HomeMy WebLinkAbout20201768 Ver 1_Meeting Request Review_20201117 tie R•.'.
DWR Pre-Filing Meeting Request Form
NORTH CAROLINA
EnYlmnal2nlrtl Qua fay
ID#* 20201768 Version* 1
Regional Office* Central Office-(919)707-9000
Reviewer List* Rob Ridings
Pre-Filing Meeting Request submitted 11/17/2020
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Contact Name* William Wescott
Contact Email Address* wescottenvironmentalservices@gmail.com
Project Name* Absher Road Extension
Project Owner* Eastfield Associates, LLC
Project County* Johnston
Owner Address: Street Address
111 West Oak Street
Address Line 2
City State/Rovince/Region
Selma North Carolina
Fbstal/Zip Code Country
27576 USA
Is this a transportation project?* r Yes r No
Type(s)of approval sought from the DWR:
rJ 401 Water Quality Certification- I— 401 Water Quality Certification-
Regular Express
• Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Rob Ridings
Please give a brief project description below.*
The applicant will apply for a nationwide permit#14.This is not a NCDOT
project.This is a road proposed by a property owner.The proposed
project will improve traffic movement between US70 Alt, US70, and existing
/future commercial businesses.Wetlands have been verified by the
USACE.The proposed project impacts 0.001 acre(56 square feet)of
wetlands.The road design was changed several times to minimize wetland
impacts. Clearing and ground disturbing activities will be limited to the
minimum needed to construct the project.All sedimentation and erosion
control measures standard for road construction will be utilized and
maintained throughout the construction of the project.Wetlands will be
clearly marked to avoid inadvertent unauthorized impacts during
construction.There will also be periodic monitoring of construction
conditions by qualified individuals to ensure that work is progressing in
accordance to the established plan.
Please give a couple of dates you are available for a meeting.
12/2/2020
12/9/2020
Please attach the documentation you would like to have the meeting about.
Wetlands Area 8 Impact Exhibit 201104.pdf 259.17KB
NCDWR-soil-topo-aerial.pdf 150.75KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an
application.
Signature r
Submittal Date 11/17/2020
Reviewer Meeting Request Decision
Has a meeting been scheduled?* ( Yes C No