Loading...
HomeMy WebLinkAbout20140762 Ver 5_November inspection_20201118 Wetland Inspection Report Project Num: 20140762 Version: 5 Status: Issued Project Name: NCDOT-US 221 (R-2915E) Project Type: Road/Highway Widening County: Watauga Region: Winston-Salem Location: NCDOT-US 221 (R-2915E) Latitude• +350 16' 05" Longitude: -81' 30' 10" SW Plan Location: Site Owner Name: NC DOT PDEA Inspection Date: 11/17/2020 Reason for Inspection: Routine Inspection Type: Site Inspection(DOT) Inspection Contact Person: Title: Phone: On-Site Representative(s): Primary Inspector: Dave Wanucha Phone: 336-776-9703 Secondary Inspector(s): Facility Compliance Status: 0 Compliant ❑ Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: Permit(401 WQC) Inspection Summary: page 1 Site Number: 20140762 Owner: Thorpe,Greizory Inspection Date: 11/17/2020 Inspection Type: Site Inspection(DOT) Reason for Visit: Routine Permit(401 WOO Yes No NA NE Does the impact(s)match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Are the culverts and/or filled areas installed properly? 0 ❑ ❑ ❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Comment: I reviewed Sites 1A,2, 9, 17, 18 of B Section and Sites 24, 23, 17, 16, 14, 11, 5,and 4 of the A Section with DEO and other DOT staff. All sites were built to plans and functioning except for Site 16 outlet. A recent storm blew out the ripraaplaced in the outlet ditch. The riprap was within the mainstem. We agreed that DOT would make repairs by reestablishing the bank stabilization permitted impacts with existing rip rap,lying into the stream bank and matching elevation of aggradational bar that was forming downstream. page 2