HomeMy WebLinkAbout20100251 Ver 1_Stormwater Info_20100709WITHERS !!?a RAVENEL ENGINEERS I PLANNERS I SURVEYORS 1410 COMMONWEALTH DRIVE, SUITE 1o1 WILMINGTON, NORTH CAROLINA, 28403 (910) 256-9277 FAX (910) 256-2584 TO: NC Divison of Water Quality - 401 Wetlands Unit 2-421 Crabtree Blvd Raleigh, NC 27604 WE ARE SENDING YOU ? Shop Drawings ? Copy of Letter E Attached ? Prints ? Change order the following items: ? Specifications COPIES DATE NO. DESCRIPTION 719110 Response to Request for More Information Letter (/ /1o) 719110 24x36 construction drawings 719110 Stormwater Management Report 719110 0&M Manuals (to be signed upon approval) THESE ARE TRANSMITTED as checked below: ® For approval ? Approved as submitted ? Resubmit copies for approval ? For your use ? Approved as noted ? Submit copies for distribution ? As requested ? Returned for corrections ? Return corrected prints ? For review and comment ? ? FOR BIDS DUE 20 ? PRINTS RETURNED AFTER LOAN TO US REMARKS: Signature: W LUJ Date: JUL 3 ZO10 DEW • N ER OJAUTY MUMIXAMUMMORMWO COPY TO: File SIGNED: Troy Beasley if enclosures are not as noted, kindly notify us at once. LETTER OF TRANS MAL DATE 719110 JOB No. 020 00 0.10 ATTENTION Mr. Ian McMillan PHONE # 919-733-1786 RE. Bri htwater Medical Complex Request for More Information Response Stormwater design o - 1oa.51 ? Under separate cover via _ ? Plans ? Samples ? Diskette ? WITHERS RAVENEL ENGINEERS I PLANNERS I SURVEYORS July 9, 2010 Mr. Ian McMillan NC Division of Water Quality 401 Oversight/Express Review Permitting Unit 2321 Crabtree Blvd Suite 250 Raleigh, NC 27604 Re: Brightwater Medical Complex DWQ Project # 10-0251 Mr. McMillan: JUL 9 1 UlJ NMA ??? 1R This letter is in response to your Request For More Information Letter, dated May 3, 2010 for the Brightwater Medical Complex project. The responses to the items listed in your letter are provided below: 1. Please clarify which parts of the proposed development are Phase I and Phase II on a full-sized plan sheet that shows surface waters, topographic lines and all anticipated impervious surfaces. The information has been added to the plan sheets. 2. You must provide the Required items Checklist associated with each of the Wet Detention Basin Supplement Forms and all required items listed therein at the correct scales. The checklist includes a signed and notarized Operation and Maintenance Agreement for the wet detention ponds as well as many other items. If all required items are not included in the next submittal, your application will be returned. The checklist is attached. Please note that we have attached a copy of the Operation & Maintenance Agreement. However, due to the complications of the developing entity being a non-profit government owned corporation, the document has not been executed, but we anticipate execution within the next week. We will hand deliver copies to your office as soon as they are received. 3. Please provide a table of elevations, areas, incremental volumes and accumulated volumes for the ponds and forebays. This must include rows for key elevations (bottom, sediment cleanout, permanent pool, temporary pool, etc.). This information has been provided in the attached stormwater management report. 1410 Commonwealth Drive, Suite 1o1 Wilmington, North Carolina 28403 tel: 910-256-9277 fax:910-256-2584 www.withersravenel.com WITHERS RAVENEL ENGINEERS 1 PLANNERS I SURVEYORS 4. Please show the following items on the pond profiles: a. The forebay invert, ponds invert and sediment clean-out elevations. b. The correct side slopes: 10:1 for the vegetated shelf and 3:1 elsewhere. c. The permanent and temporary pond elevations as well as any other relevant storage elevations. d. The size, length and slope of the outlet barrel. This information has been added to the plan sheets. 5. The average depths provided are less than the required minimum of 3 feet. This depth cannot include the 1' of sediment storage. Please revise the ponds to provide the minimum depth or more. Please correct the errors in the calculation of average depth in your resubmittal. The calculations have been revised to exclude the sediment storage areas. 6. The forebay volumes must comprise 10 percent of the total volume of the BMP. None of the four ponds have an appropriate forebay volume. Per the BMP manual major design element #17, the forebays have been designed to be 20% of the total permanent pool volumes, within a tolerance of 1.5%. 7. Planting plans for the ponds must be provided on the plans as per 10.3.7 of the BMP manual. Planting plans are included on the plan sheets. 8. Please provide the drawdown calculations for each pond. This information has been added to the attached stormwater management report. 9. Please provide a soils test based on in-field borings conducted in the footprint of the proposed wet detention ponds to document the SHWT elevation. Liners may be required if it is well below the permanent pool elevations. See also 10.3.2 of the BMP manual. A note has been added to the BMP plan sheets for the evaluation of the seasonal high water table at each BMP during construction and requiring clay liners if the seasonal high water table is not within 6" of the permanent pool. 10. Please show details of all the pond outlets and associated energy dissipation devices. This information has been added to the plan sheets. 1410 Commonwealth Drive, Suite 1o1 Wilmington, North Carolina 28403 tel: 910-256-9277 fax:910-256-2584 www.withersravenel.com WITHERS RAVENEL ENGINEERS I PLANNERS I SURVEYORS 11. Per the BMP Manual, the emergency spillway must be hardened with concrete, rip rap or other appropriate material. Each emergency spillway shall be lined with a permanent root reinforcement matting (Enkamat 7020). This information is shown on the weir detail. 12. Please be sure that any changes are consistently reflected on all documents (plans, calculations, supplement forms, etc.) Noted. 13. For the Phase II portion of the site, you must provide a conceptual stormwater management plan that includes the following: a. A depiction of the drainage areas on the site. b. An estimation of the percentage imperviousness associated with each of the drainage areas. c. A calculation of the water quality volume associated with each drainage area. d. A depiction of the proposed BMP (state the type of BMP you plan to use) on the site plan that is correctly sized based on the water quality volume. This information has been added to Sheet SW3.0 Harnett Health Hospitals Comments: Per conversation with Warren Sugg, Mulkey Engineers & Consultants, the site engineer for the hospital, the hospital project has been placed on hold pending resolution of issues not related to these documents. Therefore, we are not able to provide responses to these comments at this time. Please feel free to call us if you have any questions. Sincerely, Loftee Smith Vice President 1410 Commonwealth Drive, Suite loi Wilmington, North Carolina 28403 tel: 910-256-9277 fax:910-256-2584 www.withersravenel.com Y WITHERS ` ' RAVEN EL STORMWATER MANAGEMENT REPORT Brightwater Science & Technology Park Harnett County, North Carolina Prepared For: Harnett County Prepared By: WITHERS & RAVENEL, INC 111 MacKenan Drive Cary, North Carolina 27511 July 2010 W&R Project No. 2090050 f BRIGHTWATER SCIENCE AND TECHNOLOGY PARK STORMWATER MANAGEMENT REPORT HARNETT COUNTY, NORTH CAROLINA INTRODUCTION Brightwater Science and Technology Park is a planned business development located in Harnett County. The proposed 128-acre development will have a mix of office, institutional and retail uses including the proposed Harnett Health Systems Hospital. The site lies directly across US401 from the Harnett County Courthouse complex and is bounded to the west by the Matthews Road and to the south by US401. The main entrance to the site will align with McKinney Parkway on US401. The site lies within a WS-IV-PA watershed classification and is subject to Harnett County Water Supply Watershed Management and Protection Ordinance. The purpose of this report is to establish the minimum criteria for stormwater compliance that will apply to the initial infrastructure development and the overall proposed stormwater management approach to meet the requirements. STORMWATER MANAGEMENT REQUIREMENTS Because the proposed development is within the Cape Fear River Basin, the site must meet the requirements of the Harnett County Water Supply Watershed Management and Protection Ordinance. This ordinance states: "Exception for Non-Residential Uses: Up to 10% of the protected