Loading...
HomeMy WebLinkAbout20201780 Ver 1_Riparian Buffer Authorization Request_20201118Buffer Authorization Application Form 15ANCAC 02B .0233 (8)(b), .0243 (8)(b), .0250 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) Buffer Authorization Online Fo Update 10/23/2018 Original Submittal 11/18/2020 A. Owner/Applicant Information General Information Primary Contact Email: * Who is submitting the application?* 1. Property Owner Information: la. Name on Recorded Deed:* 1b. Responsible Party: 1c. Mailing Address:* 1d. Telephone:* 713-303-7568 3. Agent Information: 3a. Name: 3b. Company Affiliation: 3c. Mailing Address: chris.love@ncagr.gov Rease list the contact person's en -ail for questions or payrrent on this project if needed. r- Owner r- Applicant other than Owner W Agent Jerry Martin (for Corporations) Street Address 4813 Oakwealth Dr Address Line 2 aty State / Province / Region Fuquay Varina NC Rzstal / Zip Code Country 27526 USA le. Email Address:* jerrydmartin64@hotmail.com Street Address Address Line 2 aty State / Province / Region Postal / Zip Code Country 3d. Telephone: 3e. Email Address: 3f. Attach a signed and dated copy of the agent Click the upload button or drag and drop files hereto attach docurrent authorization form. R7FCnly B. Project Information and Prior Project History .... ...... ..... ...... ...... ...... ............ 1. Project Information .................................................................................................................................................................................................................................................................................................................................. 1 a. Name of Project: * Martin Grade Stabilization (Subdivision, facility, or establishrrent narre) 1b. Is this a publicly -funded transportation project?* r Yes r No 1d. Subdivision Name: Sunset Lake Subdivision le. Nearest Municipality: 1f. Property Size Fuquay Varina 1.77 acres 1g. County (or Counties) where the project is located:* 1 h. Property ID# Date of Purchase 0668272218 12/12/2016 Tax RN or Parcel id 1 i. Deed Information Type of Book Book# Page# -11 Deed 016634 F 78 Map 11 IF 1j. Attach a copy of the recorded map that indicates when the lot was last platted. Click the upload button or drag and drop files here to attach docurrent FDF only 1k. How would you like to provide the Latitude and Longitude information?* r Address Lookup r Manually Latitude * 35.6382391 Longitude*-78.7908728 11. Is the project located in any of North Carolina's twenty coastal counties?* r Yes r No 2. Surface Waters 2a. Name of the nearest body of water to proposed project:* Unnamed tributary to Middle Creek (Sunset Lake) 2b. Water Quality Classification of nearest receiving water:* 2c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:* 300 (linear feet only) i 3. Project Description: ................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: An eroded gully has formed where surface water runs off of the road and down a steep bank on the property to the unnamed stream. The land use is existing residential. 3b. Attach an 8 % x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site. Click the upload button or drag and drop files here to attach docurrent FDF only 3c. Attach an 8 % x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site. dick the upload button or drag and drop files here to attach docurrent FDF only 4. Proposed Activity Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used: Fill in the eroded gully and install a catch basin and HDPE pipe to move water flow to bottom of slope. The pipe will outlet into a preformed scour hole at bottom of slope approximately 35' from top bank of stream. A backhoe will be required to install the pipe and catch basin, and a small compactor will be needed to compact the soil after installation. The link to instructions for whats needed in site plans is broken so let me know if anything needs to be added to site plan. Attach a site plan as applicable to the project: Click the upload button or drag and drop files here to attach docurrent FDF only 5. Jurisdictional Determinations 5a. Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this property/project (including all prior phases) in the past?* f Yes r No 6. Project History ...................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* r Yes r No 7. Future Project Plans 7a. Is this project a phased project?