Loading...
HomeMy WebLinkAbout20201403 Ver 1_PNG Line 473 Drawings_rev_20201113GENERALNOTES CIVIL AND STRUCTURAL NOTES y ti FLOWERS PLANTATION REGULAI STATION ID: 84-T. SEE PROD _ ' 147 i p 4-1��I ` `✓ ` ; ET- M 1 T h - -r F7 EXISTING SITE LOCATION MAP - LINE 473 SCALE: 1 "=2,000' 0 1000 2000 1IN=1000FT NOTES: 1) LAT/LONG TO BE VERIFIED BY AS BUILD SURVEY. 2) AS BUILD SURVEY LOCATION TIE IN POINT LATITUDE: TBD LONGITUDE: TBD r LINE 473 PROJECT 0228711 \ Y I� r LINE 473 LAUNCHER AND MLV STATION ID: 84-T-91-G LD-6593 SEE PROJECT 0228708 DRAWING INDEX DRAWING NUMBER DRAWING TITLE REV. PAGE PNG-G-473-0001000 COVER PAGE / INDEX D 1 OF 34 PNG-G-473-0001001 BILL OF MATERIALS B 2 OF 34 PNG-C-473-0001000 CIVIL GENERAL NOTES, LEGENDS, & ABBREVIATIONS D 3 OF 34 PNG-C-473-0001001 SITE ACCESS ROUTE PLAN C 4 OF 34 PNG-C-473-0001005 ALIGNMENT PLAN & PROFILE - 8" PIPELINE D 5 OF 34 PNG-C-473-0001006 ALIGNMENT PLAN & PROFILE - 8" PIPELINE D 6 OF 34 PNG-C-473-0001007 ALIGNMENT PLAN & PROFILE - 8" PIPELINE D 7 OF 34 PNG-C-473-0001008 ALIGNMENT PLAN & PROFILE - 8" PIPELINE D 8 OF 34 PNG-C-473-0001009 ALIGNMENT PLAN & PROFILE - 8" PIPELINE D 9 OF 34 PNG-C-473-0001010 ALIGNMENT PLAN & PROFILE - 8" PIPELINE D 10 OF 34 PNG-C-473-0001011 ALIGNMENT PLAN & PROFILE - 8" PIPELINE D 11 OF 34 PNG-C-473-0001012 ALIGNMENT PLAN & PROFILE - 8" PIPELINE D 12 OF 34 PNG-C-473-0001013 ALIGNMENT PLAN & PROFILE - 8" PIPELINE D 13 OF 34 PNG-C-473-0001014 ALIGNMENT PLAN & PROFILE - 8" PIPELINE D 14 OF 34 PNG-C-473-0001015 HDD DETAIL SHEET HWY 70 C 15 OF 34 PNG-C-473-0001016 JACK AND BORE DETAIL SHEET HWY 42 C 16 OF 34 PNG-C-473-0001017 GEOTECHNICAL BORING LOGS A 17 OF 34 PNG-C-473-0001018 GEOTECHNICAL BORING LOGS A 18 OF 34 PNG-C-473-0001019 ES&PC NOTES B 19 OF 34 PNG-C-473-0001020 ES&PC PLAN B 20 OF 34 PNG-C-473-0001021 ES&PC PLAN B 21 OF 34 PNG-C-473-0001022 ES&PC PLAN B 22 OF 34 PNG-C-473-0001023 ES&PC PLAN B 23 OF 34 PNG-C-473-0001024 ES&PC PLAN - LAYDOWN YARD A 24 OF 34 PNG-C-473-0001025 EROSION CONTROL DETAILS B 25 OF 34 PNG-C-473-0001026 EROSION CONTROL DETAILS B 26 OF 34 PNG-C-473-0001027 EROSION CONTROL DETAILS B 27 OF 34 PNG-C-473-0001028 EROSION CONTROL DETAILS A 28 OF 34 PNG-C-473-0001029 EROSION CONTROL DETAILS A 29 OF 34 PNG-C-473-0001030 EROSION CONTROL DETAILS A 30 OF 34 PNG-C-473-0001033 CONSTRUCTION DETAILS B 31 OF 34 PNG-C-473-0001034 CONSTRUCTION DETAILS B 32 OF 34 PNG-C-473-0001035 CONSTRUCTION DETAILS B 33 OF 34 PNG-C-473-0001041 TIE IN AT LINE 94 B 34 OF 34 1. INSTALLER SHALL FURNISH ALL MATERIALS AND SERVICES NOT PROVIDED BY THE COMPANY (UNLESS OTHERWISE NOTED ON DRAWINGS OR SPECIFICATIONS) INCLUDING EQUIPMENT, TRANSPORTATION, AND PERFORMANCE OF ALL NECESSARY WORK AS SHOWN ON THE DRAWINGS AND SPECIFIED HEREINAFTER. 2. IT SHALL BE THE RESPONSIBILITY OF THE INSTALLER TO VERIFY ALL DIMENSIONS GIVEN ON THE DRAWINGS. ANY ITEM IN QUESTION SHALL BE BROUGHT TO THE ATTENTION OF THE PROJECT MANAGER PRIOR TO PROCEEDING WITH THE WORK. 3. INSTALLER SHALL BE RESPONSIBLE FOR PROTECTION OF ALL SURROUNDING AREAS. 4. ALL BELOWGROUND WELDS SHALL BE COATED WITH HBE-95 OR SP-2888 PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS. 5. ALL ABOVEGROUND PIPING TO BE BLASTED TO CORRECT SOCIETY FOR PROTECTIVE COATINGS (SSPC) SURFACE PROFILE. PAINT SYSTEM TO BE UTILIZED SHALL BE PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS. 6. UPON BACKFILLING IN AREAS OF ROCK, BURIED PIPE SHALL HAVE 6" OF SAND PAD FILL PLACED AROUND THE PIPE'S CIRCUMFERENCE. 7. PRESSURE TESTING SHALL MEET THE REQUIREMENTS OF PNG'S PRESSURE TESTING STANDARD, PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS. 8. INSTALLER SHALL DEWATER ALL HYDROSTATICALLY TESTED PIPING, USING CLEANING PIGS AS REQUIRED, AND DRY TO A DEWPOINT OF -40OF PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS. CONSTRUCTION NOTES 1. EXISTING OVERHEAD AND BELOWGROUND FACILITIES MAY BE IN THE WORK AREA VICINITY. INSTALLER IS RESPONSIBLE FOR HAVING SUCH FACILITIES LOCATED AND IS RESPONSIBLE FOR MAINTENANCE AND PRESERVATION OF THESE FACILITIES. 2. PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS, INSTALLER IS REQUIRED TO CALL 811 FOR UTILITY LOCATES A MINIMUM OF 72 HOURS PRIOR TO COMMENCEMENT OF WORK. NO EXTRA COMPENSATION WILL BE ALLOWED FOR DELAYS FROM ANY WORK PROVIDED BY OTHER UTILITIES. 3. IF EXISTING UTILITIES OF ANY TYPE ARE ENCOUNTERED IN THE FIELD AND DEEMED TO BE IN CONFLICT WITH INSTALLATION OF FACILITIES, INSTALLER SHALL NOTIFY THE PROJECT MANAGER IMMEDIATELY SO THE CONFLICT MAY BE RESOLVED. 4. WHEN EXISTING DRAINAGE FACILITIES ARE DISTURBED, INSTALLER SHALL PROVIDE AND MAINTAIN TEMPORARY OUTLETS AND CONNECTIONS FOR PRIVATE DRAINS OR SEWERS. RESTORATION OF THESE FACILITIES IS TO BE PERFORMED ONCE CONSTRUCTION IS COMPLETE AND ARE CONSIDERED INCIDENTAL COSTS OF THE PROJECT. 5. ALL DRAWING MEASUREMENTS ARE TO BE TAKEN FROM EXISTING GRADE. FINAL GRADE SHALL BE MATCHED TO SURROUNDING GRADE AS PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS. 6. INSTALLER IS TO REMAIN WITHIN CONSTRUCTION WORKING LIMITS. ACCESS TO AREAS OUTSIDE WORKING LIMITS MUST BE COORDINATED WITH THE OWNER OR PIEDMONT PROJECT MANAGER. 7. ALL EXCESS EXCAVATION, CONSTRUCTION DEMOLITION DEBRIS AND UNSUITABLE MATERIALS THAT DO NOT CONTAIN ASBESTOS SHALL BE REMOVED FROM THE SITE AND PROPERLY DISPOSED. 8. STANDARD SPECIFICATIONS REFERENCED ON THIS SHEET AND CONSTRUCTION PLANS ARE CONSIDERED AS PART OF THE CONTRACT DOCUMENTS. INCIDENTAL ITEMS OR ACCESSORIES NECESSARY TO COMPLETE THIS WORK MAY NOT BE SPECIFICALLY NOTED, BUT ARE CONSIDERED TO BE A PART OF THIS CONTRACT. 9. BEFORE ACCEPTANCE BY THE OWNER AND FINAL PAYMENT, ALL WORK SHALL BE INSPECTED AND APPROVED BY PIEDMONT OR COMPANY REPRESENTATIVE. FINAL PAYMENT SHALL BE MADE AFTER ALL OF THE INSTALLER'S WORK HAS BEEN ACCEPTED AND APPROVED AND IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. 10. DURING CONSTRUCTION, ALL LOOSE MATERIALS THAT ARE DEPOSITED IN THE FLOW LINE OF GUTTERS, DRAINAGE STRUCTURES, DITCHES, ETC. SUCH THAT THE NATURAL FLOW LINE OF WATER IS OBSTRUCTED, SHALL BE REMOVED AT THE END OF EACH WORK DAY. 11. ALL FIELD TILE ENCOUNTERED DURING CONSTRUCTION SHALL BE EXTENDED TO OUTLET INTO AN EXISTING DRAINAGE WAY. A RECORD OF ALL FIELD TILE FOR ONSITE DRAIN PIPE ENCOUNTERED SHALL BE KEPT BY THE INSTALLER AND TURNED OVER TO THE PROJECT MANAGER UPON COMPLETION OF THE PROJECT. 12. INSTALLER IS REQUIRED TO MAINTAIN A SET OF ISSUED FOR CONSTRUCTION DRAWINGS AND ALL PERMITS AT THE JOB SITE. ANY MODIFICATIONS OR ALTERATIONS TO THE PLANS OR SPECIFICATIONS SHALL BE APPROVED BY THE PROJECT MANAGER. 13. INSTALLER IS SOLELY RESPONSIBLE FOR EXECUTION OF HIS/HER WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND SPECIFICATIONS. INSTALLER IS RESPONSIBLE FOR THE CONSTRUCTION METHODS AND TECHNIQUES, SEQUENCES, TIME OF PERFORMANCE, AND ALL SAFETY PRECAUTIONS. 14. MINIMUM DEPTH OF BURIAL SHALL BE PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS. 15. ALL PIPELINES BEING CROSSED ARE TO BE PROTECTED WITH A MINIMUM OF (3) 4 FEET X 18 FEET WOODEN MATS. 16. PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS, FOR OPEN DITCH EXCAVATION, A MINIMUM OF TWO FEET OF SEPARATION SHALL BE MAINTAINED BETWEEN ALL CROSSING STRUCTURES. SEPARATION BETWEEN CROSSING STRUCTURES AND PIPELINES THAT ARE INSTALLED VIA DIRECTIONAL DRILLING METHODS IS AT THE DISCRETION OF ENGINEERING. 17. DURING BACKFILLING, A SIX INCH CROWN SHALL BE PLACED ON ALL DISTURBED AREAS. COMPACTION REQUIREMENTS SHALL BE PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS. 18. BOLTS FOR FLANGES TO BE TORQUED PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS. 1. ADDITIONAL EXCAVATIONS BELOW FOOTINGS MAY BE NECESSARY TO REACH UNDISTURBED SOIL. SHOULD THIS OCCUR, THE EXCAVATION SHALL BE BROUGHT TO THE BOTTOM OF THE FOOTING ELEVATION WITH COMPACTED SAND FILL MEETING THE REQUIREMENTS OF MODIFIED PROCTOR COMPACTION TEST (ASTM D1557) TO 95% IN SIX INCH LIFTS. 2. ALL EXPOSED CONCRETE EDGES SHALL HAVE A 1" X 1" 450 CHAMFER. 3. CONCRETE SHALL BE MIXED AND POURED PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS. TESTING SHALL CONFORM TO ACI 318. INSTALLER TO SUPPLY ALL CONCRETE AND TESTING. 4. ALL STRUCTURAL STEEL SHALL CONFORM TO ASTM A36 SPECIFICATION. STEEL REINFORCING BAR SHALL CONFORM TO ASTM A615 GRADE 60 AND WELDED WIRE FABRIC SHALL CONFORM TO ASTM A185. TIE WIRE SHALL CONFORM TO ASTM A1064. 5. UNSUITABLE OR EXCESS EARTH SPOIL SHALL BE DISPOSED OF AT AN APPROVED WASTE LOCATION. SOIL BEING TRANSPORTED ONTO THE JOB SITE SHALL BE APPROVED BY EITHER THE PROJECT MANAGER OR CONSTRUCTION MANAGER. 6. ROCKSHIELD OR SIMILAR COMPANY APPROVED PRODUCT MUST BE INSTALLED BETWEEN ALL PIPE AND FITTINGS THAT COME INTO CONTACT WITH CONCRETE. A LAYER OF NON ABRASIVE MATERIAL SUCH AS FRP SHALL BE INSTALLED BETWEEN ALL PIPE SUPPORTS AND PIPING. 7. ALL FIELD BENDING OF REBAR SHALL BE DONE COLD. SOIL EROSION AND SEDIMENT CONTROL NOTES 1. INSTALLER IS TO CONSTRUCT ALL SOIL EROSION AND SEDIMENT CONTROL MEASURES AT THE COMMENCEMENT OF THE PROJECT, PROVIDE MAINTENANCE AND ASSURE EFFECTIVENESS THROUGHOUT THE DURATION OF THE PROJECT. 2. CARE SHALL BE TAKEN TO MINIMIZE DOWNSTREAM SILTATION. RAW BANKS MAY BE SEEDED AND MULCHED TO PREVENT EROSION. 3. ALL SPOILS INCLUDING ORGANIC SOILS, VEGETATION AND DEBRIS SHALL BE REMOVED FROM THE SITE AND PROPERLY DISPOSED OF IN SUCH A MANNER AS TO NOT ERODE INTO ANY BODY OF WATER OR WETLAND. 4. SILT FENCING SHALL BE PLACED WHERE NECESSARY TO PREVENT SEDIMENT FROM LEAVING THE WORK AREA. 5. CATCH ALL INLET FILTERS ARE REQUIRED AT ALL SEWER INLETS, GRATES AND MANHOLES FOR SEDIMENT CONTROL. 6. WETLAND AREAS SHALL HAVE SILT FENCING AND ONE LAYER OF STRAW LOG INSTALLED NO CLOSER THAN 50 FEET FROM POINT OF WETLAND DELINEATION. 7. TOPSOIL STOCKPILES SHALL BE LOCATED TO AVOID EROSION OF SAID STOCKPILE ONTO OFFSITE AREAS. 8. ALL ENVIRONMENTAL MEASURES SHALL BE PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS. BURNS&McDONNELLCONSULTANTS, INC. I PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY STATE LICENSE # C-1435 PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 N&BURNS PRELIMINARY - NOT MMONNELL FOR CONSTRUCTION CONSULTANTS, INC. ISSUED FOR BID CLAUDEA McMULLAN IFCSUBMITTALDATE CAROLINA SEAL047852 PROFESSIONALENG/ARCH STAMP NO.1 DATE REVISION(S) DESCRIPTION BY I CHK APPD I DESCRIPTION APPROVALS �r� DUKEr6lj��Nat Piedmont '� ENERGY:.. Natural Gas G COPYRIGHT 2018 LINE 473 COVER PAGE / INDEX C LAYTO N , N C GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA SHEET(S) 1 OF 34 DWG SCALE NONE A 10-15-2019 p 30%DESIGN SUBMITTAL MJD CNS CAM AREA CODE 1853 DATE N/ANORTH INITIALS NIA REGIONAL ENGINEER DWG DATE 03102/2020 SUPERSEDED B 12-03-2019 60% DESIGN SUBMITTAL MJD CNS CAM ACCOUNT NUMBER C 03-02-2020 90% DESIGN SUBMITTAL MJD CNS CAM PROJECT NUMBER 0228711 DATE ATE N/A INITIALS NIA MGR TECH REC & STD DRAWING NUMBER PNG -G-473-0001 000 REVISION D D 08-25-2020 ISSUED FORBID MJD CNS CAM DRAWING BY MJD STATION ID DATE 08/25/2020 INITIALS CAM PRINCIPAL ENGINEER CHECKER INITIALS CNS DISCIPLINE / RESOURCE CENTER / LINE NUMBER LEGEND: - - - SS----- SS----- SS- -- G G G W W W -- E----- E - - - -- E-- FO FO FO cnry cnry T T T -- SSFM - - - - - SSFM-- UNK UNK OH OH OH o� i- L---- J L--� BORE PIT RECEIVING PIT �w� ENTRY PIPE STRING AREA T + 9+00 8+00 BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # C-1435 ROAD ASPHALT ROAD CONCRETE ROAD CURB ROAD DIRT ROAD GRAVEL ROAD CENTERLINE DRIVEWAY ASPHALT DRIVEWAY GRAVEL DRIVEWAY CONCRETE PAVEMENT ASPHALT DITCH BOTTOM DITCH/STREAM CENTERLINE DITCH TOP TOE OF SLOPE TOP OF BANK SIDEWALK WALL RETAINING WALL BUILDING OUTLINE BUILDING OVERHEAD PROPERTY LINE SURVEYED PROPERTY RIGHT OF WAY LINE EASEMENT PNG LINE EASEMENT ACCESS LINE EASEMENT SANITARY SEWER LINE EASEMENT UTILITY LINE FENCE GUARDRAIL TREELINE SANITARY SEWER LINE GAS LINE WATER LINE POWER LINE FIBER OPTIC LINE TRAFFIC CONTROL LINE CABLE TV LINE TELEPHONE LINE SANITARY FORCE MAIN LINE UNKNOWN UTILITY LINE OVERHEAD WIRE STORM LINE TEMPORARY SILT FENCE PROPOSED CHAIN LINK SECURITY FENCE DEMOLISH & REMOVE LINEAR SITE FEATURE PROPOSED CHAIN LINK MANUAL SWING GATE PROPOSED GRAVEL SURFACE COURSE WETLANDS CONTRACTOR HAUL ROUTE JACK AND BORE HDD PROPOSED PIPELINE PROPOSED PERMANENT EASEMENT PROPOSED TEMPORARY WORKSPACE PROPOSED WORK BY DEVELOPER GENERAL NOTES: 1. THE EXISTING SITE UTILITIES AND FEATURES SHOWN ARE BASED ON A FIELD RUN TOPOGRAPHIC SURVEY PERFORMED BY MASER CONSULTING IN NOVEMBER, 2019. 2. ALL DIMENSIONS, ELEVATIONS, AND STATIONS ARE IN FEET, UNLESS INDICATED OTHERWISE. 3. CALLOUTS, COORDINATES, AND DIMENSIONS ARE POINTED TO OR MEASURED TO STRUCTURE CENTER, EDGE OF PAVEMENT, BACK OF CURB, OR OUTSIDE FACE OF FOUNDATION WALL, UNLESS INDICATED OTHERWISE. 4. ALL WORK SHALL BE SUBJECT TO INSPECTION BY AUTHORIZED PERSONNEL OF LOCAL AND GOVERNMENT REGULATORY AGENCIES AND THE CLIENT REPRESENTATIVE. 5. SEE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (NCDOT) DESIGN STANDARDS FOR REFERENCES TO NCDOT STANDARD DRAWINGS. ALL SUBSEQUENT SPECIFICATIONS AND STANDARDS SHALL APPLY. 6. ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS AND LOCAL AND GOVERNMENT CODES, ORDINANCES, AND REGULATIONS. IN CASE OF CONTRADICTION OR DISCREPANCY BETWEEN REQUIREMENTS, CONTRACTOR SHALL INCORPORATE WHICHEVER IS MOST STRINGENT. WHERE A QUESTION REMAINS ON WHICH REQUIREMENT IS MOST STRINGENT, CONTRACTOR SHALL SUBMIT ISSUE TO THE CLIENT REPRESENTATIVE IN WRITING. THE DECISION OF THE CLIENT REPRESENTATIVE SHALL BE CONSIDERED FINAL. 7. ALL WORK SHALL BE CONDUCTED IN A PROFESSIONAL WORKMANSHIP MANNER USING USING QUALITY MATERIALS. WORK SHALL CONFORM TO THESE DRAWINGS, UNLESS INDICATED OTHERWISE OR AS DIRECTED BY THE CLIENT REPRESENTATIVE. 8. CONTRACTOR SHALL CONFINE ALL WORK TO BE WITHIN THE PERMANENT AND TEMPORARY EASEMENTS. 9. ALL GRADING, PAVEMENT WORK, AND ANY OTHER MISCELLANEOUS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE CURRENT NCDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION AND SUPPLEMENTAL SPECIFICATIONS. 10. CONTRACTOR SHALL TAKE CARE TO MAINTAIN THE SITE AND ADJACENT AREAS IN AS CLEAN A CONDITION AS POSSIBLE. ANY DEBRIS, DIRT, MUD, ETC. SHALL BE CLEANED DAILY, OR AS THE CLIENT REPRESENTATIVE DIRECTS, FROM ANY ADJOINING STREETS OR PROPERTIES BY THE CONTRACTOR AS A PART OF THE PRIMARY CONSTRUCTION WORK. THIS SHALL BE AT NO ADDITIONAL COMPENSATION TO THE CONTRACTOR. CONSTRUCTION DRAWING NOTES: 1. CONTRACTOR SHALL MAINTAIN UPDATED CONSTRUCTION DRAWINGS AT ALL TIMES THROUGH THE DURATION OF THE PROJECT. CONSTRUCTION RECORD DRAWINGS SHALL BE SUBMITTED TO THE CLIENT REPRESENTATIVE. 2. DURING CONSTRUCTION OF THE PROJECT, CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING TRACK OF ANY CLIENT REPRESENTATIVE -APPROVED FIELD CONSTRUCTION REVISIONS TO THE DESIGN DEPICTED ON APPROVED CONSTRUCTION DRAWINGS. 3. ALL VARIATIONS IN PROJECT CONDITIONS, LOCATIONS, AND CONFIGURATIONS, AND ANY OTHER CHANGES OR DEVIATIONS FROM THE INFORMATION PRESENTED ON THE ORIGINAL, APPROVED CONSTRUCTION DRAWINGS SHALL BE NOTED. THIS INCLUDES BURIED OR CONCEALED CONSTRUCTION AND UTILITY FEATURES THAT WERE REVEALED DURING CONSTRUCTION. 