Loading...
HomeMy WebLinkAbout20201370 Ver 1_DF16804.2051046_PermitDrawings_20201109_20201117(Version 2.08; Released April 2018)DF16804.2051046TIP No.:N/ACounty(ies):Johnston Page 1 of 1TIP Number:Date:Phone:Phone:Email:Email:County(ies):CAMA County?YesDesign/Future: Year: Existing: Year:Aquatic T&E Species?NoComments:Yes NoNoN/ADeck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative)ac.Two 11 foot Travel Lanes with 2 foot paved shoulders and 4 foot grassed shoulders on each sidekalford@wetherilleng.comProject Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer?NRTR Stream ID:Annual Avg Daily Traffic (veh/hr/day):Existing SiteProject Length (lin. miles or feet): ac.Surface Water Body (1): Class CNCDWR Surface Water Classification for Water BodyNeuseBuffer Rules in Effect:N/ANone3500Two 11 foot Travel Lanes with 3 foot grassed shoulders on each sideWaterbody Information2020NCDWR Stream Index No.:DF16804.2051046Impairments:Other Stream Classification: Primary Classification: Project Built-Upon Area (ac.)The purpose of the project is to replace pipe E3082 on SR 1341 (Galilee Road) over Arters Branch in Johnston County due to the road being washed out. The existing pipe is a 1@158'x105" CMPA with headwalls. The replacement structure a single spans 70', 24" cored slab with 4' caps. The roadway grade of the new structure is almost 2 foot higher along the bridge in order to obtain the correct design speed for this route. There will be no direct discharge into the stream (no deck drains on the bridge). All existing stormwater drainage patterns were maintained on the project to the fullest extent. The storm drainage from the bridge deck will be discharged on the west quadrant into a ditch. The ditches on all four quadrants were impacted by the project. The ditches were replaced to match the existing flow patterns. 1223 Jones Franklin RoadNorth Carolina Department of TransportationHighway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTSProject Type:P.O. Box 3165Address:General Project InformationN/AWBS Element:Bridge ReplacementWBS Element:Kevin Alford, PE (Wetherill Engineering, Inc.)NCDOT Contact:252-640-6427Raleigh, NC 27606Contractor / Designer:919-851-8077tccoggins@ncdot.govAddress:10/28/2020JohnstonSmithfiledChad CogginsWilson, NC 27895River Basin(s): City/Town:0.4Typical Cross Section Description: Surrounding Land Use: General Project Narrative:(Description of Minimization of Water Quality Impacts)NoRural ResidentialArters Branch27-440.30.095 milesProject DescriptionProposed ProjectNeuseNoneSupplemental Classification: Nutrient Sensitive Waters (NSW)Wetlands within Project Limits? V = =MPH ADT FUNC CLASS = PROJECT LENGTH STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 SIGNATURE: SIGNATURE: P.E. P.E. GRAPHIC SCALES HYDRAULICS ENGINEER LOCATION: TYPE OF WORK:09/08/99DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 10/29/2020...