Loading...
HomeMy WebLinkAbout20100510 Ver 1_401 Application_20100610• avers &Associates,inc. ' Since1918 TRANSMITTAL Engineers ' Planners Surveyors TO: Amy Chapman DATE: 6/25/10 JOB NO.: 2008107 NCDNR-DWQ-Permits Unit RE: Chatham County Law Enforcement Center Mail Service Center 1650 Parking Lot Modifications and Expansion Raleigh, NC 27699-1650 WE ARE SENDING YOU ? Attached ? Under separate cover via ? Shop Drawings ? Prints ? Plans ? Samples ? Change Order ® Other: the following items: ? Copy of Letter COPIES DATE NO. DESCRIPTION 5 PCN application Forms (1 Original, 4 copies) 5 Sets of Plans 5 Sets of Stormwater Calculations THESE ARE TRANSMITTED as checked below: ® For approval ? Reviewed ® For your use ? Rejected ? As Requested ? Corrected ? For Review and comment ? REMARKS: ? Revise and resubmit ? Submit copies for distribution ? Return _ corrected prints RI RS & ASSO ATE , INC. David L. Smith, P.E. c: If enclosures are not as noted, kindly notify us at once. M:\Chatham County\2008107 - LEC\ADMIN\D -Perm its\DE N R-Water Quality\100625_PCN\100625_AmyChapman_NCDNR- DWQ.doc 20100510 6131 Falls of Neuse Rd., Suite 300 • Raleigh, NC 276209 • (919) 848-3347 • FAX (919) 848-0319 Email: rivers(@riversandassociates.com ? Specifications '.1 ?r of wn r ,? `? gv o`' oG `' 2c ;c o < W1 L.,NDSANDg ToR41N? 8 AUTY N 201005 10 Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ? Section 404 Permit ? Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: N/A or General Permit (GP) number: N/A 1c. Has the NWP or GP number been verified by the Corps? ? Yes ? No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ? 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ?X Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes X? No For the record only for Corps Permit: ? Yes X? No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ?X No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ? Yes Q No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes Q No 2. Project Information 2a. Name of project: Chatham County Law Enforcement Center Parking Lot Modification and Expansion 2b. County: Chatham 2c. Nearest municipality / town: Pittsboro 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: N/A 3. Owner Information 3a. Name(s) on Recorded Deed: Chatham County 3b. Deed Book and Page No. D.B. 391, PG. 0301 / D.B. 514, PG. 0163 3c. Responsible Party (for LLC if applicable): David Hughes 3d. Street address: 295 West Street 3e. City, state, zip: Pittsboro, NC 27312 3f. Telephone no.: (919) 542-8200 3g. Fax no.: (919) 542-8272 3h. Email address: david.hughes@chathamnc.org Page 1 of 10 PCN Form - Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ? Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: David Smith, P.E. 5b. Business name (if applicable): Rivers & Associates, Inc. 5c. Street address: 6131 Falls of Neuse Rd. Suite 300 5d. City, state, zip: Raleigh, NC 27609 5e. Telephone no.: (919) 848-3347 5f. Fax no.: (919) 848-0319 5g. Email address: dsmith@riversandassociates.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 9741-56-8974 1 b. Site coordinates (in decimal degrees): Latitude: 35.7194 Longitude: 79.1822 1 c. Property size: 5.6 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Robeson Creek 16-38-(3) 2b. Water Quality Classification of nearest receiving water: WS-IV, NSW 2c. River basin: Cape Fear 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: (see attached description) 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 745 3d. Explain the purpose of the proposed project: Parking lot modification and expansion. 3e. Describe the overall project in detail, including the type of equipment to be used: (see attached description) 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? 0 Yes ? No ? Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? ? Preliminary ?X Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Martin Richmond (DWQ) Agency/Consultant Company: NCNENR/DWQ Other: 4d. 5/6/ If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 10 (Field) 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ? Yes 0 No ? Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ? Yes ? No 6b. If yes, explain. Page 3 of 10 PCN Form - Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ? Wetlands ? Streams -tributaries ?X Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 Choose one Choose one Yes/No W2 - Choose one Choose one Yes/No W3 - Choose one Choose one Yes/No W4 Choose one Choose one Yes/No W5 Choose one Choose one Yes/No W6 Choose one Choose one Yes/No - 2g. Total Wetland Impacts: 0 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 Choose one - S2 Choose one - - S3 Choose one S4 Choose one - - S5 Choose one - _ S6 Choose one 3h. Total stream and tributary impacts o 3i. Comments: Page 4 of 10 PCN Form - Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individual) list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose 02 Choose one Choose 03 Choose one Choose 04 Choose one Choose 4f. Total open water impacts 0 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? Yes E] No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation. then you MUST fill out Section D of this form. 6a. Project is in which protected basin? Neuse [] Tar-Pamlico ? Catawba E] Randleman ?X Other: 6b. Buffer Impact number- Permanent (P) or Temporary T 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet 6g. Zone 2 impact (square feet B1 P burp outfall un-named tributary to Robison Creek No 455 496 B2 Yes/No B3 Yes/No B4 Yes/No B5 Yes/No B6 Yes/No 6h. Total Buffer Impacts: 455 496 6i. Comments: rage b of 1U D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Some existing impervious areas that currently drain to the Southern portion of the site have been re-routed to the proposed Bio-retention basin to offset proposed impervious areas that will drain to the southern portion of the site. BMP & outfall required as an alternate to diffuse flow (buffer to steep by guidance). 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. No Riprap will be placed in the riparian buffer, grassed permanent swale linings will be used in the Bio-retention basin emergency spillway to dissipate flow and control erosion. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ? No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Makin a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form - Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? Yes ?X No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a . Does the project include or is it adjacent to protected riparian buffers identified ?X Yes ? No within one of the NC Riparian Buffer Protection Rules? 1 b . If yes, then is a diffuse flow plan included? If no, explain why. ? Yes ?X No 2. Stormwater Management Plan 2a . What is the overall percent imperviousness of this project? 37.9% 2b . Does this project require a Stormwater Management Plan? ? Yes ?X No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Local (Pittsboro) rules in effect. Project falls under low density per Pittsboro rules based on proposed increase in impervious surface. New impervious represents 16.2% of site. 2d . If this project DOES require a Stormwater Management Plan, then provide a brief, na rrative description of the plan: N/A 2e. Who will be responsible for the review of the Stormwater Management Plan? N/a 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? Town of Pittsboro ? Phase II ? NSW 3b. Which of the following locally-implemented stormwater management programs ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ?X No attached? 4. DWQ Stormwater Program Review ?Coastal counties ?HQW 4a. Which of the following state-implemented stormwater management programs apply ?ORW (check all that apply): ?Session Law 2006-246 ? Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ? Yes ?X No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 8 of 10 PCN Form -Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the Yes ? No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ?X No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (if so, attach a copy of the NEPA or SEPA final approval ? Yes ? No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ?Yes ?X No or Riparian Buffer Rules (15A NCAC 2B.0200)? 2b. Is this an after-the-fact permit application? ?Yes ?X No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ?Yes ?X No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. No additional wastewater will be generated by this protect. Page 9 of 10 PCN Form - Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? ? Yes ?X No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? ? Yes X No ? 5c. If yes, indicate the USFWS Field Office you have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes X? No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? ? Yes ?X No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ?X No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? DFIRM PANEL NUMBER 9741 C l //0 Applicant/Agent's Printed Name -'? lican gent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided.) Date Page 10 of 10 8' WIDE EMERGENCY ZONE 2 IMPACT U.S. HIGHWAY 64 SPILLWAY (ELEV. 370.0) WITH 496 S.F. (70' RIGHT-OF-WAY) 14' WIDE x 30' LONG x 12" THICK CLASS "B" RIP-RAP - SPILLWAY PROTECTION ON FILTER FABRIC - - - - - - - - - - - ZONE 1 IMPACT 455 S. F. ,f LIMITS OF DISTURBED AREA 4' SQ. CONCRETE RISER WITH TRASH RACK 3 O 50' , 54 L.F. 8" HDPE ®0.93% 30E 1 BIORETENTION BASIN 31 20' ZON - ToNE 2 t BUFFER IMPACT - B 1 I` 14' WIDE x 45' LONG PYRAMAT 1 (OR EQUAL) SPILLWAY LINING ? I 0 BI0RETENTION ASI LIMITS OF DISTURBED AREA A.-*1 371 E 2 IMPACT S.F. a 1NN t 2:1 3.• ? 1 ' \ 374 373- 372 3713'1 / I 50' ,BUFFER ' 30' 20 1 ZONE 2 1 ZONE 1 EXEMPT BUFFER IMPACT at1? CAR SOL 20744 • • O ?' ID L115????,. I ? I I Engineers 0 30 N t? Rivers Planners Surveyors Associates, Inc. Lie. No. F-0334 107 East Second Street Since 1918 6131 Falls of Neuse Road, Suite 300 1 inch = 30 ft. Greenville, NC 27858 (252) 752-4135 Raleigh, NC 27609 (919) 848-3347 CHATHAM COUNTY LAW ENFORCEMENT CENTER PROJECT N0. PARKING LOT MODIFICATIONS AND EXPANSION 2008107 BUFFER IMPACTS SHEET CENTER TOWNSHIP, CHATHAM COUNTY, NORTH CAROLINA 1 of 1 ?. . ,.. , ? Chatham County Law Enforcement Center r sr?c.?Y J 'V ? 2 0 1 0 0 5 1 0 Parking Lot Modifications and Expansion Stormwater Calculations November 3, 2008 June 24, 2010 (Revised) Prepared For: Chatham County 12 East Street P.O. Box 1809 Pittsboro, NC 27312 Prepared by: Rivers and Associates, Inc. 6131 Falls of Neuse Road, Suite 300 Raleigh, NC 27609 (919) 848-3347 'Aio Rivers & Associates Inc. Job #2008107 Narratives EROSION AND SEDIMENT CONTROL NARRATIVE FOR CHATHAM COUNTY LAW ENFORCEMENT CENTER PARKING LOT MODIFICATIONS AND EXPANSION PITTSBORO, NORTH CAROLINA August 21, 2008 PROJECT DESCRIPTION: Chatham County Law Enforcement Center, Parking Lot Modifications and Expansion consists of the removal of two existing buildings totaling 4,128 square feet on the southwest corner of the site and the removal of 9,948 square feet of paving and 1,180 linear feet of curb and gutter. New construction will include 29,720 square feet of new pavement, 25,027 square feet of pavement overlay and 2,557 linear feet of curb. Storm water management will consist of a new sormwater collection system on the northern portion of the site and modifications to the collection system on the southerly portion of the site. Stormwater BMP's will consist of a 6,328 square foot bio-retention basin. Parking will increase from 84 parking spaces to 128 parking spaces. PROJECT SITE: The project is located in Chatham County in the Town of Pittsboro on the Southeasterly corner of the intersection of West Road (NC Highway 64) and McClenahan Street. The site is dominated by rolling terrain. The soils on the site consist primarily of Georgeville-Urban land complex, 2 to 10 percent slopes a Hydrologic Group B soil. The site is bounded by West Road (NC Highway 64) on the North, McClenahan Street on the West a County park and a small stream to the South and a blue line stream to the East. The Northern portion of the existing site drains via sheet flow to the stream on the Eastern boundary. The Southern portion of the existing site drains via a pipe system and sheet flow to the stream on the Southern. Copies of soil information and a copy of the USGS Quadrangle Map are attached. WATER QUALITY: This site is within a WS-1V NSW protected watershed with local jurisdictional oversight by the town of Pittsboro. This site drains to the Haw River via Roberson Creek. The project will not impact any streams or riparian buffers and will not require Section 401 Certification though NCDENR. We have proposed a bio-retention basin for the northern drainage area and utilization and reconfiguration of the existing piping system as well as sheet flow to the southern stream for the southern drainage area. EROSION CONTROL: Sedimentation and erosion control for this project will require the installation and maintenance of a variety of device types including diversion and settling measures. A skimmer basin has been proposed for the Northern drainage area and has been designed in accordance with current state regulations. Both streams will be protected with silt fence with silt fence outlets to restrict sediment from entering the stream buffers. All storm inlets will be protected to restrict sediment from entering the storm system. All storm outlets will be protected with permanent velocity dissipaters. Calculations and design related to basin sizing are attached. Stormwater Management Narrative This project lies within a Watershed Overlay District and must meet the requirements as outlined in section 5.5 of the current Zoning Ordinance. This project is an expansion of use of an existing development as defined in Section 5.5.7.c. Section 5.5.7.c states that "the built upon area of the existing development is not required to be included in the density calculation". Removing the existing built upon area from the density calculations yields a density of 16.2%. A density of 16.2% is below the permitted 24% as required in section 5.5.2.b. Therefore, this project does not qualify as a High Density Development which would require engineered stormwater controls to control the first inch of rainfall (Section 5.5.10.a) or wet detention pond storinwater controls (Section 5.5.1 Lc). Stormwater management on the Northern portion of the site will be accomplished with a bio-retention basin BMP to treat the northern parking. The drainage on the southern portion of the site will be conveyed to the southern drainage way via existing drainage structures and sheet flow through the buffer. The majority of the impervious area on the Northern portion of the site will be. The treatment of the existing impervious area on the Northern portion of the site is to offset the additional impervious area added to the Southern portion that will flow to the Southern drainage way. An additional future impervious area of 0.60 acres has been accounted for in the sizing of the Bio-retention basin. Bio-retention Basin: The Bio-retention basin has been sized in accordance with the current "North Carolina Division of Water Quality - Stormwater Best Management Practices Manual" and was designed with enough storage to provide active storage control per Section 3.4. The basin drainage area is 2.33 acres. The basin impervious area is 0.93 acres Future impervious area 0.60 acres Percent impervious area of the basin is 66% The runoff coefficient of the basin per section 3.4 is 0.64 The required treatment volume per section 3.4 is 5,421 ft3 The required treatment surface area with a 1' depth of plants per section 3.4 is 5,421 ft2 The proposed basin volume is 5,845 ft3 - 107% of the required volume. The proposed basin treatment area is 6,330 ft2 - 117% of the required area. Impervious treatment areas: Existing Impervious area 1.45 ac Proposed impervious area 2.12 ac Future impervious area 0.60 ac Increase in impervious area 1.27 ac Impervious area treated Bio-retention 1.53 ac Total treated area 1.66 ac 130% of new impervious area treated Rivers , Page 1 6/24/2010 Chatham LEC Stormwater Peak Flow Summary Storm Event Pre Peak CFS Post Peak CFS _?] Percent Reduction 1 6.58 6.4 3 2 10.68 9.37 12 5 17.81 17.48 2 10 24.24 22.03 9 100 52.31 41.73 20 MAChatham County\2008107 - LEC\ADMIN\K - Design Data\Peak Summary.xis Deeds 0391 0301 I d i t z+t,,1.•,i. 4 STATE OF NORTH CAROLINA COUNTY OF CHATHAM Book 391 Page 301 THIS DEED, made this the 10th day.of September, 1975 by the CHATHAM COUNTY BOARD OF EDUCATION, a body corporate under the laws of the State of North Carolina, party of the first part, to CHATHAM COUNTY, a North Carolina Municipal Corporation, P. 0. Box 12f , Pittsboro, North Carolina 27312, party of the second part; W I T N E S S E T H THAT WHEREAS, Chatham County Board of Commissioners desires to acquire the property hereinafter described, and the Chatham County Board of Education agreed to transfer said property; and whereas, the Board of Education in Pittsboro, North Carolina by resolution duly adopted at a meeting held on June 2, 1975 the Board voted to so transfer said land. NOW, THEREFORE, in consideration of the premises and for the sum of ONE DOLLAR ($1.00) to it in hand paid by the said party of the second part, receipt of which is hereby acknowledged, the said party. of the first part does bargain, sell and convey unto the said party of the second part, its successors and assigns, all that certain tract or parcel of land situate in Center Township, Chatham County, North Carolina, and more particularly described and defined as follows, to-wit: BEGINNING at a point in the intersection of Harmon Street and U. S. Highway 64 West and running thence along a line 15 feet from the centerline of said Harmon Street South 0 degrees 40 minutes West 388 feet to a point; thence South 84 degrees 53 minutes-East 560 feet to a point in the center of Hill Creek; thence along the center of said creek the following traverse distance North 3 degrees 17 minutes West 391 feet to a point; thence North 84 degrees 53 minutes West 533 feet to the point or place of BEGINNING, containing 4.85 acres, more or less according to a map entitled "Old Elementary School" prepared by Robert J. Ayers, Surveyor, dated August 7, 1975, reference to which is hereby made for a more particular description. TO HAVE AND TO HOLD the aforesaid parcel of land together with all the rights, privileges and appurtenances thereunto belonging unto it, the said party of the second part, its successors and assigns, in fee simple absolute forever. IN WITNESS WHEREOF, the said Chatham County Board of Education has caused this deed to be signed in its name by its Chairman and its official seal to be hereto affixed, and attested by the Superintendent of Chatham County Schools who is Ex Officio Secretary to the Board, this the day and year first above written CHATHAM n? COUNTY BOARD OF EDUCATION ATT9'1 T : BY : U1 rr?X 4 `t c 111 . ; irman +! nteftent of Chatham Schools icio Secretary to the Board 0391 0302 1"- I .r Book 391 Page 302 STATE OF NORTH CAROLINA COUNTY Or CHATHAM pp I, (o?