HomeMy WebLinkAbout20100293 Ver 1_More Info Letter_20100621Dennison, Laurie
From: Johnson, Alan
Sent: Monday, June 21, 2010 2:12 PM
To: Dennison, Laurie
Subject: RE: Tracking/Tardy 6/18/10 - 7/16/10
It was sent via email ...so there is no letter ...for minor things I try to just email to the applicant.... it keeps it simple and
usually they reply within the required time frame.
From: Dennison, Laurie
Sent: Monday, June 21, 2010 12:53 PM
To: Johnson, Alan; Mcmillan, Ian
Subject: RE: Tracking/Tardy 6/18/10 - 7/16/10
Alan - we don't have a copy of the hold letter here in central. What date did you write the letter? BIMS wasn't updated
either - hence it being on tracking tardy.
Laurie
From: Johnson, Alan
Sent: Monday, June 21, 2010 9:26 AM
To: Mcmillan, Ian
Cc: Dennison, Laurie
Subject: RE: Tracking/Tardy 6/18/10 - 7/16/10
10-0293, Hovey-is a shoreline stabilization, after the fact, it is on hold....
From: Mcmillan, Ian [mailto:ian.mcmillan@ncdenr.gov]
Sent: Friday, June 18, 2010 3:04 PM
To: Al Hodge; Alan Johnson; Scarbraugh, Anthony; Belinda Henson; Chad Coburn; Chad Turlington; Chapman, Amy;
Chris Pullinger; Chuck Cranford; Danny Smith; Joanne Steenhuis; Karoly, Cyndi; Kevin Barnett; Krebs, Rob; Gilleski, Lia;
Linda Wiggs; Matt Matthews; Mcmillan, Ian; Rick Shiver; Roberto Scheller; Steve Tedder; Sue Homewood; Wilson, Susan
A
Subject: Tracking/Tardy 6/18/10 - 7/16/10
Please advise if there is info I need related to any of these projects or if there are any mistakes, and please let me
know if you have not received any particular project so I can fax/mail that to you. Please check to see ifs
have received all projects on this list and let me know if there are any you have not received. Please NOTE:
The projects highlighted in yellow on the list below which are past the statutory date are included on the list
because I do not have hard copy additional information in the file to move the statutory date forward or
confirmation in BIMS that the project has been issued.
* Mooresville:
Tracking:
10-0329, Itusi Trail Project Lake Norman State Park, Iredell Co, NW42 5/11/10 to 7/10/10
Tardy: _
10-0293, George Hover, Jr., Lot 13, Mecklenburg Co, GP30 4/20/10 to 6/19/10
*Asheville
Tracking:
None
Tardy;
None
Washington
Tracking:
09-1264, Ver. 2, Margarette Laughinghouse Driveway Access, Beaufort Co., CAMA 5/12/10 to 7/11/10
10-0366, Kiernan: Lot 25, Section 7, Phase 2, Currituck Co., NW18 5/13/10 to 7/12/10
10-0368, Estates At Carova Beach, Currituck Co., NW14 5/13/10 to 7/12/10
06-0393< Ver. 2, Donovan: Lot 10, Pamlico Co., MV 5/17/10 to 7/15/10
Tardy:
10-0043, TOAhoskie - 2009 Annexation, Hertford Co., NW12 "Courtesy Copy" 1/19/10 to 3/17/10
*Wilmington
Tracking:
10-0376, Gracelyn Park Phase IV, Carteret Co, NW18, "Courtesy Copy" 5/1710 to 7/15/10
10-0370, Ellington Farms, New Hanover Co, NW29, "Courtesy Copy" 5/14/10 to 7/13/10
10-0426, Leonard B. King, New Hanover Co, CAMA EXP 6/3/10 to 7/3/10
Tardy:
None
Raleigh
:Tracking:
None
Tardy:
None
*Winston-Salem
Tracking:
None
2
_Tardy:
10-0347, GTCC NW Campus Water & Sewer, Guilford Co, NW39 5/10/10 to 7/9/10
*Fayetteville
Tracking:
None
_Tardy:
None
Ian J. McMillan, PWS, GISP
NCDENR/Division of Water Quality
Acting Supervisor - 401/Wetlands Permitting and Oversight Unit
2321 Crabtree Blvd. Suite 250
Raleigh, NC 27604
Office: (919) 715-4631
Fax: (919) 733-6893
Email: ian.mcmillan(ccncdenr.eov
E-mail correspondence to and from this address may be subject to the
North Carolina Public Records Law and may be disclosed to third parties.
A PIWA
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins Dee Freeman
Governor Director Secretary
Mr. George Hovey Jr.
21104 Lakeview Circle
Cornelius, NC 28031
Subject: Shoreline Stabilization, Landscape Pan, Lake Norman
Dear Mr. Hovey:
May 25, 2010
DWQ # 10-0293
Mecklenburg County
On April 20, an after the fact application for a 401 Water Quality Certification was received for the
proposed site. The plan was reviewed. Greater clarification is required for the landscape plan, the type of
"pathway" to the shoreline, and the location of Zone 1 of the Catawba Riparian Buffer (30 ft from full pond).
The access to the lake must be pervious and the proposed plantings should be native species. At minimum
they should be low maintenance plants which require little chemical treatment (fertilization and herbicides). Be
advise that Mecklenburg County also has a buffer program.
Pursuant to 15A NCAC 2H .0507(h), please be advised that this project will be placed on hold. Failure
to submit the requested information by July 15, 2010 may result in the application being withdrawn from
consideration. You may reapply, but a new fee and application will be required. In addition, this office is
requesting that the Army Corps of Engineers withhold processing the 404 permit until the requested
information is provided. If you have any questions, please contact me at (704) 663-1699.
Sincerely,
Alan D. Johnson
Surface Water Protection
Sr. Env. Specialist
cc: US Army Corps of Engineers
Duke Power Lake Mgt.
Mooresville Regional Office
Location: 610 East Center Avenue, Suite 301, Mooresville, NC 28115
Phone: (704) 663-1699\Fax: (704) 663-6040\ Customer Service: 1-877-623-6748
Internet: http://Portal.ncdenr.org/web/wa
NorthCarolina
;Vatma!!y
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper