Loading...
HomeMy WebLinkAbout20060202 Ver 2_More Info Received_20100709o6 - ©i oa_va C?? 301 South McDowell Street, Suite 512 Charlotte, North Carolina 28204 tel: 704 342-4546 fax: 704 342-2296 July 8, 2010 Mr. Ian McMillan North Carolina Division of Water Quality Wetlands/401 Certification Unit 1650 Mail Service Center Raleigh, NC 27699-1650 Q2c?IE on9 0 JUL 9 2010 YMETLANDS AND STOR16VATER BRANCH ETLANDENR Subject: Charlotte-Mecklenburg Utilities - WATER Briar Creek Relief Sewer - Phase II Amendment to Pre-Construction Notification for Nationwide 12/GC 3819 Application Dear Mr. McMillan, CDM met with Mr. Alan Johnson from North Carolina Division of Water Quality on July 7, 2010 onsite for purpose of visiting the locations and reviewing the proposed stream impacts for the aforementioned project. Mr. Johnson suggested making some modifications to the original Pre- Construction Notification Application submitted for your review and approval on June 17, 2010. Mr. Johnson suggested changing the type of impact at some locations to 'Temporary' instead of 'Permanent'. Mr. Johnson also recommended extending the stream impact length at station 148+00 to a total of 75-feet. Also, since submittal of the original application for your review, there has been a minor change in the sewer alignment which resulted in elimination of stream impact at station 135+78 (numbered as stream impact S9 in the original application). Per Mr. Johnson's suggestion we are submitting only the updated sheets of the original application. These sheets reflect the changes mentioned above and the stream impact numbers have been updated accordingly. Attached, with this letter please find: • Updated Page No. 6 from the original Pre-Construction Notification (PCN) Form • Updated Attachment A Briar Creek Relief Sewer - Phase Il Amendment to Pre-Construction Notification for Nationwide 12/GC 3819 Application July 8, 2010 Page 2 If you have any questions, please contact me at (704) 342-4546. Very truly yours, Q K Abhishek Yadav Camp Dresser & McKee c: Alan Johnson, NCDENR -DWQ (w/ attachments) Amy Vershel, CMUD (w/ attachments) Laurin Kennedy, CDM (w/ attachments) File 310 (w/ attachments) 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W1 ? P ? T ? Yes ? Corps ? No ? DWQ W2 ? P ? T ? Yes ? Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 0 2h. Comments: There are no known wetland impacts proposed on the site. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) Excavation, S1 ®P ? T Installation of 54-inch Briar Creek ® PER ® Corps 25 40 pipe, restoration of (Sta. 0+50) ? INT ? DWQ original banks Excavation, S2 ® P ? T Installation of 54-inch Briar Creek ® PER ® Corps 26 40 pipe, restoration of (Sta. 14+00) ? INT ? DWQ original banks Excavation, S3 ? P ®T Installation of 54-inch UT of Briar Creek ? PER ® Corps 10 40 pipe, restoration of (Sta. 34+15) ® INT ? DWQ original banks Excavation, S4 ? P ®T Installation of 30-inch Brair Creek ® PER ® Corps 23 25 i pipe, restoration of (Sta. 42+50) ? INT ? DWQ original banks Remove existing 12- S5 ? P ® T inch aerial sewer, Briar Creek ® PER ® Corps 20 25 excavation, restoration (Sta. 74+00) ? INT ? DWQ of original banks excavation, S6 ? P ®T installation of 48-inch pipe, restoration of UT of Briar Creek (Sta. 73+10) ® PER ? INT ®Corps ? DWQ 10 40 original banks 3h. Total stream and tributary impacts 425* 1. Comments: `See Appendix A for the rest of the stream impacts Page 5 of 12 PCN Form - Version 1.3 December 10 2008 Version Attachment A: Stream Impacts (continued) 3a. Stream 3b. Type of impact 3c. Stream 3d. Perennial 3e. Type of 3f. 3g. impact name (PER) of jurisdiction Average impact number- intermittent (Corps - 404, stream length Permanent (INT)? 10 DWQ -non width (ft) (linear (P) or 404, other) feet) Temporary (T) S7 T Remove existing 18- UT of Briar PER Corps 15 60 inch aerial sewer, Creek excavation, installation (111+35) of 42-inch pipe, restoration of original banks S8 P excavation, installation Briar Creek PER Corps 35 40 of 42 -inch pipe, (125+25) restoration of original banks S9 T excavation, installation UT of Briar PER Corps 20 75 of 42-inch pipe, Creek restoration of original (148+00) banks S10 P excavation, installation Briar Creek PER Corps 25 40 of 42-inch pipe, (155+50) restoration of original banks