Loading...
HomeMy WebLinkAboutNCC205106_ESC Approval Submitted_20201118ROY COOPERd Governor MICHAEL S, REGAN Secretary S. DANIEL SMITH Director NORTH CAROUNA Envlronmenta! Quanty October 09, 2020 f RECEIVED OCT 13 2020 STANLEY D, LINDSEY & ASSOC, ETD BRENTWOOD. TN LETTER OF APPROVAL WITH MODIFICATIONS Rise Boone, LLC ATTN: Richard G. Hunter 129 North Patterson St. Valdosta, GA 31601 RE: Project Name: ASU Residential Hall Building 400 Acres Approved: 6.12 Acres Project ID: WATAU-2021-002 County: Watauga City: Boone Address: Stadium Heights Dr. River Basin: New Stream Classification: C; Tr + Submitted By: Stanley D. Lindsey and Associates, LTD Date Received by LQS: September 23, 2020 Plan Type: New Dear Mr. Hunter, This office has reviewed the subject erosion and sedimentation, control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. North Carolina Department of Environmental Quality I DivluNm of Energy, Mrneral and Onrl Rrfourcen ,9�ffmg Q5 Wlnatan-5ulrmRryinnulOiFke I ISDHnnrsMlllRuadSuite a001 Wlnston- Salem, North Car ullna27103 336.776.9500 Letter of Approval Rise Boone, LLC October 09, 2020 Page 2 of 4 This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The N01 form may be accessed at de .nc. ov NCG01. Please direct questions about the NOI form to Annette Lucas at Annette. luca ncdenr, ov or Paul Clark at Paul.clarkOncdenngov. After you submit a complete and correct N01 Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 413 .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 1 13A-61.1 (a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance - oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Letter of Approval Rise Boone, LLC October 09, 2020 Page 3 of 4 Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, //1111" e 4� Jack Dalton Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval NCG01 Fact Sheet Modifications Required for Approval cc: Stanley D. Lindsey and Associates, LTD ATTN: Steven H. Doe, PE 750 Old Hickory Blvd Building I, Suite 175 , Brentwood, TN 37027 WSRO File Letter of Approval Rise Boone, LLC October 09, 2020 Page 4 of 4 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: ASU Residential Hall Building 400 Project ID: WATAU-2021-002 County. Watauga 1. Additional measures may be required - The applicant is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 46 .0115] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities