HomeMy WebLinkAbout20201736 Ver 1_PreFiling Acknowledgement Email_20201116Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Monday, November 16, 2020 10:37 AM
To: jon.swaim@mcgillassociates.com
Cc: Trone, Rick V
Subject: Pre -Filing Meeting Request Acknowledgement - Elm City Wastewater System
Improvements Project - 20201736 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Elm City Wastewater System
Improvements Project that you submitted on 11/11/2020. The ID number for that project is 20201736, Version 1.
Reviewer Contact Information:
Reviewer: Rick Trone
Email: rick.trone@ncdenr.gov
Reviewing Office: Central Office - (919) 707-9000
You will either be contacted by staff to set up a meeting or notified by email that the 30 calendar day clock has been reached and you
are allowed to submit your application.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not
monitored.
ID#* 20201736
Version* 1
Regional Office* Central Office - (919) 707-9000
Reviewer List* Rick Trone
Pre -Filing Meeting Request submitted 11/11/2020
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Jon Swaim
jon.swaim@mcgillassociates.com
Elm City Wastewater System Improvements Project
Town of Elm City
Wilson
Street Address
117 S. Railroad St.
Address Line 2
aty
Elm City
Fbstal / Zip Code
27822
Is this a transportation project?* r Yes r No
State / Province / Region
North Carolina
Country
United States
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Jennifer Burdette
Please give a brief project description below.
The proposed project includes expansion of the permitted capacity of the
Town's wastewater treatment plant (WWTP) and spray irrigation facility
from 133,430 gpd to a maximum annual average flow of 300,000 gpd, and
a maximum monthly flow of 350,000 gpd. The project is proposed to be
completed in two phases. The first phase includes expanding the spray
field area by adding 45.14 wetted acres of land on adjacent parcels to the
existing WWTP. Phase 1 will increase capacity to 207,630 gpd annual
average flow. The proposed work on the WWTP and spray irrigation facility
will include improvements at the influent bar screen structure and
headworks, construction of an additional chlorine contact basin, new
irrigation pump station, replacement of sprinklers in the existing fields 1-3,
construction of a new irrigation force main to the new spray fields and
irrigation system with control valves. In addition, the phase 1 project
includes upgrades to the Parker Street Lift Station to replace pumps,
piping, valves and controls, and to rehabilitate the existing wet well.
Please give a couple of dates you are available for a meeting.
11 /16/2020
11 /17/2020
11 /18/2020
11 /19/2020
11 /20/2020
Please attach the documentation you would like to have the meeting about.
Location Map.pdf 325.53KB
Wetland Delineation Map 092120.pdf 3.49MB
14.04042 to J Swaim.pdf 5.6MB
pdF only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 11/11/2020