(.lt o0.sur? a Notary Public of Chatham County, North Carolina, o hereby certify that Perry Harrison, County Superintendent of Schools of Chatham County and Ex Officio Secretary to the Chatham County Board of Education, personally came before me this day and acknowledged that he is Secretary of Chatham County Board of Education,.a body corporate, and that by authority duly given and as the act of the Chatham County Board of Education, the foregoing deed wag signed in its name by Jack Wilkie, Chairman of the Chatham County Board of Education, sealed with its corporate seal, and attested by himself as its Secretary. Witness my hand and official seal, this the.,.+ day of (?wf, ?aew 1975. Notary • .. My Commission Expires: My Commission Expires Juns 9, 1976 ?• NORTH CAROLINA CHATHAM COUNTY The foregoing certificate of Ethel B. Strowd a Notary Public is certified to be correct. This instrument was presented for registration at10:55 o'clock a. M. on October 20, 1975 and recorded in BooR-3W Page 301 LEMUEL R. JOHNSON Register tpp?? Register of Deeds BY: Amahaftegi-Depdty i I/ , I k i STATE OF NORTH CAROLINA COUNTY OF CHATHAM WARRANTY DEED eooK 514,mFlut3 I THIS DEED, made this day of July, 1987, by and bet- ween the CHATHAM COUNTY BOARD OF EDUCATION, hereinafter referred to as Grantor, and the COUNTY OF CHATHAM, a body politic and corporate of the State of North Carolina, hereinafter referred to as Grantee, 1 t W I T N E S S E T H: That Grantor, for a valuable consideration paid by the Grantee, the receipt and sufficiency of which is hereby 1 acknowledged, does grant, simple, all of its right, title and interest in and to all of that certain tract or parcel of land located in Center Townshi par- ticularly BEGINNING at a set iron pipe in the eastern right of way line Number Chatham Chatham line sec north- west referred tol thence South 05 degrees 07 minutes West 75.97 feet to a set iron pipe in the northern line of the property leased to the Town of Pittaborol thence along the Town of Pittsboro's line about North 87 degrees 07 minutes 53 seconds West approximately 66 feet to a point in the eastern right of way line of MMcClennahan Street; thence along the eastern right of way line of said street about North 00 degrees 58 minu- tes East approximately 78 feet to the point or place of BBEGINNING and being all of that small parcel of land denominated as Chatham County Board of Education on the plat hereby made for a more particular description. AS partial consideration for this conveyance, Grantee hereby expressly warrants and represents to Grantor that this existing in Book 391, Page 301 of the Chatham County Registry, and com- bined of regu- lations. Both con- veyed aseparate develop- ment. 1 V. X1, 4 500K WFM164 TO HAVE AND TO HOLD the aforesaid tract or parcel of r land and all privileges and appurtenances thereunto belonging to the Grantee in fee simple. AND the Grantor covenants with the Grantee that it is seized of the premises in fee, has the right to convey the same in fee simple, that title is marketable and free of all .encumbrances, and that Grantor will warrant and defend the title to the same against the claims of all persons whom- soever. IN TESTIMONY WHEREOF, the Grantor has caused this deed to be executed in its name and its seal affixed all by authority duly given. 'L;OISSI? CHATHAM COUNTY HOARD of EBUCA?ION;;r?.^ '? By: Cha?san r• ?? ;, s 1!J sup, ATT r / l i??r,ll/ice STATE OF NORTH CAROLINA COUNTY OF CHATHAM I, , a Notary Public of the County and S to aforesaid, ce? rtI y that Perry W. Harrison, personally c e before me this day and acknowledged that he is Secretary of the Chatham County Board of Education, a body politic, and that by authority duly given and as the act of the Board of Education, the foregoing instrument was signed in its name by its Chairman, and attested by its Secretary. WITNESS my hand and notarial seal, this day of July, 1987. (SEAL) , Vbtary Public NORTH CAROLINA. CHATHAM COUNTY The foreplat oerttllcate(s) of._....._......4..art.4.-Ai .. j Nota.ry_(_Notaries) ,Public?.(e (an) aerUded to be correct T41e instrument was presented for reRtatrallea al.... 2.i.10 o'eleek ... p? M. _. an --•.•a3??•--?+.•1---•-^--^'' .39..87 and recorded to Bwk,,, .514...... FLEET BARBER REDDISH D7:^?pjd1? Register of Deeds Maps �� f'• : �'i y r '�" • ■ ■ __- 1. ir T If i ■ J fj Ah r _ ■ or _ t ff EL Iv Ur ■ `;.- ■ ' Ir NL 46 Lj � f P `i � t fes• ~ "•'���`""�+ � � _ ��`'� � l 111 �4' i .rr�''- _ -y_..y` - ~ ' } } e. •., 4.��kt 'ti �+ ter. �,+_ •_ ^ '1.,;,'���;� _- 00 m of 0 N ? Q) N (6 0- 0 lm m C_ O (0 U? t 0c ZO _U aw+ C C OE C) CD c° c y W m3 r a? (0 O Cl) N Ile O O 9OZSV966 r i E bb bS6E OC m ? 09£696£ OZ£ .p ...,, _ N °v m 0 IN ICI T Q) Z 0? N O CO j o oa (n O ?0 a? C O Z O I° O M I§1 Q _U N U N 1.10 N O m (?0 y 7 y f9 O Z-< Z''U s +5, ai o o m U O O 10 m C_ N c w ° > U 0 co O (D -o N N C E O a) 21 (0 O C 0 2 O U? a)? w co ? c-: cm 7 r C ? - U O Z a> a RS : p ' O E z N O1 11 O C, T ° f0 E 75 c z> (n U co U r-- 7 Cl) O N N -C `o (Co N Z z r CD E N Q 0 a) a) a) O U ? Q O O N M Z .0 L L `) 3 m a o 3 O O . Z a, to r? ( N y_ co co i c a) O O a) L co O L) -0 : O N N C 7 O O a) Q-0 ?j '> 0-,0 LL V) m N 3 o 3 U ? L E -M ? a) O O QN E o o E c a ) c c E m N m a) L g o 'N o(n d Q m '? c E' O c, ? m w r > a) U 3 ? a) ° w V) L aa)) c .? > o.T(6 " N Z? ? a)- W oN O - N j a (o Q) E d a) T V) a) a) D1 N ns d m a) E o. p ? 0 O -O T 7 fA N m a) - CO N ? C7 N Q a) co L -p O. -0 _ N N N d y O c0 a) O co O_ m ? 0)- a) c.S?E O C `U? O N CL > 7 >, tea) ? o'aa)m m3 rnCL o 0 N a) - Z O m E m E o> `o E U) H4; )? U FL- °.!= o m c_ 0 co 0- -C t5 V- 0 C Z O _U G C a) O E U 0 ? o ?w L U a a? a3 5 O co U C 9 a a -2 U ( t > N N O m In U) c O O r cu a) Q c m = a) N L CA 7 m a m (n c E m o 2 N L LL T L O N ' m' m a) a) N 4) m U m L m > 7 y O c C7 _ L n O G) is ' . . U V O cn C E $ of (n m n O O J m U- CL 3 m Z ( m r C ? U- 0 C LLJ CL 6) 11 p ? t \ 0 (L 3 2 W J Q o a a N c o N m ? to ? m w N N N a m _ Q) G C `I a d _ V (n 3 = a) a) O j >_ 2 w o o w U) o m o p Q O co m j O - a (n n. N > Q) o LL 4 L o m f O (n > > m O o o (D a m d U. 3 • T a > N > (0 - O m C > U a) U Q) Y U m C , c a > L Y N V _ > c Q U) ? m co U U (? J J Z a Of fn (n co (n (n (n U) (n m a c i 0 ( a ® x ? }?, ° > ?I? O fn ? Ili G7 ? . L (n o Q M Soil Map-Chatham County, North Carolina Map Unit Legend Law Enforcement Center Chatham County, North Carolina (NC037) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI GeB2 Georgeville silty clay loam, 2 to 1.0 5.0% 6 percent slopes, moderately ' Gn?% - Geor9eroded ville-Urban land - - 19.0 I - - - J 95.0% complex, 2 to 10 percent slopes Totals for Area of Interest (AOI) 20.0 100.0% Natural Resources Web Soil Survey 2.0 8/19/2008 Conservation Service National Cooperative Soil Survey Page 3 of 3 v { 4 I? 4 C { 4 4 I:. Le 4 C 3:k k t L a) U 4-0 a) E U O W .L.-4di "qqqR 9D 1 rr r C 4 4 in = EVE E ?E 4 4 y_ 4 ?y q ? ? 4 P 4. ? W N 6F ? ? s Q VY Ols DP 64 > I 4 4 4 4 s 4 ss .ss.? a U s L I. 4 ? JY V ? lk 4? O b S? 4 O ? PROJECT % IMPERVIOUS PER CURRENT UDO a? PROPOSED TOTAL AREA = 244,025 S.F. (5.60 AC.) EXISTING IMPERVIOUS AREA = 63,205 S.F. (1.45 AC.) % IMPERVIOUS =25.9% PROPOSED IMPERVIOUS AREA = 92,452 S.F. (2.12 AC.) % IMPERVIOUS =37.9% EXISTING PERVIOUS AREA = 180,820 S.F. (4.15 AC.) ADDITIONAL IMPERVIOUS AREA = 29,247 S.F. (0.67 AC.) PROJECT % IMPERVIOUS PER CURRENT UDO = 16.2% a EXISTING -------------- El 0.73 QC N GRAPHIC SCALE 100 0 50 100 ( IN FEET ) 1 inch = 100 ft. 1.22 QC POST CONSTRUCTION DRAINAGE AREAS CHATHAM COUNTY LAW ENFORCEMENT CENTER PARKING LOT MODIFICATIONS AND EXPANSION CENTER TOWNSHIP, CHATHAM COUNTY, NORTH CAROLINA Storm System Calculations a 3 0 .a T^ i 00 O O N 6 ob O ccr-m Ob N }? C T J T ( O Z N - 3 y a T ? N Cd I co Cr i CD 'rf I 1 ? rn T ? C 4f7 ? ? Ci? Ln r Saa ,N- N r 3 V V d 0 0 0 N v 3 E o 3 0 m 9 S d • (Q CL m 4-0 A? y^A ¦_ 0 00 O N cA Oo O 6 76 0 N N N C O N a E 7 Z co O O LO co Oo O OD ?t (n r- co a. M (n Un N U? N m r*., q r-? > C V 00 N (0 M 00 M N M N M 00 m 00 M C d' m (n (o M m f) M ? O O (0 M O UA (n I? LO ll? co N O O O Lq 00 O M r to r - r (D C > 00 00 N (D co N W (D 00 (n LO C M M M M m r, 00 Cl) C07 Cl Cl M C9 m ?a c 0 rn co r r 00 M Oro r r N O rn J .? O (f) (n r -i r O N N N r N L (D 01 C m d' CO Cl cq (NO ? M O N (D N N a) m M r m Lo CY) J co I? r m h N N f? m N J r t a O 0 00 00 00 (A (n (n N W co (() (n (n '00 C N r r r r r r r r r r r r m -! fn U r N M t (f) (o N M M O r N .. U LU 7 W '- N M (n (o r M M O T V F- c_ O JZ r C? d Q Zi N 0 0 N N N 3 O E `o 3 0 m `o T a) IL Q v a O O N aD O 4i N V) (a ?+ In n ? (D ^ rl 0 V 0 N 0 In N C _ y C N V N O m t\ t` O LO O N uJ Q y r r r O O O O O r O O O O a`) a as cD rn V rn V M rn M r- ao M E = a O M (o U? V (D r? V M N :3 a 0 0 0 0 0 0 r 0 0 0 o z L Q O CD r T LO V N O (D r- M M C K N O O N N V N O O O v 0 0 0 0 0 0 0 0 0 0 0 0 N V o N V ,F V c D rl? O 0 7 ° C ri CD In ( D L q C v r O O r O r . r N r O O O 0 O C N 0 V 0 0 W co M 000 0cq 000. 