\DF16804.2051046_hyd_prm_wet_tsh.dgnUSER:MHarveyARTMEN N ASO H DEPT O F TRA SPORTTIONTATEOFNRTCAR O LI NAPROJECT ENGINEER PROJECT DESIGN ENGINEER EDWARD G, WETHERILL, PE GREG S. PURVIS, PE ENGINEER ROADWAY DESIGN LETTING DATE: 45 0.095 MILES 0.013 MILES 0.082 MILES GRADING, DRAINAGE, PAVING & STRUCTURE THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. 2020 DESIGN DATA 0 0 0 PROFILE (HORIZONTAL) PLANS PROFILE (VERTICAL) 0 00 50 25 50 50 25 50 10 5 10 20 ENGINEERING ETHERILLW Raleigh, N.C. 27606 Bus: 919 851 8077 Fax: 919 851 8107 CIVIL/SITE DESIGN - GIS/GPS - CONSTRUCTION OBSERVATION TRANSPORTATION PLANNING/DESIGN - BRIDGE/STRUCTURE DESIGN 1223 Jones Franklin Rd. License No. F-0377 UNLESS ALL SIGNATURES COMPLETED DOCUMENT NOT CONSIDERED FINAL See Sheet 1B For Conventional Symbols 2018 STANDARD SPECIFICATIONS PROJECT ENGINEER - NCDOT DIVISION 4 100 100 4 PE NCDOT CONTACT: RIGHT OF WAY DATE: RURAL LOCAL SUBREGIONAL TIER JOHNSTON COUNTY REPLACE CULVERT OVER ARTERS BRANCH NA 2011NAD 83/CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. ROW, UTIL. CONST. See Sheet 1A For Index of Sheets See Sheet RW01 TO RW04 For Survey Control Sheets CONTRACT: PROJECT: DF16804.2051046DF16804.2051046 DF16804.2051046 DF16804.2051046 .541162 1343 1340 1342 1343 1341 1341 1343 1376 1341 1374 1375 1345 1347 1343 1162 1343 1386 1342 1347 1340 1341 QuailRd.LakeviewDr.Packing PlantNorthJohnsonRd.Club Rd .GalileeRd.GalileeRd.Rd.Rd.Galil eeGalil eeBlack CreekRd.Bla c k Cr e e kRd. Plant Pack ing Rd.Packi ngPl ant Rd. S wa mp NEUSE School Elementary West Smithfield Church Hopewell Transportation301 96 210 1341 VICINITY MAP OFF-SITE DETOUR PROJECT SITE Prepared for: DIVISION OF HIGHWAYS DIVISION FOUR 509 Ward Boulevard, Wilson NC, 27895 JAKE GREEN, PE, PLS TOTAL LENGTH PROJECT DF16804.2051046 = LENGTH STRUCTURE PROJECT DF16804.2051046 = LENGTH ROADWAY PROJECT DF16804.2051046 = ON SR 1341 (GALILEE ROAD)ARTERS BRANCH3,500 PRELIMINARY PLANS DF16804.2051046 (NORTH JOHNSTON RD) SR 1342 US 301/NC 96(GALILEE RD) SR 1341 -L- (GALI LEE RD) SR 1 3 4 1 -L- PROJECT DF16804.2051046 BEGIN NCDOT -L- POC STA. 15+55.00 END NCDOT PROJECT DF16804.2051046 -L- POC STA. 20+55.00 BEGIN BRIDGE -L- STA. 17+96.99 END BRIDGE -L- STA. 18+67.01 WETLAND AND SURFACE WATER IMPACTS PERMIT SITE 1 SITE 2 SHEET 1 OF 5 PERMIT DRAWING WELLONS-FETZER, LLC 36" 2SBW 36" 2SBW 3 6" 2 S BW3 6" 2 S BW3 6" 2 SBWSILT 48"WW W/1SBW48"M TL W/ W W 48"MTLSILT SILTDEBRIS AREA RIPRAP & RIPRAPWRACK LINEWRACK LI NEP OSTWD(X2) ANCHORS STEEL (X4) ANCHORS STEEL WOODS WOODS WOODS WOODS