area may be developed for non-residential uses to seventy percent (70%) built-upon area on a project by project basis. For the purpose of calculating built-upon area, total project area shall include total acreage in the tract on which the project is to be developed." This project has been designated for high intensity use as part of this exception. In reference to stream buffers this ordinance requires: "a minimum of a loo hundred (loo) foot vegetative buffer for development activities that exceed low density standards as established in this ordinance is required along all perennial waters indicated on the most recent versions of the U.S.G.S 1:24,000 (7.5minute) scale topographic maps, otherwise a minimum of thirty (30) foot buffer is required." STORMWATER MANAGEMENT APPROACH To meet the requirements of the Harnett County Water Supply Watershed Management and Protection Ordinance, streams within the site will be subject to 30' stream buffers as no perennial streams are indicated based on current U.S.G.S. mapping. In addition, an overall stormwater management plan is proposed that will treat the runoff form the first one inch of rainfall and remove a minimum of eighty-five percent (85%) of total suspended solids (TSS). Retention ponds are proposed as the primary best management practice devices. Thirty foot filter strips will be required at the release points for the first flush volume or the retention ponds shall be designed to treat for ninety percent (go%) TSS removal. Delineation of the drainage area to each BMP was based on existing terrain and a preliminary estimate of storm drainage design. The impervious area for each drainage area was estimated based on the preliminary illustrative master plan. To determine the surface area required for each BMP, the volume of run-off created by one inch of rainfall (the "first flush") was calculated for the drainage area. To calculate this water quality volume the Simple Method was used, as described in the DWQ BMP Manual. This method uses a run-off coefficient to calculate the volume of run-off given a depth of rainfall. The run-off coefficient is determined based on the percent imperviousness of the drainage area. The minimum surface area necessary for the wet ponds was determined as directed in the NC DWQ BMP manual. The first phase of construction will be to establish the road network and infrastructure to support the subsequent development of individual parcels. After completion of the various phases of grading including the phase one road network, the wet ponds designed to treat each phase or parcel shall be fully operational. All phases and parcels shall meet this stormwater management approach and submit to NCDENR DWQ for approval prior to the start of construction. Brightwater Science and Technology Park W&R Project 2090050 Stormwater Management Report March 2010 BRIGHTWATER SCIENCE AND TECHNOLOGY PARK STORMWATER MANAGEMENT REPORT HARNETT COUNTY, NORTH CAROLINA PHASE 1 BMP WORKSHEETS Brightwater Science and Technology Park W&R Project 2090050 Stormwater Management Report March 2010 Permit 477?54 NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. (to be provided by DWQ) ud r" ? E. rte. DUD E:; I. PROJECT INFORMATION Project name Brightwater Biotech Park Contact person Loftee Smith Phone number 919-469-3340 Date 5/1712010 Drainage area number Pond 1 Ill. DESIGN INFORMATION Site Characteristics Drainage area 213,008 ft2 Impervious area, post-development 108,900 ft2 % impervious 51.12 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required 9,055 ft3 Volume provided 11,896 ft3 Storage Volume: SA Waters 1.5' runoff volume n/a ft3 Pre-development 1-yr, 24-hr runoff ft3 Post-development 1-yr, 24-hr runoff ft3 Minimum volume required ft3 Volume provided ft3 Peak Flow Calculations Is the pre/post control of the lyr 24hr storm peak flow required? N (Y or N) 1-yr, 24-hr rainfall depth 3.1 in Rational C, pre-development (unitless) Rational C, post-development (unitless) Rainfall intensity: 1-yr, 24-hr storm in/hr Pre-development 1-yr, 24-hr peak flow ft3/sec Post-development 1-yr, 24-hr peak flow ft3/sec Pre/Post 1-yr, 24-hr peak flow control ft3/sec Elevations Temporary pool elevation 168.37 fmsl Permanent pool elevation 167.50 fmsl SHWT elevation (approx. at the perm. pool elevation) fmsl Top of 1Oft vegetated shelf elevation 168.00 fmsl Bottom of 1Oft vegetated shelf elevation 167.00 fmsl Sediment cleanout, top elevation (bottom of pond) 163.50 fmsl Sediment cleanout, bottom elevation 162.50 fmsl Sediment storage provided 1.00 ft Is there additional volume stored above the state-required temp. pool? Elevation of the top of the additional volume OK OK, volume provided is equal to or in excess of volume required. (Y or N) 168.6 fmsl Insufficient. Must equal the temp. pool elev. previously entered. Form SW401-Wet Detention Basin-Rev.e-9/17/09 Parts I. & II. Design Summary, Page 1 of 2 Permit No (to be provided by DWQ) Ill. DESIGN INFORMATION Surface Areas Area, temporary pool 11,424 ft2 Area REQUIRED, permanent pool 6,518 ft2 SA/DA ratio 3.06 (unitless) Area PROVIDED, permanent pool, Apemyoo 8,262 ft` OK Area, bottom of 1 Oft vegetated shelf, Abo, Shelf 5,951 ft` Area, sediment cleanout, top elevation (bottom of pond), Abot_pond 1,735 ft` Volumes Volume, temporary pool 11,896 ft3 OK Volume, permanent pool, Vpef,,,-pool 17,403 ft3 Volume, forebay (sum of forebays if more than one forebay) 3,221 ft3 Forebay % of permanent pool volume 18.5% % OK SAIDA Table Data Design TSS removal 90 % Coastal SA/DA Table Used? N (Y or N) Mountain/Piedmont SA/DA Table Used? Y (Y or N) SA/DA ratio 3.06 (unitless) Average depth (used in SA/DA table): Calculation option 1 used? (See Figure 10-2b) N (Y or N) Volume, permanent pool, Vperm " 17,403 ft' Area provided, permanent pool, Ape--" 8,262 It` Average depth calculated 2.11 ft Need 3 It min. Average depth used in SA/DA, d.„ (Round to nearest 0.5ft) 3.0 It Insufficient. Check calculation. Calculation option 2 used? (See Figure 10-2b) Y (Y or N) Area provided, permanent pool, Ape--Pool 8,262 ft` Area, bottom of 1Oft vegetated shelf, Abo, Shen 5,951 ft` Area, sediment cleanout, top elevation (bottom of pond), Abol-pond 1,735 ft2 "Depth" (distance b/w bottom of 1Oft shelf and top of sediment) 3.50 ft Average depth calculated 3.01 ft OK Average depth used in SA/DA, day, (Round to nearest 0.5ft) 3.0 ft OK Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 2.00 in Area of orifice (if-non-circular) in2 Coefficient of discharge (CD) 0.60 (unitless) Driving head (Ho) 1.10 ft Drawdown through weir? N (Y or N) Weir type (unitless) Coefficient of discharge (C,,) (unitless) Length of weir (L) ft Driving head (H) It Pre-development 1-yr, 24-hr peak flow ft3/sec Post-development 1-yr, 24-hr peak flow ft3/sec Storage volume discharge rate (through discharge orifice or weir) ft3/sec Storage volume drawdown time 2.00 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 It OK Length of flowpath to width ratio 3 :1 OK Length to width ratio 2.0 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.2 ft OK Vegetated filter provided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: pump Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & II. Design Summary, Page 2 of 2 Permit No (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Ils Sheet No. '$W 2.-N 5 LO 11.1L Jd t?l t 4i L ? FYI ) 'r L) LJ f Plans (1" - 50' or larger) of the entire site showing: Design at ultimate build-out, - Off-site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, - Vegetation specification for planting shelf, and - Filter strip. 3. Section view of the wet detention basin (1" = 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). 