4. THE CLIENT REPRESENTATIVE SHALL REVIEW COMPLETENESS, ACCURACY, AND FORMAT OF SUBMITTED CONSTRUCTION DRAWINGS. IF THE CONSTRUCTION DRAWINGS ARE CONSIDERED UNACCEPTABLE, THEY SHALL BE RETURNED TO THE CONTRACTOR FOR CORRECTION AND RESUBMISSION. THIS SHALL BE AT NO ADDITIONAL COMPENSATION TO THE CONTRACTOR. COORDINATION AND COMMUNICATION 1. CONTRACTOR SHALL APPOINT A PRIMARY CONSTRUCTION SUPERINTENDENT, SUBJECT TO THE APPROVAL OF THE CLIENT REPRESENTATIVE, WHO SHALL BE PRESENT ON THE CONSTRUCTION SITE AT ALL TIMES DURING WORKING HOURS AND ACCESSIBLE AT ALL TIMES WHILE WORK IS IN PROGRESS. THE PRIMARY CONSTRUCTION SUPERINTENDENT SHALL BE DESIGNATED THE RESPONSIBLE CONTRACTOR'S REPRESENTATIVE WHO SHALL BE AVAILABLE ON A 24-HOUR BASIS. WHEN THE CONTRACTOR'S PRIMARY CONSTRUCTION REPRESENTATIVE IS NOT AVAILABLE ON THE CONSTRUCTION SITE, AN ALTERNATE REPRESENTATIVE SHALL BE PROVIDED. CONTRACTOR SHALL PROVIDE NAMES AND CONTACT INFORMATION OF REPRESENTATIVES TO THE CLIENT REPRESENTATIVE PRIOR TO THE START OF CONSTRUCTION ACTIVITIES. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING CONSTANT COORDINATION BETWEEN ANY SUBCONTRACTORS AND THE CLIENT REPRESENTATIVE. ALL CONSTRUCTION ACTIVITIES PLANNED BY THE CONTRACTOR SHALL BE REVIEWED AND APPROVED BY THE CLIENT REPRESENTATIVE. 3. THE FOLLOWING CONTACT INFORMATION IS PROVIDED FOR CONTRACTOR'S USE IN CASE OF AN EMERGENCY: a. EMERGENCY 911 b. CHARLIE GILMAN (CONSTRUCTION) 252-339-1971 c. OTHER CONTACTS AS DIRECTED AT PRE -CONSTRUCTION MEETING EXCAVATION AND TRENCHES 1. CONTRACTOR SHALL COMPLY WITH THE MOST CURRENT EDITION OF OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) REGULATIONS AND THE STATE OF NORTH CAROLINA LAWS CONCERNING EXCAVATION. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT ALL EXCAVATION, TRENCHING AND SHORING ARE PERFORMED IN A MANNER THAT COMPLIES WITH LOCAL REGULATIONS AND OSHA REGULATIONS FOR CONSTRUCTION. 3. OPEN TRENCHES AND EXCAVATIONS AT THE CONSTRUCTION SITE SHALL BE PROMINENTLY MARKED WITH ORANGE BARRICADES WITH FLASHING RED LIGHTS ACCEPTABLE TO THE CLIENT REPRESENTATIVE. 4. CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 48 HOURS TO THE CLIENT REPRESENTATIVE AND ASSOCIATED UTILITY COMPANIES AND AGENCIES BEFORE PROCEEDING WITH ANY EXCAVATION. 5. DEWATERING OF UTILITY TRENCHES AND OTHER EXCAVATIONS MAY BE REQUIRED. 6. OPEN ONLY THOSE TRENCHES FOR WHICH MATERIAL IS ON -HAND AND READY FOR PLACING THEREIN. AS SOON AS POSSIBLE AFTER THE MATERIAL HAS BEEN PLACED AND WORK APPROVED, BACKFILL AND COMPACT TRENCHES AS SPECIFIED. 7. NO SPECIAL PROVISIONS WILL BE MADE FOR ROCK EXCAVATION, ANY BOULDERS ENCOUNTERED SHALL BE REMOVED AND DISPOSED OF OFF SITE. 8. ALL TOPSOIL SHALL BE REMOVED FROM AREAS TO BE GRADED. ALL USEABLE TOPSOIL SHALL BE STOCKPILED DURING GRADING AND REAPPLIED IN 3" LAYERS TO ALL SLOPES IMMEDIATELY AFTER GRADING IS COMPLETE. OTHER SAFETY REQUIREMENTS 1. CONTRACTOR SHALL MAINTAIN SAFETY PRACTICES THAT CONFORM TO OSHA REGULATIONS. 2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN AND PAY FOR ALL APPLICABLE PERMITS, FEES AND LICENSES FOR CONSTRUCTION AND EQUIPMENT. 3. THE CONTRACTOR SHALL PERFORM ON -SITE INSPECTIONS THROUGHOUT THE PROJECT AND REMEDY ANY SAFETY CONCERNS IMMEDIATELY. 4. THERE SHALL BE NO PERMANENT WASTE SITES ON SITE PROPERTY. ANY TEMPORARY WASTE AREA SHALL BE APPROVED BY THE CLIENT REPRESENTATIVE AND SHALL BE KEPT IN AN ORDERLY CONDITION. REMOVAL OF WASTE THAT IS NOT PROPERLY MAINTAINED IS SUBJECT TO THE DIRECTION OF THE CLIENT REPRESENTATIVE. 5. EROSION CONTROL DEVICES SHALL BE USED FOR THE ACCESS AND HAUL ROUTES, STAGING AREA, AND ANY MATERIAL STOCKPILES WHEN NECESSARY TO CONTROL EROSION AND STORM WATER RUNOFF. SEE DRAWINGS C-473-0001020 - C-473-0001027 FOR EROSION AND SEDIMENT CONTROL REQUIREMENTS. 6. STOCKPILED MATERIAL SHALL BE CONSTRAINED IN A MANNER TO PREVENT MOVEMENT RESULTING FROM WIND CONDITIONS. 7. CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO LIMIT DUST CAUSED BY CONSTRUCTION ACTIVITIES TO A LIMIT ACCEPTABLE TO PROJECT SITE OPERATIONS. THE CONTRACTOR SHALL CONTROL BLOWING DUST ON THE PROJECT SITE FROM ANY HAUL ROUTE OR WORK AREA REGARDLESS OF SOURCE. 8. WILDLIFE ATTRACTANTS, SUCH AS TRASH AND FOOD SCRAPS, FROM CONSTRUCTION PERSONNEL AND ACTIVITIES SHALL BE REMOVED FROM THE PROJECT LIMITS. 9. GASOLINE, DIESEL FUEL, OIL, AND HAZARDOUS WASTE RESULTING FROM CONTRACTOR'S OPERATIONS OR ACTIVITIES SHALL BE PROPERLY DISPOSED OF IN ACCORDANCE WITH THE SPECIFICATIONS AND LOCAL REGULATORY REQUIREMENTS AND PROPERLY REMOVED FROM THE PROJECT PROPERTY. IF HAZARDOUS MATERIALS ARE ENCOUNTERED OR UNCOVERED DURING CONSTRUCTION ACTIVITIES, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE CLIENT REPRESENTATIVE. 10. FAILURE TO COMPLY WITH THE CLIENT REPRESENTATIVE SAFETY REQUIREMENTS SHALL RESULT IN THE SUSPENSION OF CONSTRUCTION ACTIVITIES UNTIL ALL SAFETY CONCERNS ARE ADDRESSED BY THE CONTRACTOR TO THE SATISFACTION OF THE CLIENT REPRESENTATIVE. 11. ANY WORKERS AND EQUIPMENT NOT IN COMPLIANCE WITH SAFETY PLAN SHALL IMMEDIATELY BE REMOVED FROM THE WORK AREA. 12. THE CONTRACTOR SHALL NOT BURN OR BURY DEBRIS WITHOUT PERMISSION FROM THE SITE INSPECTOR. SURVEY AND SUBSURFACE INVESTIGATION NOTES: 1. SURVEY CONTROL POINTS WILL BE PROVIDED PRIOR TO CONSTRUCTION. IF THE CONTRACTOR SHOULD NEED TO DISTURB THE CONTROL POINTS DURING CONSTRUCTION, REQUEST SHALL BE GIVEN TO THE SURVEYOR TO HAVE THE CONTROL POINTS RESET. 2. IF BENCHMARKS SHOWN ARE IN AREAS THAT REQUIRE DEMOLITION, OTHER BENCHMARKS SHALL BE ESTABLISHED BEFORE DEMOLITION AND CONSTRUCTION WORK BEGINS. CONTRACTOR SHALL GIVE REQUEST TO THE SURVEYOR. 3. HORIZONTAL CONTROL IS BASED ON NAD 83 NORTH CAROLINA STATE PLANE, US FOOT. VERTICAL CONTROL IS BASED ON NAVD 88. EXISTING CONDITIONS NOTES: 1. THE LOCATIONS OF STRUCTURES AND UNDERGROUND UTILITIES AS INDICATED HAVE BEEN OBTAINED FROM EXISTING RECORDS AND FIELD SURVEYS. UNDERGROUND STRUCTURES AND UTILITIES MAY BE PRESENT WHICH ARE NOT DOCUMENTED OR LOCATED. 2. THE CONTRACTOR SHALL FIELD -CHECK ALL EXISTING CONDITIONS AND BE THOROUGHLY FAMILIAR WITH THE SITE BEFORE ANY WORK COMMENCES. ANY DISCREPANCIES IN THE DRAWINGS SHALL BE IMMEDIATELY REPORTED TO THE CLIENT REPRESENTATIVE BEFORE ANY FURTHER WORK COMMENCES. 3. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FIELD -VERIFY EXISTING STRUCTURES, UTILITIES, AND SURVEY INFORMATION, AND TO TAKE NECESSARY PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR SHALL VERIFY EXISTENCE AND MARK LOCATIONS OF ALL UTILITIES, INCLUDING SERVICE CONNECTIONS TO UNDERGROUND UTILITIES, PRIOR TO BEGINNING WORK. CONTRACTOR SHALL CONTACT THE CLIENT REPRESENTATIVE AND ALL ASSOCATED UTILITY COMPANIES AND AGENCIES TO IDENTIFY THE LOCATION OF UTILITIES. THERE IS NO GUARANTEE, EITHER EXPRESSED OR IMPLIED, THAT THE LOCATIONS, SIZE AND TYPE OF MATERIAL OF EXISTING UNDERGROUND UTILITIES INDICATED ARE REPRESENTATIVE OF THOSE TO BE ENCOUNTERED DURING CONSTRUCTION. 4. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE CLIENT REPRESENTATIVE OF OPERATIONAL PLANS. IN THE EVENT AN UNEXPECTED UTILITY OR STRUCTURE INTERFERENCE OR CONFLICT IS ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE CLIENT REPRESENTATIVE. ANY UTILITY SERVICES OR STRUCTURES DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE RESTORED IMMEDIATELY AT CONTRACTOR'S EXPENSE TO THE SATISFACTION OF THE OWNER. 5. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ITEMS NOT TO BE DAMAGED DURING DEMOLITION AND CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE DAMAGED OR DISTURBED ITEMS TO THE SATISFACTION OF THE CLIENT REPRESENTATIVE. GENERAL GRADING NOTES 1. ALL GRADING, PAVEMENT WORK, AND ANY OTHER MISCELLANEOUS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE CURRENT NC DOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION AND SUPPLEMENTAL SPECIFICATIONS. 