WOODS SILT 36" 2SBWW/ 1SBW48"WW N 5339’02" E567.46’POST WD EXISTING R/W EXISTING R/W 60.00’TEXI STI NG R/W60.00’130.8’ 130.8’ 130.3’ 130.2’ 130.7’ 133.6’ 133.6’ 133.6’ 133.6’ CULTIVATED FIELD RIP RAP ON TREE WRACK LINE ON TREE WRACK LINE ON TREE WRACK LINE SR 1342 (NORTH JOHNSTON RD) 22’ PAVED ROADWAY SR 1341 (GALILEE RD) CULTIVATED FIELD WELLONS-FETZER, LLC ANITA POWELL WELLONS-FETZER, LLC WELLONS-FETZER, LLC 22’ PAVED ROADWAYSR 1341 (GALI LEE RD) US 301/NC 96EXI STI NG R/WCULTIVATED FIELD CP P 18" H/W MTL158"x105" CMAPDAMAGED MTL H/W ARTERS BRANCHA R T E R S B R A N C H FOR STRUCTURE PLANS SEE SHEETS S-1 THRU S-14 & BRIDGE/PAVT. SKETCH -DWY- ALIGNMENT, SEE SHEET 2A-2 FOR CURVE DATA, ROW STATION/OFFSETS SEE SHEET 2A-3 FOR tTHE GRAPHIC SCALE 0’100’100’ WETLAND AND SURFACE WATER IMPACTS PERMIT SHEET 2 OF 5 PERMIT DRAWING HC HC CLEARING DENOTES HAND 15+0020+0025+00-L- -L- **************************************** RR SPIKE AT BASE OF 44" HACKBERRY TREE BL STATION 13+16.9, 162.2’ RIGHT N 632,162.2 E 2,184,631.3 BM#1 ELEVATION = 132.81’ **************************************** **************************************** RR SPIKE AT BASE OF 17" WATER OAK TREE BL STATION 16+48.7, 137.6 LEFTN 632,230.2 E 2,185,109.7BM#2 ELEVATION = 128.24’**************************************** GPS-2 BL-3 BL- 4EOI 5 0 PR 50 PR 50 PR 16 " D IP 16" DIP SS BM#1 BM#2 ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES NC GRID NAD 83 NA 2011 PI = 16+90.00 EL = 130.03’ (-)1.3100%(+)2.5033% VC = 188’ PI = 19+35.00 EL = 136.16’ (+)2.5033%(+)5.1500% VC = 131’EL. 131.80STA. 15+55.00BEGIN GRADEEL. 142.34STA. 20+55.00END GRADETIER GUIDELINES SUBREGIONAL NOTE: MEETS DS = 35 MPH K = 49 TIER GUIDELINES SUBREGIONAL NOTE: MEETS DS = 35 MPH K = 49 STA. 18+68.14END BRIDGESTA. 17+95.86BEGIN BRIDGEGROUND EXIST. GRADE PROP. (-)1.8100% EX.GRADE (+)5.6500%EX. GRADE =-L- STA. 16+06.64-DWY- STA. 10+00.00= 560 = 125.4 = 126.3 = 130.9 = 10/12/20 = 122.0 = 2685 DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION DATE OF SURVEY W.S. ELEVATION AT DATE OF SURVEY FT = 25 = 100 BRIDGE HYDRAULIC DATA = 770 = 500+ CMPA WITH HEADWALLS EXISTING 1@158"’ x 105" CENTERLINE = 119.50 INVERT AT PROPOSED CHANNEL (10-12-20) ELEV. = 122.0 ON DATE OF SURVEY WATER SURFACE NWS ELEV. = 122.51.5:1CHORD LOWEST ELEV. 125.0 EXCAVATE TO (2 FT. THICK) W/ GEOTEXTILE CLASS II RIP RAP (2 FT. THICK) W/ GEOTEXTILE CLASS II RIP RAP TOP OF BERM UNDER BRIDGE (TYP.) ADD 0.5’ OF TOP SOIL TO ELEV. 127.0 EXCAVATE TO1.5:11.5:11.5:1NO DECK DRAINS REQUIRED W/ 4’0" CAPS 1@70’ - 24" CORED SLAB C ELEV. = 133.58 SKEW = 90 STA. 18+32.00 -L-0L 1300 CY (+/-) EXCAVATION = TOTAL APPROXIMATE C C C F C C F C C C C F C F C CC C F C C C C F C FF1 1 1 2 1 ENGINEERING ETHERILLW DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED CIVIL/SITE DESIGN - GIS/GPS - CONSTRUCTION OBSERVATION TRANSPORTATION PLANNING/DESIGN - BRIDGE/STRUCTURE DESIGN Fax: 919 851 8107 Bus: 919 851 8077 Liscense No. F-0377 Raleigh, N.C. 27606 1223 Jones Franklin Rd.SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 4 R/W SHEET NO.8/17/9911/9/2020P:\2020\20137.01_Galilee Road Div 4\Hydraulics\PERMITS_Environmental\Drawings\DF16804.2051046_hyd_prm_wet_psh.dgnMHarveyDF16804.2051046 12 13 14 15 16 17 18 19 20 21 22 23 24 25 80 90 100 110 120 130 140 150 160 170 80 90 100 110 120 130 140 150 160 170 26 S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SITE 1 SITE 2 S S S HC HC (TYP.) TO SHOULDER PT. CLASS II RIP RAP CULVERT REMOVE EXISTING (TYP.) TO SHOULDER PT. CLASS II RIP RAP SEE DETAIL E BANK STABILIZATION MCF SEE DETAIL B TAIL DITCH 0402 +41SBGBEGIN18" 0401 SEE DETAIL A SPECIAL CUT DITCH 3:13:1D ( Not to Scale) d TAIL DITCH CLASS B RIP RAP = 18 TONS, GEOTEXTILE = 37 SY LENGTH = 52 FT, SLOPE = 4.17% FROM -L- STA. 17+25 TO STA. 17+78 RT. Type of Liner= Class B Rip-Rap Max. d = 1 Ft. Min. D = 1 Ft. DETAIL B Ground Natural Ground Natural Geotextile DETAIL E FROM -L- STA. 17+30 TO 17+99 FROM -L- STA. 18+19 TO 19+09 BANK STABILIZATION 2.0’(MIN.)(MAINTAIN 20’ WIDTH THROUGH THE BRIDGE OPENING) CHANNEL WIDTH VARIES 15’ TO 20’ BED CHANNEL EXISTING NOT TO SCALE GROUND NATURAL W/ GEOTEXTILE (TYP.) ALONG EXISTING BANK CLASS ’II’ RIP RAP TO FORM NEW CHANNEL USE SLOPES 2:1 OR FLATTER GEOTEXTILE = 405 SY EST. 400 TONS OF CLASS II RIP RAP SEE DETAIL C AND GEOTEXTILE B RIP RAP W/ CLASS CUT DITCH SPECIAL SEE DETAIL D AND GEOTEXTILE W/ CLASS B RIP RAP CUT DITCH 3:1D Flatter4:1 or d ( Not to Scale) CUT DITCH 61 TONS CLASS B 82 SY GEOTEXTILE FROM -L- STA. 19+50 TO STA. 20+55 RT. Slope Ditch Front DETAIL D Max. d = 1 Ft. Min. D = 1 Ft. Type of Liner= Class B Rip-Rap Ground Natural Geotextile SEE DETAIL C AND GEOTEXTILE W/ CLASS B RIP RAP SPECIAL CUT DITCH Flatter3:1 or D 3:1( Not to Scale) SPECIAL CUT DITCH FROM -L- STA. 16+05 TO STA. 17+25 RT. FROM -L- STA. 15+55 TO STA. 18+18 LT. DETAIL A Min. D = 1 Ft. Ground Natural Slope Ditch Front 3: 1 D Flatter4:1 or d ( Not to Scale) SPECIAL CUT DITCH 29 TONS CLASS B 39 SY GEOTEXTILE FROM -L- STA. 19+00 TO STA. 19+50 RT. 49 TONS CLASS B 103 SY GEOTEXTILE FROM -L- STA. 18+64 TO STA. 20+05 LT. DETAIL C Max. d = 1 Ft. Min. D = 1 Ft. Type of Liner= Class B Rip-Rap Slope Ditch Front Ground Natural Geotextile SEE DETAIL A SPECIAL CUT DITCH ( Not to Scale) Geotextile Elevation Natural Bed 38 TONS CLASS B 80 SY GEOTEXTILE FROM -L- STA. 18+26 TO STA. 19+00 RT. 15 TONS CLASS B 32 SY GEOTEXTILE FROM -L- STA. 17+25 TO STA. 18+13 RT. Ground Natural Ground Natural (Variable) Channel Bed EXISTING CHANNEL STABILIZATION DETAIL F 1’ Type of Liner= Class B Rip-Rap - Keyed-In SEE DETAIL E STABILIZATION EXISTING CHANNEL (-)0.84% (-)2.06% (+)8.82% (+)7.00% ELEV.