Loading...
HomeMy WebLinkAbout310012_30 day POA_20201113PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): FMW1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 10.0 1 inches b. designed 25 yr./24 hr. storm &structural freeboard 19.51 inches c. line b - line a (inches in red zone) = 9.5 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 46331 ft2 e. line c/12 x line d x 7.48 gallons/W 274357 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 40880 ft3 h. current herd # 1 1240 certified herd #1 1240 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 9/21/2020 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 40880 ft:3 01 W 27026 ft3 84656 gallons 0.73 Ibs/1000 gal. 262.1 lbs. PAN PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): FM-W 2 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 13.01 inches b. designed 25 yr./24 hr. storm &structural freeboard 19.51 inches c. line b - line a (inches in red zone) = 6.5 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 96001 ft2 e. line c/12 x line d x 7.48 gallons/W 388964 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 118684 ft3 h. current herd # 1 3600 certified herd #1 3600 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 9/21/2020 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 118684 ft' 0 W 56000 ft3 217773 gallons 1.08 Ibs/1000 gal. 655.3 lbs. PAN PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): FM-W 3 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 14.01 inches b. designed 25 yr./24 hr. storm &structural freeboard 19.51 inches c. line b - line a (inches in red zone) = 5.5 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 96800 ft2 e. line c/12 x line d x 7.48 gallons/W 331863 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 118684 ft3 h. current herd # 1 3600 certified herd #1 3600 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 9/21/2020 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 118684 ft' 0 W 56466 ft3 218354 gallons 1. 171 Ibs/1000 gal. 643.8 lbs. PAN PoA (30 Day) 2/21/00 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-012 County: Duplin Facility Name: MR Whaley Certified Operator Name: Greg Brown Operator Number: 19631 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 MW1 MW2 MW3 no no no 10 13 14 2. Check all applicable items XXXX Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. XXXX Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 11 /19/2020 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. MR Whaley AJ Linton Tech Spec. Phone: Facility Owner/Manager (print) 6 Y ': .4 �,nto * V Facility Owner/Manager (signature) Date: 910-290-1042 11/16/2020 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: MW 1 line m = 262.1 lb PAN 2. Structure ID: MW 2 line m = 655.3 lb PAN 3. Structure ID: MW 3 line m = 643.8 lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 +2+3+4+5+6= 1561.1 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PFRIOn_ ISO NOT I IST FIFI IDS TO WHICH PAN CANNOT RF APPI IFn mIRING THIS in nAY PFRIOn_ o. tract # p. field # q. crop r. acres s. remaining IRR- 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 71100 pivot Small Grain 18.01 50.00 900.5 Mar - Oct 71100 p10 Small Grain 3.89 50.00 194.5 Mar - Oct 71100 p9 Small Grain 3.63 50.00 181.5 Mar - Oct 71100 p8 Small Grain 1.88 50.00 94.0 Mar - Oct 71100 p5 Small Grain 3.30 50.00 165.0 Mar - Oct 71100 p6 Small Grain 2.75 50.00 137.5 Mar - Oct 71100 p7 Small Grain 3.40 50.00 170.0 Mar - Oct 71100 p11 Small Grain 3.72 50.00 186.0 Mar - Oct 71100 p12 Small Grain 3.83 50.00 191.5 Mar - Oct 71100 p13 Small Grain 5.08 50.00 254.0 Mar - Oct State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 2474.5 Ib. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 1561.1 Ib. PAN x. Crop's remaining PAN balance (line v from section III) = 2474.5 Ib. PAN y. Overall PAN balance (w - x) = -913 Ib. PAN ine y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and aul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN ased on new information. If new fields are to be included as an option for lowering lagoon level, add these elds to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to nother permitted facility, provide information regarding the herd population and lagoon freeboard levels at the :ceiving facility. NARRATIVE: Irrigation onto existing spray fields will begin as weather and field conditions permit. There is sufficient land and PAN available. PoA (30 Day) 2/21 /00