Loading...
HomeMy WebLinkAboutWQCS00331_Correspondence_20201102d;0, Carolina Water Service � of North CarolinaT" November 2, 2020 Morella Sanchez -King Regional Supervisor Water Quality Regional Operations Section Wilmington Regional Office Division of Water Resources, NCDEQ Subject: Compliance Inspection Report Response Belvedere Plantation Collection System Collection System Permit No. WQCS00331 Pender County Dear Morella Sanchez -King, Please accept this letter as our response to the Belvedere Collection System Compliance Inspection Report, received October 12, 2020. Regarding the repairs to pump station #2 as noted in the report, we wanted to inform you that this work is to be completed by the developer. Therefore, we cannot provide a definitive schedule for when the work will be completed. We can assure you that our staff has been in contact with the developer and alerted him to the repairs that were pointed out within the inspection report. Going forward, our staff will continue to monitor the progress of the work, as well as maintain frequent contact with the developer to ensure all work is completed as quick as possible. In addition, we will update your office accordingly to provide you with the current status of the repairs. We hope this will fulfill the response requirement stated in the Compliance Inspection Report, but if you would like additional information please do not hesitate to contact myself, Dana Hill, or Lane Chilton. Sincerely, 4 - Regulatory Compliance Manager Carolina Water Service Inc. of North Carolina cc: Dana Hill, Director of Operations, CWSNC Lane Chilton, Area Manager, CWSNC • 4944 Parkway Plaza Blvd. Suite 375 • Charlotte, North Carolina 28217 • 800-525-7990