10 A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev 8-9/17/09 Part 111. Required Items Checklist, Page 1 of 1 / 4 Project Name: Brightwater Biotech Park City/State: Lillington, NC Project #: 2090050 Date: 17-May-10 Table 10-1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 90% Pollutant Removal Efficiency in the Moutains and Piedmont % Impervious Permanent Pool Dept h (feet) Cover 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10 0.90 0.80 0.80 0.60 0.50 0.50 0.40 20 1.50 1.30 1.10 1.00 0.90 0.80 0.80 30 1.90 1.80 1.70 1.40 1.30 1.00 1.00 40 2.50 2.30 2.00 1.80 1.60 1.50 1.30 50 3.00 2.80 2.50 2.00 1.90 1.70 1.60 60 3.50 3.20 2.80 2.50 2.20 1.90 1.80 70 4.00 3.70 3.30 2.80 2.50 2.20 2.00 80 4.50 4.10 3.80 3.30 2.80 2.60 2.30 90 5.00 4.50 4.00 3.50 3.00 2.80 2.60 Source: NCDENR/DWQ Stormwater Best Management Practices, pg. 10-9, July 2007 STORMWATER BMP POND 1 Land Use Area (ac) % IA Imp. Area (ac) Impervious 2.5 100 2.5 Open Space 2.39 0 0.0 Totals 4.89 2.5 Total % Impervious Surface Area = 51.1 % Surface Area of Permanent Pool: Assumed depth = 3 feet SA/DA ratio = 3.06 % From Table 10-1 Minimum pond surface area (SA) = (DA * SA/DA ratio)/100 SA = 0.149 acres 6510 sq. ft. Normal pool elevation = 167.5 feet Surface area provided = 0.190 acres 8262 sq. ft. 1-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(1) where, Rv = Runoff coefficient, in./in. I = Percent impervious Rv = 0.51 in./in. Total runoff volume from 1-inch precipitation: Runoff volume, S = (Design rainfall) (Rv) (Drainage Area) S = 0.208 acre-ft 9055 cu.ft. Water quality pool elevation required= 168.37 feet Water quality pool elevation provided= 168.60 feet Storage volume provided = 0.273 acre-ft 11896 cu. ft. Additional storage volume provided = 2841 cu. ft. a Project Name: Brightwater Biotech Park City/State: Lillington, NC STORMWATER BMP - Pond 1 Orifice Calculator Q =CdW(2gh)1(1/2) Variables WQ Volume: 0.207875 Acre-ft 9055.035 cf Head (average): 1.10 ft 0.55 ft Draw down time: 48 hrs 172800 s Orifice Area = 0.014675 sq. ft 2.113165 sq. in Orifice Diameter= 1.640295 in Project #: 2090050 Date: 14-May-10 Constants g = 32.2 ft/s2 Cd= 0.6 USE 2 INCH DIAMETER ORIFICE STORMWATER BMP POND 1 Average Depth Calculator (BMP 1) Normal Pool Elevation 167.5 ft Bottom of Shelf 167 ft Normal Pool Surface 8262 sf Area at Bottom of Shelf 5951 sf Area Bottom of Pond (main pond only) 1735 sf Elevation (ft) Depth (ft) Area (sf) Incr. Volume (cf) Ac c. Volume (cf) Normal Pool 167.5 0 8262 - - Bottom of Shelf 167 0.5 5951 3553.25 3553.25 166 1.5 4753 5352 8905.25 165 2.5 3636 4194.5 13099.75 164 3.5 2606 3121 16220.75 Bottom of Pond* 163.5 4 2125 1182.75 17403.5 163.5 4 2125 0 17403.5 163.5 4 2125 0 17403.5 Max. Depth of Pond = 4 ft Average Depth Calculations Option 1 = 2.106451222 ft Option 2 = 3.01 ft Pond Design Average Depth = 3.00 ft (minimum 3') Average Depth Calculation you should use: Option 2 Note: Average Depth must be greater than or equal to average depth used to size surface area of pond * Bottom of pond is the Sediment Clean out Top elevation I Forebay Design Tool (BMP 1) Elevation (ft) Depth (ft) Area (sf) Incr. Volume (cf) Acc. Volume (cf) Normal Pool 167.5 0 1733 - - Bottom of Shelf 167 0.5 1096 707.25 707.25 166 1.5 862 979 1686.25 165 2.5 654 758 2444.25 164 3.5 470 562 3006.25 Bottom of Forbay 163.5 4 390 215 3221.25 Bottom of Sediment 162.5 5 248 319 3540.25 Not included in forebay volume Forebay Volume = 3221.25 cf Pond Volume = 17403.5 cf Forebay Percent = 18.51% Status of Forebay Design: Forbay is sufficiently large Pond Volume Calculation (BMP 1) Elevation (ft) Depth (ft) Area (sf) Incr. Volume (cf) Acc. Volume (cf) Normal Pool 167.5 0 8262 - - Bottom of Shelf 167 0.5 5951 3553.25 3553.25 166 1.5 4753 5352 8905.25 165 2.5 3636 4194.5 13099.75 164 3.5 2606 3121 16220.75 Bottom of Pond 163.5 4 2125 1182.75 17403.5 Bottom of Sediment 162.5 5 2125 2125 19528.5 *not included in pond volume Pond Volume = 17403.5 cf Permit NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. (to be provided by DWQ) A - fi is L PROJECT INFORMATION Project name Brightwater Biotech Park Contact person Loftee Smith Phone number 919469-3340 Date b/1 //Zulu Drainage area number Pond 2 II. DESIGN INFORMATION Site Characteristics Drainage area 100,623 ftz Impervious area, post-development 31,363 fe % impervious 31.17 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required 2,772 ft3 OK Volume provided 7,928 ft3 OK, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the lyr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided nla ft3 ft3 -ft3 to ft3 N (Y or N) 3.1 in (unitless) (unitless) in/hr ft3/sec ft3lsec ft3lsec 161.95 fmsl 161.50 fmsl fmsl 162.00 fmsl 161.00 fmsl 157.00 fmsl 156.00 fmsl 1.00 ft Is there additional volume stored above the state-required temp. pool? Y (Y or N) Elevation of the top of the additional volume 162.6 fmsl Insufficient. Must equal the temp. pool elev. previously entered. Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts 1. & 11. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) II. DESIGN' INFORMATION Surface Areas Area, temporary pool 7,634 ft2 Area REQUIRED, permanent pool 1,982 ft2 SA/DA ratio 1.97 (unitless) Area PROVIDED, permanent pool, Apenp-l 5,408 ft` OK Area, bottom of 1 Oft vegetated shelf, Abot shelf 3,707 ft` Area, sediment cleanout, top elevation (bottom of pond), Abo and 732 ft` Volumes Volume, temporary pool 7,928 ft3 OK Volume, permanent pool, Vperm-Poo 10,915 ft3 Volume, forebay (sum of forebays if more than one forebay) 2,299 ft3 Forebay % of permanent pool volume 21.1% % OK SAIDA Table Data Design TSS removal 90 % Coastal SAIDA Table Used? N (Y or N) Mountain/Piedmont SAIDA Table Used? Y (Y or N) SA/DA ratio 1.97 (unitless) Average depth (used in SA/DA table): Calculation option 1 used? (See Figure 10-2b) N (Y or N) Volume, permanent pool, Vpem-pm 10,915 ft' Area provided, permanent pool, Apenp 5,408 ft2 Average depth calculated 2.01 It Need 3 ft min. Average depth used in SA/DA, de,„ (Round to nearest 0.5ft) 3.0 ft Insufficient. Check calculation. Calculation option 2 used? (See Figure 10-2b) Y (Y or N) Area provided, permanent pool, Apen po, 5,408 ft` Area, bottom of 1Oft vegetated shelf, Abot shelf 3,707 ft` Area, sediment cleanout, top elevation (bottom of pond), Abotj?nd 732 ft2 "Depth" (distance b/w bottom of 1Oft shelf and top of sediment) 4.00 ft Average depth calculated 3.12 ft OK Average depth used in SA/DA, d.„ (Round to nearest 0.5ft) 3.0 ft OK Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 1.00 in Area of orifice (if-non-circular) in2 Coefficient of discharge (Cc) 0.60 (unitless) Driving head (Ho) 1.10 ft Drawdown through weir? N (Y or N) Weir type (unitless) Coefficient of discharge (CW) (unitless) Length of weir (L) ft Driving head (H) ft Pre-development 1-yr, 24-hr peak flow ft3/sec Post-development 1-yr, 24-hr peak flow ft3/sec Storage volume discharge rate (through discharge orifice or weir) ft3/sec Storage volume drawdown time 2.00 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 It OK Length of flowpath to width ratio 3 :1 OK Length to width ratio 2.0 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.1 ft OK Vegetated filter provided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: pump Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & II. Design Summary, Page 2 of 2 Permit No (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan niti,als Sheet No. " ' 1. Plans (1 - 50 or larger) of the entire site showing: • Design at ultimate build-out, Off-site drainage (if applicable), D li e neated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. " ' 2. Partial plan (1 = 30 or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, - Vegetation specification for planting shelf, and / - Filter strip. 3. Section view of the wet detention basin (1" = 20' or larger) showing: Side slopes, 3:1 or lower, Pretreatment and treatment areas, and Inlet and outlet structures. 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified r on the plans prior to use as a wet detention basin. 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, a C to verify volume provided. 6 A . construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. 7 Th ti l l ti ` . e suppor ng ca cu a ons. ' l ?ADr G 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. vl . 