Loading...
HomeMy WebLinkAbout20091318 Ver 2_Modifications_20100712 TRVED of Eyo E1W �010 3ea,� NC28604 II= Noormer� aConsultng ftmicM mac. Fa ��-�7-�s S a -- Fax 828-297-1982 Rto ona ours: mad: wcc.jv@s4bod.com July 6,2010 Ms Tasha McCormick USACE Asheville Regulatory Field Office 151 Paton Ave,Rm 208 @ Asheville,NC 28801-5006 i5 L5 tJ RE:Action ID:2010.0023 JUL 1 2 C t0 DWQ Project#:09-1318 Emergency Vet Clinic: Town of Boone,Watauga County,NC DENR-WATER QUALITY - Modfication for Culvert Design Change WETLMos MD STOR.tirWATER BRANCH Dear Tasha: Inducted with this letter is a modified detail showing a concrete apron e)den&V approximately 6 feet out from each end of the proposed dual-72"by W culvert structure.This change was requested by the manufacturer of the precast structure, and is needed to provide greater stru ducal stability at inlet and outlet ends of the precast concrete headwall and wingwaN structure. As shown in the pemitted design, all flows less than bankfull will be maintained in the low Dow pipe, a concrete wall has been added to. the upstream concrete apron with top elevation at approximately bankfull. As a result of this change the amount of permanent impact to Hodges Creek will increase from 15 to 25 linear feet. Temporary impact lengths will remain the same and the total impact to all streams on the project will increase from 48 linear feet to 58 linear feet. 1 have also attached sheet 5 of 11 from the PCN form showing this change. On behalf.of my client, Dr. David limey, I am requesting approval of this modification. If you have any questions regarding this information please call me at 828-297-6946,thank you. Sincerely, J n C.Was President,ENV Er vironmental Consulting Services Inc. : Ms sue ca�iood ike Trew Mr.David Unzey C. Proposed impacts Inventory J. Impacts Summary 1 a. Which sections were completed below for your project(check all that apply): ®Wetlands ®Streams-tributaries ❑Buffers ❑Open Waters ❑Pond Construction 2. Welland Impacts If there are wetland impacts proposed on the site,then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Welland impact Type of jurisdiction number— Type of impact Type of wetland Forested (Corps-404, 10 Area of impact Permanent(P)or (if known) MM—non-404,other) (acres) Temporary W1 ®P❑T Fill Riparian Yes ®Corps 0.065 ®No ®DWQ W2 ®P❑T Fill Riparian ❑Yes ®Corps 0.02 ®No ®DWQ W3 []POT excavation Riparian ❑Yes ®Corps No®No ®DWQ W4 [IP❑T excavation Riparian- ❑Yes ®Corps 0.002 . No ®DWQ W5 ❑ P❑T [I Yes ❑C� ❑No ❑DWQ W6 ❑ P❑T ❑Yes ❑Corps ❑No ❑DWQ 2g.Total wetland impacts .098 2h.Comments:Wetlands are adjacent to trout waters 3. Stream Impacts If there are perennial or intermittent stream impacts('mduding temporary impacts)proposed on the site,then complete this question for all stream sites impacted. 3a: 3b. 3c. 3d. 3e. 3f. 39. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number- (PER)or (Corps-404,10 stream length Permanent(P)or intermittent DWQ—non..404, width (linear Temporary('f) (INT)? other) (feet) feet) S1 RP❑T Pipe Extension Hodges Creek ® PER ®Corps 9 25 ❑INT ®DWQ ® PER ®Corps S2 ❑P®T Utilities Hodges Creek ❑INT ®DWQ 9 8 Construction, PER ®Corps S3 [] POT Grade Control and Hodges Creek 9 25 bank protection INT ® DWQ S4 ❑ P❑T ❑PER ❑Corps ❑INT ❑DWQ S5 ❑P❑T [I PER ❑Corps ❑INT ❑DWQ S6 ❑ P❑T ❑PER ❑Corps ❑INT ❑DWQ 31L Total stream and tributary. impacts 58 3i.Comments: Page 6 of 12 PCN Form—Version 1.3 December 10,2008 Version I ROP SED DRIVE EMERGENCY VET CLINIC CULVERT INSTALLATION DETAIL N 12-2-2009 MOD 6-29-2010 - � NOTES RIPRAP AT OUTLET OF Grade and install filter fabric and large riprap �— HIGH-FLOW PIPE at outlet of proposed high-flow pipe Precast concrete headwalls, Wingwalls, and apron to CULV INLET be used to minimize time of construction and CONTROL RM CMP use of wet concrete in proximity to stream. Culvert installation to be performed in phases 7 Existing pipe to be shifted north and used as CONCRETE L F 65 temporary diversion pipe while proposed low-flow WALL :3 1 7 0- pipe and headwalls are installed in the dry. LoW-flaw CMP - pipe invert to be one-foot below streambed. W pj Following installation of proposed low-flow pipe, HODGES CRaa flow will be shifted to new pipe and proposed high- flow pipe and headwall will be installed. High flout pipe to be installed 0.8 feet above low-flow pipe. 3 1 88 Install inflow control berm according to detail and stabilize �` �\ all disturbed stream bank and riparian areas. Banks to be covered With coir matting or approved 8o ECAST ONCRET equal and seeded With temporary seed mix according AP ON to Erosion Control Plan, Install rock vanes as needed to protect stream banks immediately above and below culvert. Coordinate with Environmental Consultant on design and placement of structures. Overseed all disturbed areas with seed mix ERNMX-178 SCALE 1 "= 15 or approved equal. 0 15 30 PROJECT ENGINEER MUNICIPAL ENGINEERING SERVICES COMPANY, PA PO BOX 349, 178 - NC 28607 PH: WS-M-1787 SKPKYYLLINE S YORS CULVERT INLET CONTROL BERM DETAIL PO BOX 442, BOWe NC 29807 (NTS) 828-252-3353 E AL NT NSU E I IRONMENTAL CS TTIMp SERVICED, INC. 3 54 INGER RD, B�"R.ELK NC 28504 2.6'-3' NATIVE STONE BOULDERS PLACED TO NORMAL FLO� CULVERT: INSTALL ITH INVERT e2e-2G7-�CREATE A NEAR-BANKFULL BERM IN FRONT ONE-FOOT B LO STREAM BED ELErW7 OF THE HIGH-FLON PIPE. TIE TO BANKFULL W YATION. PERM�IT DRAWINGS PREPAID BY ENy-ECD, INC. WALL. UBD BAR JrA AID RAN PROVIDED BY PROJECT CONCRETE BANKFULL WALL TO EXTEND i FROM HEADWALL TO EDGE OF APRON. TO MAINTAIN ALL FLOWS LESS THAN BANKFULL 72' CMP IN LOW FLOW PIPE. 72' PROPOSED BANKFULL (APPROX) BANK APPROX. EX. STREAM BED C NCRETE APRO