Loading...
HomeMy WebLinkAbout090107_Certificate of Coverage_20101018 ROYGovernCOOPER or :_,,,,,c;:,_._.s.T.,ATE..._.m..;:itt46,i,.s. °_ V O 0 3 ti'U;, MICHAEL S.REGAN N.n Secretary 8*016w010 VV} t! Ros LINDA CULPEPPER NORTH CAROLINA r�k,r:,..TRIiI,I ^� Director Environmental Quality -}-^t Y^ 1".1.c-1n lal OFFICE October 18, 2019 W Robert Livingston Turnbull Company Farms, LLC 2019 Dowd Dairy Rd White Oak,NC 28399 Subject: Sludge Survey Testing Dates Certificate of Coverage No. AWS090107 Turnbull Company Farms, LLC Animal Waste Management System Bladen County Dear W Robert Livingston: The Division of Water Resources (Division)received your sludge survey information on September 20,2019. With the survey results, you requested an extension of the sludge survey requirement for Lagoon `2 - east' at the Turnbull Company Farms, LLC facility. Due to the amount of treatment volume available, and the rate of sludge accumulation for the lagoon, the Division agrees that a sludge survey is not needed until December 31,2024. The next sludge survey for Lagoon `2 east' at Turnbull Company Farms, LLC should be performed before December 31, 2024. Please retain this letter and keep it with your farm records for reference. Please call me at(919) 707-3705 if you have any questions. Sincerely, 722171ZV Heath C. Robinson Animal Feeding Operations Program cc: Fayetteville Regional Office, Water Quality Regional Operations Section Permit File AWS090107 Non of onmn Q II n ... �,� 512 NorthrthCaroli SalisaburyDepartment Street 1.1636Envir Mail Serviceetal Centeruality RaleiyDivisioh.NorthofWater CarolinaResources 27699 1636 .......: _or 919.707.9000 • - A Sludge Survey Evaluation Form Today's Date 10/18/2019 Facility# 090107 Owner: Robert Livingston Lagoon ID 2 East Sludge Survey Received: 9/20/2019 Sludge Survey Performed: 12/27/2018 Sludge Depth(Row 0): (ft) 1.8 Existing Treatment Depth(Row P): (ft) 4.60 Start Date: 4/26/1994 Facility age at time of survey:(yr) 25 Average Sludge Accumulation(ft/yr): 0.07 Requested Extension: (yr) 5 Requested Due Date 2024 II I Sludge Accumulation during extension period: (ft) 0.36 Treatment Depth Available after Extension:(ft) 4.24 Sludge level OK? YES Ratio Estimates Based on Depth EXISTING EXEMPTION Ratio of Sludge layer to total trmt depth 0.28 0.34 Ratio of Sludge depth OK? YES EXISTING EXEMPTION Average Sludge layer thickness(T) 1.8 2.16 Depth of the lagoon from top of bank to bottom soil surface (D) 10.7 10.7 Slope=Horizontal/vertical side slope(S) 3 3 Length at the top of inside bank(L) 269 269 Width at the top inside slope(W) 271 271 Thickness of existing liquid treatment zone(Y) 4.60 4.24 Length at midpoint of sludge layer(Lm)=L-2S(D-(T/2)) 210.20 211.29 Width at midpoint of sludge layer(Wm)=W-2S(D-(T/2)) 212.20 213.29 Volume of sludge(Vs)=Lm*Wm*T 80287.99 97551.27 Volume in gallons(Vsg)=Vs*7.481 600634.47 729683.52 Thickness of total treatment zone(Z)=T+Y 6.40 6.40 Length at midpoint of total treatment zone(Lz)=L-2(S)(D-(Z/2)) 224.00 224.00 Width at midpoint of total treatment zone(Wz)=W-2(S)(D-(ZJ2)) 226.00 226.00 Volume of total treatment zone(Vz)=Lz*Wz*Z 323993.60 323993.60 Ratio(R)of sludge layer volume to total trmt volume 0.248 0.301 Sludge Volume Ratio OK? YES Maximum extension until end of permit cycle Next survey to be done: (calendar yr) 12/31/2024 Notification letter mailed: 10/18/2019