Loading...
HomeMy WebLinkAbout20201503 Ver 1_PreFiling Email 30-Day Clock Reached Email_20201119Strickland, Bev From: laserfiche@ncdenr.gov Sent: Thursday, November 19, 2020 12:01 AM To: brubino@quible.com Cc: Tankard, Robert Subject: Pre -Filing Time Clock has been reached for Trent Ragland Replacement Bulkhead - 20201503 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Trent Ragland Replacement Bulkhead that you submitted on 10/19/2020. The I D number for that project is 20201503, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored ID#* 20201503 Version* 1 Regional Office* Washington Regional Office - (252) 946-6481 Reviewer List* Robert Tankard Pre -Filing Meeting Request submitted 10/19/2020 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Brian Rubino brubino@quible.com Trent Ragland Replacement Bulkhead Trent Ragland, Soundside Road Properties, LLC Chowan Street Address 3725 National Drive Address Line 2 Ste 150 aty Raleigh Rbstal / Zip Code 27612 Is this a transportation project? * r Yes r No State / Frovince / Region NC Country United States Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit F Modification W Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Chris Pullinger Please give a brief project description below. Replacement of 889 linear feet of existing shoreline stabilization bulkhead. The new bulkhead is proposed to be built 2 ft waterward of the existing one. The existing bulkhead has begun to fail and there are three areas where it has washed out in the recent past. This cannot be permitted under a CAMA General Permit since the total length exceeds 500 If. Brian Rubino from Quible & Assoc, P.C. and the owner (Trent Ragland) met with Cynthia Rountree from NCDCM on 9/29/2020 to evaluate conditions and to initiate the CAMA Permitting process. Please give a couple of dates you are available for a meeting. 11 /2/2020 11 /4/2020 11 /13/2020 Please attach the documentation you would like to have the meeting about. P20091-SITE EXHIBIT- 101920.pdf 1.75MB photopage.pdf 419.88KB pdr only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 10/19/2020