9. A copy of the deed restrictions (if required). .d - 10 A il t th t i b d l fi t ld i • . so s repor a s ase upon an ac ua e nvestigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.8-9/17/09 Part III. Required Items Ch(cklist, Page 1 of 1 t i Project Name: Brightwater Biotech Park City/State: Lillington, NC Project #: 2090050 Date: 17-May-10 Table 10-1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 90% Pollutant Removal Efficient in the Moutains and Piedmont % Impervious Permanent Pool Depth (feet) Cover 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10 0.90 0.80 0.80 0.60 0.50 0.50 0.40 20 1.50 1.30 1.10 1.00 0.90 0.80 0.80 30 1.90 1.80 1.70 1.40 1.30 1.00 1.00 40 2.50 2.30 2.00 1.80 1.60 1.50 1.30 50 3.00 2.80 2.50 2.00 1.90 1.70 1.60 60 3.50 3.20 2.80 2.50 2.20 1.90 1.80 70 4.00 3.70 3.30 2.80 2.50 2.20 2.00 80 4.50 4.10 3.80 3.30 2.80 2.60 2.30 L 90 5.00 4.50 4.00 3.50 3.00 2.80 2.60 Source: NCDENR/DWQ Stormwater Best Management Practices, pg. 10-9, July 2007 STORMWATER BMP POND 2 Land Use Area (ac) % IA Imp. Area (ac) Impervious 0.72 100 0.7 Open Space 1.59 0 0.0 Totals 2.31 0.7 Total % Impervious Surface Area = 31.2 % Surface Area of Permanent Pool: Assumed depth = 3 feet SA/DA ratio = 1.97 % From Table 10-1 Minimum pond surface area (SA) _ (DA * SA/DA ratio)/100 SA = 0.046 acres 1982 sq. ft. Normal pool elevation = 161.5 feet Surface area provided = 0.124 acres 5408 sq. ft. 1-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(1) where, Rv = Runoff coefficient, in./in. I = Percent impervious Rv = 0.33 in./in. Total runoff volume from 1-inch precipitation: Runoff volume, S = (Design rainfall) (Rv) (Drainage Area) S = 0.064 acre-ft 2772 cu. ft. Water quality pool elevation required= 161.95 feet Water quality pool elevation provided= 162.60 feet Storage volume provided = 0.182 acre-ft 7928 cu. ft. Additional storage volume provided = 5156 cu. ft. Project Name: Brightwater Biotech Park City/State: Lillington, NC STORMWATER BMP - Pond 2 Orifice Calculator Q =Cd*A*(2gh)"(112) Variables WQ Volume: 0.063625 Acre-ft 2771.505 cf Head (average): 1.10 ft 0.55 ft Draw down time: 48 hrs 172800 s Orifice Area = 0.004492 sq. ft 0.646783 sq. in Orifice Diameter= 0.907475 in USE 1 INCH DIAMETER ORIFICE Project #: 2090050 Date: 14-May-10 Constants g = 32.2 ft/s2 Cd= 0.6 STORMWATER BMP POND 2 Average Depth Calculator (BMP 2) Normal Pool Elevation 161.5 ft Bottom of Shelf 161 ft Normal Pool Surface 5408 sf Area at Bottom of Shelf 3707 sf Area Bottom of Pond (main pond only) 732 sf Elevation (ft) Depth (ft) Area (sf) Incr. Volume (cf) Acc. Volume (cf) Normal Pool 161.5 0 5408 - - Bottom of Shelf 161 0.5 3707 2278.75 2278.75 160 1.5 2865 3286 5564.75 159 2.5 2104 2484.5 8049.25 158 3.5 1448 1776 9825.25 Bottom of Pond* 157 4.5 732- 1090 10915.25 157 4.5 732 0 10915.25 157 4.5 732 0 10915.25 Max. Depth of Pond = 4.5 ft Average Depth Calculations Option 1 = 2.018352441 ft Option 2 = 3.12 ft Pond Design Average Depth = 3.00 ft (minimum 3') Average Depth Calculation you should use: Option 2 Note: Average Depth must be greater than or equal to average depth used to size surface area of pond * Bottom of pond is the Sediment Clean out Top elevation Forebay Design Tool (BMP 2) Elevation (ft) Depth (ft) Area (sf) Normal Pool 161.5 0 1478 Bottom of Shelf 161 0.5 868 160 1.5 656 159 2.5 469 Bottom of Forbay 158 3.5 307 Bottom of Sediment ` 157 4.5 173 Incr. Volume (cf) Acc. Volume (cf) 586.5 586.5 762 1348.5 562.5 1911 388 2299 240 2539 Forebay Volume = 2299 cf Pond Volume = 10915.25 cf Forebay Percent = Status of Forebay Design *not included in forebay volume 21.06% Forbay is sufficiently large Pond Volume Calculation (BMP 2) Elevation (ft) Depth (ft) Area (sf) Incr. Volume (cf) Acc. Volume (cf) Normal Pool 161.5 0 5408 - - Bottom of Shelf 161 0.5 3707 2278.75 2278.75 160 1.5 2865 3286 5564.75 159 2.5 2104 2484.5 8049.25 158 3.5 1448 1776 9825.25 Bottom of Pond 157 4.5 732 1090 10915.25 Bottom of Sediment 156 5.5 401 566.5 11481.75 *not included in pond volume Pond Volume = 10915.25 cf Permit No a NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. (to be provided by DWQ) A ?,?.. I. PROJECT INFORMATION Project name Brightwater Biotech Park Contact person Loftee Smith Phone number 919469-3340 Date 5/17/2010 Drainage area number Pond 3 II. DESIGN INFORMATION Site Characteristics Drainage area 229,996 ft2 Impervious area, post-development 69,696 ft2 % impervious 30.30 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required 6,186 ft3 Volume provided 11,992 ft3 Storage Volume: SA Waters 1.5' runoff volume n/a ft3 Pre-development 1-yr, 24-hr runoff ft3 Post-development 1-yr, 24-hr runoff ft3 Minimum volume required ft3 Volume provided ft3 Peak Flow Calculations Is the pre/post control of the lyr 24hr storm peak flow required? N (Y or N) 1-yr, 24-hr rainfall depth 3.1 in Rational C, pre-development (unitless) Rational C, post-development (unitless) Rainfall intensity: 1-yr, 24-hr storm in/hr Pre-development 1-yr, 24-hr peak flow ft3/sec Post-development 1-yr, 24-hr peak flow ft3/sec Pre/Post 1-yr, 24-hr peak flow control ft3/sec Elevations Temporary pool elevation 167.11 fmsl Permanent pool elevation 166.50 fmsl SHWT elevation (approx. at the perm. pool elevation) fmsl Top of 1Oft vegetated shelf elevation 167.00 fmsl Bottom of 1 Oft vegetated shelf elevation 166.00 fmsl Sediment cleanout, top elevation (bottom of pond) 162.00 fmsl Sediment cleanout, bottom elevation 161.00 fmsl Sediment storage provided 1.00 ft Is there additional volume stored above the state-required temp. pool? Elevation of the top of the additional volume OK OK, volume provided is equal to or in excess of volume required. (Y or N) 167.6 fmsl Insufficient. Must equal the temp. pool elev. previously entered. Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & It. Design Summary, Page 1 of 2 Permit No (to be provided by DWQ) II. DESIGN INFORMATION Surface Areas Area, temporary pool 11,420 ft2 Area REQUIRED, permanent pool 4,416 ft2 SA/DA ratio 1.92 (unitless) Area PROVIDED, permanent pool, Apem,_pod 8,683 ft2 OK Area, bottom of 1 Oft vegetated shelf, Abot shelf 6,436 ft2 Area, sediment cleanout, top elevation (bottom of pond), Abot_pond 1,827 ft` Volumes Volume, temporary pool 11,992 ft3 OK Volume, permanent pool, Vpen_pwi 20,226 ft3 Volume, forebay (sum of forebays if more than one forebay) 3,988 ft3 Forebay % of permanent pool volume 19.7% % OK SA/DA Table Data Design TSS removal 90 % Coastal SA/DA Table Used? N (Y or N) Mountain/Piedmont SA/DA Table Used? Y (Y or N) SA/DA ratio 1.92 (unitless) Average depth (used in SA/DA table): Calculation option 1 used? (See Figure 10-2b) N (Y or N) Volume, permanent pool, Vperm_pod 20,226 ft' Area provided, permanent pool, Apenpoo 8,683 ft2 Average depth calculated 2.33 ft Need 3 ft min. Average depth used in SA/DA, dav, (Round to nearest 0.5ft) 3.0 ft Insufficient. Check calculation. Calculation option 2 used? (See Figure 10-2b) Y (Y or N) Area provided, permanent pool, Apenpod 8,683 ft2 Area, bottom of 1Oft vegetated shelf, Abot shelf 6,436 ft2 Area, sediment cleanout, top elevation (bottom of pond), Abot pond 1,827 ft2 "Depth" (distance blw bottom of 1Oft shelf and top of sediment) 4.00 ft Average depth calculated 3.32 ft OK Average depth used in SA/DA, ds, (Round to nearest 0.5ft) 3.0 ft Insufficient. Check calculation. Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 1.00 in Area of orifice (if-non-circular) in' Coefficient of discharge (CD) 0.60 (unitless) Driving head (Ho) 1.10 ft Drawdown through weir? N (Y or N) Weir type (unitless) Coefficient of discharge (C.) (unitless) Length of weir (L) It Driving head (H) It Pre-development 1-yr, 24-hr peak flow ft3/sec Post-development 1-yr, 24-hr peak flow ft3/sec Storage volume discharge rate (through discharge orifice or weir) ft3/sec Storage volume drawdown time 2.00 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 ft OK Length of flowpath to width ratio 3 :1 OK Length to width ratio 2.0 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.1 ft OK Vegetated filter provided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: pump Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & II. Design Summary, Page 2 of 2 Permit N (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. y 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build-out, - Off-site drainage (if applicable), '• - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. l 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, - Vegetation specification for planting shelf, and ?-?- ? U ? f I• -Filter strip. 3. Section view of the wet detention basin (1" = 20' or larger) showing: Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and Inlet and outlet structures. l '_°j 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, ! to verify volume provided. 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. &'64 7. The supporting calculations. ??V "`? Qa? 