=123.50 FT -L- 18+18 (LT) END DITCH ELEV.=127.17 FT -L- 17+25 (RT) END DITCH ELEV.=127.77 FT -L- 18+64 (LT) BEGIN DITCH ELEV.=137.71 FT -L- 20+05 (LT) END DITCH ELEV.=133.91 FT -L- 19+50 (RT) END DITCH ELEV.=129.50 FT -L- 19+00 (RT) BEGIN DITCH RIGHT DITCH LEFT DITCH ELEV.=128.92 FT -L- 15+55 (LT) BEGIN DITCH ELEV.=128.18 FT -L- 16+05 (RT) BEGIN DITCH WELLONS-FETZER, LLC 36" 2SBW 36" 2SBW 3 6" 2 S BW3 6" 2 S BW3 6" 2 SBWSILT 48"WW W/1SBW48"M TL W/ W W 48"MTLSILT SILTDEBRIS AREA RIPRAP & RIPRAPWRACK LINEWRACK LI NEP OSTWD(X2) ANCHORS STEEL (X4) ANCHORS STEEL WOODS WOODS WOODS WOODS WOODS SILT 36" 2SBWW/ 1SBW48"WW N 5339’02" E567.46’POST WD EXISTING R/W EXISTING R/W 60.00’TEXI STI NG R/W60.00’130.8’ 130.8’ 130.3’ 130.2’ 130.7’ 133.6’ 133.6’ 133.6’ 133.6’ CULTIVATED FIELD RIP RAP ON TREE WRACK LINE ON TREE WRACK LINE ON TREE WRACK LINE SR 1342 (NORTH JOHNSTON RD) 22’ PAVED ROADWAY SR 1341 (GALILEE RD) CULTIVATED FIELD WELLONS-FETZER, LLC ANITA POWELL WELLONS-FETZER, LLC WELLONS-FETZER, LLC 22’ PAVED ROADWAYSR 1341 (GALI LEE RD) US 301/NC 96EXI STI NG R/WCULTIVATED FIELD CP P 18" H/W MTL158"x105" CMAPDAMAGED MTL H/W 120120120120120120120120120120 120 120 120 120120120120120120130130130130130 13013013013013013 0 130130130130130130130130 130 130 130 140140140140140140140 140140150150150150150150150150 150160160ARTERS BRANCHA R T E R S B R A N C H FOR STRUCTURE PLANS SEE SHEETS S-1 THRU S-14 & BRIDGE/PAVT. SKETCH -DWY- ALIGNMENT, SEE SHEET 2A-2 FOR CURVE DATA, ROW STATION/OFFSETS SEE SHEET 2A-3 FOR tTHE GRAPHIC SCALE 0’100’100’ WETLAND AND SURFACE WATER IMPACTS PERMIT SHEET 3 OF 5 PERMIT DRAWING HC HC CLEARING DENOTES HAND 15+0020+0025+00-L- -L- **************************************** RR SPIKE AT BASE OF 44" HACKBERRY TREE BL STATION 13+16.9, 162.2’ RIGHT N 632,162.2 E 2,184,631.3 BM#1 ELEVATION = 132.81’ **************************************** **************************************** RR SPIKE AT BASE OF 17" WATER OAK TREE BL STATION 16+48.7, 137.6 LEFTN 632,230.2 E 2,185,109.7BM#2 ELEVATION = 128.24’**************************************** GPS-2 BL-3 BL- 4EOI 5 0 PR 50 PR 50 PR 16 " D IP 16" DIP SS BM#1 BM#2 ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES NC GRID NAD 83 NA 2011 PI = 16+90.00 EL = 130.03’ (-)1.3100%(+)2.5033% VC = 188’ PI = 19+35.00 EL = 136.16’ (+)2.5033%(+)5.1500% VC = 131’EL. 131.80STA. 15+55.00BEGIN GRADEEL. 142.34STA. 20+55.00END GRADETIER GUIDELINES SUBREGIONAL NOTE: MEETS DS = 35 MPH K = 49 TIER GUIDELINES SUBREGIONAL NOTE: MEETS DS = 35 MPH K = 49 STA. 18+68.14END BRIDGESTA. 