000 W a00. C> 0 cq W ? O O O O 00 0 0 0 0 0 0 0 O 0 LO C N 0 N - - M N M O G? .?. O O O O O O O O O O O O a) a1 C O u) N ao CD M N W V h C> N Lq p O W N N V O N V a F E 0 0 0 0 0 0 0 0 0 - 0 0 ja (0 V 0 00 V 0 O 0 N N O O Q O n O O O LO O co O M O N O r co O M O N O O O Cl) co O M (D O M (D r, N O LO m O t\ M z N (O u) 7 .V.. L6 V M N N r r ui M r r O M M V M 0) V N O O V T co C K CO (D u) a N N N m u) N O 0 0 0 0 0 0 0 0 0 0 0 0 c o o a! U co M O ao O Co o co O co o M o M O eo o Co O M O M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C m V t` r M O O r r O U? O r- r- co (o co ui c6 co r` Lo ui u) (tea C! vy. V N (D CD O C\j M ( N O co It r" u) r- LO V v r O O r O r r N r O O O G w O Cl) (D O 0) (D O Cl) (D r" N O u) O t` M u) N O u) ry v u) V M N N r r uj (h r r O L a C a) 70 Q J U r N M V LO (D rl m O O T N r U C _ C y V L /^ 66 w C r N CO V c(? (D n CO m O T ? O c '- 0 Z d Z 0 0 N N N 3 m E 0 U) 3 0 m `o 2 G) •l0 a J T? i O O O N m O O U i? N N N C O E Z ? C N co (0 O ? M LO N M O + + w O LO m C O LO H U O 7 M N N r r (D C6 r r O r d V O r O M O N N N O N N a .?.. r O C O O LQ O O C 9 O O r C O O C 's) O O O L Q C m t` r M O O r r m q N •? (` r- Co Co LO O Co CO I,- LO O Cri ro p C d V O O O O O O O co O O O co O O O O O m O co O co O co V O O O O O O O O O O O O Ol d O W rD L2 r r r ?2 ?2 r r r C_ N C } CO O O O l 00 00 O co It O r- (D II Q M O O l? N O N (O h O r O ' O N (D 00 N N 00 O V' (n O C M M M N M O m M I-- M Cl) C O Cl) m a c O CO l O It m ? M O O O N r- N C ) O N m O N N V N m O fA C (O (D CO CO (O r` O CO (D (o O r` Cc a J m ' LO LO m 00 0 0 C\j N a N U ) 6 M r-? (ri N 0 0 m ( 0 N CA L6 (o O M CD M M 9 M C m ? M M O O M N N N N N m O O O m O 00 O N d' (0 O N N m ti' T C C3) Cl) N 0) N m m Cn N V (D (o t 2 O N N r- 00 00 CD Co N N r n M M M M co co co co M co co co N E -1 CL Cl) N r N N N Cl) O O O N O co O N It CD O O N (D lz' m M r- m N M m m N It (D (D M M M M N M M Cl) M M M M O m O V O O O M co N d' 00 0 . O O O r CD cq q CO . O C Cl) n 7 n N CY) r- I W CC) o() 00 00 N oo ? M M co co M M Cl) Cl) co Cl) M Cl) .N ? ? r N M V O O N Co m O r C\j r c N C C C i W C '- N CO It O (O r- 00 m O T V O r _ JZ z 0 0 N N 3 W s 0 3 0 R -`o T Pre-Construction runoff -vs- Post-Construction runoff at peak discharge ponts 10-year storm pre post Bio-retention basin outfall 10.07 cfs 3.60 cfs FES "EX 5.88 cfs 5.56 cfs FES "EH" no change a 0 i 00 O O N O N 00 O d' N G_ J O Z C? T r' I i I N m; O T T F+ T (D C i T L 0 Q) a a 00 O O N O N OD O d m D V Ul C13 C ? O N r O) C 0 y O r O O O 4) Q = a T O? fl.: M :3 .s O O O Z V K N N M N C (,? O O O O i U ,F O U) N CD LO 00 M Cn C .U. r r r r C d o V co co co co 3 o 0 0 0 N m ° c p Q` 0 :a o 0 ? 0 N 0 a> (D co o aM E o 0 0 0 ? d Ci C\J N + + 0 V s r q r lp O O C W co O r 0 N 7 v Cn 4 C'7 r r K O ON O ? N ?Q r 0 0 0 c m m ? m V 00 3V 0 0 0 6 U C CO N O O O O O LO 0 R rN. im ) v N o c m ? cc `U r r r r 0- cc a00 COD O CMC) LL cc LO It CY) r Q N C Q _ J ? y °) o r r Y «? cd ? U) C r N m 't 7 U LU _ O JZ Z 0 0 N m d 3 ?n E 0 cn 3 0 m -`o T vvF 14f Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Aug 20 2008, 2:13 PM Hyd. No. 1 bio-retention pre-construction r o f Hydrograph type = S Runoff Peak discharge 10.07 cf Storm frequency = 10 yrs Time interval = min Drainage area = ac Curve number = 80 Basin Slope = 4.7% Hydraulic length = 253 ft Tc method = LAG Time of conc. (Tc) = 4.87 min Total precip. = 4.99 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 19,368 cuft Q (cfs) 12.00 10.00 8.00 6.00 4.00 2.00 bio-retention pre-construction runoff Hyd. No. 1 -- 10 Yr Q (cfs) 12.00 10.00 8.00 6.00 4.00 2.00 0.00 -' ' i 0.00 0.0 2.2 4.3 6.5 8.7 10.8 13.0 15.2 17.3 19.5 21.7 Hyd No. 1 Time (hrs) Mydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 4 call cntr Ivl sprde Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration Wednesday, Aug 20 2008, 2:13 PM Peak discharge = 1.17 cfs Time interval = min Curve number = 70 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 2,354 cuft Q (cfs) 2.00 1.00 0.00 _L 0 r pre-construction runoff = S S Runoff =Q Ors = 0.3 ac = 0.0 % = USER = 4.99 in = 24 h rs call cntr Ivl sprder pre-construction runoff Hyd. No. 4 -- 10 Yr 2 Hyd No. 4 Q (cfs) 2.00 1.00 - 0.00 5 7 9 12 14 16 19 21 23 26 Time (hrs) BMP Calculations Bmiomretentmion Basin Pnnd Rennrt Hydraflow Hydrographs by Intelisolve Tuesday, Aug 19 2008, 11:40 AM Pond No. 1 - Bioretention basin Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cult) 0.00 368.00 5,360 0 0 1.00 369.00 6,330 5,845 5,845 2.00 370.00 7,370 6,850 12,695 3.00 371.00 8,470 7,920 20,615 Culvert/ Orifice Structures [A] [B] [C] [D] Rise (in) = 8.00 0.00 0.00 0.00 Span (in) = 8.00 0.00 0.00 0.00 No. Barrels = 1 0 0 0 Invert El. (ft) = 363.00 0.00 0.00 0.00 Length (ft) = 50.00 0.00 0.00 0.00 Slope (%) = 1.00 0.00 0.00 0.00 N-Value = .013 .000 .000 .000 Cirif. Coeff. = 0.60 0.00 0.00 0.00 Multi-Stage = n/a No No No Weir Structures [A] [B] [C] [D] Crest Len (ft) = 16.00 8.00 0.00 0.00 Crest El. (ft) = 369.00 370.00 0.00 0.00 Weir Coeff. = 3.33 3.33 0.00 0.00 Weir Type = Riser Rect --- --- Multi-Stage = Yes No No No Exfiltration = 0.000 in/hr (Wet area) Tailwater Elev. = 0.00 it Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Weir riser checked for orifice conditions. Stage (ft) 3.00 2.00 Stage / Discharge 1.00 0.00 1 0.00 3.00 6.00 9.00 12.00 15.00 18.00 21.00 24.00 Total Q Stage (ft) 3.00 2.00 1.00 -- 0.00 27.00 30.00 Discharge (cfs) B'iomretent'ion Basin 2-year storm Flydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 1 direc m Hydrograph type = SCS Runoff Storm frequency =(ZiEiD Drainage area = 1.000 ac Basin Slope = 4.7% Tc method = LAG Total precip. = 3.34 in Storm duration = 24 hrs Tuesday, Aug 19 2008, 2:58 PM Peak discharge =2.92 cfs Time interval = min Curve number = 80 Hydraulic length = 253 ft Time of conc. (Tc) = 4.80 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 5,483 cuft Q (cfs) 3.00 direct to bmp Hyd. No. 1 -- 2 Yr 2.00 1.00 0.00 -L 0 2 Hyd No. 1 5 7 9 12 14 16 19 21 23 Q (cfs) 3.00 2.00 1.00 ---- 0.00 26 Time (hrs) H.ydrograph Plot Hydraflow Hydrographs by Intelisolve Tuesday, Aug 19 2008, 2:58 PM Hyd. No. 2 outfall a Hydrograph type = SCS Runoff Peak discharge = 3.72 cfs Storm frequency PYrs Time interval = Drainage area = ac O Curve number = 90 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 7.60 min Total precip. = 3.34 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 8,135 cuft Q (cfs) 4.00 3.00 outfall a Hyd. No. 2 -- 2 Yr Q (cfs) 4.00 2.00 1.00 0.00 -LW 0.0 2.2 4.3 6.5 Hyd No. 2 3.00 2.00 1.00 ' - 0.00 8.7 10.8 13.0 15.2 17.3 19.5 21.7 Time (hrs) • Ilydrograph Plot Hydraflow Hydrographs by Intelisolve Tuesday, Aug 19 2008, 2:58 PM Hyd. No. 3 outfall b Hydrograph type = S CS Runoff Peak discharge = 1 Storm frequency = 2 rs Time interval = 1 min Drainage area = 0.300 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 8.00 min Total precip. = 3.34 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 3,299 cuft Q (cfs) 2.00 outfall b Hyd. No. 3 -- 2 Yr 1.00 0.00 -L- 0.0 2.0 4.0 6.0 8.0 Hyd No. 3 Q (cfs) 2.00 1.00 0.00 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) • H.ydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 4 total from outfalls Hydrograph type = bine Storm frequency 2 yrs Inflow hyds. = 2, Tuesday, Aug 19 2008, 2:58 PM Peak discharge =(5 .06 cfs Time interval = in Hydrograph Volume = 11,434 cult Q (cfs) 6.00 total from outfalls Hyd. No. 4 -- 2 Yr 5.00 4.00 3.00 2.00 1.00 0.00 -L - 0.0 2.2 4.3 Hyd No. 4 Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 6.5 8.7 10.8 13.0 15.2 17.3 19.5 21.7 Time (hrs) - Hyd No. 2 Hyd No. 3 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Tuesday, Aug 19 2008, 2:58 PM Hyd. No. 5 total runoff to bmp bine Peak discharge = 7.86 cfs Hydrograph type = P,4 Storm frequency Time interval = 1 min Inflow hyds. _ Hydr ograph Volume = 16,917 cuft total runoff to bmp Q cfs Hyd. No. 5 -- 2 Yr a (cfs) 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 ?-- ° 0.00 0.0 2.2 4.3 6.5 8.7 10.8 13.0 15.2 17.3 19.5 21.7 23.8 Time (hrs) - Hyd No. 5 Hyd No. 1 Hyd No. 4 • Hydrograph Plot Hydraflow Hydrographs by Intelisolve Tuesday, Aug 19 2008, 3:9 PM Hyd. No. 6 Bioretention basin Hydrograph type = j3aaQrvoir Peak discharge = C33 cfs Storm frequency 2 yrs Time interval = 1 min Inflow hyd. No. = Max. Elevation = 369.26 ft Reservoir name = Bioretention basin Max. Storage = 7,598 cuft Storage Indication method used. Q (cfs) 8.00 6.00 4.00 2.00 0.00 0 Bioretention basin Hyd. No. 6 -- 2 Yr Q (cfs) 8.00 6.00 4.00 2.00 0.00 2 5 7 9 12 14 16 19 21 23 26 Hyd No. 6 Hyd No. 5 Time (hrs) Hydrograph Volume = 11,072 cuft Hydrograph Plot Hydraflow Hydrographs by Intelisolve Tuesday, Aug 19 2008, 3:9 PM Hyd. No. 7 Spillway Weir Hydrograph type = Diversionl Peak discharge =(O =00Cf s St orm frequency =2 yrs Time interval = 1 min Inflow hydrograph = 6 2nd diverted hyd. = 8 Diversion method = Pond - Bioretention basin Pond structure = Weir B Hydrograph Volume = 0 cuft Q (cfs) 4.00 Spillway Weir Hyd. No. 7 -- 2 Yr 3.00 2.00 1.00 0.00 -L 0 Q (cfs) 4.00 3.00 2.00 1.00 I I I I I I I I 1 0.00 2 5 7 9 12 14 16 19 21 23 26 Time (hrs) Hyd No. 7 Hyd No. 6 Hyd No. 8 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 8 Riser Weir Hydrograph type = Diversion2 Storm frequency =(2 yrs Inflow hydrograph = 6 Diversion method = Pond - Bioretention basin Tuesday, Aug 19 2008, 3:9 PM Peak discharge = 3.38 cfs Time interval = 1 min 2nd diverted hyd. = 7 Pond structure = Weir B Hydrograph Volume = 11,072 cuft Q (cfs) 4.00 Riser Weir Hyd. No. 8 -- 2 Yr 3.00 2.00 1.00 0.00 -- 0 Q (cfs) 4.00 3.00 2.00 1.00 I I I I I _ 0.00 2 5 7 9 12 14 16 19 21 23 26 Time (hrs) Hyd No. 8 Hyd No. 6 Hyd No. 7 B'10mretent'ion Basin 10-year storm Hvrimmanh Pint Hydraflow Hydrographs by Intelisolve Tuesday, Aug 19 2008, 11:24 AM Hyd. No. 1 direct to bmp Hydrograph type = S Runoff Peak discharge 5.44 cfs Storm frequency 10 yrs Time interval = n Drainage area = 11"ac Curve number = 80 Basin Slope = 4.7% Hydraulic length = 253 ft Tc method = LAG Time of conc. (Tc) = 4.80 min Total precip. = 4.99 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 10,469 cuft Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 