Loading...
HomeMy WebLinkAbout090054_Plan of Action (POA)_20200806PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 9_54 Facility Name: Graham Farms cerraaaopwabrNann Sidney W. Taylor County: Bladen Operator Number: 18446 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from tha current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon NameflD: Spd way(Y or N): Levellinches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 1 N 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action a attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed aites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWO prior to transfer of waste to a site riot covered in the facility's CAWMP. Operation will be partially or fully depopulated. 'Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and hand population for the receiving facility 3. Earliest possible date to begin lead application of waste: 8110120 Weather permitting. 1 hereby certify that 1 have reviewed the Information listed above and Included within the attached Plan of Action, and to the best of my l mviedge and ablllty. the information Is occurs% and correct. Prestage Farms Inc. Phone: 910-M-5771 Facility Owner/Manager (print) -0110/�w/� Date: 602020 Facility Ow sW;nager (signature) 30 DAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Namelldenti8er (ID): lGreham Farms 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level acoordirg to marker 17.0 inches b. designed 25 yrJ24 hr. storm & structural freeboard 19.0 Inches c. line b - fine a (Inches In red zone) = 2.0 Inches top of dice surface area according to design d. (area at below sWctural freeboard elevation) 88837 fe a. line c/12 x the d x 7.48 gallon/ 85567 gallons 3. Projected volume of wade liquid produced during draw down period I. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 97181 ft' h. current herd 9 2940 cer8fied herd i 2940 actual waste produced = current herd i x line g = 97161 W certified herd 8 I. volume of wash water according to structural design Ole I. excess rainfall over evaporation according to design 4?2331t3 k. (Was h + i + j) x 7.48 x 30 days/line f= 173778 gallons 4. Total PAN to be land applied during draw down period 1. current waste analysis dated 8/1f2020 1.28 m. ((lines e + k)/1000) x fine I . 332 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 11. TOTAL POUNDS OF PAN STORED WrMN STRUCTURAL FREEBOARD ANDIOR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY i. Structure ID: Graham Nne m = 332.0 b PAN 2. Structure ID: line m - b PAN 3. Structure ID: line m = Ib PAN 4. Structure ID: line m - lb PAN 5. Structure ID: Una m = lb PAN 5. Structure I D: line m w lb PAN n. lines I+2+3+4+5+Sw 332.0lbPAN IN. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PER1011_ DO NOT 1 1ST FIFI n t TA WFMP_M DAY rANNnT RF ADDI IFn n11D1M2 T a m1 nAV DFDinn ...w. r.... . . .w 1.—.. .w�unw� y- IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) ■ 332.0 6. PAN x. Crop's remaining PAN balance Pins v from section IN) w �'�Ib. PAN y. Overall PAN balance (w . x) ■ ----Mff Ib. PAN Line y must show as a deficit. If line y dos not slow as a deficit, list course of action here including pump and haul, depopulation. herd reduction, etc. For pump & haul and herd reduction options, reoloulats now PAN bated an now information. H new fields are to be Included as an option for lowering lagoon level, add these Ilelds to the PAN balance table and recalculate the overall PAN balance. If animal waste Is to be hauled to another pennitled facility, provide Information regarding the hard population and lagoon freeboard levels at the receiving Witty. Self reported to DVVR on 814,20.