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. )' I 9. A copy of the deed restrictions (if required). t 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.8-9/17/09 Part III. Required Items Checklist, Page 1 of 1 Project Name: Brightwater Biotech Park City/State: Lillington, NC Project #: 2090050 Date: 17-May-10 Table 10-1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 90% Pollutant Removal Efficiency in the Moutains and Piedmont % Impervious Permanent Pool Dept h (feet) Cover 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10 0.90 0.80 0.80 0.60 0.50 0.50 0.40 20 1.50 1.30 1.10 1.00 0.90 0.80 0.80 30 1.90 1.80 1.70 1.40 1.30 1.00 1.00 40 2.50 2.30 2.00 1.80 1.60 1.50 1.30 50 3.00 2.80 2.50 2.00 1.90 1.70 1.60 60 3.50 3.20 2.80 2.50 2.20 1.90 1.80 70 4.00 3.70 3.30 2.80 2.50 2.20 2.00 80 4.50 4.10 3.80 3.30 2.80 2.60 2.30 90 5.00 4.50 4.00 3.50 3.00 2.80 2.60 Source: NCDENR/DWQ Stormwater Best Management Practices, pg. 10-9, July 2007 STORMWATER BMP POND 3 Land Use Area (ac) % IA Imp. Area (ac) Impervious 1.6 100 1.6 Open Space 3.68 0 0.0 Totals 5.28 1.6 Total % Impervious Surface Area = 30.3 % Surface Area of Permanent Pool: Assumed depth = 3 feet SA/DA ratio = 1.92 % From Table 10-1 Minimum pond surface area (SA) = (DA * SA/DA ratio)/100 SA = 0.101 "acres 4412 sq. ft. Normal pool elevation = 166.5 feet Surface area provided = 0.199 acres 8683 sq. ft. 1-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(1) where, Rv = Runoff coefficient, in./in. I = Percent impervious Rv = 0.32 in./in. Total runoff volume from 1-inch precipitation: Runoff volume, S = (Design rainfall) (Rv) (Drainage Area) S = 0.142 acre-ft 6186 cu. ft. Water quality pool elevation required= 167.11 feet Water quality pool elevation provided= 167.60 feet Storage volume provided = 0.275 acre-ft 11992 Cu. ft. Additional storage volume provided = 5806 cu. ft. I Y Project Name: Brightwater Biotech Park City/State: Lillington, NC STORMWATER BMP - Pond 3 Orifice Calculator Q =Cd*A*(2gh)^(1/2) Variables WQ Volume: Head (average): Draw down time: Orifice Area= 0.010024 sq. ft 0.142 Acre-ft 6185.52 cf 1.10 ft 0.55 ft 48 hrs 172800 s Orifice Diameter = 1.355704 in USE 1 INCH DIAMETER ORIFICE 1.443509 sq. in Project #: 2090050 Date: 14-May-10 Constants g = 32.2 ft/sz Cd= 0.6 STORMWATER BMP POND 3 Average Depth Calculator (BMP 3) Normal Pool Elevation 166.5 ft Bottom of Shelf 166 ft Normal Pool Surface 8683 sf Area at Bottom of Shelf 6436 sf Area Bottom of Pond (main pond only) 1827 sf Elevation (ft) Depth (ft) Area (sf) Incr. Volume (cf) Acc. Volume (cf) Normal Pool 166.5 0 8683 - - Bottom of Shelf 166 0.5 6436 3779.75 3779.75 165 1.5 5215 5825.5 9605.25 164 2.5 4072 4643.5 14248.75 163 3.5 3028 3550 17798.75 Bottom of Pond* 162 4.5 1827 2427.5 20226.25 162 4.5 1827 0 20226.25 162 4.5 1827 0 20226.25 Max. Depth of Pond = 4.5 ft Average Depth Calculations Option 1 = 2.329408039 ft Option 2 = 3.32 ft Pond Design Average Depth = 3.00 Average Depth Calculation you should use: ft (minimum 3') Option 2 Note: Average Depth must be greater than or equal to average depth used to size surface area of pond * Bottom of pond is the Sediment Clean out Top elevation STORMWATER BMP POND 3 Forebay Design Tool (BMP 3) Elevation (ft) Depth (ft) Area (sf) Incr. Volume (cf) Acc. Volume (cf) Normal Pool 166.5 0 2333 - - Bottom of Shelf 166 0.5 1519 963 963 165 1.5 1165 1342 2305 164 2.5 835 1000 3305 Bottom of Forbay 163 3.5 532 683.5 3988.5 Bottom of Sediment 162 4.5 256 394 4382.5 *not included in forebay volume Forebay Volume = 3988.5 cf Pond Volume = 20226.25 cf Forebay Percent = 19.72% Status of Forebay Design: Forbay is sufficiently large Pond Volume Calculation (BMP 3) Elevation (ft) Depth (ft) Area (sf) Incr. Volume (cf) Acc. Volume (cf) Normal Pool 166.5 0 8683 - - Bottom of Shelf 166 0.5 6436 3779.75 3779.75 165 1.5 5215 5825.5 9605.25 164 2.5 4072 4643.5 14248.75 163 3.5 3028 3550 17798.75 Bottom of Pond 162 4.5 1827 2427.5 20226.25 Bottom of Sediment 161 5.5 1222 1524.5 21750.75 *not included in pond volume Pond Volume = 20226.25 cf Permit No t NC©ENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. (to be provided by DWO) 1. PROJECT INFORMATION Project name Brightwater Biotech Park Contact person Loftee Smith Phone number 919-469-3340 Date 5/1712010 Drainage area number Pond 4 II. DESIGN INFORMATION Site Characteristics Drainage area 237,402 ftz Impervious area, post-development 154,638 ft2 % impervious 65.14 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required 12,587 ft3 Volume provided 15,943 ft3 Storage Volume: SA Waters 1.5" runoff volume n/a ft3 Pre-development 1-yr, 24-hr runoff ft3 Post-development 1-yr, 24-hr runoff ft3 Minimum volume required ft3 Volume provided ft3 Peak Flow Calculations Is the pre/post control of the lyr 24hr storm peak flow required? N (Y or N) 1-yr, 24-hr rainfall depth 3.1 in Rational C, pre-development (unitless) Rational C, post-development (unitless) Rainfall intensity: 1-yr, 24-hr storm in/hr Pre-development 1-yr, 24-hr peak flow ft3/sec Post-development 1-yr, 24-hr peak flow ft3/sec Pre/Post 1-yr, 24-hr peak flow control ft3/sec Elevations Temporary pool elevation 159.54 fmsl Permanent pool elevation 158.50 fmsl SHWT elevation (approx. at the perm. pool elevation) fmsl Top of 1Oft vegetated shelf elevation 159.00 fmsl Bottom of 10ft vegetated shelf elevation 158.00 fmsl Sediment cleanout, top elevation (bottom of pond) 154.50 fmsl Sediment cleanout, bottom elevation 153.50 fmsl Sediment storage provided 1.00 ft Is there additional volume stored above the state-required temp. pool? Elevation of the top of the additional volume OK OK, volume provided is equal to or in excess of volume required. (Y or N) 159.8 fmsl Insufficient. Must equal the temp. pool elev. previously entered. Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & II. Design Summary, Page 1 of 2 Permit (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. 1. Plans (1" - 50' or larger) of the entire site showing: Design at ultimate build-out, Off-site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, - Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. 1 t t + - I • 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: Outlet structure with trash rack or similar, Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filter strip. " ' 3. Section view of the wet detention basin (1 = 20 or larger) showing: Side slopes, 3:1 or lower, Pretreatment and treatment areas, and Inlet and outlet structures. 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. W ` t • 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the ` entire drainage area is stabilized. fi'"EC 7. The supporting calculations. l 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). 1 0. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.8-9/17/09 Part III. Required Items Checklist, Page 1 of 1 Project Name: Brightwater Biotech Park City/State: Lillington, NC Project #: 2090050 Date: 17-May-10 Table 10-1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 90% Pollutant Removal Efficient in the Moutains and Piedmont % Impervious Permanent Pool Dept h (feet) Cover 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10 0.90 0.80 0.80 0.60 0.50 0.50 0.40 20 1.50 1.30 1.10 1.00 0.90 0.80 0.80 30 1.90 1.80 1.70 1.40 1.30 1.00 1.00 40 2.50 2.30 2.00 1.80 1.60 1.50 1.30 50 3.00 2.80 2.50 2.00 1.90 1.70 1.60 60 3.50 3.20 2.80 2.50 2.20 1.90 1.80 70 4.00 3.70 3.30 2.80 2.50 2.20 2.00 80 4.50 4.10 3.80 3.30 2.80 2.60 2.30 90 5.00 4.50 4.00 3.50 3.00 2.80 2.60 Source: NCUtNK/UW(j Stonnwater best Management Practices, pg. 10-9, July 2007 STORMWATER BMP POND 4 Land Use Area (ac) % IA Imp. Area (ac) Impervious 3.55 100 3.6 Open Space 1.9 0 0.0 Totals 116- 5.45 3.6 Total % Impervious Surface Area = 65.1 % Surface Area of Permanent Pool: Assumed depth = 3 feet SA/DA ratio = 3.76 % From Table 10-1 Minimum pond surface area (SA) _ (DA * SA/DA ratio)/100 SA = 0.205 acres 8919 sq. ft. Normal pool elevation = 158.5 feet Surface area provided = 0.231 acres 10078 sq. ft. 1-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(1) where, Rv = Runoff coefficient, in./in. I = Percent impervious Rv = 0.64 in./in. Total runoff volume from 1-inch precipitation: Runoff volume, S = (Design rainfall) (Rv) (Drainage Area) S = 0.289 acre-ft 12587 cu. ft. Water quality pool elevation required= 159.54 feet Water quality pool elevation provided= 159.80 feet Storage volume provided = 0.366 acre-ft 15943 cu. ft. Additional storage volume provided = 3356 cu. ft. A ? Project Name: Brightwater Biotech Park City/State: Lillington, NC STORMWATER BMP - Pond 4 Orifice Calculator Q =Cd*A*(2gh)"(1/2) Variables WQ Volume: 0.288958 Acre-ft 12587.03 cf Head (average): 1.30 ft 0.65 ft Draw down time: 48 hrs 172800 s Orifice Area = 0.018764 sq. ft 2.702035 sq. in Orifice Diameter= 1.854816 in USE 2 INCH DIAMETER ORIFICE Project #: 2090050 Date: 14-May-10 Constants g = 32.2 ft/sZ Cd= 0.6 STORMWATER BMP POND 4 Average Depth Calculator (BMP 4) Normal Pool Elevation 158.5 ft Bottom of Shelf 158 ft Normal Pool Surface 10078 sf Area at Bottom of Shelf 7643 sf Area Bottom of Pond (main pond only) 2570 sf Elevation (ft) Depth (ft) Area (sf) Incr. Volume (cf) Acc. Volume (cf) Normal