M1erd # 2880 certified M1erd # 2880 actual waste produced = cur nt M1erd # line g = 94978 R3 certified M1erd # �_ volume of wasM1 water according to structural design ORa j_ excess ramFall over a aporation according to design 49000 R3 K_ Qines M1 + � + j) x 7 48 x 30 days/line F= � 79493 gallons 4_ Total PAN to be land applied during draw down period L current waste analysis dated 0 � 22 Ibs/� 000 9aL m_ (Qines e + K)/� 000) x line I = 4'10.6 Ibs_ PAN REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE. (CIicK on iM1e nazi Sirudure iab sM1own below) POA (30 Uay) 2/2t/00 PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 UAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE t_Structure Name/Identifier QU)_ BJOt2 2 Current liquid volume in 25 yr /24 M1r_ storm storage 8. structural Freeboard a_ current liquid level according to marKer � 3.O cM1es b_ designed 25 yr /24 M1r_ storm 8. structural Freeboard � 9.O cM1es c_ line b - line a (inc M1es in red zo e) = 6.O inc M1es d_ top of diKe surtace area according to design (a ea at below structural Freeboard elevation) 84600 its e_ line c/t 2 x line d x 7 48 gallons/R 3 3t 6404 gallons 3 Projected volume of waste liquid produced during draw down period F_ temporary storage period according to structural design t801days g_ volume of waste produced according to structural design OTt3 M1_ current M1erd # 2880 certified M1erd # 2880 actual waste produced = cur nt M1erd # line g = R3 certified M1erd # �_ volume of wasM1 water according to structural design 94948 R3 j_ excess ramFall over a aporation according to design 49350 R3 K_ Qines M1 + � + j) x 7 48 x 30 days/line F= � 79892 gallons 4_ Total PAN to be land applied during draw down period L current waste analysis dated 0 t_t7 lbs/t0009aL m_ (Qines e + K)/� 000) x line I = 580.7 Ibs_ PAN REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE. (CIicK on iM1e nazi Sirudure iab sM1own below) POA (30 Uay) 2/2t/00 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number 31-50 County Duplin Facility Name BJD Farm #1 Certified Operator Name Bizzell Davis Operator Number 18035 1 Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways, and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways Lagoon Name/ID Spillway(Y or N) Level(inches) Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 BJD11 BJD12 BJD13 16 13 23 2 Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures Five and 30 day Plans of Action are attached Hydraulic and agronomic balances are within acceptable ranges X Liquid level is within the 25 year 24 hour storm elevations for one or more structures A 30 day Plan of Action is attached Agronomic balance is within acceptable range Waste is to be pumped and hauled to off site locations Volume and PAN content of waste to be pumped and hauled is reflected in section III tables Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP Operation will be partially or fully depopulated "Attach a complete schedule with corresponding animal units and dates for depopulation "if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3 Earliest possible date to begin land application of waste 11/16/2020 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Bizzell Davis Phone 910-284-0078 Facility Owner/Manager (print) Date 11/15/2020 Facility Owner/Manager (siqnature)