direct to bmp Hyd. No. 1 -- 10 Yr Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 --i i i 0.00 0.0 2.2 4.3 6.5 8.7 10.8 13.0 15.2 17.3 19.5 21.7 Hyd No. 1 Time (hrs) Hydxograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 2 outfall a Hydrograph type = §,QZ Runoff Storm frequency = 'LM Drainage area = 1.c Basin Slope = 0.0 % Tc method = USER Total precip. = 4.99 in Storm duration = 24 hrs Tuesday, Aug 19 2008, 11:24 AM Peak discharge 6.07 cf Time interval = Curve number = 90 Hydraulic length = 0 ft Time of conc. (Tc) = 7.60 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 13,685 cult Q (cfs) 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 outfall a Hyd. No. 2 -- 10 Yr Q (cfs) 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0 00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Hyd No. 2 Time (hrs) • Hydrograph Plot Hydraflow Hydrographs by Intelisolve Tuesday, Aug 19 2008, 11:24 AM Hyd. No. 3 outfall p Hydrograph type = Runoff Peak discharge = 2.01 cfs Storm frequency = rs Time interval = Drainage area = 0.300 ac Curve number = 98 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 8.00 min Total precip. = 4.99 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 5,047 cuft outfall b Q (cfs) Hyd. No. 3 -- 10 Yr Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 - Hyd No. 3 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 4 total from outfalls Hydrograph type = Combine Storm frequency = (2E) Inflow hyds. = 2, 3 Hydrograph Volume = 18,732 cuft Q (cfs) 10.00 8.00 6.00 4.00 2.00 0.00 -1 0.0 Tuesday, Aug 19 2008, 11:24 AM Peak discharge = 8.09 cfs Time interval = 1 min total from outfalls Hyd. No. 4 -- 10 Yr Q (cfs) 10.00 2.0 4.0 6.0 8.0 Hyd No. 4 Hyd No. 2 8.00 6.00 4.00 2.00 0.00 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Hyd No. 3 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 5 total runoff to bmp Hydrograph type = C ine Storm frequency 3;10 yrs Inflow hyds. Q (cfs 14.00 12.00 10.00 8.00 6.00 4.00 2.00 Tuesday, Aug 19 2008, 11:24 AM Peak discharge = 13.37 cfs Time interval = 1 min Hydrograph Volume = 29,201 cuft total runoff to burp Hyd. No. 5 -- 10 Yr I Q (cfs) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0.00 - - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Hyd No. 5 Hyd No. 1 Hyd No. 4 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Tuesday, Aug 19 2008, 11:42 AM Hyd. No. 6 Bioretention basin Hydrograph type = Reservoir Peak discharge = 3.60 cfs Storm frequency = 10 yrs - Time interval = 1 min Inflow hyd. No. = 5"" - Max. Elevation = 370.02 ft Reservoir name = Bioretention basin Max. Storage = 12,890 cuft Storage Indication method used. Bioretention basin Q (cfs) Hyd. No. 6 -- 10 Yr 14.00 12.00 10.00 8.00 6.00 4.00 Hydrograph Volume = 23,356 cuft 2.00 Q (cfs) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0.00 -' ii ' 1 0.00 0 2 5 7 9 12 14 16 19 21 23 26 Time (hrs) Hyd No. 6 Hyd No. 5 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Tuesday, Aug 19 2008, 11:39 AM Hyd. No. 7 Spillway Weir Hydrograph type = Diversionl Peak discharge 0.21 cfs Storm frequency 0 yrs Time interval =.:y Inflow hydrograph = 2nd diverted hyd. = 8 Diversion method = Pond -New Pond1 Pond structure = Weir 6 Hydrograph Volume = 43 cult Q (cfs) 4.00 3.00 2.00 1.00 0.00 _L 0 Spillway Weir Hyd. No. 7 -- 10 Yr Q (cfs) 4.00 2 5 Hyd No. 7 7 9 - Hyd No. 6 3.00 2.00 1.00 '- 0.00 12 14 16 19 21 23 26 Time (hrs) Hyd No. 8 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 8 Riser Weir Hydrograph type = Diversion2 Storm frequency = 0 yrs Inflow hydrograph = Diversion method = Pond -New Pondl Tuesday, Aug 19 2008, 11:39 AM Peak discharge - 3.52 cfs Time interval = 1 min 2nd diverted hyd. = 7 Pond structure = Weir B Hydrograph Volume = 23,313 cuft Q (cfs) 4.00 3.00 2.00 1.00 0.00 -L 0 Riser Weir Hyd. No. 8 -- 10 Yr 2.00 1.00 0.00 2 5 7 9 12 14 16 19 21 23 26 Hyd No. 8 Hyd No. 6 Hyd No. 7 Time (hrs) Q (cfs) 4.00 3.00 Bmiomretentmion Basin 100-year storm Hydrograph Plot Hydraflow Hydrographs by Intelisolve Tuesday, Aug 19 2008,11:24 AM Hyd. No. 1 direct to bmp Hydrograph type = S unoff Peak discharge = 10.29 cfs Storm frequency = 100 yrs Time interval = Drainage area = 1. ac Curve number = 80 Basin Slope = 4.7 % Hydraulic length = 253 ft Tc method = LAG Time of conc. (Tc) = 4.80 min Total precip. = 8.01 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 20,453 cuft Q (cfs) 12.00 direct to bmp Hyd. No. 1 -- 100 Yr 10.00 8.00 6.00 4.00 2.00 0.00 1 0.0 2.0 Hyd No. 1 4.0 6.0 8.0 Q (cfs) 12.00 10.00 8.00 6.00 4.00 2.00 -- 0.00 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 2 outfall a .... AW"0"* Hydrograph type = Runoff Storm frequency 100 rs Drainage area = 1.000 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 8.01 in Storm duration = 24 hrs Tuesday, Aug 19 2008, 11:24 AM Peak discharge =(-1 0.31 cfs Time interval = Curve number = 90 Hydraulic length = 0 ft Time of conc. (Tc) = 7.60 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 24,121 cult Q (cfs) 12.00 10.00 8.00 6.00 4.00 2.00 outfall a Hyd. No. 2 -- 100 Yr a (cfs) 12.00 10.00 8.00 6.00 4.00 2.00 0.00 _ 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 2 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Tuesday, Aug 19 2008,11:24 AM Hyd. No. 3 o ut all Hydrograph type = SC Runoff Peak discharge = q3. 24 cfs Storm frequency = 1W ) Time interval = In Drainage area = 0. a c Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 8.00 min Total precip. = 8.01 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 8,250 cuft outfall b Q (cfs) Hyd. No. 3 -- 100 Yr Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 3 Time (hrs) ' Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 4 total from outfalls Hydrograph type = Combine Storm frequency = 100 yrs Inflow hyds. = 2, 3 Tuesday, Aug 19 2008,11:24 AM Peak discharge = 13.56 c s Time interval = min Hydrograph Volume = 32,372 cuft Q (cfs) 14.00 total from outfalls Hyd. No. 4 -- 100 Yr 12.00 10.00 8.00 6.00 4.00 2.00 0.00 0.0 2.0 4.0 Hyd No. 4 Q (cfs) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0.00 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) - Hyd No. 2 Hyd No. 3 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Tuesday, Aug 19 2008, 11:24 AM Hyd. No. 5 total runoff.-To _bmp Hydrograph type = ine Peak discharge 23.53 cfs Storm frequency 100 rs Time interval = Inflow hyds. = 1, 4 Hydrograph Volume = 52,824 cuft Q (cfs) 24.00 total runoff to burp Hyd. No. 5 -- 100 Yr 20.00 16.00 12.00 8.00 4.00 0.00 -L- 0.0 2.0 4.0 Hyd No. 5 Q (cfs) 24.00 20.00 16.00 12.00 8.00 4.00 0.00 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) - Hyd No. 1 Hyd No. 4 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Tuesday, Aug 19 2008, 11:42 AM Hyd. No. 6 Bioretention basin Hydrograph type = Reservoir Peak discharge = 16.15 c Storm frequency 00 r Time interval = I Inflow hyd. No. = 5 Max. Elevation = 370.62 ft Reservoir name = Bioretention basin Max. Storage = 17,576 cuft Storage Indication method used. Q (cfs) 24.00 Bioretention basin Hyd. No. 6 -- 100 Yr 20.00 16.00 Hydrograph Volume = 46,979 cult 12.00 8.00 4.00 Q (cfs) 24.00 20.00 16.00 12.00 8.00 4.00 0.00 -' ---r- r i i 0.00 0 2 5 7 9 12 14 16 19 21 23 26 Time (hrs) Hyd No. 6 Hyd No. 5 Hydfograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 7 Spillway Weir Hydrograph type = D' ersionl Storm frequency 100 rs Inflow hydrograph = Diversion method = Pond -New Pondl Tuesday, Aug 19 2008, 11:39 AM Peak discharge = 12.91 cfs Time interval = min 2nd diverted hyd. = 8 Pond structure = Weir B Hydrograph Volume = 9,413 cuft Q (cfs) 18.00 Spillway Weir Hyd. No. 7 -- 100 Yr 15.00 12.00 9.00 6.00 3.00 0.00 0 2 5 Hyd No. 7 7 Q (cfs) 18.00 15.00 12.00 9.00 6.00 3.00 ' ' 0.00 9 12 14 16 19 21 23 26 Time (hrs) Hyd No. 6 Hyd No. 8 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Tuesday, Aug 19 2008, 11:39 AM Hyd. No. 8 Riser Weir Hydrograph type = Diversion2 Peak discharge 3.51 cfs Storm frequency = 00 yrs Time interval = In Inflow hydrograph = 6 2nd diverted hyd. = 7 Diversion method = Pond - New Pond1 Pond structure = Weir B Hydrograph Volume = 37,566 cuft Q (cfs) 18.00 15.00 12.00 9.00 6.00 3.00 0.00 0 2 5 Hyd No. 8 Riser Weir Hyd. No. 8 -- 100 Yr Q (cfs) 18.00 7 15.00 12.00 9.00 6.00 3.00 ?- 0.00 9 12 14 16 19 21 23 26 Time (hrs) Hyd No. 6 Hyd No. 7 Miscellaneous BMP Calculations and Summaries Bio-retention basin sizing Chatham County Law Enforcement Center Job #2008107 Bioretention Basin Area = 2.33 ac Impervious Area: Proposed 0.93 ac Future 0.60 ac offsite 0.00 ac TOTAL 1.53 ac Percent Impervious = 1.53 divided by 2.33 66% Runoff Volume Rv = 0.05 + (0.9 x la) la= 66% Rv = 0.64 Treatment Volume V= 3630 x Rd x Rv x A Rd = 1 Rainfall Depth Rv = 0.64 A = 2.33 ac Basin Area V = 5421 ft3 Treatment Surface Area A = Qv/Dp Qv = 5421 ft3 Dp = 1.00 ft Depth (plants) A = 5421 ft2 Required vs Proposed Areas and Volumes Total Area: Required = 5421 ft2 Proposed = 6330 ft2 Total Volume Required = 5421 ft3 Proposed = 5845 ft3 Bio-retention Basin flow summary max. depth duration above 1' max. flow at discharge max flow to emergency spillway duration 2 r 24hr storm 1.26' 12.23 hrs. 3.38 cfs 0.00 cfs 0.0 hrs. 10 r 24hr storm 2.03' 12.46 hrs. 3.52 cfs 0.00 cfs 0.0 hrs. 100 r 24hr stom 2.62' 13.56 hrs. 3.52 cfs 12.91 cfs 0.53 hrs Appendices NEW YORK DOT DISSIPATOR METHOD FOR USE IN DEFINED CHANNELS (Source: "Bank and channel lining procedures", New York Department of T i ransportat on, Division of Design and Construction, 1971.) V to ? ? Ws NOTE: To use the following chart you must know: ,? ?e (1) Q full capacity (2) Q1o (3) V full (4) V10 where Q = discharge in cfs and V = Velocity in FPS. ESTIMATION OF STONE SIZE AND DIMENSIONS FOR CULVERT APRONS Step 1) Compute flow velocity V at culvert or paved channel outlet. Step 2) For pipe culverts Do is diameter. For pipe arch, arch and box culverts, and paved channel outlets, D. = A. where A. = cross-sectional area of flow at outlet. For multiple culverts, use D. = 1.25 x D. of single culvert. Step 3) For apron grades of 10% or steeper, use recommendations For next higher zone. (Zones 1 through 6). 