HomeMy WebLinkAbout20201223 Ver 1_Pre-Filing Meeting Information_20201118Contact Name*
Contact Email Address*
Project Owner*
Project Name*
Project County*
Owner Address:*
Is this a transportation project?*
Chris Tinklenberg
Chris.Tinklenberg@kimley-horn.com
North Point Development, LLC
North Point - Gastonia Logistics Center
Gaston
Street Address
4825 NW 41 st Street
Address Line 2
No. 500
aty
Riverside
Postal / Zip axle
64150
r Yes r No
Type(s) of approval sought from the DWR:
F 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
W Individual Permit F Modification
F Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes C No
Please list all existing project ID's associated with this projects.*
SAW-2020-00836
State / Province / Pegion
MO
Country
USA
Do you know the name of the staff member you would like to request a meeting with?
Bryan Roden -Reynolds (USACE), Sue Homevvood and Alan
Johnson (DWR)
Please give a brief project description below.*
North Point Development proposes industrial development on 350-acres of
land between 1-85 and W 1 st Street
located in Gastonia and Lowell, Gaston County, North Carolina. The
proposed project includes the construction of
access roads, parking, utilities, and stormwater management facilities. The
proposed site plan will be provided
access via the future Lineberger Connector Project which includes the
Aberdeen Road extension and Lineberger
Road relocation. The proposed project seeks to construct eight (8)
distribution warehouse buildings, ranging from
203,840 SF to 1,300,000 SF and totaling 3,914,512 SF. Truck and
employee parking areas are required at each
building.
Please give a couple of dates you are available for a meeting.
9/25/2020
9/28/2020
9/29/2020
9/30/2020
10/1 /2020
Please attach the documentation you would like to have the meeting about.
C_Permit Drawings_Optimized.pdf 1.85MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
1 also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature *
Submittal Date 9/23/2020