Loading...
HomeMy WebLinkAboutNCC205296_NOI Application_20201120Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 11/17/2020 3:15:57 PM (NCG01 NOI Submission) Approve by Garcia, Lauren V 11/18/2020 9:17:30 AM (Review- Construction NOI 36418) • The task was assigned to Garcia, Lauren V by round robin distribution 11/17/2020 3:16 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: November 19, 2020 5:00 PM. The priority is: High 11/17/2020 3:16 PM Submit by Selkane, Aziza 11/20/2020 7:14:24 AM (Payment Verification for NCC205296) * William H McCahill • Selkane, Aziza assigned the task to Selkane, Aziza 11/20/2020 7:13 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: December 30, 2020 5:00 PM. The priority is: High 11/18/2020 9:17 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting IT No an NOI that was r Yes rejected before? 1a. Project Name * Hoggard Mill Substation 1 b. Specific Lot This field any be used to list specifc lot numbers. Numbers 5883-86-1216 5883-76-9168 5883-76-7281 2. County* Bertie 3. Highway or Street 108 Isaac Gilliam Lane Address * Street narre only is acceptable if no address number assigned yet 4. City or Township* Windsor 5. State * NC 6. Zip Code * 27983 7. Latitude * Enter the latitude in decirral degrees 36.0322 8. Longitude* Enter the longitude in decinal degrees (MJSTbe negative) -77.0105 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 12/01/2020 Estimated Construction Project Start Date 10. Date to End* 12/31/2021 Estimated Construction Project End Cute 11. SIC (Primary) * Other (9999) Standard Industrial aassification for Ceveloprrent 12. Acres to be 2.59 disturbed* (including off -site borrow and waste areas) 13. Total site area 2.59 (acres) * 14. Post- 0.54 construction (Estirrated) impervious area (acres) * NCC Project NCC-BERTI-2020-Hoggard Mill Substation Tracking ID Assignedautorraticaly Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Chiska Creek Wate rbody* %rre of waterbody into which storrrwater runoff will discharge 15b. Waterbody 24-2-5 Index No.* NCWaterbody Index Number Stormwater rJ No discharges will flow r- Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ F2rnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally Pesponsible Entity Name * Virginia Electric and Power Company It pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. Note: The organization name must match the business entity name registered with the NC Secretary of State. You can verify the registration here. 2. First Name * Kevin IF Corporation, enter Faegistered Agent First %rre 3. Last Name* Fields It Corporation, enter Fbgistered Agent Last %rre 3b. Title Authorized Representative 4. Permitee E-mail kevin.l.fields@dominionenergy.com Address* 5. Permittee 804-771-3769 Telephone No.* 6. Permittee Mailing Street Address Address* 10900 Nuckols Road, 4th Floor Address Line 2 City State / Frovince / Fbgion Glen Allen VA Fbstal / Zip Code Country 23060-9276 us Check box if the V Yes street address the same as mailing address 7. Permittee Street Street Address Address* 10900 Nuckols Road, 4th Floor Address Line 2 City State / Frovince / Region Glen Allen VA Fbstal / Zip Code Country 23060-9276 us 8. Type of Non -Government Ownership C. Site Contact Information Part C. Roject Site Contact Inforrration 1. Primary Site J. Eric Contact - First Name * 2. Primary Site Clay Contact - Last Name * 3. Title Electric Transmission Construction Consultant 4. Site Contact E- james.e.clay@dominionenergy.com mail Address* 5. Site Contact 804-335-9534 Telephone No.* 6. Organization Dominion Energy Virginia Name 7. Site Contact Street Address Mailing Address* 10900 Nuckols Road, 4th Floor Address Line 2 City Glen Allen Flostal / Zip Code 23060 8. Consultant Name (Optional) C2 Environmental First and Last narre 9. Consultant E-mail jjohnson@c2environmental.com This person will be copied on all correspondence. 10. Consultant 757-636-5047 Telephone No. State / Rovince / Fbgion VA Country us D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 11/12/2020 Approved * 2. E&SC Plan Project Berti-2021-001 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Washington (WaRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan Berti-2021-001 Hoggard Mill Substation - 11122020 Approval letter or 768.49KB (EXP).pdf Grading Permit Mist be FL7Ffon-rat 6. Site Location Map Mist be RDFforrret (lint 201VB) 0097_loc-vic_substation.pdf 989.01 KB Rease do not upload entire set of E&SC plans. 7. Notes (Optional) Provide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Include additional waterbodies for linear projects if necessary. 8. NOI Certification eNO1 Certification Form_Hoggard Mill Substation.pdf 742.22KB Form Mist be RDFforrret This is an Express f No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Kevin Fields Title Authorized Representative Organization Legally Responsible Entity Virginia Electric and Power Company Date * 11/17/2020 F. Tracking and COC Info NOI Tracking No. 36418 NC Reference No. NCG01-2020-5296 Uses 'count_nurrber' variable (increrrented by SP) Certificate of NCC205296 Coverage (COC) Uses 'count_nurrber' variable (increrrented by SP) No.* Count Number 5296 Sequential nurrber for subrrittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.) Initial Invoice No. NCC205296-2020 Invoice Due Date 12/18/2020 Initial Fee $ 100.00 Invoice Status OPEN