HomeMy WebLinkAbout310022_Plan of Action_20201113PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 31-22 County: Duplin
Facility Name: Dexter Jackson (1-20)
Certified Operator Name: Michael C. Gilbert Operator Number: AW19392
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Lagoon Name/ID: A B C D
Spillway(Y or N):
Level(inches):
N N N Y
12 12 13 22
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 11 /17/20 Weather permitting.
hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Michael C. Gilbert Phone: 919-631-2721
Facility Owner/Manager (print)
Date: 11 /13/2020
Facility Owner/Manager (signature)
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM
STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: A
line m =
812.1 lb PAN
2.
Structure ID: B
line m =
932.9 lb PAN
3.
Structure ID: C
line m =
1136.7 lb PAN
4.
Structure ID: D
line m =
1217.3 lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n. lines +2+3+4+5+6= 4099.0 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR-
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
u. application window'
86
W
Wheat
5.29
77.00
407.3
SEP-APR
86
X
Wheat
4.67
83.50
389.9
SEP-APR
86
Y
Wheat
4.76
84.10
400.3
SEP-APR
86
Z
Wheat
4.96
97.40
483.1
SEP-APR
86
AA
Wheat
4.73
96.20
455.0
SEP-APR
86
BB
Wheat
4.30
93.30
401.2
SEP-APR
86
CC
Wheat
4.28
89.20
381.8
SEP-APR
86
DD
Wheat
3.80
91.40
347.3
SEP-APR
86
EE
Wheat
3.49
88.40
308.5
SEP-APR
86
FF
Wheat
3.22
89.30
287.5
SEP-APR
86
GG
Wheat
2.96
98.90
292.7
SEP-APR
v. Total PAN available for all tields (sum of column t) _
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) _
x. Crop's remaining PAN balance (line v from section III) _
y. Overall PAN balance (w - x) =
411b4.6 I b. PAN
4099.0 lb. PAN
4154.8 lb. PAN
-55.8 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Sef reported to DWR on 11/13/20.
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): FA--
2. Current liquid volume in 25 yr./24 hr. storm storage &structural freeboard
a. current liquid level according to marker 12.01 inches
b. designed 25 yr./24 hr. storm &structural freeboard 19.01 inches
c. line b - line a (inches in red zone) = 7.0 inches
top of dike surface area according to design
d. (area at below structural freeboard elevation) 70875 ft2
e. line c/12 x line d x 7.48 gallons/W 309251 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 118684 1ft3
h. current herd # 1 3675 certified herd #1 3675
actual waste produced =current herd # x line g = 118684 ft'
certified herd #
i. volume of wash water according to structural design 01 ft3
j. excess rainfall over evaporation according to design 42933.3 1ft3
k. (lines h + i + j) x 7.48 x 30 days/line f= 201483 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 10/26/2020 1.59
m. ((lines e + k)/1000) x line 1 = 812 lbs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
1. AVERAGE LIVE WEIGHT (ALW)
0 sows (farrow to finish)
0 sows (farrow to feeder)
0 head (finishing only)
0 sows (farrow to wean)
0 head (wean to feeder)
Describe other :
Volume of waste produced:
0 lbs ALW/135
0 gal or
180 days excess rainfall =
x 1417 =
x 522 =
x 135 =
x 433 =
x 30 =
0 lbs
0 lbs
0 lbs
0 lbs
0 lbs
Total Average Live Weight = 0 lbs
x 1.37 gal/day
0 cu . ft
7.0 inches
Volume = 7.0 inches * DA/12 inches per foot
Volume = 41343.8 cu ft
180 days
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): FB--
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 12.01 inches
b. designed 25 yr./24 hr. storm &structural freeboard 19.01 inches
c. line b - line a (inches in red zone) = 7.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 83406.3 ft2
e. line c/12 x line d x 7.48 gallons/W 363929 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 118684 ft3
h. current herd # 1 3675 certified herd #1 3675
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 10/26/2020
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
118684 ft'
0 W
51333.3 ft3
211955 gallons
1.62 Ibs/1000 gal.
932.9 lbs. PAN
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): C
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 13.01 inches
b. designed 25 yr./24 hr. storm &structural freeboard 19.01 inches
c. line b - line a (inches in red zone) = 6.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 88076 ft2
e. line c/12 x line d x 7.48 gallons/W 329404 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 121451 ft3
h. current herd # 1 3675 certified herd #1 3675
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 10/26/2020
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
121451 ft'
0 W
56933 ft3
222385 gallons
2.06 Ibs/1000 gal.
1136.7 lbs. PAN
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): D
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 22.01 inches
b. designed 25 yr./24 hr. storm &structural freeboard 30.01 inches
c. line b - line a (inches in red zone) = 8.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 124756 1ft2
e. line c/12 x line d x 7.48 gallons/ft3 622117 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 121157.1 ft3
h. current herd # 1 3675 certified herd #1 3675
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 10/26/2020
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
121157 ft'
0 ft3
92546 ft3
266417 gallons
1.37 Ibs/1000 gal.
1217.3 lbs. PAN
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
2. Current liquid volume in 25 yr./24 hr. storm storage &structural freeboard
a. current liquid level according to marker Qinches
b. designed 25 yr./24 hr. storm &structural freeboard Qinches
c. line b - line a (inches in red zone) = inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) ft2
e. line c/12 x line d x 7.48 gallons/W gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design Odays
g. volume of waste produced according to structural design Oft3
h. current herd # Icertified herd #Q
actual waste produced =current herd # x line g = ft:3
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
gallons
I lbs/1000 gal.
0 lbs. PAN
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
2. Current liquid volume in 25 yr./24 hr. storm storage &structural freeboard
a. current liquid level according to marker Qinches
b. designed 25 yr./24 hr. storm &structural freeboard Qinches
c. line b - line a (inches in red zone) = inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) ft2
e. line c/12 x line d x 7.48 gallons/W gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design Odays
g. volume of waste produced according to structural design Oft3
h. current herd # Icertified herd #Q
actual waste produced =current herd # x line g = ft:3
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
gallons
I lbs/1000 gal.
0 lbs. PAN
PoA (30 Day) 2/21/00