Loading...
HomeMy WebLinkAbout20100516 Ver 1_401 Application_20100610r? LILVJ I J L%WI11 a PROGRAM June 28, 2010 Amy Chapman NC Division of Water Quality 401 /Wetlands Unit 2321 Crabtree Blvd, Suite 250 Raleigh, NC 27604 RE: PCN form and construction plan sheets UT to Altamahaw, Alamance County NCEEP # 92837 Dear Amy, 201005 1 6 Q?@?adr?? JUN 3 o 2010 DENR . WATER-OUALITY WETLANDS AM STOUKA11A ISRANCN Enclosed please find two copies, one original and one photo copy, of the completed PCN form and construction plan sheets for the referenced project. The proposed construction activities include installation of a temporary construction access road through active pasture, stabilization of the existing pond emergency spillway, and construction of a modified level spreader to diffuse flow through the vegetated buffer. Sincerely, Kristie Corson NCEEP Project Manager (919) 715-1954 V-M(_1 5U.JL S Rostov... L ... Protect' OW Stag NACTA North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699-1652 / 919-715-0476 / www.nceep.net 20100516 Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ? Section 404 Permit ? Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ? Yes ? No 1d. Type(s) of approval sought from the DWQ (check all that apply): ? 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ?X Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes ?X No For the record only for Corps Permit: ? Yes ?X No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ?X No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ? Yes ?X No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ?X No 2. Project Information 2a. Name of project: UT to Altamahaw 2b. County: Alamance -m 2c. Nearest municipality / town: Elon 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information WETLANDS AND5T0RxVrATA SgMM 3a. Name(s) on Recorded Deed: Charles Hursey Sr., et al 3b. Deed Book and Page No. 1765, 523 Plat Bk 067, Pit Page 0207 3c. Responsible Party (for LLC if applicable): 3d. Street address: 2443 Barber Road 3e. City, state, zip: Elon, NC 27244 3f. Telephone no.: 336-584-1377 3g. Fax no.: NA 3h. Email address: NA Page 1 of 10 PCN Form - Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ?X Other, specify: owner of conservation easement 4b. Name: NC Ecosystem Enhancement Program 4c. Business name (if applicable): 4d. Street address: 2728 Capital Boulevard, Suite 1H 103 4e. City, state, zip: Raleigh, NC 27604 4f. Telephone no.: 919-715-1954 4g. Fax no.: 4h. Email address: kristie.corson@ncdenr.gov 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 94-9144 1 b. Site coordinates (in decimal degrees): Latitude: Longitude: 1 c. Property size: 4.63 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: UT to Altamahaw 2b. Water Quality Classification of nearest receiving water: C 2c. River basin: Cape Fear 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Active pasture. Rural residential and ag land, mostly pasture. 3b. List the total estimated acreage of all existing wetlands on the property: 0.026 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 1,477 3d. Explain the purpose of the proposed project: Provide cattle exclusionary fencing and alternative water for landowner. Plant buffer and stabilize existing emergency spillway to improve sediment con 0 3e. Describe the overall project in detail, including the type of equipment to be used: Install temporary construction access road. Shape existing emergency spillway to improve sediment control conditions. Excavator and dump trucks. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ? Yes ? No ? Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? ? Preliminary ? Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ?Yes ? No ? Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ? Yes ?X No 6b. If yes, explain. Page 3 of 10 PCN Form - Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary I a. Which sections were completed below for your project (check all that apply): ? Wetlands ? Streams -tributaries ?X Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Tem ora T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 - Choose one Choose one Yes/No W2 - Choose one Choose one Yes/No W3 - Choose one Choose one Yes/No W4 - Choose one Choose one Yes/No W5 - Choose one Choose one Yes/No - W6 - Choose one Choose one Yes/No 2g. Total Wetland Impacts: 2h. Comments: No impacts to wetlands. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 - Choose one - S2 - Choose one - S3 Choose one - S4 - Choose one - S5 Choose one S6 - Choose one 3h. Total stream and tributary impacts 3i. Comments: No impacts to streams. Page 4 of 10 PCN Form - Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individual) list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 Choose one Choose 02 Choose one Choose 03 Choose one Choose 04 Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? F] Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ? Neuse E] Tar-Pamlico ? Catawba ? Randleman ?X Other:Jordan Lake 6b. Buffer Impact number - Permanent (P) or -Temporary T 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet 6g. Zone 2 impact (square feet B1 T reshaping existing spillway UT to Altamahaw No 300 300 B2 Yes/No B3 Yes/No B4 - Yes/No B5 - Yes/No B6 Yes/No 6h. Total Buffer Impacts: 300 300 6i. Comments: The proposed construction activities occur on an existing spillway, void of vegetation, i 01 b C_ Axo&? kcl i xA SPrcc_'t'Q, 1(2 V0Li0-' OX 4 buM' L"o occU' . 1n Win-ke,.. Z010 12.utl . Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. % 110 QWA4-\ OOM S (),- std -?O C X`Gi nr etc c>- v--T-4 tmd aua . (`ta '?r-pack S -k-n v(%A-64C c+N "k( n c-C LA.A. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. C ass f rv'(_;c,-\' en c? ? pmant wit i w? x h4.s?-Q road a nCC SeC, ,,,t exams: ?? Cowl trecouj,&S C s, it Rnc?)l( ernpl??ed . 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes gNo 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, w hich mitigation option will be used for this project? ? Mitigation bank ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Makin a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form - Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? Yes No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified d Yes ? No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ? Yes E] No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 2b. Does this project require a Stormwater Management Plan? ? Yes No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why : ( QL? t?CQ?uc1 S ??*`n C (1?!`EY?C9 (fin E ?n_5-t+?c,.- CYO 5? ?'Zc ?-+ 1 rViNt?Tel?cBn 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review NA 3a. In which local government's jurisdiction is this project? ? Phase II 3b. Which of the following locally-implemented stormwater management programs [] NSW ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review []Coastal counties []HQW 4a. Which of the following state-implemented stormwater management programs apply ?ORW (check all that apply): []Session Law 2006-246 []Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached. 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes [] No Page 8 of 10 PCN Form - Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the E Yes ? No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ? Yes ? No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ?Yes ?lo or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ?Yes ONo 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional develo ment which ld i t b d ?Yes No A p , cou mpac near y ownstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 9 of 10 PCN Form - Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? El Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act &Yes ? No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. -l?? 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? N A 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes Q""No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal t h d i h / governmen s ave es gnated as aving historic or cultural preservation ? Yes No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes &3/No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did.you use to make the floodplain determination? NC E c a sy S &n N01N 4rY%.,Uf ty ' f o p ?•(I i sh C coow\ , ' Applicant/Agent's Printed Name Applicant/Agent s Signature Date 4? (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 10 of 10 I 3 N ? O pi-m; ? ,gym, a 5 m yQ(E?r]°z" ' z ?o ?N ° ?L :9 z 0 oZ ?a cn a U' '? o dr O r ? o tTj H Z? o ? O c? ?., # ° >N> a z z> n yy w ?Z PTO 0000 rngi logical E n? , rung i ae (Z,I?gF $o-«e J Hdlg 5pn-8.. NC 271- > r N PSH-01 MAY 28, 2010 SHEET DATE 50512-001 MmEcr NO. a of k m m s 9i B UT TO ALTAMAHAW CREEK SPILLWAY STABILIZATION REVISIONS AND RIPARIAN PLANTING F' N4?g PWAMFOR NC DEPARTMENT OF ENVIRONMENT AND < ... NATURAL RESOURCES ECOSYSTEM ENHANCEMENT PROGRAM „ ... . e N O 0 0 cn ?L eF1 gf pZ30 aS I I IF992'.g c? 3 O??? O o n$ ?i n Z " 9, 8°0' = f"' ?a M? o? 3 E a r 8 9 b D • so it i ;II 8 X 'yV Os Y y r rQ N N b g ?s w s ? e 434 ?8 0 ? ?? O ?a ti y C 110 3 a' 3 t N 0 9 y h y?y O O ERIN PSH-02 MAY 28, 2010 LEGEND SHEET REVISIONS E&n'c ??al SKEET DATE FORT UT TO ALTAMAHAW CREEK ,,,, ; oyr mcen n 50512-001 SPILLWAY STABILIZATION a NOT TO SCALE AND RIPARIAN PLANTINGPREPARED FOR n " A € $ I ze R+k?? $n?a PRO]ECT NO. NC DEPARTMENT OF ENVIRONMENT •? "^:?;,• Hotly SpH-y, NC z75+o AND NATURAL RESOURCES ECOSYSTEM ENHANCEMENT PROGRAM r A v N r O ? ? J O. to A i.+ N ppS $nBq ? ? ?, ? ? ? ? ¢? ?, n s W i6s a ? ? a'Po ? S'R n ?B. o• ?' O 4 0 S° i NO, I £ g8g o SS° °° y 5 S5' g 0. pg :g e: 4F .8 K-1 it A a$ eft k I I t '; & 8 ? y q$ s. GIs s k 0 g qq g F ? s ? A 9g F? g F = , Rg o? L 1M1 F, P. 91 °o ? .per ?. ay "3_X B n n dam n mm gc a n 9a > 1 94 .-I R Q 11. FL ff. } W> E. R g Q ° g E.W ?... 8.g g g. E. s Qg p fl ? Sgj up. q''?p egg ®? AF?z ? 6< ?s $ p ? ®.YB'? ??' R?9• ? g ? w" ? Ry g S S ?. IL 8 B S R w 8 E R p 6 yyp 6$C '4 3 g o p B; ? P 8 a. ?. qUy ? ? 