2. THE GRAVEL SURFACE COURSE SHALL BE CONSTRUCTED IN ACCORDANCE WITH SECTION 520 OF THE NC DOT STANDARD SPECIFICATIONS. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR GRADING INCLUDING EXCAVATION, EMBANKMENT, AND BACKFILLING AS NECESSARY TO CONSTRUCT ALL AGGREGATE ACCESS ROADS, AS OUTLINED IN THESE TECHNICAL SPECIAL PROVISIONS AND AS DIRECTED BY THE CLIENT REPRESENTATIVE. 4. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY DAMAGE DONE TO STORM MANHOLES OR OTHER UTILITIES DURING GRADING. 5. DISTRIBUTE EXCESS SOIL ON SITE AT THE DIRECTION OF THE CLIENT REPRESENTATIVE. DO NOT ALTER DIRECTION OF SURFACE DRAINAGE PATTERNS. 6. THE TOLERANCE OF THIS WORK SHALL BE TO WITHIN TO 0.1 FT OF THE EXISTING GROUND SURFACE ELEVATIONS. 7. THE ACCESS ROAD SUBGRADE SHALL HAVE SUFFICIENT STABILITY TO ACCOMMODATE CONSTRUCTION TRAFFIC WITHOUT EXCESSIVE SUBRADE RUTTING OR SHOVING. AT THE TIME OF PLACEMENT OF THE PAVEMENT, THE IN SITU SUBGRADE SHALL HAVE A CALIFORNIA BEARING RATIO (CBR) OF AT LEAST 6 PERCENT IN THE TOP 12 INCHES OF SUBGRADE. THE CBR PERCENTAGE WILL BE ASCERTAINED BY THE CONTRACTOR. 8. IF SOFT SPOTS ARE IDENTIFIED IN THE SUBGRADE SOIL, THE SUBGRADE SHALL BE SCARIFIED AND PROOF -ROLLED TO THE DEPTHS REQUIRED BY THE OWNER'S CONSTRUCTION INSPECTOR TO COMPACT AREAS TO THE DENSITY REQUIREMENTS OF THIS DOCUMENT. IF THE SOFT AREAS CANNOT BE ADEQUATELY COMPACTED, THE SOFT SOIL SHALL BE REMOVED AND REPLACED PER THE DESIGN PLANS WITH SUITABLE SOIL MATERIAL AND COMPACTED TO THE DENSITY REQUIREMENTS IN ACCORDANCE WITH THIS DOCUMENT. 9, THE QUALITY OF THE SOIL TO BE USED AS FILL MATERIAL SHALL BE AS SPECIFIED IN THIS DOCUMENT, ALL BACKFILL SHALL BE SPREAD IN LOOSE LIFTS NOT EXCEEDING 8" INCHES IN THICKNESS WHEN SELF-PROPELLED EQUIPMENT IS USED AND NOT EXCEEDING 6" WHEN HAND GUIDED EQUIPMENT IS USED. ALL ROOTS, WOOD, AND VEGETATION SHALL BE REMOVED FROM THE LAYER OF FILL PRIOR TO COMPACTION. ALL FILL AND EXPOSED SOIL IN CUT AREAS SHALL BE COMPACTED AS SPECIFIED IN THIS DOCUMENT. SOIL COMPACTION TESTS WILL BE REQUESTED BY THE OWNER AT APPROPRIATE INTERVALS DURING GRADING OPERATIONS. 10. ALL HAUL -IN MATERIAL SHALL BE FREE OF ROCKS 3" IN DIAMETER AND LARGER. THE OWNER'S CONSTRUCTION INSPECTOR SHALL APPROVE ALL HAUL -IN MATERIAL TO ENSURE THE QUALITY AND THE ABSENCE OF ENVIRONMENTAL HAZARDS. 11. THE FILL AREA SHALL BE CONSTRUCTED TO THE LINES AND GRADES SHOWN ON THE DESIGN DRAWINGS WITH MATERIAL SPECIFIED IN THIS DOCUMENT. THE CONTRACTOR SHALL LAY OUT ALL LINES AND GRADES FOR THE BACKFILL AREAS. ANY PROPOSED CHANGES TO THE SLOPES AND GRADES SHALL REQUIRE THE APPROVAL OF THE OWNER'S CONSTRUCTION INSPECTOR IN ADVANCE. THE CONTRACTOR SHALL BE REQUIRED TO REMOVE, AT HIS OWN EXPENSE, ANY COMPACTED MATERIAL PLACED OUTSIDE OF THE APPROVED LINES OR GRADES. 12. SPOIL MATERIAL SHALL BE TOPSOIL AND OTHER SOIL MATERIALS CONTAINING GREATER THAN 5 PERCENT ORGANIC MATERIAL, SOIL WHICH IS TOO WET, SOIL WHICH DOES NOT MEET THE PLASTICITY AND/OR GRADATION LIMITS FOR SELECT MATERIAL AS SPECIFIED IN THIS DOCUMENT, OR OTHER SOIL MATERIAL DESIGNATED BY THE OWNER'S CONSTRUCTION INSPECTOR TO BE UNSUITABLE FOR SELECT MATERIAL. 13. SELECT SOIL MATERIAL SHALL BE THAT MATERIAL CLASSIFIED AS SM, SP, SC, SW AND CL, OR SW AND SC IN ACCORDANCE WITH ASTM D2487, AND SHALL HAVE A MAXIMUM LIQUID LIMIT OF 30, A MAXIMUM PLASTICITY INDEX OF 8, AND A MAXIMUM OF 35 PERCENT PASSING THE #200 SIEVE. 14. THE TOP SURFACE OF EACH LIFT OF BACKFILL SHALL BE PROTECTED FROM PUMPING, PONDING, AND GULLYING. 15. COMPACTION TESTING WILL BE PROVIDED AT THE EXPENSE OF THE CONTRACTOR. COMPACTION REQUIREMENTS OF SOIL BACKFILL SHALL BE AS INDICATED IN THE FOLLOWING TABLE: LOCATION OF FILL MINIMUM REQUIRED COMPACTION LEVEL STANDARD PROCTOR A. GENERAL YARD AREA 98%(ASTM D698) B. UPPER 18 INCHES OF SOIL TO BE USED AS 98%(ASTM D698) ROAD SUBGRADE MATERIAL AND EXTENDING A MINIMUM OF 5 FEET BEYOND THE EDGE OF DEFINED ROADWAYS (IMMEDIATELY UNDER BASE MATERIAL) 15. CRUSHED STONE IN DRIVE AREAS SHALL BE COMPACTED WITH A STATIC STEEL DRUM ROLLER (APPROXIMATELY 8 TONS). IF A VIBRATORY COMPACTOR IS USED, NO MORE THAN FOUR (4) PASSES SHALL BE ALLOWED. 16. APPROVAL SHALL BE RECEIVED FROM THE CLIENT REPRESENTATIVE FOR EACH FILL TYPE TO BE USED PRIOR TO PROCEEDING WITH BACKFILL OPERATIONS WITH THE MATERIAL IN QUESTION. 17. BACKFILL TO BE IMPORTED SHALL BE TESTED IN ACCORDANCE WITH THIS DOCUMENT AND APPROVED BY THE PROJECT MANAGER PRIOR TO DELIVERY OF MATERIAL TO THE SITE. THE OWNER'S CONSTRUCTION INSPECTOR ACCEPTS NO LIABILITY FOR ANY OUT OF SPECIFICATION MATERIAL ACCEPTED AND STOCKPILED BY THE CONTRACTOR 18. INSPECTION AND TESTING OF MATERIAL SHALL BE PERFORMED AS REQUIRED BY THIS DOCUMENT AT THE EXPENSE OF THE CONTRACTOR. 19. TESTS AND ANALYSIS OF MATERIAL SHALL BE PERFORMED IN ACCORDANCE WITH THE APPLICABLE STANDARDS REFERENCED IN THIS DOCUMENT FOR THE SPECIFIC TEST. FIELD INSPECTION SHALL BE PERFORMED AS REQUIRED BY THIS DOCUMENT. 20. THE BACKFILL AND EXPOSED SOIL IN CUT AREAS SHALL BE COMPACTED AS SPECIFIED ON THIS DOCUMENT. FIELD DENSITY TESTS SHALL BE PERFORMED BY THE CONTRACTOR TO VERIFY COMPACTION REQUIREMENTS HAVE BEEN ACHIEVED. IN -PLACE FIELD DENSITY TESTING OF THE COMPACTED BACKFILL SHALL BE CONDUCTED ACCORDING TO THE PROCEDURES OF THE SAND CONE METHOD (ASTM 1556), NUCLEAR METHOD (ASTM D3017), OR ACCORDING TO THE PROVISIONS OF THIS DOCUMENT. TEST RESULTS REPORTED SHALL INCLUDE BOTH THE MOISTURE CONTENT AND DRY DENSITY, ALONG WITH OTHER PERTINENT DATA SUCH AS LOCATION, ELEVATION, PROCTOR CURVE USED FOR COMPARISON, ETC. THE TESTING FREQUENCY SHALL BE ONE TEST FOR EACH 5,000 SQUARE FEET OF LIFT AREA OR PORTION THEREOF FOR EACH LIFT. IN ISOLATED AREAS OF LESS THAN 5,000 SQUARE FEET, TEST AT LEAST EVERY THIRD LIFT. WHEN BACKFILL OPERATIONS ARE CONCENTRATED IN SMALL AREAS USING LIGHT MANUALLY -GUIDED EQUIPMENT AND RELATIVELY THIN LIFTS, THE FREQUENCY OF DENSITY TESTING MAY BE REVISED AS DIRECTED BY THE OWNER'S CONSTRUCTION INSPECTOR. TEST LOCATION SHALL BE THE WEAKEST APPEARING AREA OF THE TOP LIFT DETERMINED BY TRACKING ACTION OF THE EQUIPMENT. 21. SUITABILITY OF SOIL MATERIAL FOR USE AS BACKFILL SHALL BE DETERMINED FOR EACH FILL TYPE BY THE RESULTS OF THE FOLLOWING TESTS: A. LIQUID LIMIT IN ACCORDANCE WITH ASTM D4318. B. PARTICLE SIZE ANALYSIS IN ACCORDANCE WITH ASTM D422. C. MOISTURE -DENSITY RELATIONS (STANDARD PROCTOR) IN ACCORDANCE WITH ASTM D698. D. MOISTURE CONTENT IN ACCORDANCE WITH ASTM D2216. E. SAMPLING OF SOIL SHALL BE IN ACCORDANCE WITH ASTM D2216. F. SOIL SHALL BE CLASSIFIED IN ACCORDANCE WITH ASTM D2487. 22. FREQUENCY OF TESTS: TESTS OF MATERIALS TO BE USED IN THE OPERATIONS COVERED IN THIS DOCUMENT SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS GIVEN IN THIS DOCUMENT. FREQUENCIES OF IN -PLACE DENSITY TESTS SHALL BE AS STATED IN THIS DOCUMENT. 23. IF QUESTIONABLE COMPACTION RESULTS ARE OBTAINED, THE CLIENT REPRESENTATIVE MAY REQUIRE THE CONTRACTOR TO PERFORM PROCTOR CHECKS (ON DRY SIDE OF OPTIMUM) TO VERIFY THAT THE PROPER PROCTOR CURVE IS BEING REFERENCED. IF NOT, A NEW PROCTOR CURVE DETERMINED BY A FIVE -POINT TEST SHALL BE REQUIRED. IF THE COMPACTION REQUIREMENTS FOR A LIFT HAVE NOT BEEN ACHIEVED, THE LIFT SHALL BE REWORKED OR REPLACED AT THE CONTRACTOR'S EXPENSE, 24. TESTING OF IN -PLACE DENSITY AND MOISTURE CONTENT BY NUCLEAR METHODS IN ACCORDANCE WITH ASTM D2922 AND ASTM D3017, RESPECTIVELY, WILL BE ALLOWED PROVIDED: A. ACCEPTABLE CORRELATION WITH SAND CONE DENSITY AND LABORATORY DETERMINED MOISTURE CONTENT TEST RESULTS CAN BE OBTAINED ACCORDING TO THE GUIDELINES OF "CALIBRATION" SECTIONS OF ASTM D2922 AND ASTM D3017. B. THE INITIAL CORRELATION RESULTS ARE REVIEWED AND USE OF THE NUCLEAR DEVICE IS APPROVED BY THE OWNER'S CONSTRUCTION INSPECTOR. C. THE CONTRACTOR INSURES THAT THE REPRESENTATIVE FROM THE TESTING AGENCY OPERATING THE NUCLEAR DENSITY TESTING HAS THE NECESSARY STATE AND/OR FEDERAL LICENSES TO OPERATE THE DEVICE AND CARRY A NUCLEAR ENERGY SOURCE. EMBANKMENT FILL NOTES: EMBANKMENT FILL SHALL CONSIT OF AN INORGANIC, NON -PLASTIC, GRANULAR SOIL CONTAINING LESS THAN 10% MATERIAL PASSING THE NO.200 MESH SIEVE WITH UNIFIED SOIL CLASSIFICATION OF SP, SP-SC, OR SP-SM. EMBANKMENT FILL SHALL BE PLACED IN LIFTS NOT EXCEEDING 8 INCHES WHEN USING A STATIC DRUM ROLLER WITH A MINIMUM OPERATING WEIGHT OF 5 TONS WITH A DRUM DIAMETER OF 3 TO 4 FEET. WHERE LIGHTWEIGHT VIBRATORY COMPACTION METHODS ARE UTIILIZED MAXIMUM LOOSE LIFT THICKNESS SHALL BE 6 INCHES. COMPACTION TO MEET A MAXIMUM DRY DENSITY OF 98% STANDARD PROCTOR DRY DENSITY. 