Loading...
HomeMy WebLinkAboutNCC205338_ESC Approval Submitted_20201120R.O r COOPER" 40m1w $Krrar OWN CNN A*Opirrmr N6RTH CAROLINA February 12, 2020 LETTER OF APPROVAL WITH MODIFICATIONS Wildlands Engineering, Inc. ATTN: John Hutton, VP 312 W. Millbrook Road, Suite 225 Raleigh, NC 27609 RE: Project Name: Daniels Creek Acres Approved: 54.46 Project ID: HARNE-2020-077 County: Harnett, City: Broadway, River Basin: Cape Fear Stream Classification: Other Submitted By: Wildlands Engineering, Inc. Date Received by LQS: January 13, 2020 Plan Type: New Dear Mr. Hutton Address: Tim Patterson Lane This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval with Modifications. A list of the modifications and reservations is attached. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Should the plan not perform adequately, a revised plan will be required (G.S. 113A-54.1)(b). As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at deq.nc.gov NCG01. Please direct questions about the NOI form to Annette Lucas at Annette. lucas ncdenr. ov or Paul Clark at Paul.clark ncdenr. ov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. A $100 fee will be charged annually until a Notice of Termination is issued. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. North Carolina Department of FAVIronmental Q 41 ty _[ DtYw0n=0F Energy, Mineral an Land Resources REQ I Fayiett"I let 9lonal Office 225Gree6Street.Sutte7l4.1 Fayetteville, North Canlzllna 2MI ./�'�/ 910.433.3300 Letter of Approval with Modifications Wildlands Engineering, Inc. February 12, 2020 Page 2 of 3 Title 15A NCAC 4B .0118(a) and the NCGOI permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO I permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, f Jodi Pace, EI Regional Engineering Associate DEMLR Enclosures: Certificate of Approval Modifications Required for Approval NPDES NCGO1 Fact Sheet cc: Angela Allen, Wildlands Engineering, Inc. (electronic copy) Debra Ensminger, Moore County Planning (electronic copy) Fayetteville Regional Office file Letter of Approval with Modifications WiIdlands Engineering, Inc. February 12, 2020 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: DANIELS CREEK Project ID: HARNE-2020-040 County: Harnett The Match Lines do not match. Provide 2 copies of the plan with matching match lines. The Stockpile on Sheet 4.4 can easily be moved east so that it is 50' from the stream. The NE most Stockpile on Sheet 4.5 can easily be moved North so that it is 50' from the stream, or it can be shown smaller. Show silt fence all along the downstream side of the stockpile on Sheet 4.11. Ref G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities