HomeMy WebLinkAbout20100503 Ver 1_More Info Received_20100714lc - 055)3
Ian McMillan 7/14/2010
Acting Supervisor
401 Oversight / Express permitting unt
NC DENR
c?lcq= 0WP
SUBJECT: Discrepancy letter dated 6/25/2010
DuPont Company - Fayetteville Works 'JUL 14 2010
401/404 permit application
DENR-WATEROMP
WEnANDS AND STORNWATER WAD
Dear McMillan
This letter and attachments are a responce to your discrepancy letter dated
6/25/2010. Attached is a copy of your original discrepancy letter for reference. Per
our phone conversation I have updated the individual impacts as well as total
impacts and attached copies of application pages 1 & 5 of our original permit
application. Also attached is a Delegation of Authority letter from E. I. DuPont de
Nemours inc. Vice President of Operations W. C. Martin delegating authority to the
site manager, Karen Wrigley who signed the original application.
If you have any questions you can call me on (910)-678-1611
Sincerly,
Don c amish
Project Manage
E. I. DuPont de Nemours
Fayetteville Works plant.
Attachments:
(1) COME OF DESCREPANCY LETTER DATED 6/25/2010
(S) COPIES OF APPLICATION PAGES 1 & S
(1) LETTER - PLANT MANAGER'S DELEGATION OF A UTHORITY
(C) -1)503
aM.
E. I. DU PONT DE NEMOURS AND COMPANY
DELEGATION OF AUTHORITY
By this letter, I, W. C. Martin, Vice President-Operations, E. I. du Pont de Nemours and
Company ("DuPont") hereby delegate, to the extent permitted by law, to the Plant Manager or
designated acting plant manager of the Fayetteville Works Plant located at 22828 NC Highway
87 West, Fayetteville, NC 28306-7332 (the "Plant") the authority to:
• Sign or execute any permit application, report, certification or other document relating to
compliance by the Plant with state and federal environmental laws or regulations,
including but not limited to: the Clean Air Act, 42 USC §7401 et seq., as amended, the
Clean Water Act, 33 USC § 1251 et seq., as amended, the Resource Conservation &
Recovery Act, 42 USC §6901 et seq., as amended and comparable state laws.
• Execute all orders and agreements relating to compliance by the Plant with Federal, State
or local environmental laws and regulations.
• Approve the provisions of any compliance program, project-completion schedule, or
similar document relating to construction, modification, and/or operation of any
equipment or facilities at the Plant.
• Execute and deliver any other documents and do any other actions in connection with the
foregoing, as the Plant Manager may deem necessary and advisable.
It being understood that said Plant Manager will consult Legal and/or SHE, as appropriate before
exercising the authority hereby granted.
The Plant employs more than 250 persons or has gross annual sales or gross annual expenditures
exceeding $25 million (in second quarter 1980 dollars.)
This Delegation of Authority is given without the authority to make further delegations.
r, //?? bos.? " /,??
Date W. C. Martin
Vice President-Operations
1, Calissa W. Brown, an Assistant Secretary of the Company, do hereby certify that W. C. Martin
is the Vice President-Operations and that the signature set forth above is his genuine signature.
IN WITNESS WHEREOF I set my hand this 07 day of , 2010.
Assistant Secretary
(SEAL)
JUL 1 4 2010
DENR • WATER QUALITY
WETLANDS AND STOli1MA:ER SRANOi
E.I. du Pont de Nemours and Company
?o- DSo3
OryWA
j
olii? c
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.3 Dec 10 2008
Pre-Construction Notification PCN Form
A. Applicant Information
1. Processing
1 a. Type(s) of approval sought from the
Corps:
®Section 404 Permit ®Section 10 Permit
1b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: NWP7
1c. Has the NWP or GP number been verified by the Corps? ? Yes ® No
1d. Type(s) of approval sought from the DWQ (check all that apply):
® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit
? 401 Water Quality Certification - Express ? Riparian Buffer Authorization
1e. Is this notification solely for the record
because written approval is not required? For the record only for DWQ 401
Certification:
? Yes ® No For the record only for Corps Permit:
? Yes ® No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program. ? Yes ® No
1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h
below. ? Yes ® No
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No
2. Project Information
2a. Name of project: DuPont Fayetteville Works, Outfall Relocation Project
2b. County: Bladen Co
2c. Nearest municipality / town: St Pauls
2d. Subdivision name: NA
2e. NCDOT only, T.I.P. or state
project no: 51-0014090
ful
3. Owner Information JUL L.If
1 t 2010
3a. Name(s) on Recorded Deed: E. I. DuPont de Nemours & Co. DENR-
3b. Deed Book and Page No. YMILANUS ANDST011 ST011WATER RANCH
3c. Responsible Party (for LLC if
applicable):
3d. Street address: 22828 NC 87 Highway West.
3e. City, state, zip: Fayetteville NC, 28306
3f. Telephone no.: 910-678-1546
3g. Fax no.:
3h. Email address: Karen. B.Wrigley@usa.dupont.com
Page 1 of 11
PCN Form - Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for your project (check all that apply):
® Wetlands ® Streams - tributaries ? Buffers
? Open Waters ? Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ - non-404, other) (acres)
Temporary T
W1 ? P ®T Excavation/backfill ? ® Yes
El No ® Corps
E] DWQ
0.145 acres
W2 ? P ? T ? Yes ? Corps
? No ? DWQ
W3 ? P ? T ? Yes ? Corps
? No ? DWQ
W4 ? P ? T ? Yes ? Corps
? No ? DWQ
W5 ? P ? T ? Yes ? Corps
? No ? DWQ
W6 ? P ? T ? Yes ? Corps
? No ? DWQ
2g. Total wetland impacts 0.145 Acres
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number - (PER) or (Corps - 404, 10 stream length
Permanent (P) or intermittent DWQ - non-404, width (linear
Temporary (T) (INT)? other) (feet) feet)
S1 ? P ®T Dredge / backfill Cape Fear River ® PER
? INT ® Corps
? DWQ >75ft
S2 ? P ®T Excavation/ Unknown ? PER ® Corps 4ft 20
Backfill ® INT ? DWQ
S3 ? P ? T ? PER ? Corps
? INT ? DWQ
S4 ? P ? T ? PER ? Corps
? INT ? DWQ
S5 ? P ? T ? PER ? Corps
? INT ? DWQ
S6 ? P ? T ? PER ? Corps
? INT ? DWQ
3h. Total stream and tributary impacts
3i. Comments:
Page 5 of 11
PCN Form - Version 1.3 December 10, 2008 Version