2. ANY GRADING TO CORRECT SLOPES SHALL BE COMPACTED PER THIS DOCUMENT. GENERAL EXCAVATION REQUIRED FOR CONSTRUCTION 1. THIS ITEM SHALL CONSIST OF FURNISHING ALL LABOR, MATERIALS, MACHINERY, TOOLS, AND SUPERVISION FOR EXCAVATION AND GRADING REQUIRED TO PREPARE THE ROADWAY, AND GRADING REQUIRED TO COMPLETE THE FINAL GRADING OF AREAS ADJACENT TO THE ROADWAY AS SHOWN ON THE PLANS IN ACCORDANCE WITH THE PROVISIONS OF SECTION 225 OF THE NC DOT STANDARD SPECIFICATIONS INSOFAR AS THEY ARE NOT AMENDED BY THE PLANS AND THESE SPECIAL PROVISIONS, AND IN ACCORDANCE WITH THE FOLLOWING SPECIAL PROVISIONS, SUBGRADE COMPACTION VERIFICATION 1. THE CONTRACTOR SHALL EMPLOY AN INDEPENDENT CONSTRUCTION MATERIAL ENGINEERING TESTING FIRM TO MONITOR THE PROOFROLLING OF THE SITE AFTER THE STRIPPINGS HAVE BEEN REMOVED TO INSPECT AND TEST THE COMPACTED FILL AREAS IN THE ACCESS ROAD AREAS AS INDICATED ON THE BID DOCUMENTS AND/OR AS SPECIFIED BY THE OWNER'S DESIGNATED REPRESENTATIVE. COPIES OF THE TEST RESULTS SHALL BE FURNISHED TO THE OWNER'S DESIGNATED REPRESENTATIVE AND OTHERS AS INDICATED BY OWNER'S DESIGNATED REPRESENTATIVE. THE OWNER'S DESIGNATED REPRESENTATIVE MUST APPROVE THE INDEPENDENT CONSTRUCTION MATERIAL ENGINEERING TESTING FIRM. INCLUDED WITH THIS BID PROPOSAL, THE CONTRACTOR SHALL FURNISH THE NAME, ADDRESS AND A PHONE NUMBER OF THE INDEPENDENT CONSTRUCTION MATERIAL ENGINEERING TESTING FIRM FOR APPROVAL. ABBREVIATIONS: ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS BOC BACK OF CURB CB CATCH BASIN CBR CALIFORNIA BEARING RATIO C/L CENTERLINE COMB COMBINATION BEND (VERT. & HOR. DIRECTIONAL CHANGE) CONC CONCRETE CI CURB INLET CMP CORRUGATED METAIL PIPE DB DEED BOOK DI DROP INLET DR DRIVE ELEC ELECTRICAL EOP EDGE OF PAYMENT EX EXISTING FT FEET FTG FITTING JAB JACK AND BORE GIS GEOGRAPHIC INFORMATION SYSTEM LL LAND LOT MAX MAXIMUM MIN MINIMUM MISC MISCELLANEOUS NTS NOT TO SCALE PG PAGE PVC POLYVINYL PLASTIC PIPE NCDEQ NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY NCDOT NORTH CAROLINA DEPARTMENT OF TRANSPORTATION N/F NOW OR FORMERLY NPDES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM NTS NOT TO SCALE OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION PC POINT OF CURVATURE P/L PROPERTY LINE PT POINT OF TANGENCY RCP REINFORCED CONCRETE PIPE R/W RIGHT OF WAY SAG SAG (PIPE DIRECTION UP) SBL SIDE BEND LEFT SBR SIDE BEND RIGHT SSMH SANITARY SEWER MANHOLE STMH STORM MANHOLE PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 CLAUDEA McMULLAN NO.1 DATE REVISION(S) DESCRIPTION BY CHK APPD I DESCRIPTION APPROVALS IFC SUBMITTAL DATE NORTH CAROLINA A 10-15-2019 30% DESIGN SUBMITTAL MJD CNS CAM AREA CODE 1853 DATE N/A INITIALS NIA REGIONAL ENGINEER Piedmont B 12-03-2019 60% DESIGN SUBMITTAL MJD CNS CAM ACCOUNT NUMBER SEAL047852 C 03-02-2020 90% DESIGN SUBMITTAL MJD CNS CAM PROJECT NUMBER 0228711 DATE N/A INITIALS N/A MGR TECH REC &STD r DUKEr6 '� ENERGY l Natural Gas D 08-25-2020 ISSUED FOR BID MJD CNS CAM DRAWING BY MJD PROFESSIONALENG/ARCH STAMP STATION ID I DATE 08/25/2020 INITIALS CAM PRINCIPAL ENGINEER COPYRIGHT 2018 CHECKER INITIALS CNS LINE 473 CIVIL GENERAL NOTES, LEGENDS, & ABBREVIATION CLAYTON, NC GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA PRELIMINARY - NOT FOR CONSTRUCTION ISSUED FOR BID SHEET(S) 3 OF 34 1 DWG SCALE DWG DATE 03/02/2020 ISUPERSEDED DRAWING NUMBER PNG -C-473-0001000 DISCIPLINE / RESOURCE CENTER / LINE NUMBER NONE REVISION D - - --- I - CONTRACTO 05H03100C "�,fy '� / NORTH CAROLINA GRAVEL r.►h�* ..-, .RAILROAD COMPANY CONSTRUCTION ►�" �' `'` 5 ENTRANCE NEUSE RIVER BUFFER g OVA `\ �I GRAVEL CONSTRUCTION ENTRANCE _ ti i S ! HDD EXIT IMO) 05104001 Y BAYER CROPSCIENCE LP NEUSE RIVER BUFFER HDID ENTRY ��� � 05H040.0.2C ��. GRIFOLS I THERAPEUTICS INC. 7 f.4 05HO3009 TONY RAY CARROLL ' i' LINE 473 LAUNCHER AND MLV STATION ID: 84-T-91-GLD-6593 SEE PROJECT 0228708 _CONTRACTOR HAUL ROUTE --- - PROPOSED PERMANENT SITE ACCESS ROAD TIE IN PLAN AT PNG LINE 94 SEE PNG-C-473-0001041 a. 05HO4032F (TRACT 2) JIMMY R. COX AND WIFE JUDY G. COX FLOWERS PLANTATION REGULATOR STATION STATION ID: 84-T-91-GLD-6606 SEE PROJECT 0228708 - N� P% `���/f!! PROPOSED PERMANENT SITE ACCESS DRIVE r a� JACK AND BORE HWY 42 '" ems. GRAVEL CONSTRUCTION ENTRANCE ' „,�. 1 •^Rk ■ LAYDOWN YARD APPROX. 2 MILES ACCESS AND STAGING 1. ACCESS AND HAUL ROUTES FOR ALL CONTRACTOR PERSONNEL, VEHICLES, EQUIPMENT, AND DELIVERIES ARE ILLUSTRATED ON THIS DRAWING AND ARE SUBJECT TO THE APPROVAL OF THE CLIENT REPRESENTATIVE. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE OFF -SITE HAUL ROUTES WITH THE APPROPRIATE OWNER WHO HAS JURISDICTION OVER THE AFFECTED ROUTE. ACCESS ROUTES AND HAUL ROUTES ARE SUBJECT TO CHANGE AT THE DIRECTION OF THE CLIENT REPRESENTATIVE AND MAY CHANGE BASED ON OPERATIONAL REQUIREMENTS OF THE SITE. 2. CONTRACTOR SHALL COORDINATE ACTIVITIES AND MAINTAIN ALL ACCESS AND HAUL ROUTES IN A MANNER THAT ALLOWS UNOBSTRUCTED EMERGENCY ACCESS TO ALL PROJECT AREAS AND EXISTING ROADWAYS AT ALL TIMES WITHOUT DELAY TO EMERGENCY AND SECURITY VEHICLE RESPONSE TIME. 3. IF ANY EMERGENCY ROUTES REQUIRE CLOSURE DUE TO CONSTRUCTION ACTIVITIES, CONTRACTOR SHALL NOTIFY THE CLIENT REPRESENTATIVE, POLICE, LOCAL FIRE AUTHORITY, AND ALL OTHER EMERGENCY SERVICES OF THE CLOSURE. 4. CONTRACTOR SHALL MAINTAIN ACCESS AND HAUL ROUTES TO BE FREE FROM DEBRIS CAUSED FROM CONSTRUCTION ACTIVITIES ON A DAILY BASIS. 5. CONTRACTOR SHALL RESTRICT ALL OPERATIONS TO AREAS WITHIN THE CONSTRUCTION LIMITS UNLESS COORDINATED OTHERWISE WITH THE CLIENT P REPRESENTATIVE. 140 ► - r ti� �,�/,- `{, �`►L+i \ �,, '.� ',':' 6. WHEN NOT ENGAGED IN CONSTRUCTION ACTIVITIES, CONTRACTOR'S EQUIPMENT �• , P �\ :, AND VEHICLES SHALL BE PARKED IN THE STAGING AREA. r 'r'rs f 7. ACCESS POINTS, HAUL ROUTES, STAGING AREA, AND ANY OTHER AREAS ��` �,� \. +``'�� :'-' '•�'' DISTURBED BY THE CONTRACTOR SHALL BE RESTORED TO THEIR ORIGINAL let CONDITION OR BETTER TO THE SATISFACTION OF THE CLIENT REPRESENTATIVE. TRAFFIC CONTROL 1. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL CORDON OFF THE CONSTRUCTION WORK AREA AND ASSOCIATED ROADWAYS BY USING ' ;-- BARRICADES APPROVED BY THE CLIENT REPRESENTATIVE. y` 2. ALL CONSTRUCTION EQUIPMENT AND VEHICLES SHALL BE MARKED WITH ` �`.,.f COMPANY DESIGNS, INSIGNIAS, OR OTHER MARKINGS, WHICH ARE CLEARLY VISIBLE. - - :f{ .r 3. CONSTRUCTION EQUIPMENT SHALL HAVE AUTOMATIC SIGNALING DEVICES TO SOUND AN ALARM WHEN MOVING IN REVERSE. r .' IL 4. NO PEDESTRIAN TRAFFIC SHALL BE ALLOWED INSIDE THE CONSTRUCTION LIMITS. 