Loading...
HomeMy WebLinkAboutNCC205190_ESC Approval Submitted_20201118RGY COOPER Governoe MICHAEL S. REGAN Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality July 23, 2020 LETTER OF APPROVAL WITH MODIFICATIONS Benderson Development Company, LLC Attention: James Boglioli, Director 570 Delaware Avenue Buffalo, New York 14202 RE: Project Name: Union West Center Medical Facility (Express Review) Acres Approved: 2.97 Project ID: UNION-2021-001 County: Union, City: Indian Trail Address: W. Hwy 74 River Basin: Yadkin -Pee Dee Stream Classification: Other Submitted By: Daniel Renckens, PE, Bohler Engineering NC, PLLC Date Received by LQS: July 8, 2020 Plan Type: New Dear Mr. Boglioli: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@nedenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGOI permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 413.0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. North Carolina Department of Environmental Quality i Division of Energy. Mineral and Land Resources Mooresville Regional Office 1 610 East Center Avenue. Suite 301 i Mooresville, North Carolina 28115 oewrtmemetFnvvoomrt9nW aan+v 704.663.1699 . Letter of Approval with Modification July 23, 2020 Page 2 of 3 2. The NCGOI permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-S 1 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, 1 Shannon Leonard Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCGO1 Fact Sheet c: Inspection Department ec: Daniel Renckens, PE Letter of Approval with Modification July 23, 2020 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Union West Center Medical Facility (Express Review) Project ID: UNION-2021-001 County: Union 1. Stone outlets in the silt fence shall be installed with Class B stone and 12" washed stone per attached construction detail. 2. The temporary and permanent seeding specifications attached shall be followed. 3. The location of the borrow source shall be provided to this office prior to transporting material on site. 4. The fill slopes on the West/Northwest sides shall be seeded/mulched/matted immediately upon placement of fill material.