Loading...
HomeMy WebLinkAbout310122_BIMS incident 202003311_20201116PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): I E&B Farms Inc. 1 FN: 31-122 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard 11/16/2020 a. current liquid level according to marker 17.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 2.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 83496 ft2 e. line c/12 x line d x 7.48 gallons/ft3 104092 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 121352 ft3 h. current herd # 3672 certified herd #1 3672 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 7/20/2020 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 171�,7 ft� Oft3 50750 ft3 214554 gallons 1.77 Ibs/1000 gal. 564.0 Ibs. PAN PoA (30 Day) 2/21 /00 11 /16/2020 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: E&B Farms Inc.(1) line m = 564.0 lb PAN 2. Structure ID: E&B Farms Inc. (2) line m = lb PAN 3. Structure ID: E&B Farms Inc. (3) line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN In. lines 1 +2+3+4+5+6= 564.0 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 2900 P1 Small Grain 3.04 50.00 152.0 OCT - MAR P2 Small Grain 4.30 50.00 215.0 OCT - MAR P3 Small Grain 6.72 50.00 336.0 OCT - MAR P5 Small Grain 5.05 50.00 252.5 OCT - MAR P6 Small Grain 2.49 50.00 124.5 OCT - MAR P7 Small Grain 4.34 50.00 217.0 OCT - MAR P9 Small Grain 2.43 50.00 121.5 OCT - MAR P11 Small Grain 4.30 50.00 215.0 OCT - MAR P16 Small Grain 4.02 50.00 201.0 OCT - MAR P17 Small Grain 3.97 50.00 198.5 OCT - MAR P18 Small Grain 4.00 50.00 200.0 OCT - MAR P19 Small Grain 2.95 50.00 147.5 OCT - MAR P20 Small Grain 3.15 50.00 157.5 OCT - MAR 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 2538.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line In from section II) = 564.0 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 2538.0 lb. PAN y. Overall PAN balance (w - x) = -1974 lb. PAN PoA (30 Day) 2/21 /00 11 /16/2020 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Waste will be applied agronomically and hydraulically as weather permits. PoA (30 Day) 2/21 /00 11 /16/2020