HomeMy WebLinkAbout310122_BIMS incident 202003311_20201116PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): I E&B Farms Inc. 1 FN: 31-122
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
11/16/2020
a. current liquid level according to marker 17.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = 2.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 83496 ft2
e. line c/12 x line d x 7.48 gallons/ft3 104092 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 121352 ft3
h. current herd # 3672 certified herd #1 3672
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 7/20/2020
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
171�,7 ft�
Oft3
50750 ft3
214554 gallons
1.77 Ibs/1000 gal.
564.0 Ibs. PAN
PoA (30 Day) 2/21 /00 11 /16/2020
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES
FOR FACILITY
1.
Structure ID: E&B Farms Inc.(1)
line m =
564.0 lb PAN
2.
Structure ID: E&B Farms Inc. (2)
line m =
lb PAN
3.
Structure ID: E&B Farms Inc. (3)
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
In. lines 1 +2+3+4+5+6= 564.0 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
2900
P1
Small Grain
3.04
50.00
152.0
OCT - MAR
P2
Small Grain
4.30
50.00
215.0
OCT - MAR
P3
Small Grain
6.72
50.00
336.0
OCT - MAR
P5
Small Grain
5.05
50.00
252.5
OCT - MAR
P6
Small Grain
2.49
50.00
124.5
OCT - MAR
P7
Small Grain
4.34
50.00
217.0
OCT - MAR
P9
Small Grain
2.43
50.00
121.5
OCT - MAR
P11
Small Grain
4.30
50.00
215.0
OCT - MAR
P16
Small Grain
4.02
50.00
201.0
OCT - MAR
P17
Small Grain
3.97
50.00
198.5
OCT - MAR
P18
Small Grain
4.00
50.00
200.0
OCT - MAR
P19
Small Grain
2.95
50.00
147.5
OCT - MAR
P20
Small Grain
3.15
50.00
157.5
OCT - MAR
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 2538.0 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line In from section II) = 564.0 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 2538.0 lb. PAN
y. Overall PAN balance (w - x) = -1974 lb. PAN
PoA (30 Day) 2/21 /00 11 /16/2020
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Waste will be applied agronomically and hydraulically as weather permits.
PoA (30 Day) 2/21 /00 11 /16/2020