Pool 158.5 0 10078 - - Bottom of Shelf 158 0.5 7643 4430.25 4430.25 157 1.5 6295 6969 11399.25 156 2.5 5024 5659.5 17058.75 155 3.5 3857 4440.5 21499.25 Bottom of Pond* 154.5 4 2570 1606.75 23106 154.5 4 2570 0 23106 154.5 4 2570 0 23106 Max. Depth of Pond = 4 ft Average Depth Calculations Option 1 = 2.292716809 ft Option 2 = 3.11 ft Pond Design Average Depth = 3.00 ft (minimum T) Average Depth Calculation you should use: Option 2 Note: Average Depth must be greater than or equal to average depth used to size surface area of pond * Bottom of pond is the Sediment Clean out Top elevation STORMWATER BMP POND 4 Forebay Design Tool (BMP 4) Elevation (ft) Depth (ft) Area (sf) Incr. Volume (cf) Acc. Volume (cf) Normal Pool 158.5 0 2424 - - Bottom of Shelf 158 0.5 1674 1024.5 1024.5 157 1.5 1375 1524.5 2549 156 2.5 1100 1237.5 3786.5 Bottom of Forbay 155 3.5 849 974.5 4761 Bottom of Sediment 154 4.5 630 739.5 5500.5 *not included in forebay volume Forebay Volume = 4761 cf Pond Volume = 23106 cf Forebay Percent = 20.61% Status of Forebay Design: Forbay is sufficiently large Pond Volume Calculation (BMP 4) Elevation (ft) Depth (ft) Area (sf) Incr. Volume (cf) Acc. Volume (cf) Normal Pool 158.5 0 10078 - - Bottom of Shelf 158 0.5 7643 4430.25 4430.25 157 1.5 6295 6969 11399.25 156 2.5 5024 5659.5 17058.75 155 3.5 3857 4440.5 21499.25 Bottom of Pond 154.5 4 2570 1606.75 23106 Bottom of Sediment 153.5 5 2570 2570 25676 *not included in pond volume Pond Volume = 23106 cf BRIGHTWATER SCIENCE AND TECHNOLOGY PARK STORMWATER MANAGEMENT REPORT HARNETT COUNTY, NORTH CAROLINA PHASE 1 POND PACK REPORT Brightwater Science and Technology Park W&R Project 2090050 Stormwater Management Report March 2010 Type.... Master Network Summary Page 2.01 Name.... Watershed File.... K:\09\09-0050\090050-Brightwater Ph II\H-H\Pond Pack\Brightwater Biotech Park 05- MASTER DESIGN STORM SUMMARY Network Storm Collection: Dunn NOAA 14, 24 Total Depth Return Event in 2 3.7000 10 5.5800 25 6.7500 100 8.7300 1 3.0500 Rainfall Type ---------------- Time-Depth Curve Time-Depth Curve Time-Depth Curve Time-Depth Curve Synthetic Curve RNF ID Dunn 2-yr, 24-hr Dunn 10-yr, 24hr Dunn 25-yr, 24hr Dunn 100-yr, 24h TypeII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Return HYG Vol Qpeak Node ID Type Event ac-ft Trun ------ hrs ----------- BMP 1 ------ IN ---- POND ------ 2 ---- -- 1.075 --------- 12.1000 BMP 1 IN POND 10 1.809 12.1000 BMP 1 IN POND 25 2.274 12.1000 BMP 1 IN POND 100 3.068 12.1000 BMP 1 IN POND 1 .827 11.9000 BMP 1 OUT POND 2 1.070 12.1500 BMP 1 OUT POND 10 1.805 12.1500 BMP 1 OUT POND 25 2.270 12.1500 BMP 1 OUT POND 100 3.063 12.1500 BMP 1 OUT POND 1 .823 12.0500 BMP2 IN POND 2 .438 12.1000 BMP2 IN POND 10 .773 12.1000 BMP2 IN POND 25 .987 12.1000 BMP2 IN POND 100 1.356 12.1000 BMP2 IN POND 1 .328 11.9000 Max Qpeak Max WSEL Pond Storage cfs ft ac-ft -------- 22.90 -------- ------------ 30.99 36.53 43.04 14.95 17.14 169.02 .373 24.13 169.14 .404 30.94 169.23 .432 36.73 169.31 .454 10.08 168.89 .337 9.53 13.62 16.30 19.56 5.95 S/N: Bentley PondPack (10.00.027.00) 3:18 PM Bentley Systems, Inc. 5/14/2010 Type.... Master Network Summary Page 2.02 Name.... Watershed File.... K:\09\09-0050\090050-Brightwater Ph II\H-H\Pond Pack\Brightwater Biotech Park 05- MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID Type Event ac-ft Trun ---- hrs cfs - ft ac-ft ----- BMP2 ----- ------- OUT ---- POND ------ 2 ------ -- .403 --------- 12.2500 -- ----- 4.37 -------- 162.76 ------------ .201 BMP2 OUT POND 10 .734 12.1500 10.76 162.91 .227 BMP2 OUT POND 25 .948 12.1500 14.09 162.97 .239 BMP2 OUT POND 100 1.316 12.1500 17.04 163.02 .248 BMP2 OUT POND 1 .293 12.3500 .73 162.63 .178 BMP3 IN POND 2 .965 12.1000 21.04 BMP3 IN POND 10 1.720 12.1000 30.51 BMP3 IN POND 25 2.207 12.1000 36.66 BMP3 IN POND 100 3.046 12.1000 44.19 BMP3 IN POND 1 .717 11.9000 12.98 BMP3 OUT POND 2 .854 12.2000 13.55 167.96 .359 BMP3 OUT POND 10 1.606 12.1500 23.69 168.13 .406 BMP3 OUT POND 25 2.092 12.1500 31.07 168.24 .436 BMP3 OUT POND 100 2.929 12.1500 37.81 168.33 .461 BMP3 OUT POND 1 .608 12.1000 5.62 167.79 .315 BMP4 IN POND 2 1.569 12.1000 33.18 BMP4 IN POND 10 2.612 12.1000 44.33 BMP4 IN POND 25 3.270 12.1000 52.08 BMP4 IN POND 100 4.392 12.1000 61.12 BM24 IN POND 1 1.216 11.9000 21.88 BMP4 OUT POND 2 1.558 12.1500 25.36 160.36 .539 BMP4 OUT POND 10 2.600 12.1500 34.29 160.48 .580 BMP4 OUT POND 25 3.258 12.1500 43.81 160.61 .621 BMP4 OUT POND 100 4.379 12.1500 51.87 160.70 .653 BMP4 OUT POND 1 1.205 12.0500 15.25 160.19 .487 *OUT POST TOTAL JCT 2 17.099 12.1000 323.26 *OUT POST TOTAL JCT 10 32.782 12.1000 557.03 *OUT POST TOTAL JCT 25 43.184 12.1000 699.37 *OUT POST TOTAL JCT 100 61.397 12.1000 877.40 *OUT POST TOTAL JCT 1 12.165 11.9500 181.61 S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 3:18 PM 5/14/2010 'Type.... Master Network Summary Page 2.03 Name.... Watershed File.... K:\09\09-0050\090050-Brightwater Ph II\H-H\Pond Pack\Brightwater Biotech Park 05- MASTER NETWORK SUMMARY SCS Unit Hydregraph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Return HYG Vol Node ID Type Event ac-ft Trun ---------------- *OUT PRE TOTAL - ---- JCT ------ 2 ---------- 17.022 *OUT PRE TOTAL JCT 10 33.524 *OUT PRE TOTAL JCT 25 44.586 *OUT PRE TOTAL JCT 100 64.023 *OUT PRE TOTAL JCT 1 11.888 TO BMP 1 AREA 2 1.075 TO BMP 1 AREA 10 1.809 TO BMP 1 AREA 25 2.274 TO BMP 1 AREA 100 3.068 TO BMP 1 AREA 1 .827 TO BMP2 AREA 2 .438 TO BMP2 AREA 10 .773 TO BMP2 AREA 25 .987 TO BMP2 AREA 100 1.356 TO BMP2 AREA 1 .328 TO BMP3 AREA 2 .965 TO BMP3 AREA 10 1.720 TO BMP3 AREA 25 2.207 TO BMP3 AREA 100 3.046 TO BMP3 AREA 1 .717 TO BMP4 AREA 2 1.569 TO BMP4 AREA 10 2.612 TO BMP4 AREA 25 3.270 TO BMP4 AREA 100 4.392 TO BMP4 AREA 1 1.216 TO PRE AREA 2 17.022 TO PRE AREA 10 33.524 TO PRE AREA 25 44.586 TO PRE AREA 100 64.023 TO PRE AREA 1 11.888 Max Qpeak Qpeak Max WSEL Pond Storage hrs --------- cfs ft ac-ft 12.3000 -------- -------- ------------ 221.77 12.2500 351.17 12.2500 480.01 12.2500 616.36 12.1000 146.95 12.1000 22.90 12.1000 30.99 12.1000 36.53 12.1000 43.04 11.9000 14.95 12.1000 9.53 12.1000 13.62 12.1000 16.30 12.1000 19.56 11.9000 5.95 12.1000 21.04 12.1000 30.51 12.1000 36.66 12.1000 44.19 11.9000 12.98 12.1000 33.18 12.1000 44.33 12.1000 52.08 12.1000 61.12 11.9000 21.88 12.3000 221.77 12.2500 351.17 12.2500 480.01 12.2500 616.36 12.1000 146.95 SIN: Bentley PondPack (10.00.027.00) 3:18 PM Bentley Systems, Inc. 5/14/2010 Type.... Master Network Summary Page 2.04 Name.... Watershed File.... K:\09\09-0050\090050-Brightwater Ph II\H-H\Pond Pack\Brightwater Biotech Park 05- MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID Type Event ac-ft Trun hrs cfs ft ac-ft - ----------- UNTREATED ------ POST ---- AREA ------ 2 ---------- 13.214 --------- 12.1000 -------- ----- -- ------------ 287.30 UNTREATED POST AREA 10 26.038 12.1000 475.08 UNTREATED POST AREA 25 34.618 12.1000 592.50 UNTREATED POST AREA 100 49.710 12.1000 747.50 UNTREATED POST AREA 1 9.236 11.9500 165.87 SIN: Bentley PondPack (10.00.027.00) 3:18 PM Bentley Systems, Inc. 5/14/2010 r BRIGHTWATER SCIENCE AND TECHNOLOGY PARK STORMWATER MANAGEMENT REPORT HARNETT COUNTY, NORTH CAROLINA MASTER PLAN BMP SIZING CALCULATIONS Brightwater Science and Technology Park Stormwater Management Report W&R Project 2090050 March 2010 BRIGHTWATER BIOTECH PARK 2090050.00 HARNETT COUNTY, NORTH CAROLINA MASTER PLAN BMP SIZING REQUIREMENTS DA TOTAL DA (AC) ESTIMATED IMPERVIOUS (AC) SURFACE AREA REQUIRED (SF) WQV REQUIRED (CF) IMP % T1 10.01 5.02 11,509 23414 50.1 T2 7.44 4.01 7,106 14451 53.9 T3 19.83 11.38 19,964 40778 57.4 T4 8.52 4.43 7,897 16019 52.0 01 5.67 3.10 2,823 5783 54.7 02 4.13 2.41 4,257 8552 58.4 03 7.37 3.87 6,887 13981 52.5 R1 6.45 3.79 6,625 13553 58.8 R3 4.08 1.94 3,517 7079 47.5 RW4 2.78 1.09 2,058 4066 39.2 RW5 2.58 0.88 1,686 3343 34.1 HHS 20.09 - - - - Project Name: Brightwater Biotech Park City/State: Lillington, NC Project #: 2090050 Date: 9-J u I-10 Table 10-1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant Removal Efficiency in the Moutains and Piedmont % Impervious Permanent Pool Dept h (feet) Cover 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Source: NCDENR/DWQ Stormwater Best Management Practices, pg. 10-9, July 2007 STORMWATER BMP T1 Land Use Area (ac) % IA Imp. Area (ac) Impervious 6.5 100 6.5 Open Space 5.5 0 0.0 Totals 12 6.5 Total % Impervious Surface Area = 54.2 % Surface Area of Permanent Pool: Assumed depth = 3 feet SA/DA ratio = 2.20 % From Table 10-1 Minimum pond surface area (SA) _ (DA * SA/DA ratio)/100 SA = y q.64 acres 11509 sq.ft. Normal pool elevation = 0.0 feet Surface area provided = 0.000 acres 0 sq. ft. 1-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(1) where, Rv = Runoff coefficient, in./in. I = Percent impervious Rv = 0.54 in./in. Total runoff volume from 1-inch precipitation: Runoff volume, S = (Design rainfall) (Rv) (Drainage Area) S = 0.53rl.' acre-ft 23414 cu. ft. Water quality pool elevation = 0.00 feet Storage volume provided = 0.000 acre-ft 0 cu. ft. 0. , Project Name: Brightwater Biotech Park City/State: Lillington, NC Project #: 2090050 Date: 9-j u I-10 Table 10-1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant Removal Efficiency in the Moutains and Piedmont % Impervious Permanent Pool Depth (feet) Cover 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Source: NCUtNK/UWQ Normwater Best Management Practices, pg. 10-9, July 2007 STORMWATER BMP T2 Land Use Area (ac) % IA Imp. Area (ac) Impervious 4.01 100 4.0 Open Space 3.43 0 0.0 Totals 7.44 4.0 Total % Impervious Surface Area = 53.9 % Surface Area of Permanent Pool: Assumed depth = 3 feet SA/DA ratio = 2.19 % From Table 10-1 Minimum pond surface area (SA) = (DA * SA/DA ratio)/100 SA = X00 acres 7106 sq. ft. Normal pool elevation = 0.0 feet Surface area provided = 0.000 acres 0 sq. ft. 1-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(1) where, Rv = Runoff coefficient, in./in. I = Percent impervious Rv = 0.54 in./in. Total runoff volume from 1-inch precipitation: Runoff volume, S = (Design rainfall) (Rv) (Drainage Area) S = 0232 acre-ft 14451 cu. ft. Water quality pool elevation = 0.00 feet Storage volume provided = 0.000 acre-ft 0 cu. ft. Project Name: Brightwater Biotech Park City/State: Lillington, NC Project #: 2090050 Date: 9-Ju I-10 Table 10-1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant Removal Efficient in the Moutains and Piedmont % Impervious Permanent Pool Depth (feet) Cover 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Source: NCDENR/DWQ Stormwater Best Management Practices, pg. 10-9, July 2007 STORMWATER BMP T3 Land Use Area (ac) % IA Imp. Area (ac) Impervious 11.38 100 11.4 Open Space 8.45 0 0.0 Totals 19.83 11.4 Total % Impervious Surface Area = 57.4 % Surface Area of Permanent Pool: Assumed depth = 3 feet SA/DA ratio = 2.31 % From Table 10-1 Minimum pond surface area (SA) = (DA * SA/DA ratio)/100 SA = 9.458 acres 19964 sq.ft. Normal pool elevation = 0.0 feet Surface area provided = 0.000 acres 0 sq. ft. 1-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(1) where, Rv = Runoff coefficient, in./in. I = Percent impervious Rv = 0.57 in./in. Total runoff volume from 1-inch precipitation: Runoff volume. S = (Design rainfall) (Rv) (Drainage Area) S = 0.9:36, acre-ft 40778 cu. ft. Water quality pool elevation = 0.00 feet Storage volume provided = 0.000 acre-ft 0 cu. ft. 4 11 Project Name: Brightwater Biotech Park City/State: Lillington, NC Project #: 2090050 Date: 9-)ul-10 Table 10-1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant Removal Efficient in the Moutains and Piedmont % Impervious Permanent Pool Depth (feet) Cover 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Source: NCDENR/DWQ Stormwater Best Management Practices, pg. 10-9, July 2007 STORMWATER BMP T4 Land Use Area (ac) % IA Imp. Area (ac) Impervious 4.43 100 4.4 Open Space 4.09 0 0.0 Totals 8.52 4.4 Total % Impervious Surface Area = 52.0 % Surface Area of Permanent Pool: Assumed depth = 3 feet SA/DA ratio = 2.13 % from Table 10-1 Minimum pond surface area (SA) _ (DA * SA/DA ratio)/100 SA = 010 acres 7897 sq. ft. Normal pool elevation = 0.0 feet Surface area provided = 0.000 acres 0 sq. ft. 1-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(p where, Rv = Runoff coefficient, in./in. I = Percent impervious Rv = 0.52 in./in. Total runoff volume from 1-inch precipitation: Runoff volume, S = (Design rainfall) (Rv) (Drainage Area) S = '' .036 acre-ft 16019 cu. ft. Water quality pool elevation= 0.00 feet Storage volume provided = 0.000 acre-ft 0 cu. ft. r , Proiect Name: Brightwater Biotech Park City/State: Lillington, NC Project #: 2090050 Date: 9-jut-10 Table 10-1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant Removal Efficiency in the Moutains and Piedmont % Impervious Permanent Pool Depth (feet) Cover 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Source: NCDENR/DWQ stormwater best management rracaces, pg. w-1), jury zuui STORMWATER BMP 01 Land Use Area (ac) % IA Imp. Area (ac) Impervious 1.62 100 1.6 Open Space 1.08 0 0.0 Totals 2.7 1.6 Total % Impervious Surface Area = 60.0 % Surface Area of Permanent Pool: Assumed depth = 3 feet SA/DA ratio = 2.40 % From Table 10-1 Minimum pond surface area (SA) = (DA * SA/DA ratio)/100 SA = A.06.5 ' acres 1825 sq. ft. Normal pool elevation = 0.0 feet Surface area provided = 0.000 acres 0 sq. ft. 1-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler 0987) Rv = 0.05 + 0.009() where, Rv = Runoff coefficient, in./in. I = Percent impervious Rv - 0.59 in./in. Total runoff volume from 1-inch precipitation: Runoff volume. S = (Design rainfall) (Rv) (Drainage Area) S = fl.433 .',acre-ft 5783 . cu. ft. Water quality pool elevation = 0.00 feet Storage volume provided = 0.000 acre-ft 0 cu. ft. I I I Project Name: Brightwater Biotech Park City/State: Lillington, NC Proiect #: 2090050 Date: 9-Jul-10 Table 10-1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant Removal Efficiency in the Moutains and Piedmont 1716 Impervious Permanent Pool Dept h (feet) Cover 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Source: NCDENR/DWQ Stormwater best Management rracuces, pg. iu-9, twy euui STORMWATER BMP 03 Land Use Area (ac) % IA Imp. Area (ac) Impervious 3.87 100 3.9 Open Space 3.5 0 0.0 Totals 7.37 3.9 Total % Impervious Surface Area = 52.5 °% Surface Area of Permanent Pool: Assumed depth = 3 feet SA/DA ratio = 2.15 % From Table 10-1 Minimum pond surface area (SA) _ (DA * SA/DA ratio)/100 SA .158 acres 6887 sq. ft. Normal pool elevation = 0.0 feet Surface area provided = 0.000 acres 0 sq. ft. 1-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler 0 987) Rv = 0.05 + 0.009() where, Rv = Runoff coefficient, in./in. I = Percent impervious Rv - 0.52 in./in. Total runoff volume from 1-inch precipitation: Runoff volume, S = (Design rainfall) (Rv) (Drainage Area) S = 0`32 acre-ft 13981 cu. ft. Water quality pool elevation = 0.00 feet Storage volume provided = 0.000 acre-ft 0 cu. ft. Project Name: Brightwater Biotech Park City/State: Lillington, NC Project #: 2090050 Date: 9-Jul-10 Table 10-1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant Removal Efficient in the Moutains and Piedmont % Impervious Permanent Pool Dept h (feet) Cover 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Source: NCDENR/DWQ Stormwater Best Management Practices, pg. 1 U-9, July 2uul STORMWATER BMP R1 Land Use Area (ac) % IA Imp. Area (ac) Impervious 3.79 100 3.8 Open Space 2.66 0 0.0 Totals 6.45 3.8 Total % Impervious Surface Area = 58.8 % Surface Area of Permanent Pool: Assumed depth = 3 feet SA/DA ratio = 2.36 % From Table 10-1 Minimum pond surface area (SA) = (DA * SA/DA ratio)/100 SA = ;0.152, acres 6625 sq. ft. Normal pool elevation = 0.0 feet Surface area provided = 0.000 acres 0 sq. ft. 1-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(1) where, Rv = Runoff coefficient, in./in. I = Percent impervious Rv = 0.58 in./in. Total runoff volume from 1-inch precipitation: Runoff volume, S = (Design rainfall) (Rv) (Drainage Area) S = " 0.311 ' acre-ft 13553 cu. ft. Water quality pool elevation = 0.00 feet Storage volume provided = 0.000 acre-ft 0 cu. ft. Project Name: Brightwater Biotech Park City/State: Lillington, NC Project #: 2090050 Date: 9-)ul-10 Table 10-1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant Removal Efficient in the Moutains and Piedmont 7/6 Impervious Permanent Pool Dept h (feet) Cover 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Source: NCDENR/DWQ btormwater tsest management rracuces, pg. i u-7, luiy zuui STORMWATER BMP R3 Land Use Area (ac) % IA Imp. Area (ac) Impervious 1.94 100 1.9 Open Space 2.14 0 0.0 Totals 4.08 22? -7 1.9 Total % Impervious Surface Area = 47.5 % Surface Area of Permanent Pool: Assumed depth = 3 feet SA/DA ratio = 1.98 % From Table 10-1 Minimum pond surface area (SA) _ (DA * SA/DA ratio)/100 SA 16.001' acres 3517 sq. ft. Normal pool elevation = 0.0 feet Surface area provided = 0.000 acres 0 sq. ft. 1-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009() where, Rv = Runoff coefficient, in./in. I = Percent impervious Rv = 0.48 in./in. Total runoff volume from 1-inch precipitation: Runoff volume, S = (Design rainfall) (Rv) (Drainage Area) S = 0.163 acre-ft 7079 cu. ft. Water quality pool elevation= 0.00 feet Storage volume provided = 0.000 acre-ft 0 cu. ft. 1 0 . . 