17+95.86BEGIN BRIDGEGROUND EXIST. GRADE PROP. (-)1.8100% EX.GRADE (+)5.6500%EX. GRADE =-L- STA. 16+06.64-DWY- STA. 10+00.00= 560 = 125.4 = 126.3 = 130.9 = 10/12/20 = 122.0 = 2685 DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION DATE OF SURVEY W.S. ELEVATION AT DATE OF SURVEY FT = 25 = 100 BRIDGE HYDRAULIC DATA = 770 = 500+ CMPA WITH HEADWALLS EXISTING 1@158"’ x 105" CENTERLINE = 119.50 INVERT AT PROPOSED CHANNEL (10-12-20) ELEV. = 122.0 ON DATE OF SURVEY WATER SURFACE NWS ELEV. = 122.51.5:1CHORD LOWEST ELEV. 125.0 EXCAVATE TO (2 FT. THICK) W/ GEOTEXTILE CLASS II RIP RAP (2 FT. THICK) W/ GEOTEXTILE CLASS II RIP RAP TOP OF BERM UNDER BRIDGE (TYP.) ADD 0.5’ OF TOP SOIL TO ELEV. 127.0 EXCAVATE TO1.5:11.5:11.5:1NO DECK DRAINS REQUIRED W/ 4’0" CAPS 1@70’ - 24" CORED SLAB C ELEV. = 133.58 SKEW = 90 STA. 18+32.00 -L-0L 1300 CY (+/-) EXCAVATION = TOTAL APPROXIMATE C C C F C C F C C C C F C F C CC C F C C C C F C FF1 1 1 2 1 ENGINEERING ETHERILLW DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED CIVIL/SITE DESIGN - GIS/GPS - CONSTRUCTION OBSERVATION TRANSPORTATION PLANNING/DESIGN - BRIDGE/STRUCTURE DESIGN Fax: 919 851 8107 Bus: 919 851 8077 Liscense No. F-0377 Raleigh, N.C. 27606 1223 Jones Franklin Rd.SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 4 R/W SHEET NO.8/17/9911/9/2020P:\2020\20137.01_Galilee Road Div 4\Hydraulics\PERMITS_Environmental\Drawings\DF16804.2051046_hyd_prm_wet_psh.dgnMHarveyDF16804.2051046 12 13 14 15 16 17 18 19 20 21 22 23 24 25 80 90 100 110 120 130 140 150 160 170 80 90 100 110 120 130 140 150 160 170 26 S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SITE 1 SITE 2 S S S HC HC (TYP.) TO SHOULDER PT. CLASS II RIP RAP CULVERT REMOVE EXISTING (TYP.) TO SHOULDER PT. CLASS II RIP RAP SEE DETAIL E BANK STABILIZATION MCF SEE DETAIL B TAIL DITCH 0402 +41SBGBEGIN18" 0401 SEE DETAIL A SPECIAL CUT DITCH 3:13:1D ( Not to Scale) d TAIL DITCH CLASS B RIP RAP = 18 TONS, GEOTEXTILE = 37 SY LENGTH = 52 FT, SLOPE = 4.17% FROM -L- STA. 17+25 TO STA. 17+78 RT. Type of Liner= Class B Rip-Rap Max. d = 1 Ft. Min. D = 1 Ft. DETAIL B Ground Natural Ground Natural Geotextile DETAIL E FROM -L- STA. 17+30 TO 17+99 FROM -L- STA. 18+19 TO 19+09 BANK STABILIZATION 2.0’(MIN.)(MAINTAIN 20’ WIDTH THROUGH THE BRIDGE OPENING) CHANNEL WIDTH VARIES 15’ TO 20’ BED CHANNEL EXISTING NOT TO SCALE GROUND NATURAL W/ GEOTEXTILE (TYP.) ALONG EXISTING BANK CLASS ’II’ RIP RAP TO FORM NEW CHANNEL USE SLOPES 2:1 OR FLATTER GEOTEXTILE = 405 SY EST. 400 TONS OF CLASS II RIP RAP SEE DETAIL C AND GEOTEXTILE B RIP RAP W/ CLASS CUT DITCH SPECIAL SEE DETAIL D AND GEOTEXTILE W/ CLASS B RIP RAP CUT DITCH 3:1D Flatter4:1 or d ( Not to Scale) CUT DITCH 61 TONS CLASS B 82 SY