Loading...
HomeMy WebLinkAbout090081_Plan of Action (POA)_20200601 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 9 81 County: Bladen Facility Name: Priest Bros Certified Operator Name: Kevin Priest Operator Number: 985751 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 1 Spillway(Y or N): N Level(inches): 8 2. Check all applicable items X Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 6/1/2020 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action,and to the best of my knowledge and ability,the information is accurate and correct. Kevin Priest Phone: 910-876-1368 Facility Owner/Manager(print) Date: 6/1/2020 Facility Owner/Manager(signature) PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE(5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier(ID): 1 2. Current liquid volume in structural freeboard a. current liquid level according to marker 8.0 inches b. designed structural freeboard zone 12.0 inches (Normally 12 inches or greater) c. line b- line a (inches within structural freeboard) = 4.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 59976 ft2 e. line c/12 x line d x 7.48 gallons/ft3 149540 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 80307 ft3 h. current herd# 2448 certified herd# 2448 actual waste produced =current herd# x line g = 80307 ft3 certified herd# i. volume of wash water according to structural design 0 ft3 j. excess rainfall over evaporation according to design 36750 ft3 k. (lines h + i +j)x 7.48 x 5 days/line f= 24322 gallons 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e+ line k= 173862 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA(5 Day)2/21/00