* r Yes r No C. Proposed Impacts Inventory Buffer Impacts Project is in which protected Basin?* r Neuse River Basin (15A NCAC 02B.0233) r Catawba River Basin (15A NCAC 02B.0243) r Randleman Lake Watershed (15A NCAC 02B.0250) r Tar -Pamlico River Basin (15A NCAC 02B.0259) r .Jordan Lake Watershed (15A NCAC 02B.0267) r Goose Creek Watershed (15A NCAC 02B.0606 & 15A NCAC 02B.0607) Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Site# - Reason Stream Name Buffer Impact* Impact Type * Zone 1 Zone 2 Martin1 Unnamed Permanent Allowable 0.00 200.00 lVbp label (e.g. Fbad (P) Square Square Crossing 1) F@rmorTenp Feet Feet Total Zone 1 Impacts: 0.00 Total Zone 2 Impacts: 200.00 Total Buffer Impacts: 200.00 Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project.* Project will protect downstream waters from continued erosion that is occurring in the gully. Project has been designed to have the preformed scour hole built as far from the stream edge as possible. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. The smallest possible equipment will be used during construction. Any disturbed area besides the scour hole will be immediately reseeded. E. Diffuse Flow Plan la. What type of SCM are you providing?* G Level Spreader 17 Vegetated Conveyance (lower SHWT) r Wetland Swale (higher SHWT) r Proposed project will not create concentrated stormwater flow through the buffer rJ Other SCM that removed minimum of 30% nitrogen 1b. Describe how diffuse flow will be maintained:* Project will utilize a preformed scour hole as described in the NCDOT Stormwater Best Management Practices Toolbox The preformed scour hole will be built where the ground levels out so that diffuse flow along the edges of the basin can be maintained. 1 c. Diffuse Flow Documentation* (lick the upload button or drag and drop files here to attach docunent Preformed ScourHoleChecklist.pdf 712.8KB FDF only F. Supplementary Information Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? G Yes r No A 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPAISEPA)? t Yes r No Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? r' (-- No 2b. Is this an after -the -fact buffer authorization application? r^ Yes r No G. Additional Information Please upload any additional information you would like the Division to consider during application review. Additional Attachments: Click the upload button or drag and drop files here to attach docurrent FDF only Additional Comments: H. Sign and Submit By digitally signing below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act') o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the application form." Print Name:* Chris Love Signature Submission Date: (Auto populated field) N Initial Review Is this accepted into the review process?* Is this project a public transportation project?* ID#* Version:* Select Reviewer: Select Reviewing Office* Has payment been received?* O Yes O No O Yes O No 20201780 1 Stephanie Goss:eads\szgoss Raleigh Regional Office - (919) 791-4200 C No Payment Needed r Fee Received r Need Fee - send electronic notification North Carolina Department of Transportation Highway Stormwater Program PREFORMED SCOUR HOLE CHECKLIST Page 1 of 1 Project: TIP No: Prepared by: Date: Checked by: Date: NCDOT Division: River Basin: City: NCDWR Stream Classification County: Primary: CAMA County: Yes No Supplemental: 303(d) Stream: Yes No Buffer Required: Yes No PROJECT DESCRIPTION Check the correct response. Yes No Not Applicable Comments/Design Assumptions 1 Was a field visit made for the proposed preformed scour hole site/location? 2 Was the preformed scour hole positioned outside the roadway clear recovery zone? 3 Were off-site drainage areas verified and accommodated? 4 Were adequate ingress and egress for maintenance provided within right-of-way? 5 Were different preformed scour hole locations and orientations considered to optimize water quality benefits? Explain. 6 Was topography downgrade of the preformed scour hole reviewed for ability to diffuse flow? 7 Is the PSRM apron shown on the plans flush with the natural ground? 8 Is the discharge pipe an allowable size for use with a preformed scour hole (15 in. or 18 in.)? 9 Have maximum allowable discharges based on the Q 10 discharge been verified? 10 Were all design assumptions documented? Martin Grade Stabilization Chris Love 11/18/20 NA Fuquay Varina Wake B NSW x x x x x x x 18 in pipe Not a DOT project x Not a DOT project x x