20- F 15- IL U W 10- s- 0- 01 Figure 8.06c 111111111, 11? X11 11 11;.:111111 111111 11111 1111 11.1 ill 111 .I. III 1111 ?I111 .III.i?lllll?ll' Milli ;.1111 \1?1111i III, 1111111 111111111?1i1 11 11.11 I 11' .1.1111 1111111 1 ..,. il?'C 1 ?I? il1111111? 1111111 i1 I,I ??;?i?? ' V •' 111 111111 II ,1 ,11 III ?11i1? ;11111111 t1111?11 It 1111 ?, II 111 II .111. 1111 ?I11 11. 11111 ' ' 11111111' 11111, 1 '111 1111111 !111'11 IIIIIIiIIlillllltiilIilillli 11111 1111111 111 I.11 '11 111 1111111111111 lllll.ili.. 1111; IIII 111 11111 111111 11111 111111 I?i? I 1 111 IIIi II 111111 111 II1111?11 il;i ' ?I?rillllll Ali 1111111 II 111 IIIIIIIIIII 11111,1 1,11 '11 1 111;1 1 11:1 1111 •11 1111 I 11' '?Illlli '111111 1111;11,1 .11 II Ii?111111111111 7 1111 111111111 II 1' 1111 II 1111 11. '1.11111 111 'Illli'p 1111 II 11111 11111111111 .?I'Ill 111 JJ 111,. li i11111? 111 111 111 ' 111 111 1 Ii11111111iiii111?111i111 ii 1111 11111 1'1'11111 IIIII1111 11111 III 111 ,I 11 1111 111 1 ' 1 1 1 1 I I I I 1 .1 I 1 1 " 1 1 1 1 I 111 11 11! iillllll IIIII 111111111111 'Il 1111111/ 1111111 111111111 ;111111 1 111 I 11111. 111 11111 111!11111 1111111. 111 11' 11111111 1111 1 III .I IIII1111 III11 111111111 I 1111111 II I •1111 I 111 11 111. I1 111111111 111 'I;1 IIII1111 '11111111 1111111111 111,11• I' II Ie?II IIII111 111111 II111111 II'Il III ?I ` 'Il " II 3 11 111 11111,11 II II' 111 111 4 111111111111' II 111 1,11 111 11 11111..111111 II II ? • 1 1111111 11 1111 111111111 I 11111 1' 111 ? 1111 t 11111 I 1111111 11111111 I 11111 11111 1111 II 111111 it I' 1i111?111' 111 ........... 111 III II II 11 II I 11111111' 111 111 1111111 111 11111 I; II I 1111111 111 IIIII 11111111. 1 1 II111 11111 111111111 111111 11111 111 1111111 1111'1111 1111 1 11 III 11111111 III II yl l,I lylll 1111 11 11 II 111 IIII II II I I 10' 15' 20' 25' DIAMETER (Ft.) Rev. 12/93 8.06.5 u ID = 1/A51 r F 1 w- 3?1•Z? use :4'wV. ? 121i ?Ir,? G4A5? ?? LENGTH OF APRON Z O APRON MATERIAL TO PROTECT TO PREVENT SCOUR CULVERT HOLE USE L2 ALWAYS L2 L1 1 STONE FILLING (FINE) CL. A 3 X Do 4 x D. 2 STONE FILLING (LIGHT) CL. B 3 X Do 6 x D. 3 STONE FILLING (MEDIUM) CL. 1 4 X Do 8 x D. 4 STONE FILLING (HEAVY) CL. 1 4 X Do 8 x D. 5 STONE FILLING (HEAVY) CL. 2 5 X D, 10 x D. 6 STONE FILLING (HEAVY) CL. 2 6 X Do 10 x D. 7 SPECIAL STUDY REQUIRED (ENERGY DISSIPATORS, STILLING BASIN OR LARGER SIZE STONE). Figure 8.06d Width = 3 times pipe dia. (min.) DETERMINATION OF STONE SIZES FOR DUMPED STONE CHANNEL LININGS AND REVETMENTS Step 1. Use figure 8.06.b.3 to determine maximum stone size (e.g. for 12 Fps = 20" or 550 lbs. Step 2. Use figure 8.06.b.4 to determine acceptable size range for stone (for 12 FPS it is 125-500 lbs. for 75% of stone, and the maximum and minimum range in weight should be 25-500 lbs.). NOTE: In determining channel velocities for stone linings and revetment, use the following coefficients of roughness: Diameter Manning's Min. thickness (inches) "n" of lining (inches) --t Fine 3 -0 (IL 9 12 fight 6 0.035 12 18 Medium 13 0.040 18 24 Heavy 23 0.044 30 36 (Channels) (Dissapators) 8.06.6 Rev. 12/93 Appendices NEW YORK DOT DISSIPATOR METHOD FOR USE IN DEFINED CHANNELS (Source: "Bank and channel lining procedures", New York Department of 10 ' tct G?S Transportation, Division of Design and Construction, 1971.) V`1 ': NOTE: To use the following chart you must know: 0 (1) Q full capacity (2) Q,o (3) Vfull (4) V10 where Q = discharge in cfs and V = Velocity in FPS. ESTIMATION OF STONE SIZE AND DIMENSIONS FOR CULVERT APRONS Step 1) Compute flow velocity V at culvert or paved channel outlet. Step 2) For pipe culverts Do is diameter. For pipe arch, arch and box culverts, and paved channel outlets, Do = A. where A. = cross-sectional area of flow at outlet. For multiple culverts, use D. = 1.25 x D. of single culvert. Step 3) For apron grades of 10% or steeper, use recommendations For next higher zone. (Zones 1 through 6). 25 20- F 15- a LLLr U O W 10- 5- 5- W Nt . , 0- I I ' '.K' W <p' 6' 0' S1 Figure 8.06c 11111 1111111 1111111 MI11 II II11 11.1 111 1 1 I 1111 1 11 11 1 11111 (IIII 111 11111111111 111 1 .II .1111 \11111 III 1111111 11111111! Ili Il 111 111111 111 II. i 1116 I Illi i.11111111. 1111 I I? 111 11111111 .11 ill ?lil? 111 II 111111 II iii II 11 I ill IIIII 1111 il? 111 11111 I 111illllll 111 111 ?IIIIII !111 11 IIIIIIillllll?Illiil ?I1111i 1111 1 1111111 111 11111111 111IIIIIIiili111ii1i iiliil? i?? lil _1111.111 1111111111111 ?I111 111111. l?li 111111 1111 ??????? II iii iii 11111 111 111 .1111111 111111111111111111 1111 1 1 l 1111 IIII 11111 11 III 1111111 111 111 II 111'1111111 111 111 11111 II 11 111 11 I11? ? X11 1111111 111 111111111 1111 I1 111111 11111111111 II III 11115 IIIII 1111111111 1111111 III 1 II 111111111111 11111111111 II I I I I 11111 I I (IIII 1111111111111111111 III IIII 11 111111 111 ?1 1111 ill II 11! 11111111 IIIII II11111111111 •II 111 1111 1111111 11111111 ;111111 111 1111 111 II! 11111 111!11111 1111111. 111 111 11111 111 111 11 IIII I1 11111. 111 1111111 111 II111 .11 I1 111 111 111 II 1111 II? 1111111 111 III11111 111111111 111 tl 11 11 111 11 1111111 IIII 111111111 Illll 111 1 2 III 1111 11111111 II ??? ?? illl?l 3 it 111 111 4 ill 111111111 11 111 11111 III II I IIII11111111111 II 1 1 1 11111111 1111 II1111111 1 1 11111 1I 1 111 1 IIII 1 11111 I 1111111 11111111 II 1 111 1111111 11111 1 1 11 1 1 FI 111 1 I I 1 1 11 111111 111111 it 111 11111 B • 11 1 1 1 i 111 111111111 111 111 111111 '111 11111 II 1 11111111 11111 111 11 1 11111 IIII 1111111 11? 1111 III1?1111 i 111 111 1111111 I II 11111 11111111 111 Il 11.1 ?? 1111 1111 1111 II I I I I 10' 15' 20' 25' DIAMETER (Ft.) Rev. 12/93 8.06.5 0 b-- I'D' . 41 f Use 3'w ,e-4-1L LENGTH OF APRON w Z APRON MATERIAL TO PROTECT TO PREVENT SCOUR O CULVERT HOLE USE L2 ALWAYS L2 L1 1 TONE FILLING (FINE) CL. A 3 X Do 4 x D. 2 STONE FILLING (LIGHT) CL. B 3 X Do 6 x D. 3 STONE FILLING (MEDIUM) CL. 1 4 X Do 8 x D. 4 STONE FILLING (HEAVY) CL. 1 4 X Do 8 x D. 5 STONE FILLING (HEAVY) CL. 2 5 X Do 10 x D. 6 STONE FILLING (HEAVY) CL. 2 6 X Do 10 x D. 7 SPECIAL STUDY REQUIRED (ENERGY DISSIPATORS, STILLING BASIN OR LARGER SIZE STONE). Figure 8.06d Cl S S Width = 3 times pipe dia. (min.) DETERMINATION OF STONE SIZES FOR DUMPED STONE CHANNEL LININGS AND REVETMENTS Step 1. Use figure 8.06.b.3 to determine maximum stone size (e.g. for 12 Fps = 20" or 550 lbs. Step 2. Use figure 8.06.b.4 to determine acceptable size range for stone (for 12 FPS it is 125-500 lbs. for 75% of stone, and the maximum and minimum range in weight should be 25-500 lbs.). NOTE: In determining channel velocities for stone linings and revetment, use the following coefficients of roughness: Diameter Manning's Min. thickness w (inches) "n" of lining (inches) _ Fine 3 0.031 9 12 Light 6 0.035 12 18 Medium 13 0.040 18 24 Heavy 23 0.044 30 36 (Channels) (Dissapators) 8.06.6 Rev. 12/93 ' Sio-1Z9TE14T1OW St?iL.LWALK 1Oj5Sj1phTOR 100 0, 6;"z !?11-11 t -?.Ihl CUSS "L 1? Riprap Aprons for Low Tallwater (downstream flow depth < 0.5 x pipe diameter) Culvert Lowest value Intermediate val ues to inter late from Hi hest value Diameter Q LA D5 Q LA D50 Q L A D50 I Cfs Ft In Cfs Ft In Cfs Ft In n 2.5 . 3 9 131 6 14 17 8.5 3.5 15 20 16 17 7 7 25 20 12 4 35 22 10 40 60 25 29 14 18 f 5 5 5 50 26 12 80 33 19 . 6 70 29 14 110 37 22 2 7 90 33 15.5 140 41 24 8 5 140 18 220 50 28 . 10 7 260 52 26 220 46 19 320 64 37 Erosion Control Calculations TEMPORARY SEDIMENT BASIN #1 SEDIMENT POND CALCULATIONS PRE-GRADING DRAINAGE AREA = 1.84 ACRES DISTURBED AREA = 1.18 ACRES RUNOFF CHARACTERISTICS Tc = 5 MIN C = 0.43 NONE COMPOSITE I = 7.08 IN/HR 10- YEAR A= 1.84 ACRES Q= 5.6 CFS Q=CIA BASIN TYPE (TRAP, SKIMMER, RISER)= SKIMMER MAX AREA TRAP = 5 AC AMAX AREA SKIMME R = 10 AC REQUIRED STORAGE VOLUME 1.18 acres x 1800 ft3/ac = 2124 ft3 REQUIRED SURFACE AREA 5.6 cfs x 0.0075 = 0.04 ACRES 1823 ft2 MINIMUM BASIN DEPTH = 4 FT TOP AREA FROM PLAN = 6330 SF BOT AREA FROM PLAN = 2770 SF SURFACE VOLUME AREA (ft) (ft) 18200 6330 TEMPORARY SEDIMENT BASIN #1 11SEDIMENT POND CALCULATIONS POST-GRADING W/SYSTEM Da SYSTEM = 1.3 ACRES C= 0.8 Da DIRECT FLOW= 1 ACRES C= 0.6 DISTURBED AREA = 1.36 ACRES C= 0.75 RUNOFF CHARACTERISTICS Tc = 10 MIN C = 0.71 NONE COMPOSITE I = 5.66 IN/HR 10- YEAR A= 2.3 ACRES Q= 9.3 CFS Q=CIA BASIN TYPE (TRAP, SKIMMER, RISER)= SKIMMER MAX AREA TRAP = 5 AC AMAX AREA SKIMME R = 10 AC REQUIRED STORAGE VOLUME 1.36 acres x 1800 ft3/ac = 2448 ft3 REQUIRED SURFACE AREA 9.3 cfs x 0.0075 = 0.07 ACRES 3033 ft2 MINIMUM BASIN DEPTH = 4 FT TOP AREA FROM PLAN = 6330 SF BOT AREA FROM PLAN = 2770 SF SURFACE VOLUME AREA (ft) (ft) 18200 6330 Pond Report % Hydraflow Hydrographs by Intelisolve Wednesday, Aug 20 2008, 9:45 AM Pond No. 1 - Sediment basin 1 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cuft) 0.00 365.00 2,770 0 0 1.00 366.00 3,563 3,167 3,167 2.00 367.00 4,426 3,995 7,161 3.00 368.00 5,360 4,893 12,054 4.00 369.00 6,330 5,845 17,899 5.00 370.00 7,370 6,850 24,749 6.00 371.00 8,470 7,920 32,669 Culvert/ Orifice Structures [A] [B] [C] [D] Rise (in) = 8.00 0.00 