Loading...
HomeMy WebLinkAbout20201736 Ver 1_PreFiling Acknowledgement Email_20201116Strickland, Bev From: laserfiche@ncdenr.gov Sent: Monday, November 16, 2020 10:37 AM To: jon.swaim@mcgillassociates.com Cc: Trone, Rick V Subject: Pre -Filing Meeting Request Acknowledgement - Elm City Wastewater System Improvements Project - 20201736 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Elm City Wastewater System Improvements Project that you submitted on 11/11/2020. The ID number for that project is 20201736, Version 1. Reviewer Contact Information: Reviewer: Rick Trone Email: rick.trone@ncdenr.gov Reviewing Office: Central Office - (919) 707-9000 You will either be contacted by staff to set up a meeting or notified by email that the 30 calendar day clock has been reached and you are allowed to submit your application. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. ID#* 20201736 Version* 1 Regional Office* Central Office - (919) 707-9000 Reviewer List* Rick Trone Pre -Filing Meeting Request submitted 11/11/2020 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Jon Swaim jon.swaim@mcgillassociates.com Elm City Wastewater System Improvements Project Town of Elm City Wilson Street Address 117 S. Railroad St. Address Line 2 aty Elm City Fbstal / Zip Code 27822 Is this a transportation project?* r Yes r No State / Province / Region North Carolina Country United States Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Jennifer Burdette Please give a brief project description below. The proposed project includes expansion of the permitted capacity of the Town's wastewater treatment plant (WWTP) and spray irrigation facility from 133,430 gpd to a maximum annual average flow of 300,000 gpd, and a maximum monthly flow of 350,000 gpd. The project is proposed to be completed in two phases. The first phase includes expanding the spray field area by adding 45.14 wetted acres of land on adjacent parcels to the existing WWTP. Phase 1 will increase capacity to 207,630 gpd annual average flow. The proposed work on the WWTP and spray irrigation facility will include improvements at the influent bar screen structure and headworks, construction of an additional chlorine contact basin, new irrigation pump station, replacement of sprinklers in the existing fields 1-3, construction of a new irrigation force main to the new spray fields and irrigation system with control valves. In addition, the phase 1 project includes upgrades to the Parker Street Lift Station to replace pumps, piping, valves and controls, and to rehabilitate the existing wet well. Please give a couple of dates you are available for a meeting. 11 /16/2020 11 /17/2020 11 /18/2020 11 /19/2020 11 /20/2020 Please attach the documentation you would like to have the meeting about. Location Map.pdf 325.53KB Wetland Delineation Map 092120.pdf 3.49MB 14.04042 to J Swaim.pdf 5.6MB pdF only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 11/11/2020