HomeMy WebLinkAbout090077_Inspection_20200914 ivision of Water Resources
Facility Number 6 - 77 0 Division of Soil and Water Conservation
0 Other Agency
Type of Visit: OComplia ce Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: outine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: r z�� Arrival Time:I f7,30 Departure Time:I//,'y J I County: �. ,v,•` Region:
Farm Name: g ,( 37.7 Owner Email:
Owner Name: Do►e_4 �44 Phone:
Mailing Address:
Physical Address:
Facility Contact: fhweel— :2;7 1,s. --- Title: Phone:
Onsite Representative: ��rr Integrator: _� Y 7t--/
Certified Operator: Certification Number: /1O
Back-up Operator: Certification Number:
Location of Farm: Latitude: Longitude:
Design Current Design Current Design Current
Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop.
Wean to Finish Layer Dairy Cow
Wean to Feeder �vDZirlo Non-Layer _ Dairy Calf
Feeder to Finish Dairy Heifer
Farrow to Wean Design Current Dry Cow
Farrow to Feeder D Poul Ca'aei Po I. Non-Dairy
Farrow to Finish MIENE -- Beef Stocker
Gifts •Non-La ers —_ Beef Feeder
Boars II Pullets -- Beef Brood Cow
Other •Turke Poults
Other II Other
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE
b. Did the discharge reach waters of the State?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
c. What is the estimated volume that reached waters of the State(gallons)?
d. Does the discharge bypass the waste management system?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes 13 o ❑ NA ❑ NE
3.Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes EKIO ❑ NA ❑ NE
of the State other than from a discharge?
Page 1 of 3 2/4/2015 Continued
(Facility Number: / - 77 (Date of Inspection: ff/I/s
Waste Collection&Treatment
4.Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes IEK ❑ NA ❑ NE
a. If yes,is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier:
Spillway?:
Designed Freeboard(in): /9
Observed Freeboard(in): ""---•
5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes El< ❑ NA ❑ NE
(i.e.,large trees,severe erosion,seepage,etc.)
6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes EtNo ❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental t reat,notify DWR
7.Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes I Ko ❑ NA ❑ NE
(not applicable to roofed pits,dry stacks,and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes /❑/No ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10.Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE
maintenance or improvement?
11.Is there evidence of incorrect land application?If yes,check the appropriate box below. ❑ Yes <o ❑ NA 0 NE
O Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.)
❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12.Crop Type(s)
13. Soil Type(s): p, .4/o /t <J ` 4
14.Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE
15.Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE
16.Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes �o ❑ NA ❑ NE
acres determination?
17.Does the facility lack adequate acreage for land application? ❑ Yes to ❑ NA ❑ NE
18. Is there a lack of properly operating waste application equipment? ❑ Yes 12 1‹ ❑ NA ❑ NE
Required Records&Documents
19.Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes ❑ NA ❑ NE
20.Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes Io ❑ NA ❑ NE
the appropriate box.
❑WUP El Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other:
21.Does record keeping need improvement?If yes,check the appropriate box below. ❑ Yes 1 No ❑ NA ❑ NE
['Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code
❑Rainfall 0 Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and 1" Rainfall Inspections Sludge Survey
22.Did the facility fail to install and maintain a rain gauge? 0 Yes No ❑ NA ❑ NE
23.If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes Er<lo ❑ NA ❑ NE
Page 2 of 3 2/4/2015 Continued
'Facility Number: / ' -77 'Date of Inspection: 9—///--/ U
24.Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 13 No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes,check 0 Yes El< ❑ NA ❑ NE
the appropriate box(es)below.
❑Failure to complete annual sludge survey ['Failure to develop a POA for sludge levels
0 Non-compliant sludge levels in any lagoon
List structure(s)and date of first survey indicating non-compliance:
26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes 12Ko ❑ NA ❑ NE
27.Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes No ❑ NA ❑ NE
Other Issues
28.Did the facility fail to properly dispose of dead animals with 24 hours and/or document 0 Yes 21 No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29.At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE
If yes,contact a regional Air Quality representative immediately.
30.Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes �Io ❑ NA ❑ NE
permit?(i.e.,discharge,freeboard problems,over-application)
31. Do subsurface tile drains exist at the facility?If yes,check the appropriate box below. ❑ Yes No ❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32.Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ElNA ❑ NE
33.Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes No ❑ NA ❑ NE
34.Does the facility require a follow-up visit by the same agency? ❑ Yes Io ❑ NA ❑ NE
Comments(refer to question#):Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations(use additional pages as necessary).
/7 --r'apadr 011/3: 7J 5.
7/"n alas, ArejnYf 6tc�.s 0
Reviewer/Inspector Name: Y Phone: �gv-- -'e4Jr�
Reviewer/Inspector Signature: 254 aG Date: 4 7"4f . . 2D
Page 3 of 3 2/4/2015