5 {ga e: ? 6 r B R B g _gw x A, 8 °k id w ° g e Rye. $?ff? 8.g, 5'gR?g?p ? E9m? g.wFr EAR v? 9 R n 5 S0. ww ?t°o i L E• aSw PSH-03 MAY 2B, 2010 CONSTRUCTION SEQUENCE SHEET DATE UT TOALTAMAFL4WCREEK ... p h`. Ebn'cineeringN gical AMAH REVISIONS SPILLWAYSTABILiZATION 50512-001 AND MARIAN PLANTING -? NOT TO SCALE ?a i 2e Rsldgk$er<ee PROJECT NO. NC DEPARTMENT ?? es. - <+` o€ ?e? „' ••,+;.,: Mo9ySp??p,NC27s- L E ENVIRONMENT AND NATURAL RESOURCES ? ,,9M,",,,,,°• ECOSYSTEM ENHANCEMENT PROGRAM jig a J. m ? r • 'd w i i i i r s a J I? i F? tin 30 a ° E 00 .y O O 0000 0 I O O CO O 00 O R 00 00 00 O ]CO, 0E O O ; 8.'?!?? k7 O 0 00 X000 ° O E e a ?? 0i L c ? a a? a ?I a? a? ? Fie ? PSH-04.a MAY 28, 2010 STORMWATER MANAGEMENT DETAII MR IM CDIO?I SHEET DATE UT TO ALTAM AHAW CREEK ineedn£r t SPILLWAY STABILIZATION NOT TO SCALE AND RIPARIAN PLANTING i xe R,Id? sn?e? J PRQIECT Na PREPARED FOR rlciiy $?, NC x71,o NC DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES ECOSYSTEM ENHANCEMENT PROGRAM REVISIONS H O H M? o y Alt I as I I I n q 4-j! s _ x t w ?? ?g Hyp I I ? ° `b ° R€ U? ° O O ? H I T Q ti m ARM S? TY ? ? f?-- u• wN. .? !AWN-? PSH-04.b MAY 28, 2010 EROSION CONTROL DETAILS SHEET DATE UT TO ALTAMAHAW CREEK o` Et?hirMnn ?IGal TM REVISIONS dROA " m SPILLWAY STABILIZAnON NOT TO SCALE 50512-001 AND RIPARIAN PLANTING ?gh `J?rca? PROJECT NO. PREPARED FOR Mdiy -5p6-g-, NC Z7 W NC DEPARTMENT OF ENVIRONMENT +?,' AND NATURAL RESOURCES „ ECOSYSTEM ENHANCEMENT PROGRAM E x z 0 0 Q O M O A 8 Pig d .i \ T N U El I R -Al QQQQJJ ffqq ? Y Z8 n,4 ?Kx d PSH-05.a MAY 28, 2010 CONSTRUCTION LAYOUT REVISIONS logical SHEET DATE PORA UT TO ALTAMAHAW CREEK SPILLWAY STABILIZATION"? :•= g n incenng 50512-001 AND RIPARIAN PLANTING za Reldgh Se,ees PROJECT NO. PREPAREDIUR % ++?„°. 66 NC DEPARTMENT OF ENVIRONMENT h°uy 5P? ;p NC 271- AND NATURAL RESOURCES C ECOSYSTEM ENHANCEMENT PROGRAM e v_ i? C H( ] z ^? CC ?!OH ?g M T9 Ri x E? d r 4 l PSH-05.b MAY 28.2010 DATE PLAN VIEW THE P REVISIONS Ica f 'c ? MAH UT TO ALTAMAEL4W CREEK ee rin?!n 6n in 50512-001 SPILLWAY STABILIZATION AND RIPARIAN PLANTING J PR07ECT NO. PREPARED FOR NC DEPARTMENT OF ENVIRONMENT i .+a Holly $pa-y, NC:73+o AND NATURAL RESOURCES ECOSYSTEM ENHANCBMENTPROGRAM x ?N N O °z a x % 0 s, 9G O,p F• glcal E &h'cincering ? za R.I?gh $nee? Houy SP??y, NC i77+o PSH-05.c MAY 28, 2010 SHEET DATE 50512-001 MWECT NO. EROSION CONTROL FOR TM UT TO ALTAMAHAW CREEK SPILLWAY STABILIZATION AND RIPARIAN PLANTING PREPAREDFOR NC DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES ECOSYSTEM ENHANCEMENT PROGRAM REVISIONS A•.N PN ?^pGa .r8 's GOIO QIC,aI ?incerin? i ze R,k?6 $?« H4 NC 27f? PSH-05.d MAY 28, 2MO SHEET DATE 50512-001 PRO15CT NO. EROSION CONTROL FOR THE UT TO ALTAMAHAW CREEK SPILLWAY STABIUiZAT70N AND RIPARIAN PLANTING PREPARED FOR NC DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES ECOSYSTEM ENHANCEMENT PROGRAM l 9 t?°'s p REVISIONS 3?qc c o v r T m p g <P. 99 g O a P CG N pW q p° C R 0 :E m O 0 0 0 n CIO qo a qe a yty ?? no m $ uo mq? op y ? " R@LT °? ? = a ? O a °z m?p G ?e n 5 ? yin /?(ar A ? (?? A pN II ?' ' ` ?y o v. t^ pp O N O o < i N II r r ? o II ? I w? t'? lyl ° P+m ?I ° °A II ? W _ 8 .j C ? s o r?? ?O-I ? 6 0? ? ,? y u N, V in E ? n ? ? wN g 2 ? N ? E ? m W rro g _ =? r? ° A f' a hv-y ? V 5 6 ?' 