Loading...
HomeMy WebLinkAbout090100_Structure Evaluation_20181002 6 —/7- Structure Evaluation Inspection • • Facility Number: 2- -- /ate- Date: Time in: �,•j-� Time out: // vr) Farm Name: AA--;/ 1'c Farm 911 address: Owner Name: )(-7 l 7;e Aso---- Phone Facility Contact: Onsite Representative: — Integrator: )44- Certified Operator: Cert. Number Is storage capacity less than adequate? Yes /No If yes is waste level into the structural freeboard? Yes.7 No Was non-compliant level reported to DWR POA received l Structure: 1 2 3 4 5 6 Identifier: Spillway? Designed Freeboard (in.): / Observed Freeboard (in.): 16? Are there any immediate threats to the integrity of any of tie structures observed? Yes No .,4Is,� ,, Do any structures lack adequate markers as required by the permit? Yes /No_ Does any part of the waste.management system need repair Yes No Condition of field's 917 Condition of receiving crop I Comments: /71Q3 ),P0 . tfry eS /-"fret a �� //4-1;vz-of Ad" �- �r' feu use s f' :tQ„ t� ;F h r � �`17r�r �v�i .:7_Tid I/ - ry� -- cvr Alas -✓,s' , 6; ,; - GtofSs 3 �rz-