HomeMy WebLinkAbout20060138 Ver 3_More Info Received_20100702FW: 06-0138ver3 hornaday rd - hold letter - guilford
FW: 06-0138ver3 hornaday rd - hold letter - guilford
Homewood, Sue
Sent: Friday, July 02, 2010 1:22 PM
To: Dennison, Laurie; Strickland, Bev
Attachments: P 013.jpg (185 KB) ; P 014.jp9 (182 KB) ; P 015.jpg (218 KB)
I will consider this a response to my hold letter.
Happy 4th ladies!
Sue Homewood
NC DENR Winston-Salem Regional Office
Division of Water Quality
585 Waughtown Street
Winston-Salem, NC 27107
Voice: (336) 771-4964
FAX: (336) 771-4630
Page I of 2
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and
may be disclosed to third parties.
From: Dugal, Tre [mailto:MDUGAL@wilbursmith.com]
Sent: Thursday, July 01, 2010 7:07 PM
To: Homewood, Sue; Cordell, Thomas; Parker, Jerry A
Cc: Euliss, Amy
Subject: RE: 06-0138ver3 hornaday rd - hold letter - guilford
I visited the site and discussed the preformed scour hole with the contractor, Marvin Leatherwood of Dane
Construction. It appears that the preformed scour hole (PSH) has been installed properly and that the bridge
pier does not affect the function of this device. The contractor indicated that prior to the seed taking hold on
the downstream slope of the PSH, a rain event washed some of the bank and caused some rilling of the bank
(see P013). The contractor also indicated that the rain event was around 3" over a few hour period which is a
pretty intense storm event. The area affected was approximately 20 feet wide. Grass has begun to take but
runoff from the PSH will continue to be directed to the rill areas and not sheet flow down the banks. I
recommended that the netting be removed in the area and the bank regraded to remove the rills, reseed the
area and then covered with the net mulch. Once this is completed the flow from the PSH will sheet flow down
the bank as it should.
Please let me know if this meets your approval for the modification of the previously issued water quality
certification. If you have any questions related to this or need any other information, please contact me.
Thanks,
Tre Dugal, P.E.
Director - Civil Infrastructure
Wilbur Smith Associates
421 Fayetteville Street, Suite 1303, Raleigh, NC 27601
w: 919.755.0583 d: 919.573.4190 f: 919.832.8798
https://mail.ne. gov/owa/?ae=Item&t=IPM.Note&id=RgAAAAAAOgPoLNIPQZ06vH VRO... 7/6/2010
FW: 06-0138ver3 hornaday rd - hold letter - guilford
MDugal@WilburSmith.com
www.WilburSmith.com
Consider the planet before printing.
From: Homewood, Sue [mailto: sue. homewood@ncdenr.gov]
Sent: Tuesday, June 15, 2010 1:35 PM
To: Cordell, Thomas; Dugal, Tre; Parker, Jerry A
Cc: Euliss, Amy
Subject: 06-0138ver3 hornaday rd - hold letter - guilford
Tom/Tre,
Page 2 of 2
This is just to hold the clock until we can meet and talk it over in detail. You can respond after that meeting.
https://mail.nc.gov/owa/?ae=Item&t=IPM.Note&id=RgAAAAAAOgPoLNIPQZ06vHVRO... 7/6/2010
ri
WINE
Now
1
s AL-"
UTr u F! ;
d
i s F ,
P t t i•` k4 F , q '
r {
1
w?
i y
K&-dh.- ., __
rsr+. ?
.. A,.. , Apr 1 , t - ? -
°
tip
?? ;1 ?°74` ? •-',- r °° & i - ? •. P ?+?, ,dry ? • ? ?. y? _ - i _
? ? ?• a q?? ? ?• . ? . Tiy 9 A, ? ? ? • t '?. J i !4 -? ?
xr
.. rf'
Ilk
L?A
+ x
AoLiMM
166
`„ r Aor i !'
?y, I a
Jboef
? ? ;? ° $w ? i • ?' ? 3?„e ,? F ? , ` ?, ? i . ??`? ,;.+? i "fit:` eF?
r
- 6- - - r }r ix }}}... ?[111?i, ?' y q7 •ox,e,E e ! - g ,
V a fff T ?, ?• is x^ i
, ,` }y? ? . Ya ? L d fff ? ?? ?!?- ?. a ? P ?• ,[?4^ ? , °„ w ? •5 J
7 ? ,F
,. E d, k • ? ? ?
... 1?' -,7? ,`' `? J, to. 'i r 'ya., • ?' ..? ?dti .`s k?yi. _-^ y -q k ?,:'' ` TIP.,
Yf ?^ ` 44 ?.._? •'. a .. `A"? ?*?'? 4? t?-, r5 p?y s; ?* Gr ,.. e7 =
I
r. ' 77 'c m'.;?. 111 ? F ? ? py L ,?y, ?P.?1L _ j Ar• ?''? 1 ?.k,,[P 1
x x _
w' -
,
' d
`r, ? „? '# 'i 'k, f,, .s.`. . ? °:I ? „"r• 4.,f?•° a ?;y .. ? ?" `?y,
i , ,
?, M1 q iJ
Air
ool?
' f w
`? ? ?, Ij ?.} ? + .tae. •.
' m
? •t I
P9 e
EEO
.. . 4L }
i*?- ; r
92;'
.y
t
i
I
0
q, Wo 4, A l a„ s
a y i -04
ryw ?t ?.
3,t a' iM .