Loading...
HomeMy WebLinkAbout20201526 Ver 1_Pre-Filing Meeting Request_20201020ID#* 20201526 Version* 1 Regional Office* Mooresville Regional Office - (704) 663-1699 Reviewer List* Alan Johnson Pre -Filing Meeting Request submitted 10/20/2020 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Amber Lipsky amber.Iipsky@wetlands-epg.com Concord Ave -Monroe site Pace Development Group Union Street Address 6719-C Fairview Road Address Line 2 aty Charlotte Postal / Zip Code 28210 Is this a transportation project?* r Yes r No State / Province / Region NC Country USA Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F- 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Please list all existing project ID's associated with this projects.* SAW-2019-02211 Do you know the name of the staff member you would like to request a meeting with? Alan Johnson Please give a brief project description below.* The forthcoming PCN will include a request for Nationwide Permit 29 associated with the proposed Concord Ave -Monroe site on 120 acres west of the intersection of Concord Ave and Concord Hwy in Monroe, NC. There are eight wetlands and four streams on site. A preliminary jurisdictional determination was submitted and approved on 1/17/2 by Bryan Roden - Reynolds. Please give a couple of dates you are available for a meeting. 11 /2/2020 Please attach the documentation you would like to have the meeting about. 7. Delineation Map JD edits.pdf 389.13KB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 10/20/2020 Drawn By: Reviewed By: NRN LSR DATE: 6/21/19 Updated 10/2/19 FIGURE NO. 6 CONCORD AVENUE – MONROE Union Co., NC DELINEATION MAP -WATERS OF THE U.S.- EXISTING CONDITIONS STUDY SUBJECT TO USACE/NCDEQ VERIFICATION WETLAND F -0.02 ac WETLAND H -0.1 ac CULVERT WETLAND G -0.1 ac PERENNIAL STREAM B -1,200 lf INTERMITTENT STREAM C -350 lf PERENNIAL STREAM A -2,600 lf PROJECT BOUNDARY STUDY LIMITS WETLAND D -0.01 ac WETLAND E -0.1 ac 1 3 2 4 6 8 5 NCDEQ STREAM FORM A NCDEQ STREAM FORM C 7 USACE UPLAND DP1 USACE WETLAND FORM F WETLAND J -0.02 ac 11 WETLAND L -0.2 ac INTERMITTENT STREAM M -200 lf WETLAND K - 0.2 ac *** NCDEQ VERIFICATION 9/3/19 & 10/2/19 ***