Loading...
HomeMy WebLinkAboutNCC202231_NOT Closeout Documents_20201120North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 County: Harnett Project: ESA Buies Creek Solar, LLC River basin: Cape Fear Person financially responsible: Pure Power Contractors, Inc. - Justin Taylor, Project #: HARNE-2020-018 President NPDES COC: NCC202231 Address: 2812 Gray Fox Road, Monroe, NC 28110 1. Project Location: Leslie Campbell Avenue, Lillington Pictures: No 2. Weather and soil conditions: sunny, workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No One Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: November 19, 2020 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance with the SPCA and released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination. Please note that this correspondence must be uploaded as part of completing the Notice of Termination process. Reported by: Mike Lawyer Others present: Date of inspection: November 18, 2020 Time arriving on site: 3:25 PM Time leaving site: 3:38 PM cc: Michael Crowley, Engineer; Matthew Dickey, Project Manager; John Budway, Superintendent