GEOTEXTILE FROM -L- STA. 19+50 TO STA. 20+55 RT. Slope Ditch Front DETAIL D Max. d = 1 Ft. Min. D = 1 Ft. Type of Liner= Class B Rip-Rap Ground Natural Geotextile SEE DETAIL C AND GEOTEXTILE W/ CLASS B RIP RAP SPECIAL CUT DITCH Flatter3:1 or D 3:1( Not to Scale) SPECIAL CUT DITCH FROM -L- STA. 16+05 TO STA. 17+25 RT. FROM -L- STA. 15+55 TO STA. 18+18 LT. DETAIL A Min. D = 1 Ft. Ground Natural Slope Ditch Front 3: 1 D Flatter4:1 or d ( Not to Scale) SPECIAL CUT DITCH 29 TONS CLASS B 39 SY GEOTEXTILE FROM -L- STA. 19+00 TO STA. 19+50 RT. 49 TONS CLASS B 103 SY GEOTEXTILE FROM -L- STA. 18+64 TO STA. 20+05 LT. DETAIL C Max. d = 1 Ft. Min. D = 1 Ft. Type of Liner= Class B Rip-Rap Slope Ditch Front Ground Natural Geotextile SEE DETAIL A SPECIAL CUT DITCH ( Not to Scale) Geotextile Elevation Natural Bed 38 TONS CLASS B 80 SY GEOTEXTILE FROM -L- STA. 18+26 TO STA. 19+00 RT. 15 TONS CLASS B 32 SY GEOTEXTILE FROM -L- STA. 17+25 TO STA. 18+13 RT. Ground Natural Ground Natural (Variable) Channel Bed EXISTING CHANNEL STABILIZATION DETAIL F 1’ Type of Liner= Class B Rip-Rap - Keyed-In SEE DETAIL E STABILIZATION EXISTING CHANNEL (-)0.84% (-)2.06% (+)8.82% (+)7.00% ELEV.=123.50 FT -L- 18+18 (LT) END DITCH ELEV.=127.17 FT -L- 17+25 (RT) END DITCH ELEV.=127.77 FT -L- 18+64 (LT) BEGIN DITCH ELEV.=137.71 FT -L- 20+05 (LT) END DITCH ELEV.=133.91 FT -L- 19+50 (RT) END DITCH ELEV.=129.50 FT -L- 19+00 (RT) BEGIN DITCH RIGHT DITCH LEFT DITCH ELEV.=128.92 FT -L- 15+55 (LT) BEGIN DITCH ELEV.=128.18 FT -L- 16+05 (RT) BEGIN DITCH 132.70 131.80 0.0280.036 STA. 20+55.00 END PROJECT 131.08 3:13:13:1 0.0250.016 127.89 DWY 9.2:1 130.69 3:1 0.0250.005 3:1126.96 3:13:1 127.80 130.38 3:1 3:1 0.0290.029 127.383:11"/FT. 125.93 3:1130.31 3:13:1 0.0410.041 3:1125.42 127.17 3:1 130.31 3:13:1 0.053 0.053 3:1124.90 00 00 55 55 1010 1010 1515 1515 2020 2020 2525 2525 3030 3030 3535 3535 4040 4040 4545 4545 5050 5050 5555 5555 6060 6060 6565 6565 7070 7070 7575 7575 0 10/29/2020...\GALILEE RD_RDY_XPL.dgnUSER:MHarvey8/23/99PROJ. REFERENCE NO.SHEET NO. 130 130 15+05.00 130 130 135 135 15+55.00 130 130 16+05.00 130 130 16+50.00 125 125 130 130 17+00.00 125 125 130 130 17+25.00 125 125 130 130 135 135 17+50.00 X-1DF16804.2051046 -L- 5 10 SHEET 4 OF 5 PERMIT DRAWING Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)1 -L- Sta. 17+83 - 18+56 Lt Bank Stabilization 0.03 0.04 91 23 2 -L- Sta. 17+90 - 18+41 Rt Bank Stabilization < 0.01 < 0.01 0.012314 TOTALS*: < 0.01 0.03 0.05 114 37 0*Rounded totals are sum of actual impactsNOTES:Revised 2018 Feb SHEET 5OF 5 WETLAND AND SURACE WATER IMPACTS SUMMARYWETLAND IMPACTS SURFACE WATER IMPACTSJOHNSTON COUNTYDF16804.2051046 NC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS10/30/2020