8 c ? + . 6 ? E` g ? 6 ? _ .?Fc H ro N ? o n ? E 6 ? ? Q g d0 Jz g N ??E ? y o o , CS u ,? bJ °pb o E r y ? F ?Ji ? Z t7l E 3 E PSH-05.e SHUT MAY 28, 2MO DATE bn; _ n? R•lelgl, S?Ce J H-Il Spnw,NCz71- NOT TO SCALE 5PRQ]Wr NO. CALCULATIONS FOR THE UT TO ALTAN AHAW CREEK SPILLWAY STABILIZATION AND RIPARIAN PLANTING PREPARED FOR NC DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES ECOSYSTEM ENHANCEMENT PROGRAB REVISIONS 1N FinaN =?' ?? i ? 9 g i ?n "pa 5 ? g 3 i a s' A ^ 0 3 O .y 2 O O b' y1 7 N A 41 b-? e S ? Y colo ical PSH-06 SHEET MAY 28, 7010 DATE SITE STABILIZATION PLAN AORTHE UT TO ALTAMAHAW CREEK REV ISIONS .? a`•< n ineel'In °' E SPILLWAY STABILIZATION - i xe R ki h 5 NOT TO SCALE 50512-001 AND RIPARIAN PLANTING PRBPARED FOR m s g ?..* PROJECT NO. y Holl jp,mg., NC x77+0 NC DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES ECOSYSTEM ENHANCEMENT PROGRAM ° 8 a 8 ?e w ?. B Y N g li ? a O > C 9 ^ ? ? icy{ ' a O A O a O > Q ,90f J> ?$ A O A O A O > O q 0 ??p A O > Q 9 ' b s ? C " • ' b s ?p o ?p o ? O " b o ?D o b s Tj a " 6 ? b a R M e r°?e z z e m4n? e z z ?ga e `eg 3 3 3 e 3 R R R R m ? Y m m Y Y Y ?? , ?Zv ??? ?•7r b ? z n ? x 7 y ? e Y e ? e C O o t Q c ° Ibi r e • ? 7 O e ? ? m ? e ? y ly c ? ? E a Y` 8 _ N e U -;5 I z cologcal [Ehgineering!? J i ze R•i=$Sit H-11l 5FH; p, NC 171- PSH-07.a MAY 28, 2010 SHEET DATE 50512-001 PROJECT NO. PLANTING PLAN FOR THE UT TO ALTAMAHAW CREEK SPILLWAY STABILIZATION AND RIPARIAN PLANTING PREPARED FOR NC DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES COSYSTEM ENHANCEMENT PROGRAM u o d E REVISIONS u''non?'PX? s J€_l ill Jail 2 1 r aa a? R ° 3 CL s Y m o 3 & e ? m m f 1 9 1 p 1 o A C, N ? o u t ro 3 . ` c N G z N I. at t lit a t li y@ B ? ? dS R. b d 00 l`I 0 iZ y O b G? d n PSH-07.b MAY 28, 2010 PLANTING DETAILS AND SPECIES lo Cal SHEET DATE FoRnm REVISIONS UT TO ALTAMAHAW CREEK in CCrin J SPILLWAY STABILIZATION Efn 50512-001 AND MARIAN ANTAG a za Rak sh $ Zee NOT TO SCALE CT NO. PREPARED FOR i R r "c PROJECT tidy 5P"^F?. NC:7»° NC DEPARTMENT OF ENV RONMENT ?' AND NATURAL RESOURCES s ECOSYSTEM ENHANCEMENT PROGRAM R 8 ? ?g 1P ° ? !. ? : R g9.a gaw z ???' WN t all, 1141. 114 ME fill- I.- @ a???, R s '?R ® [A) ¢' J¦ I g E Q Ir y y/ @.? Pj. R ?. e8? fS ? PAR @g x W €,. ilt E dill E ?w a6 ., ??a sa ? ?? ? g ? 9 z C 8 C CE sr C f°C b e> pga a a a h a ?a Eta ?: g6C a.= 8.6'F.6.8. r< '?~ ?R FY'~ R^ E R S $R 65 i Vj sx yg? g a^R d. $A Fg. Ft" M .w. 5 . GG If° ?g R? 8 ?FS ? R It if S = IF z s? a s PSH-07.c MAY 28, 2010 INVASIVE SFEcIES MANAGEMENT E&n'cinecrin Ical SHEET DATE AND PLANTING NOTES REVISIONS FOR TIM ,.+!'•1,,.,,p o^ ,;i UTTO ALTAMAHAW CREE<c SPILLWAY'xm N. g 50512-001 SfABrUZATION AND RIPARIAN PLANTING '_ 6R :e Rn160 S w°t NOT TO SCALE PRO]ECf NO. PREPARED FOR nN+ Hdiy SPA-q, NC 17N- NC DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES ECOSYSTEM ENHANCEMENT PROGRAM m? FB?g? e°? RN S ?Np?g? F €? a p$j?-0$ MAY 28, 2010 BOUNDARY MARKING PLAN UT TO ALTAMAFI AMAHAW CREEK ftyineering? logical SHEET DATE FORnIE SPILLWAY STABILIZATION 50512-001 AND RIPARIAN PLANTING i ze R.6,g 5? PROJECT NO. PREPARED FOR Holly 5pmg-. NC 275- NC DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES ECOSYSCEM ENHANCEMENT PROGRAM r)°oz o erg 14 6-3 En t7l ;c to xyHtm ?Ln dzj OI0 vJ-? t`Tl ?N 0 8 REVISIONS