0 Project Name: Brightwater Biotech Park City/State: Lillington, NC Project #: 2090050 Date: 9-Jul-10 Table 10-1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant Removal Efficient in the Moutains and Piedmont % Impervious Permanent Pool Depth (feet) Cover 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Source: NCDENR/DWQ Stormwater Best Management Practices, pg. 10-9, July 2007 STORMWATER BMP RW4 Land Use Area (ac) % IA Imp. Area (ac) Impervious 1.09 100 1.1 Open Space 1.69 0 0.0 Totals 2.78 1.1 Total % Impervious Surface Area = 39.2 % Surface Area of Permanent Pool: Assumed depth = 3 feet SA/DA ratio = 1.70 % From Table 10-1 Minimum pond surface area (SA) = (DA * SA/DA ratio)/100 SA = 0.047 acres 2u?8 sq. ft. Normal pool elevation = 0.0 feet Surface area provided = 0.000 acres 0 sq. ft. 1-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(1) where, Rv = Runoff coefficient, in./in. I = Percent impervious Rv = 0.40 in./in. Total runoff volume from 1-inch precipitation: Runoff volume, S = (Design rainfall) (Rv) (Drainage Area) S = 0.093 acre-ft 4066 cu.ft. Water quality pool elevation= 0.00 feet Storage volume provided = 0.000 acre-ft 0 cu. ft. 0 " 0 Project Name: Brightwater Biotech Park City/State: Lillington, NC Project #: 2090050 Date: 9-Ju I-10 Table 10-1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant Removal Efficiency in the Moutains and Piedmont % Impervious Permanent Pool Dept h (feet) Cover 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Source: NCDENR/DWQ Stormwater Best Management Practices, pg. 10.9, July 2007 STORMWATER BMP RW5 Land Use Area (ac) % IA Imp. Area (ac) Impervious 0.88 100 0.9 Open Space 1.7 0 0.0 Totals 2.58 0.9 Total % Impervious Surface Area = 34.1 % Surface Area of Permanent Pool: Assumed depth = 3 feet SA/DA ratio = 1.50 % From Table 10-1 Minimum pond surface area (SA) _ (DA * SA/DA ratio)/100 SA = 0.09 acres 1686 sq. ft. Normal pool elevation = 0.0 feet Surface area provided = 0.000 acres 0 sq. ft. 1-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(1) where, Rv = Runoff coefficient, in./in. I = Percent impervious Rv = 0.36 in./in. Total runoff volume from 1-inch precipitation: Runoff volume. S = (Design rainfall) (Rv) (Drainage Area) S = O.Oir acre-ft 3343 cu. ft. Water quality pool elevation = 0.00 feet Storage volume provided = 0.000 acre-ft 0 cu. ft. Permit Number: (to be provided b DWQ) Drainage Area Number: -V_ Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ? does X does not This system (check one): ? does does not incorporate a vegetated filter at the outlet. incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/ debris is resent. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximate) six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: /A P 1 BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: R P I BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. (if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads_ feet in the main pond, the sediment shall be removed. When the permanent pool depth reads feet in the forebay, the sediment shall be removed. Sediment Removal Bottom BASIN DIAGRAM ill in the blanks) 0 Permanent Pool Elevation . 5 v .?j Pe anen Pool , ?,?• ?-v - - - - - - - - - - - - - - Volume Sediment Removal Elevation ?S -ft Min. ----------------------------------------- -? 162.So Sediment Bottom Elevation Storage FOREBAY MAIN POND Volume ------I 1-ft Storage Form SW401-Wet Detention Bain O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: 1, r tw0.?t?- Sc;Qh GQ ?-?2chino?o qy Pac BMP drainage area number: Print name: Title: Address: Phone: Signature: Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, a Notary Public for the State of , County of , do hereby certify that personally appeared before me this day of , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 Permit Number: (to be provided b DWQ) Drainage Area Number: /U\ Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ? does [does not This system (check one): ? does N does not incorporate a vegetated filter at the outlet. incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will rentediate the problem: The entire BMP Trash/ debris is resent. Remove the trash/ debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Forn1 SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: V_'A P 2 BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: 19 Ae 2. BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. (if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads feet in the main pond, the sediment shall be removed. When the permanent pool depth reads IS feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation' •V? Sediment Removal ?sg l ----------------- ? 1577 t efrnanen Pool /Volume Sediment Removal Elevation ?, - Volume -ft Min. ---------------- Sediment Bottom Elevation ?? 1-ft r. Storage Sedimei Bottom FOREBAY Form SW401-Wet Detention Basin O&M-Rev.4 MAIN POND Page 3 of 4 Storage Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: R., f 1,? "?t'r S C',-2hGQ'aC? T`2C?V\0 I o,?,y P?f r? BMP drainage area number: 3A f - 2-Print name: Title: Address: Phone: Signature:- Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, day of a Notary Public for the State of County of , do hereby certify that personally appeared before me this _ and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 Of 4 Permit Number: (to be provided b DWQ) Drainage Area Number: ??_?- Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ? does X does not This syst (check one): ? does does not incorporate a vegetated filter at the outlet. incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/ debris is resent. Remove the trash/ debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of 101 18. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: 5 P 3 BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided b DWQ) Drainage Area Number: /A BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. (if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads ?t feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 3'S feet in the forebay, the sediment shall be removed. Sediment Removal Bottom BASIN DIAGRAM (fill in the blanks) 0 Permanent Pool Elevation Pe anen Pool L - - - - - - - - - - Volume Sediment Removal Elevation 12 Volume -ft Min. -----------------------------? ----------- Sediment Bottom Elevation 1-ft n Storage Sedimei Storage FOREBAY MAIN POND Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the syst1emL or prior to any changes to the system or responsible party. Project name: ?? t ??` oA-? f c%k),1tA_4 T2cann? o ?t ??' BMP drainage area number: I?A`p Print name: Title: Address: Phone: Signature:- Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, a Notary Public for the State of County of , do hereby certify that personally appeared before me this _ day of , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires Forth SW401-Wet Detention Basel O&M-Rev.4 Page 4 of 4 Permit Number: (to be provided b DWQ) Drainage Area Number: /A ? L4 Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system check one): ? does C9 does not This system check one): ? does 7 does not incorporate a vegetated filter at the outlet. incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/ debris is resent. Remove the trash/ debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: L BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be prov'ded by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. (if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads - I feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 3 • 's feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation I ST. S Sediment Removal 7 ? 11 ,may------I e}hnanen Pool ?.- - Volume Sediment Removal Elevation Volume -ft Min. ---- ---------------------------------------- Sediment Bottom Elevation 53.E 1-ft r. Storage Sedimei Bottom FOREBAY Form SW401-Wet Detention Basin O&M-Rev.4 MAIN POND Page 3 of 4 Storage Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: BMP drainage area number: Print name: Title: Address: Phone: Signature:_ Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, a Notary Public for the State of , County of , do hereby certify that day of personally appeared before me this _ and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4