HomeMy WebLinkAbout20201527 Ver 1_Pre-Filing Meeting Request_20201020ID#* 20201527
Version* 1
Regional Office* Mooresville Regional Office - (704) 663-1699
Reviewer List* Alan Johnson
Pre -Filing Meeting Request submitted 10/20/2020
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Amber Lipsky
amber.Iipsky@wetlands-epg.com
Bakers Creek site
Suncrest RealOp
Rowan
Street Address
2701 E Camelback Road
Address Line 2
Suite 180
aty
Phoenix
Fbstal / Zip Code
85016
Is this a transportation project? * r Yes r No
State / Province / Region
Arizona
Country
USA
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit F Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Please list all existing project ID's associated with this projects.*
SAW-2019-02291
Do you know the name of the staff member you would like to request a meeting with?
Alan Johnson
Please give a brief project description below.*
The forthcoming PCN will include a request for Nationwide Permit 29
associated with the proposed Bakers Creek site on 106 acres west of the
intersection of Plaza Ave and W 18th Street in Kannapolis, NC. There are
six wetlands and two streams on site. A preliminary jurisdictional
determination was submitted and approved on 12/11/19 by Catherine
Janiczak.
Please give a couple of dates you are available for a meeting.
11 /2/2020
Please attach the documentation you would like to have the meeting about.
7. Bakers Creek Delineation Map 073019 .pdf 863.85KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 10/20/2020
SUNCREST KANNAPOLIS
Rowan Co., NC
DELINEATION MAP
Subject to USACE/NCDEQ verification
FIGURE
7
7/30/19
Prepared for:
SUNCREST REAL ESTATE GROUP
Acres:
+/- 105.91
Drawn By:
NRN
Reviewed By:
LSR
PERENNIAL STREAM A
-3320 lf
PERENNIAL
STREAM G
-450 lf
PERENNIAL STREAM B
-281 lf
WETLAND D
-0.005 ac
WETLAND E
-0.01 ac
PERENNIAL
STREAM C
-49 lf
BAKERS BRANCH
Intermittent
-1040 lf
PROJECT BOUNDARY
STUDY LIMITS
BAKERS BRANCH
Perennial
-175 lf
1
2
3
4