0.00 0.00 Span (in) = 8.00 0.00 0.00 0.00 No. Barrels = 1 0 0 0 Invert El. (ft) = 363.00 0.00 0.00 0.00 Length (ft) = 50.00 0.00 0.00 0.00 Slope (%) = 1.00 0.00 0.00 0.00 N-Value = .013 .000 .000 .000 Orif. Coeff. = 0.60 0.00 0.00 0.00 Multi-Stage = n/a No No No Weir Structures [A] [B] [C] [D] Crest Len (ft) = 16.00 8.00 0.00 0.00 Crest El. (ft) = 369.00 370.00 0.00 0.00 Weir Coeff. = 3.33 3.33 0.00 0.00 Weir Type = Riser Rect --- --- Multi-Stage = Yes No No No Exfiltration = 0.000 in/hr (Wet area) Tailwater Elev. = 0.00 ft Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Weir riser checked for orifice conditions. Stage (ft) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 0.00 Stage / Discharge Stage (ft) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 30.00 Discharge (cfs) 3.00 6.00 9.00 12.00 15.00 18.00 21.00 24.00 27.00 - Total Q Hvirimmanh Piet Hydraflow Hydrographs by Intelisolve Wednesday, Aug 20 2008, 9:45 AM Hyd. No. 6 <no description> Hydrograph type = Reservoir Peak discharge = 0.00 cfs Storm frequency = 2 yrs Time interval = 1 min Inflow hyd. No. = 5 Max. Elevation = 0.00 ft Reservoir name = Sediment basin 1 Max. Storage = 0 cuft Storage Indication method used. Q (cfs) 8.00 6.00 4.00 2.00 0.00 0 <no description> Hyd. No. 6 -- 2 Yr 5 10 15 19 24 29 Hyd No. 6 Hyd No. 5 34 Hydrograph Volume = 0 cult Q (cfs) 8.00 6.00 4.00 2.00 0.00 39 44 48 Time (hrs) • Hvrirnnranh Dint Hydraflow Hydrographs by Intelisolve Wednesday, Aug 20 2008, 9:47 AM Hyd. No. 6 <no description> Hydrograph type = Reservoir Peak discharge = 8.98 cfs Storm frequency = 100 yrs Time interval = 1 min Inflow hyd. No. = 5 Max. Elevation = 370.35 ft Reservoir name = Sediment basin 1 Max. Storage = 27,537 cuft Storage Indication method used. Q (cfs) 24.00 20.00 16.00 12.00 8.00 4.00 <no description> Hyd. No. 6 -- 100 Yr Q (cfs) 24.00 20.00 16.00 12.00 8.00 4.00 0.00 0.00 0 2 5 7 9 12 14 16 19 21 23 26 Time (hrs) Hyd No. 6 Hyd No. 5 Hydrograph Volume = 34,925 cuft ?v ect e I •. sr i "t FA 0 0 n 0o 0 S 0 i i $ jtac7C? 24 ? r c,r w ?aw co - ?a o s ? I VVI UYIN iioom ` ECDesign® 2003 Channel Analysis Report Project Information Last Update: 8/20/2008 5:31:36 PM Project Name: Chatham County LEC Description: City: Raleigh State: NC Units: English Notes: Channel Design Channel Name: to DI#1 Units: English Design Life: 1200 months Design Criteria Vegetation and Soil Channel Geometry Flow/Velocity Flow Rate (Q) Vegetated Yes Bed Slope (ft(ft) 0.057 Discharge (cf(s) 1.41 Vegetation Class D Req. Freeboard (ft) Flow Duration (hrs) 24 Soil Filled No Channel Length (ft) 77 Avg. Velocity (ft/s) 1.27 Channel Side Slopes Channel Bend false Bottom Width (ft) 2 Required Factor of Safety Left (HA V) 3 Bend Radius (ft) 0 Channel Depth (ft) 1 Right (H:1 V) 3 Outside Bend Results Avg. Flow Depth (ft): 0.34 Velocity (fVs) Shear Stress (lbs/sgft) Pass Quantity Lining Materials g Computed Maximum Allowed Safety Factor Computed Maximum Allowed Safety Factor (SY) Left 1.230 1.010 Bottom 1.340 1.200 Right 1.230 1.010 Calculation Results Flow Depth (ft) 0.340 Left Wetted Perimeter (ft) 1.060 Flow Area (ft) 1.010 Bottom Wetted Perimeter (ft) 2.010 Right Wetted Perimeter (ft) 1.060 Total Wetted Perimeter (ft) 4.130 Hydraulic Radius (ft) 0.250 Avg. Velocity (ft/s) 1.270 Composite'n' 0.1042 Avg. Discharge (cf/s) 1.410 EC-DESIGN® 2003 page 1 8/20/2008 . ECDesign® 2003 Channel Analysis Report Project Information Last Update: 8/20/2008 5:31:12 PM Project Name: Chatham County LEC Description: City: Raleigh State: NC Units: English Notes: Channel Design Channel Name: to DI#2 Units: English Design Life: 1200 months Design Criteria Vegetation and Soil Channel Geometry Flow/Velocity Flow Rate (Q) Vegetated Yes Bed Slope (ft/ft) 0.052 Discharge (cf/s) 0.62 Vegetation Class D Req. Freeboard (ft) Flow Duration (hrs) 24 Soil Filled No Channel Length (ft) 77 Avg. Velocity (ft/s) 1.26 Channel Side Slopes Channel Bend false Bottom Width (ft) 2 Required Factor of Safety Left (H:1 V) 3 Bend Radius (ft) 0 Channel Depth (ft) 1 Right (H:1 V) 3 ------------ --- - Outside Bend Results Avg. Flow Depth (ft): 0.35 Velocity (ft/s) Shear Stress (lbs/sgft) Pass Quantity Lining Materials Computed Maximum Allowed Safety Factor Computed Maximum Allowed Safety Factor (Sy) Left 1.220 0.960 Bottom 1.330 1.140 Right 1.220 0.960 Calculation Results Flow Depth (ft) 0.350 Left Wetted Perimeter (ft) 1.110 Flow Area (ft) 1.080 Bottom Wetted Perimeter (ft) 2.010 Right Wetted Perimeter (ft) 1.110 Total Wetted Perimeter (ft) 4.230 Hydraulic Radius (ft) 0.250 Avg. Velocity (ft1s) 1.260 Composite'n' 0.1029 Avg. Discharge (cf/s) 0.620 EC-DESIGN® 2003 page 1 8/20/2008 ECDesign® 2003 Channel Analysis Report Project Information Last Update: 8/20/2008 5:35:22 PM Project Name: Chatham County LEC Description: City: Raleigh State: NC Units: English Notes: Channel Design Channel Name: to DI#3 Units: English Design Life: 1200 months Design Criteria Vegetation and Soil Channel Geometry Flow/Velocity Flow Rate (Q) Vegetated Yes Bed Slope (ft/ft) 0.037 Discharge (cf/s) 0.79 Vegetation Class D Req. Freeboard (ft) Flow Duration (hrs) 24 Soil Filled No Channel Length (ft) 80 Avg. Velocity (ft/s) 0.8 Channel Side Slopes Channel Bend false Bottom Width (ft) 2 Required Factor of Safety Left (H:1 V) 3 Bend Radius (ft) 0 Channel Depth (ft) 1 Right (H:l V) 3 Outside Bend Results Avg. Flow Depth (It). 0.33 Velocity (ft/s) Shear Stress (lbs/sgft) Pass Quantity Lining Materials Computed Maximum Allowed Safety Factor Computed Maximum Allowed Safety Factor (SY) Left 0.770 0.650 Bottom 0.840 0.770 Right 0.770 0.650 Calculation Results Flow Depth (ft) 0.330 Left Wetted Perimeter (ft) 1.050 Flow Area (ft) 0.990 Bottom Wetted Perimeter (ft) 2.000 Right Wetted Perimeter (ft) 1.050 Total Wetted Perimeter (ft) 4.100 Hydraulic Radius (ft) 0.240 Avg. Velocity (ft/s) 0.800 Composite'n' 0.1324 Avg. Discharge (cf/s) 0.790 EC-DESIGNS 2003 page 1 8/20/2008 ECDesign® 2003 Channel Analysis Report Project Information Last Update: 8/20/2008 5:37:46 PM Project Name: Chatham County LEC Description: City: Raleigh State: NC Units: English Notes: Channel Design Channel Name: to DI#4 Units: English Design Life: 1200 months Design Criteria Vegetation and Soil Channel Geometry Flow/Velocity Flow Rate (Q) Vegetated Yes Bed Slope (ft/ft) 0.037 Discharge (cf/s) 0.79 Vegetation Class D Req. Freeboard (ft) Flow Duration (hrs) 24 Soil Filled No Channel Length (ft) 63 Avg Velocity (ft/s) 0.8 Channel Side Slopes Channel Bend false Bottom Width (ft) 2 Required Factor of Safety Left (H:1 V) 3 Bend Radius (ft) 0 Channel Depth (ft) 1 Right (H:1 V) 3 Outside Bend Results Avg. Flow Depth (ft): 0.33 Velocity (ft/s) Shear Stress (lbs/sgft) Pass Quantity Limn Materials Lining Computed Maximum Allowed Safety Factor Computed Maximum Allowed Safety Factor (SY) Left 0.770 0.650 Bottom 0.840 0.770 Right 0.770 0.650 Calculation Results Flow Depth (ft) 0.330 Left Wetted Perimeter (ft) 1.050 Flow Area (ft) 0.990 Bottom Wetted Perimeter (ft) 2.000 Right Wetted Perimeter (ft) 1.050 Total Wetted Perimeter (ft) 4.100 Hydraulic Radius (ft) 0.240 Avg. Velocity (ft/s) 0.800 Composite'n' 0.1324 Avg. Discharge (cf/s) 0.790 EC-DESIGN® 2003 page 1 8/20/2008 BMP OPERATION AND MAINTENANCE MANUAL Chatham County Law Enforcement Center Parking Lot Modifications and Expansion Prepared For: Chatham County 12 East Street P.O. Box 1809 Pittsboro, NC 27312 Prepared by: Rivers and Associates, Inc. 6131 Falls of Neuse Road, Suite 300 Raleigh, NC 27609 (919) 848-3347 Rivers & Associates Inc. Job #2008107 l Bioretention Operation and Maintenance A maintenance record on this BMP shall be kept in a log in a known set location. Records of maintenance items to include dates, inspector's name, type of maintenance, etc. shall be kept. Any deficient BMP elements noted in the inspection shall be corrected, repaired or replaced immediately. Important inspection and maintenance procedures: - Immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants become established (commonly six weeks). - Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell. - Heavy equipment will NEVER be driven over the bioretention cell. - Special care will be taken to prevent sediment from entering the bioretention cell. - Once a year, a soil test of the soil media will be conducted. After the bioretention cell is established, it shall be inspected once a month and within 24 hours after every storm event greater than 1.0. Maintenance activities shall be performed as follows: 1. Inspect the bioretention area system for soil and mulch erosion, vegetated cover, and general condition after every significant runoff producing rainfall event and at least monthly. Remove trash as needed. 2. Repair eroded areas immediately, re-seed, re-plant, and re-mulch as necessary to maintain good vegetative and mulch cover. 3. Remove accumulated sediment as needed to maintain good infiltration. When the filtering capacity diminishes substantially (e.g., when water ponds on the surface for more than 24 hours), the top few inches of material must be removed and replaced with fresh planting soil material. Regardless of infiltration capacity, accumulated sediment in the bioretention basin shall be removed when the depth is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over-excavating. Over-excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). 4. Replace, or add additional mulch as needed. Removal of the old mulch layer before applying the new layer is recommended every 2 to 3 years. 5. Prune trees and shrubs and remove debris on an annual basis. Grassed vegetation should not exceed 6 inches in height. 