Loading...
HomeMy WebLinkAbout20201223 Ver 1_Pre-Filing Meeting Information_20201118Contact Name* Contact Email Address* Project Owner* Project Name* Project County* Owner Address:* Is this a transportation project?* Chris Tinklenberg Chris.Tinklenberg@kimley-horn.com North Point Development, LLC North Point - Gastonia Logistics Center Gaston Street Address 4825 NW 41 st Street Address Line 2 No. 500 aty Riverside Postal / Zip axle 64150 r Yes r No Type(s) of approval sought from the DWR: F 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express W Individual Permit F Modification F Shoreline Stabilization Does this project have an existing project ID#?* r Yes C No Please list all existing project ID's associated with this projects.* SAW-2020-00836 State / Province / Pegion MO Country USA Do you know the name of the staff member you would like to request a meeting with? Bryan Roden -Reynolds (USACE), Sue Homevvood and Alan Johnson (DWR) Please give a brief project description below.* North Point Development proposes industrial development on 350-acres of land between 1-85 and W 1 st Street located in Gastonia and Lowell, Gaston County, North Carolina. The proposed project includes the construction of access roads, parking, utilities, and stormwater management facilities. The proposed site plan will be provided access via the future Lineberger Connector Project which includes the Aberdeen Road extension and Lineberger Road relocation. The proposed project seeks to construct eight (8) distribution warehouse buildings, ranging from 203,840 SF to 1,300,000 SF and totaling 3,914,512 SF. Truck and employee parking areas are required at each building. Please give a couple of dates you are available for a meeting. 9/25/2020 9/28/2020 9/29/2020 9/30/2020 10/1 /2020 Please attach the documentation you would like to have the meeting about. C_Permit Drawings_Optimized.pdf 1.85MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. 1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. 1 also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature * Submittal Date 9/23/2020