6. Treat all diseased trees and shrubs whenever needed. Remove and replace all dead and diseased vegetation considered beyond treatment every 6 months. 7. Replace support stakes yearly (in the spring). Replace deficient stakes or wires whenever needed. 8. Soil testing shall be conducted annually to determine pH and any accumulation of toxins in the planting media. Lime or other alkaline substances shall be applied as recommended per the soil test and toxic soils shall be removed, disposed of properly and replaced with new planting media. 9. All components of the bioretention area system shall be maintained in good working order. 1 of 3 BMP element: Potential problems: How to remediate the problem: The entire BMP Trash/debris is resent. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to bioretention cell erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe, The pipe is clogged (if Unclog the pipe. Dispose of the stone verge or swale applicable). sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and clogged covered in sediment (if stone and replace with clean stone. applicable). The pretreatment area Flow is bypassing Regrade if necessary to route all pretreatment area and/or flow to the pretreatment area. gullies have formed. Restabilize the area after grading. Sediment has accumulated to Search for the source of the a depth greater than three sediment and remedy the problem if inches. possible. Remove the sediment and restabilize the pretreatment area. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. The bioretention cell: Best professional practices Prune according to best professional vegetation show that pruning is needed practices. to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Tree stakes/wires are present Remove tree stake/wires (which six months after planting. can kill the tree if not removed). 2of3 i r BMP element: Potential problems: How to remediate the problem: The bioretention cell: Mulch is breaking down or Spot mulch if there are only random soils and mulch has floated away. void areas. Replace whole mulch layer if necessary. Remove the remaining much and replace with triple shredded hard wood mulch at a maximum depth of three inches. Soils and/or mulch are Determine the extent of the clogging clogged with sediment. remove and replace either just the top layers or the entire media as needed. Dispose of the spoil in an appropriate off-site location. Use triple shredded hard wood mulch at a maximum depth of three inches. Search for the source of the sediment and remedy the problem if possible. An annual soil test shows that Dolomitic lime shall be applied as pH has dropped or heavy recommended per the soil test and metals have accumulated in toxic soils shall be removed, the soil media. disposed of properly and replaced with new lantin media. The underdrain system Clogging has occurred. Wash out the underdrain system. (if applicable) The drop inlet Clogging has occurred. Clean out the drop inlet. Dispose of the sediment off-site. The drop inlet is damaged Repair or replace the drop inlet. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Bioretention Maintenance Tasks and Schedule 'bask Scbed_ule Remove trash and debris Monthly Check and repair an eroded areas Monthly Remulch an void areas Monthly Check Vegetation and replace any damaged plant materials Monthly Inspect for ponding, washed out areas, soil conditions Monthly Perimeter mowing Monthly Inspect collection system for proper functioning Quarterly Reseed grass swale or border Annually Apply new mulch Annually Pruning Annually Perform soil test and replace soil if needed Annually Repair broken pipes As needed Replace rip rap that is chocked with sediment As needed Remove sediment As needed Replace mulch Eve three ears 3of3 r Bioretention Inspection Checklist Project Name: Project Address: Owner's Name: Owner's Address: BMP name and location: Inspection Date: Maintenance Item o ° a z Comments Debris Clear of trash and debris Vegetation Banks/Surrounding areas mowed Unwanted vegetation Plant condition and appearance Mulch condition Condition of swale or border Erosion Evidence of erosion or washed out areas Sedimentation Foreba condition (if resent Evidence of sediment in facility Energy dissipaters Condition of dissipater at inlet Condition of dissipater at outfall Inlet Condition of pipe or swale Outlet Condition of outlet/drop box Dewaterin Standing water-drawdown time must be between 48-120 hours Overall Functionality Soil Condition Miscellaneous r Action Recommended ( for any items marked U, attach additional sheets as needed): Action Taken (for any items marked U, attach additional sheets as needed): Additional Comments (attach additional sheets as needed): r 1 Permeable Pavement Operation and Maintenance A maintenance record on this BMP shall be kept in a log in a known set location. Records of maintenance items to include dates, inspector's name, type of maintenance, etc. shall be kept. Any deficient BMP elements noted in the inspection shall be corrected, repaired or replaced immediately. Important operation and maintenance procedures: - Stable groundcover will be maintained in the drainage area to reduce the sediment load to the permeable pavement. - The area around the perimeter of the permeable pavement will be stabilized and mowed, with clippings removed. - Any weeds that grow in the permeable pavement will be sprayed with pesticide immediately. Weeds will not be pulled, since this could damage the fill media. - Once a year, the permeable pavement surface will be vacuum swept. - At no time shall wet sweeping (moistening followed by sweeping) be allowed as a means of maintenance. - There shall be no repair or treatment of Permeable Pavement surfaces with other types of pavement surfaces. All repairs to Permeable Pavement surfaces must be accomplished utilizing permeable pavement which meets the original pavement specifications. - Concentrated runoff from roof drains, piping, swales or other point sources, directly onto the permeable pavement surface shall not be allowed. These areas must be diverted away from the permeable pavement. Initial Inspection: Permeable Pavements shall be inspected monthly for the first three months for the following: BMP element: Potential problem: How to remediate the problem: The perimeter of Areas of bare soil and/or In the event that rutting or failure of the groundcover the permeable erosive gullies have occurs, the eroded area shall be repaired immediately pavement formed. and permanent groundcover re-established. Appropriate temporary Erosion Control measures (such as silt fence) shall be installed in the affected area during the establishment of permanent groundcover, and any impacted area of permeable pavement is to be cleaned via vacuum sweeping. The surface of the Rutting / uneven This indicates inadequate compaction of the pavement permeable settlement base / sub-base. If rutting or uneven settlement on the pavement order of 1/2 inch or greater occurs, permeable pavement shall be removed and base / sub-base re-compacted, smoothed, and permeable pavement shall then be re- installed. Base and sub-base compaction shall be monitored by a licensed geotechnical engineer to ensure that infiltration capacity of base and sub-base are not compromised b compaction and smoothing processes. The pavement does not Vacuum sweep the pavement. If the pavement still dewater between storms, does not dewater, consult a professional. or water is running off. 1 of 2 v The permeable pavement will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How to remediate the problem: The perimeter of the Areas of bare soil and/or erosive Regrade the soil if necessary to remove permeable pavement gullies have formed. the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of 3 to 6 long. inches (remove clippings). The surface of the Trash/debris is present. Remove the trash/debris. permeable pavement Weeds are growing on the Do not pull the weeds (may pull out surface of the permeable media as well). Spray them with pavement. pesticide. Sediment is present on the Vacuum sweep the pavement. surface. The structure is deteriorating or Consult an appropriate professional. damaged. Damaged areas of the pavement shall be removed and repaired. The pavement does not dewater Vacuum sweep the pavement. If the between storms. pavement still does not dewater, consult a professional. Permanently clogged pavement shall be removed and repaired. Permeable Pavement Maintenance Tasks and Schedule Task Schedule Remove sediment from pavement surface Monthly Clean pavement of oil and grease Monthly Spray weeds and moss with herbicides Monthly, during growing season Vacuum sweep surface Annually Replace ravel Annually Inspect for deterioration Annually Verify surface dewaters after storms Annually 2of2 4 -4- V Permeable Pavement Inspection Checklist Project Name: Project Address: Owner's Name: Owner's Address: BMP name and location: Inspection Date: Maintenance Item 4,4 z a Comments 6t c 4z C a Debris Clear of trash and debris Clean of oil and grease Vegetation Unwanted vegetation Dewaterin Evidence of standing water Sedimentation Evidence of sediment in facility/vacuum sweep annually Overall Functionati Condition of pavement (check for deterioration, clogging) Condition of ravel Miscellaneous Action Recommended ( for any items marked U, attach additional sheets as needed): Action Taken (for any items marked U, attach additional sheets as needed): w Additional Comments (attach additional sheets as needed):