5. ANY DAMAGE TO ROADS AND PAVEMENTS -TO -REMAIN DUE TO CONSTRUCTION EQUIPMENT OR TRAFFIC SHALL BE REPAIRED TO RESTORE THE ROADS AND P j --- -�--_Y QpN CONTRACTOR HAUL ROUTE r_ PAVEMENTS TO THEIR ORIGINAL CONDITION TO THE SATISFACTION OF THE CLIENT REPRESENTATIVE. �-� : \ W GRAVEL CONSTRUCTION ENTRANCE 1 1' LIMITS OF DISTURBED AREA CONTRACTOR LAYDOWN _ * ' ` - AREA & HAUL ROAD: 5.38 A LAYDOWN YARD I"'•�' - v �•� +. _ ; PIPELINE PROJECT: 18.68 AC SEE PNG-C-473-0001024 - f� � � POINT OF CONTACT (CONSTRUCTION): I a CHARLIE GILMAN 252-339-1971 PRELIMINARY - NOT pr FOR CONSTRUCTION ISSUED FOR BID Q BURNS&McDONNELLCONSULTANTS, INC. PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY a STATE LICENSE # C-1435 N 0 PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 o CLAUDEA McMULLAN NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS IFC SUBMITTAL DATE LINE 473 A 12-03-2019 60% DESIGN SUBMITTAL MJD CNS CAM AREA CODE 1853 DATE INITIALS REGIONAL NORTH CAROLINA SEAL047852 N/A N/A ENGINEER p/r�DUKE Piedmont SITE ACCESS ROUTE PLAN B 03-02-2020 90% DESIGN SUBMITTAL MJD CNS CAM ACCOUNT NUMBER DATE INITIALS 21 L�JN/A C 08-25-2020 ISSUED FOR BID MJD CNS CAM PROJECT NUMBER 0228711 MGR TECH V ENERGY,: Natural Gas DRAWING BY MJD NIA REC &STD C LAYTO N N C z , STATION ID DATE INITIALS PRINCIPAL PROFESSIONALENG/ARCH STAMP N 08/25/2020 CAM ENGINEER COPYRIGHT 2018 GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA CHECKER INITIALS CNS SHEET(S) 4 OF 34 1 DWG SCALE DWG DATE 03/02/2020 SUPERSEDED DRAWING NUMBER PNG -C-473-0001001 DISCIPLINE / RESOURCE CENTER / LINE NUMBER NONE REVISION C TAX ID: 05H04002C 05H03100C OWNER: GRIFOLS THERAPEUTICS INC NORTH CAROLINA RAILROAD COMPANY a LL o DEED BOOK / PAGE: DB/PAGE DB/PAGE LL o CD ACREAGE cD Of o= EASEMENTS REF. DWG. NO. CD o � z w m CD 0 LU o p z z0 < U) ~ c¢n " 0 < cn � rn ch o co cn + + + Ln Ln U � cn cn cn 50' PERMANENT PROPOSED 8" PIPELINE EASEMENTNOTES R/ k1W R R IRW ER -NI _ E NUMBER: CR 37 r� -- LoHNsroN �o B 1. PERMANENT MAINTAINED EASEMENT o --- -- - -- - -- - WIDTH THROUGH WETLANDS AND D 38+00 ��, 39+00 40+00 41+OO 42+OO 43+OO 44+O( 45+00 - 0 \� n STREAMS SHALL BE 30' TO COMPLY WITH w PNG PERMANENTLY MAINTAINED ACCESS r of a;-y g CORRIDOR PROTOCOL. rz WIN no WINe Mike + ■■■■•■■■ ■■■■■■■ ■■■■■■■ ■■■■■■1■ ■ 11 ■ ■IN' icr, ■■■■ ■■■■■■■■■■■■■■■■■■■OEM %■ ■■■■ I■■ I■■ ■■■■I■ ■■■■I■■■■■11■■� TEST STATION # 3 INSTALL (3) BLACK STRANDED #12 + ■■■■I�■■■■■I�■ c" ■■■■I■ j■■■I■I ■11 ■I I■ I■ ■■�■■■■■I�■■■ I ■■■■■ I ■■■■■ I ■■■■■■I ■■I ■■■ I� ■�■■�■■�■■ J a ��■■� ■�■�■ !■■��■� ��■■■ ■�■■I ■�■■1 i■■�■11 ■■��■I i�■�_I �i■��IIi■��■_I ■�■■�I■1 ■■�■■I ■�■�I■I�■■■I� T H H N WIRES ONTO LINE 473 NEAR ANGLE POINT AND ■■■■■■■■■■■■■ o AINI all BRING BRING WIRES UP INTO BIG FINK ABOVE GRADE TEST \ NOTE 1 ■■1■■��1 STATION. INSTALL BORIN AC-20 STELTH7 REFERENCE I�■■ I�■■ ELECTRODE AT PIPE LEVEL ACCORDING TO ■■ ■■ l \ ■I■■■I�■■■I� MANUFACTURER'S SPECIFICATIONS AND BRING WIRE Q J 25 TEMPORARY - ■��I■■�■���■■■■ \ `■■■I■■■■�I■■I WORKSPACE UP INTO SAME FINK TEST STATION. PLACE TEST \ " - ���I■■����I■���� STATION IN A CATTLE GUARD. V ADDITIONAL '11r■■�■11 ■ -- CD�- \ TEMPORARY ■■�■ \. 75 z 05H04002C WORKSPACE I■j PROPOSED SITE ACCESS DRIVE 1■■II 05H03100C +:'r. MATCH LINE 47+50 z z F- s JOINT F- 0< �I LENGTH0 0 J �M 0 335 335 0 EXISTING GRADE — — — =II 330 330 _ J 325 — 325 _ �_ - - io 320 320 — — — — — _ at J_ 0 315 315 Lij _ - 0 0 N -� - 0 a 310 310 _ u PROPOSED PIPELINE 305 305 c � cN3 J 300 300 PRELIMINARY - NOT W 295 295 FOR CONSTRUCTION 0 ISSUED FOR BID 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 MATERIAL 1000, 11 CONST. METHOD OPEN EN CUT CLASS / MAOP CLASS 3 / 1000 PSIG BURNS& McDONNELLCONSULTANTS, INC. PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY REF. DWG(S) PNG-C-473-0001022 STATE LICENSE # C-1435 PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 CLAUDEA MCMULLAN IFC SUBMITTAL DATE NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS LINE 473 SHEET(S) 10 OF 34 DWG SCALE H: 1"=50', V: 1"=10' A 10-15-2019 30% DESIGN SUBMITTAL MJD CNS CAM AREA CODE 1853 DATE INITIALS REGIONAL NORTH CAROLINA SEAL047852 NIA NIA ENGINEER +: DUKEr6111 Piedmont Q ALIGNMENT P LAN & PROFILE - 8" PIPELINE DWG DATE 03102/2020 SUPERSEDED B 12-03-2019 60% DESIGN SUBMITTAL MJD CNS CAM ACCOUNT NUMBER DATE INITIALS C 03-02-2020 60% DESIGN SUBMITTAL MJD CNS CAM PROJECT NUMBER 0228711 NIA NIA MGR TECH ' � ENERGY Natural Gas DRAWING NUMBER REVISION D 08-25-2020 ISSUED FOR BID MJD CNS CAM DRAWING BY MJD REC &STD CLAYTON, NC PNG -C-473-0001010 E DATE INITIALS E 09-18-2020 RE -ISSUED FOR BID JJM CNS CAM STATION ID PRINCIPAL PROFESSIONAL ENG/ARCHSTAMP 09/18/2020 CAM ENGINEER COPYRIGHT 2018 GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA CHECKER INITIALS CNS DISCIPLINE / RESOURCE CENTER / LINE NUMBER TAX ID: 05H03100C OWNER: NORTH CAROLINA RAILROAD COMPANY Q O DEED BOOK / PAGE: DB /PAGE o ACREAGE 9 a' Of EASEMENTS REF. DWG. NO. CD z 0 z w m a = o 0 0 = o CD z z o w u a a z Of� m z m z o U o o U_ U_ U) rn M x x w w n o 17 M On co + a0 cl-i co + co+� L�CJ LC> U')co H H co co cn co L( co co pw M_ •-_ - l / \ w II Mir / 50' PERMANENT EASEMENT OWNER: NA — — P ONUMBER. CR23F P E NUMBER: CR239 Yl -Cal` OWNER: NA \ w\ - - - NUMBER: CR295 O = / _ — — — — — — — NOTES I I \ \ O R '.f Vm p E ` INV-320.59 \ _ / — 1. PERMANENT MAINTAINED EASEMENT _ _ ++ •, P/�L — — — —' _ — — „ :cR2 N WIDTH THROUGH WETLANDS AND - - - — — — o STREAMS SHALL BE 30' TO COMPLY WITH = c PNG PERMANENTLY MAINTAINED ACCESS D 48+00 �n ML49+00 50+00 51 +00 52+00 ic> 53+00 54+00 55+00 56+0o z J a CORRIDOR PROTOCOL. - lII 57+00 = rAAA LO wommm— o 58+00 Z co J �1�1�1111111�111111�11111%1�111 ���111111�1111 111 111 111 111 111 �n 111 111 N1�i1::1M!ii1111:1 11 N::���� no MIMI 11111 ��717t_ �1111 ��1111 w�1�11II77�"� 1111 1717 �n 11 1111 1111 1111 1111 1111 1111 1111 11111 11111 •��� �������� 11111�11�11�11�111�1111�111�11�1�1111�1��111�>i'"���� 5gf0p + �• N I■ 11 11 11 ffive 1771��j71/ III I 11111■ dwiff1w �7i 1�� 11 11 1111 11111 1 . I� �11�1 11111 111 111111 1111 N 111111 1 11■ LIJ 1111 2 11111 111111 . I I ��1�111i1�11 11�111�111111 25' TEMPORARY WORKSPACE 90,05HO3100C 2 mail 11! U 1111�. Q ADDITIONAL TEMPORARY WORKSPACE 50' NEUSE RIVER BUFFER ADDITIONAL TEMPORARY WORKSPACE - - PROPOSED 8" PIPELINE z z o �aHr 0< �LU o 0- 0 J M N Q c 345 345 U3 II It 340 EXISTING GRADE 340 �.i N 335 — ���\ ---- -- ---- 335 J L4 330 _ z — J o-- -- — - Ji \ — — — — / - - _ _ — — 0 Of o 325 — — ---- -- -- — _ _ 325 0 0 a N - - — 320 320 - - - PROPOSED PIPELINE c w 315 - - - - 315 _ 310 310 PRELIMINARY - NOT W FOR CONSTRUCTION 305 305 ISSUED FOR BID c 48+00 49+00 50+00 51+00 52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 MATERIAL 1200' CONST. METHOD OPEN EN CUT CLASS / MAOP CLASS 3 / 1000 PSIG BURNS&McDONNELLCONSULTANTS, INC. PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY REF. DWG(S) PNG-C-473-0001022 STATE LICENSE # C-1435 PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 CLAUDEA MCMULLAN IFCSUBMITTAL DATE NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS LINE 473 SHEET(S) 11 OF 34 DWG SCALE H: 1"=50', V: 1"=10' A 10-15-2019 30% DESIGN SUBMITTAL MJD CNS CAM AREA CODE 1853 DATE NITIALS REGIONAL NORTH CAROLINA SEAL047852 N/A NIA ENGINEER '�� DUKEr6lj[�Piedmont Q ALIGNMENT PLAN & PROFILE - 8" PIPELINE DWG DATE 03102/2020 SUPERSEDED B 12-03-2019 60% DESIGN SUBMITTAL MJD CNS CAM ACCOUNT NUMBER DATE INITIALS C 03-02-2020 90% DESIGN SUBMITTAL MJD CNS CAM PROJECT NUMBER 0228711 N/A NIA MGR TECH `C ENERGY:: . Natural Gas DRAWING NUMBER REVISION D 08-25-2020 ISSUED FOR BID MJD CNS CAM DRAWING BY MJD REC & STD C LAYTO N NC PNG -C-473-0001011 E DATE INITIALS E 09-18-2020 RE -ISSUED FOR BID JJM CNS CAM STATION ID PRINCIPAL PROFESSIONAL ENG/ARCHSTAMP 09/18/2020 CAM ENGINEER COPYRIGHT 2018 GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA CHECKER INITIALS CNS DISCIPLINE / RESOURCE CENTER / LINE NUMBER >_ TAX ID: 05HO3100C } � owNER: NORTH CAROLINA RAILROAD COMPANY O DEED BOOK I PAGE: DB / PAGE o ACREAGE 9 a' a= EASEMENTS REF. DWG. NO. CD_ o z w m m CD z o o a m o m o z U) o o a w w w c o Q w a U) co V � O N V � co Co M O 00 cn co M co co co co U3 - r 1 NOTES — 1. PERMANENT MAINTAINED EASEMENT i / / r / — O/RFCTiO NON`, — - WIDTH THROUGH WETLANDS AND STREAMS SHALL BE 30' TO COMPLY WITH N CLEARANCE: NUMBER: CR243 -- � GROUND ELEVAT9jV.✓326.47' 6. � � � • ' )/ 0WNER:UNK PROPOSED 8 PIPELINE POLE NUMBER:CN91B PNG PERMANENTLY MAINTAINED ACCESS , / • j ; i �o� I I CORRIDOR PROTOCOL. 50' PERMANENT EASEMENT oL ABER.R.UNK ,/ NA - POLE 4 I I� U) NL O ELEVATE" • N at = 64+00 63+00, � 65+00 66+00 can 67+ � � 00 a F 0 J + g�+00 ♦♦ ♦♦♦♦♦♦♦♦♦♦♦♦♦ ♦♦♦♦♦♦��♦ ��mig ►♦�♦♦♦♦♦♦♦♦♦♦� ♦♦♦ �♦ cn I— s " / ti � Q � �,�.�♦♦�♦i�♦ice♦i���♦♦♦��♦` - `so ��♦♦♦♦♦♦♦�♦♦•05HO3100C ♦♦♦♦♦♦♦♦♦♦♦♦� 25' TEMPORARY WORKSPACE - 50' NEUSE RIVER BUFFER NOTE 1.. z z F- o JOINT F- 0< �LU o LU 0 J U) M N c 340 EXISTING GRADE 340 c II 335 — — 335 It �i J 330 z ---- — 330 — _ _ — — J 325 O— J = 320 — 320 LU J - — — J_ a N PROPOSED PIPELINE — _ J_ c 315 - - 315 - It 310 310 N 305 305 _ J— _ PRELIMINARY - NOT W 300 300 FOR CONSTRUCTION ISSUED FOR BID 60+00 61+00 62+00 63+00 64+00 65+00 66+00 67+00 68+00 69+00 MATERIAL 1000, CONST. METHOD OPEN EN CUT CLASS / MAOP CLASS 3 / 1000 PSIG BURNS&McDONNELLCONSULTANTS, INC. PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY REF. DWG(S) PNG-C-473-0001022 STATE LICENSE # C-1435 PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 CLAUDEA McMULLAN NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET(S) 12 OF 34 DWG SCALE H: 1"=50', V: 1"=10' IFCSUBMITTAL DATE LINE 473 A 10-15-2019 30% DESIGN SUBMITTAL MJD CNS CAM AREA CODE 1853 DATE NITIALS REGIONAL NORTH CAROLINA SEAL047852 N/A NIA ENGINEER '�� DUKE Piedmont Q ALIGNMENT PLAN &PROFILE - 8�� PIPELINE DWG DATE 03102/2020 SUPERSEDED B 12-03-2019 60% DESIGN SUBMITTAL MJD CNS CAM ACCOUNT NUMBER DATE INITIALS C 03-02-2020 90% DESIGN SUBMITTAL MJD CNS CAM PROJECT NUMBER 0228711 MGR TECH `C ENERGY:: �. Natural Gas r6 DRAWING NUMBER REVISION D 08-25-2020 ISSUED FOR BID MJD CNS CAM DRAWING BY MJD N/A NIA REC & STD C LAYTO N NC PNG -C-473-0001012 E DATE INITIALS E 09-18-2020 RE -ISSUED FOR BID JJM CNS CAM STATION ID PRINCIPAL PROFESSIONAL ENG/ARCHSTAMP 09/18/2020 CAM ENGINEER COPYRIGHT 2018 GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA CHECKER INITIALS CNS DISCIPLINE / RESOURCE CENTER / LINE NUMBER >_ TAX ID: 05HO3100C } � OWNER: NORTH CAROLINA RAILROAD COMPANY NC HWY 42 E O DEED BOOK I PAGE: DB / PAGE o 0 ACREAGE 9 EASEMENTS REF. DWG. NO. CD z z m O z z O o LU w = c z z O U) C/) M O 0 M O'> ti Q H 00 00 ti Q 4" NOTES n/ - I \ �MOWNER:!/NK t 50' PERMANENT EASEMENT �\ POLE I�IaER: 1. PERMANENT MAINTAINED EASEMENT ' V PROPOSED SITE MATCH LINE 79+75 WIDTH THROUGH WETLANDS AND p 00 T j POLE NUMBER.MUNKOWNER.UNK \ ACCESS DRIVE STREAMS SHALL BE 30' TO COMPLY WITH i \ POLE NUMB :C 921 : , - C' PNG PERMANENTLY MAINTAINED ACCESS II )WNER: UNK I L 4ER:CN919� \ 1 ► - - __ / C7 CORRIDOR PROTOCOL. CLEARANCE: ^ so .. p &ROUND ELL vH iiUN:.30..9.na / _ E PNG-C-473-0001016 FOR DETAIL N 77+00CD 73+00 74+00 75+00 76+0� / 78+00 B-1 = D 70+00 71+0� 72+00/ STA = 78+91 z p OFF = 0 1 c� = o ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦♦ ♦♦ ♦ ♦♦ ♦♦ ♦♦ ♦♦ ♦♦ ♦♦ ♦♦ ♦♦ ♦ ♦♦ ♦ ♦ ♦ ♦♦ ♦♦ ♦♦ ♦♦ ♦♦ ♦♦ ♦♦ ♦♦ ♦♦ Raw ♦♦ ♦♦ ♦♦ ♦♦ ♦♦ ♦♦ ♦♦ ♦♦ ♦♦ ♦♦ ♦i ♦ ♦i ♦i ♦i ♦i ♦i ♦i ♦i ♦i ♦i ♦i ♦i i, ♦♦ ♦♦ J + ♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦��,♦♦♦♦♦♦♦♦♦♦♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ N� ♦ ♦ ♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ I 25 TEMPORARY �. 25 TEMPORARY WORKSPACE PROPOSED 8 PIPELINE RECEIVING PIT WORKSPACE _ 50, t - I - ADDITIONAL TEMPORARY WORKSPACE 05HO3100C - /®� 50' NEUSE RIVER BUFFER z z o jar o� �a_ o Ji L o J M N 0 340 340 U0 STA: 79+26 II OVERHEAD ELECTRIC It 335 (25' CLEARANCE) 335 C.i c i 33o 330 PROPOSED AUGER BORE EXISTING GRADE SEE PNG-C-473-0001016 p 325 - _ - - 325 N - — — — — TA: 79+53 w o = - ---- ----- ELECTRIC w c 320 320 — - - - z_ o Of a c N _ -- — — — _ _ _ _ o a — — — 0 315 — 315 - - - - - _ - STA. 79+46 WATER LINE It 310 -- -- - -- - _ - 310 - - RECEIVING PIT W b - PROPOSED PIPELINE b 305 BORE HWY 42 305 - _ _ - - - - - PRELIMINARY -NOT - > 300 300 FOR CONSTRUCTION ISSUED FORBID 70+00 71+00 72+00 73+00 74+00 75+00 76+00 77+00 78+00 79+00 p MATERIAL 933' 92' 11 0EN CONST. METHOD OPENCUT BORE CLASS / MAOP CLASS 3 / 1000 PSIG BURNS&McDONNELLCONSULTANTS, INC. PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY REF. DWG(S) PNG-C-473-0001016 STATE LICENSE#C-1435 PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PNG-C-473-0001023 CLAUDEA McMULLAN NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET(S) 13 OF 34 DWG SCALE H: 1"=50', V: 1"=10' IFCSUBMITTAL DATE LINE 473 A 10-15-2019 30% DESIGN SUBMITTAL MJD CNS CAM AREA CODE 1853 DATE NITIALS REGIONAL NORTH CAROLINA SEAL047852 N/A NIA ENGINEER '�� DUKEr6lj[�Piedmont ALIGNMENT PLAN Q & PROFILE - 8" PIPELINE DWG DATE 03102/2020 SUPERSEDED B 12-03-2019 60% DESIGN SUBMITTAL MJD CNS CAM ACCOUNT NUMBER DATE INITIALS C 03-02-2020 90% DESIGN SUBMITTAL MJD CNS CAM PROJECT NUMBER 0228711 MGR TECH `C ENERGY:: Natural Gas DRAWING NUMBER REVISION D 08-25-2020 ISSUED FOR BID MJD CNS CAM DRAWING BY MJD N/A NIA REC & STD . C LAYTO N NC PNG -C-473-0001013 E DATE INITIALS E 09-18-2020 RE -ISSUED FOR BID JJM CNS CAM STATION ID PRINCIPAL PROFESSIONAL ENG/ARCHSTAMP 09/18/82020 CAM ENGINEER COPYRIGHT 2018 GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA CHECKER INITIALS CNS DISCIPLINE / RESOURCE CENTER / LINE NUMBER GENERAL EROSION AND SEDIMENT CONTROL NOTES CONSTRUCTION SEQUENCE (SITE) a. INITIAL INSTALLATION OF EROSION AND SEDIMENT CONTROL MEASURES; 1. THIS PROJECT IS LOCATED IN THE NEUSE RIVER BASIN. (PHASE 1) b. CLEARING AND GRUBBING OF EXISTING GROUND COVER; RECEIVING WATERS: LITTLE CREEK CLASSIFICATION: C;NSW 1. CONTACT THE DEMLR RALEIGH REGIONAL OFFICE AT LEAST 48 HOURS PRIOR C. COMPLETION OF ANY GRADING THAT REQUIRES GROUND COVER; TO COMMENCING THE LAND -DISTURBING ACTIVITY. THE CONTACT NUMBER 2. CONSTRUCTION ACTIVITY POLLUTION PREVENTION IS REQUIRED FOR THIS IS (919) 791-4200. d. COMPLETION OF ALL LAND -DISTURBING ACTIVITY, CONSTRUCTION, OR PROJECT. PREVENTION OF POLLUTION RESULTING FROM CONSTRUCTION DEVELOPMENT, INCLUDING PERMANENT GROUND COVER ESTABLISHMENT ACTIVITIES SHALL BE ACCOMPLISHED BY CONTROLLING SOIL EROSION, 2. INSTALL CONSTRUCTION ENTRANCE(S) AS SHOWN ON PLAN SHEETS WHERE AND REMOVAL OF ALL TEMPORARY MEASURES; AND WATERWAY SEDIMENTATION, AND AIRBORNE DUST GENERATION. EQUIPMENT WILL ENTER AND LEAVE THE PROJECT SITE. CONTRACTOR SHALL ENSURE THAT NO SEDIMENT RESULTING FROM e. TRANSFER OF OWNERSHIP OR CONTROL OF THE TRACT OF LAND WHERE CONSTRUCTION ACTIVITIES INFRINGES ONTO ADJACENT PROPERTIES. 3. INSTALL EROSION CONTROL DEVICES. THE EROSION AND SEDIMENTATION CONTROL PLAN HAS BEEN APPROVED CONTRACTOR SHALL COORDINATE EROSION AND SEDIMENT CONTROL WITH AND WORK HAS BEGUN. THE NEW OWNER OR PERSON IN CONTROL SHALL OTHER CONSTRUCTION ENTITIES PERFORMING WORK ON ADJACENT 4. STABILIZE DISTURBED AREAS WITH EROSION CONTROL DEVICES. UTILIZE CONDUCT AND DOCUMENT INSPECTIONS UNTIL THE PROJECT IS PROPERTIES. TEMPORARY SEEDING AS NECESSARY. PERMANENTLY STABILIZED AS SET FORTH IN SUB -ITEM (C) OF THIS ITEM. 3. SOIL EROSION AND SEDIMENT CONTROLS ARE MEASURES USED TO REDUCE 5. CONTACT INSPECTOR FOR ONSITE INSPECTION OF INSTALLED EROSION 2. DOCUMENTATION OF SELF -INSPECTIONS PERFORMED UNDER ITEM (1) OF THE AMOUNT OF SOIL PARTICLES THAT ARE CARRIED OFF AN AREA AND CONTROL DEVICES. THIS RULE SHALL INCLUDE: DEPOSITED INTO A DRAINAGE COLLECTION SYSTEM OR INTO A BODY OF WATER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT 6. MAINTAIN DEVICES AS NEEDED PER NCDEQ MAINTENANCE INSTRUCTIONS. a. VISUAL VERIFICATION OF GROUND STABILIZATION AND OTHER EROSION EROSION AND SEDIMENTATION ARE CONTROLLED TO THE EXTENT CONTROL MEASURES AND PRACTICES AS CALLED FOR IN THE APPROVED PRACTICABLE. ALL APPLICABLE SOIL EROSION AND SEDIMENT CONTROL 7. ALL BARE SOILS ARE TO BE STABILIZED UNDER CONDITIONS OUTLINED IN THE PLAN; MEASURES SHALL BE IMPLEMENTED AND MAINTAINED THROUGHOUT THE CURRENT NPDES PERMIT OR, IF IT IS IN A CRITICAL AREA, BY THE END OF THE DURATION OF CONSTRUCTION ACTIVITIES. PRIOR TO INITIATING DAY. b. VERIFICATION BY MEASUREMENT OF SETTLING BASINS, TEMPORARY CONSTRUCTION IN AN AREA, ALL TEMPORARY EROSION AND SEDIMENT CONSTRUCTION ENTRANCES, ENERGY DISSIPATORS, AND TRAPS. CONTROL PRACTICES SHALL BE IN PLACE. UPON PROJECT COMPLETION AND 8. SELF -INSPECTIONS FOR EROSION AND SEDIMENTATION CONTROL MEASURES PERMANENT STABILIZATION, ALL TEMPORARY SOIL EROSION AND SEDIMENT ARE TO BE PERFORMED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND c. THE NAME, ADDRESS, ORGANIZATION AFFILIATION, TELEPHONE NUMBER, CONTROL MEASURES SHALL BE REMOVED. WITHIN 24 HOURS OF EVERY RAIN EVENT OF GREATER THAN 1 INCH. ANY AND SIGNATURE OF THE PERSON CONDUCTING THE INSPECTION AND THE NEEDED REPAIRS SHALL BE MADE IMMEDIATELY TO MAINTAIN MEASURES AS DATE OF THE INSPECTION SHALL BE INCLUDED, WHETHER ON A COPY OF 4. TEMPORARY EROSION CONTROL SHALL BE THE CONTRACTOR'S DESIGNED. ALL ESC MEASURES SHALL BE MAINTAINED AS SPECIFIED IN THE THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR AN RESPONSIBILITY, WHO SHALL UTILIZE APPROPRIATE BEST MANAGEMENT CONSTRUCTION DETAILS ON THIS PLAN. A RAIN GAUGE SHALL BE INSTALLED INSPECTION REPORT. A TEMPLATE FOR AN EXAMPLE OF AN INSPECTION PRACTICES (BMPS). THOSE BMPS SHALL CONSIST OF SILT FENCE, WATTLES AT THE PROJECT SITE FOR MONITORING. AND MONITORING REPORT IS PROVIDED ON THE DEMLR WEBSITE AT: OR OTHER MEANS TO CONTROL EROSION AS NEEDED. HTTPS://DEQ.NC.GOV/ABOUT/DIVISIONS/ENERGY-MINERAL- (PHASE 2 & 3) LAN DRESOURCESIEROSION-SEDIMENT-CONTROL/FORMS. ANY RELEVANT 5. CONTRACTOR SHALL PLACE SILT FENCE PRIOR TO BEGINNING WORK. THE LICENSES AND CERTIFICATIONS MAY ALSO BE INCLUDED. ANY DEVICES SHALL BE PLACED DOWN -SLOPE OF DISTURBED AREAS WHERE 1. BEGIN ACCESS ROAD INSTALLATION ON THE SITE AND SITE EXPANSION. DOCUMENTATION OF INSPECTIONS THAT OCCUR ON A COPY OF THE SHEET EROSION WOULD OCCUR. SILT FENCE SHALL BE CLEANED AND APPROVED EROSION AND SEDIMENTATION CONTROL PLAN SHALL OCCUR REPAIRED WHEN SEDIMENT BUILDUP REACHES ONE-THIRD OF SILT FENCE 2. MAINTAIN ALL EROSION CONTROL DEVICES PER NCDEQ MAINTENANCE ON A SINGLE COPY OF THE PLAN AND THAT PLAN SHALL BE MADE HEIGHT. AFTER SIGNIFICANT RUNOFF EVENTS (1" OF RAINFALL OR MORE) INSTRUCTIONS. AVAILABLE ON THE SITE. AND ON A WEEKLY BASIS, THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL STRUCTURES FOR SILT BUILD-UP THAT INTERFERES WITH THE 3. STABILIZE SITE AS AREAS ARE BROUGHT UP TO FINISH GRADE WITH d. A RECORD OF ANY SIGNIFICANT DEVIATION FROM ANY EROSION OR PERFORMANCE OF THE EROSION CONTROL STRUCTURE AND REPAIR OR VEGETATION, GRAVEL, ETC. SEDIMENTATION CONTROL MEASURE FROM THAT ON THE APPROVED PLAN. REPLACE THOSE STRUCTURES, AS NECESSARY. FOR THE PURPOSE OF THIS RULE, A "SIGNIFICANT DEVIATION" MEANS AN 4. ALL EROSION CONTROL DEVICES SHALL REMAIN IN PLACE AS SHOWN ON THE OMISSION, ALTERNATION, OR RELOCATION OF AN EROSION OR 6. ALL STORM DRAIN INLETS SHALL BE PROTECTED BY APPROPRIATE BMPS DRAWINGS UNTIL THE ENTIRE SITE IS PERMANENTLY STABILIZED AND SEDIMENTATION CONTROL MEASURE THAT PREVENTS IT FROM DURING CONSTRUCTION, UNTIL ALL SOURCES WITH POTENTIAL FOR APPROVED BY THE NCDEQ INSPECTOR. PERFORMING AS INTENDED. THE RECORD SHALL INCLUDE MEASURES DISCHARGE TO THE INLETS HAVE BEEN STABILIZED. REQUIRED TO CORRECT THE SIGNIFICANT DEVIATION, ALONG WITH 5. GROUNDCOVER SHALL BE ESTABLISHED IN 90 CALENDAR DAYS. HOWEVER, DOCUMENTATION OF WHEN THOSE MEASURES WERE TAKEN. DEVIATIONS 7. ALL EXISTING DRAIN INLETS SHALL HAVE INLET PROTECTION INSTALLED IN NPDES GROUNDCOVER REQUIREMENTS TAKE PRECEDENCE. FROM THE APPROVED PLAN MAY ALSO BE RECOMMENDED TO ENHANCE ACCORDANCE WITH NORTH CAROLINA MANUAL FOR EROSION CONTROL. THE INTENDED PERFORMANCE OF THE SEDIMENTATION AND EROSION EROSION PROTECTION MAY BE REMOVED WHEN VEGETATION IS 6. WHEN CONSTRUCTION IS COMPLETE AND ALL AREAS ARE STABILIZED CONTROL MEASURES. ESTABLISHED. COMPLETELY, ARRANGE FOR FINAL INSPECTION WITH THE NCDEQ INSPECTOR. 8. IN ACCORDANCE WITH SECTION II.B.2 OF THE NPDES GENERAL PERMIT, ANY DISTURBED AREA LEFT EXPOSED SHALL BE STABILIZED WITH TEMPORARY 7. WHEN THE PROJECT IS COMPLETE, THE PERMITTEE SHALL CONTACT DEMLR SEEDING WITHIN 7 TO 14 DAYS IN ACCORDANCE WITH NORTH CAROLINA TO CLOSE OUT THE E&SC PLAN. AFTER DEMLR INFORMS THE PERMITTEE OF EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL SECTION THE PROJECT CLOSE OUT, VIA INSPECTION REPORT, THE PERMITTEE SHALL 6.11. PERMANENT STABILIZATION SHALL BE ACHIEVED THROUGH PERMANENT VISIT DEQ.NC.GOV/NCG01 TO SUBMIT AN ELECTRONIC NOTICE OF SEEDING FOR ALL DISTURBED AREAS. SEE SEEDING SCHEDULE IN NORTH TERMINATION (E-NOT). A $100 ANNUAL GENERAL PERMIT FEE WILL BE CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN CHARGED UNTIL THE E-NOT HAS BEEN FILLED OUT. MANUAL SECTION 6.11. 9. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED AND APPROVED BY NCDEQ, TEMPORARY EROSION AND SEDIMENTATION CONTROLS MUST BE REMOVED. AREAS DISTURBED DURING REMOVAL OF THE CONTROLS MUST BE STABILIZED WITH PERMANENT SEEDING AS SOON AS POSSIBLE WITHIN 14 CALENDAR DAYS. 10. PER NPDES REQUIREMENTS, A RAIN GAUGE, SELF -INSPECTIONS RECORDS, PERMIT, CERTIFICATE OF COVERAGE, AND S&E PLAN ARE REQUIRED TO BE MAINTAINED ON SITE AND ACCESSIBLE DURING INSPECTION. IT IS RECOMMENDED THAT THESE ITEMS BE PLACED IN A PERMITS BOX AT THE BEGINNING OR ENTRANCE OF PROJECT. 11. THE CONTRACTOR SHALL CONDUCT SELF -INSPECTIONS OF THE EROSION AND SEDIMENTATION CONTROL MEASURES AND COMPLETE THE DUKE ENERGY PROVIDED SELF -INSPECTION FORM. TWELVE MONTHS OF COMPLETE INSPECTION FORMS SHALL BE KEPT ON -SITE AND AVAILABLE FOR INSPECTION AT ALL TIMES. IT IS RECOMMENDED A COPY BE KEPT IN A PERMITS BOX. BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # C-1435 CLAUDE A. McMULLAN IFC SUBMITTAL DATE NORTH CAROLINA SEAL 047852 PROFESSIONAL ENG/ARCH STAMP 8. IF SITE IS APPROVED, REMOVE EROSION CONTROL MEASURES AND STABILIZE RESULTING BARE AREAS IMMEDIATELY. SELF -INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY NCGS 113A54.1 (E) (EFFECTIVE OCTOBER 1, 2010; READOPTED EFFECTIVE APRIL 1, 2020) 15A NCAC 04B .0131 SELF -INSPECTIONS ALL LAND -DISTURBING ACTIVITIES REQUIRED TO HAVE AN APPROVED EROSION AND SEDIMENTATION CONTROL PLAN UNDER G.S. 113A54.1(E) SHALL CONDUCT SELF -INSPECTIONS FOR INITIAL INSTALLATION OR MODIFICATION OF ANY EROSION AND SEDIMENTATION CONTROL DEVICES AND PRACTICES DESCRIBED IN AN APPROVED PLAN. IN ADDITION, WEEKLY AND RAIN -EVENT SELF -INSPECTIONS ARE REQUIRED BY FEDERAL REGULATIONS, THAT ARE IMPLEMENTED THROUGH THE NPDES CONSTRUCTION GENERAL PERMIT NO. NCG 010000. 1. FOR SELF -INSPECTIONS REQUIRED PURSUANT TO G.S. 11 3A-54.1 (E), THE INSPECTION SHALL BE PERFORMED DURING OR AFTER EACH OF THE FOLLOWING PHASES OF THE PLAN; PRELIMINARY - NOT FOR CONSTRUCTION ISSUED FOR BID PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY REF. DWG(S) PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD I DESCRIPTION APPROVALS Piedmont DUKEr6ljl� �C ENERGY:.. Natural Gas COPYRIGHT 2018 LINE 473 EROSION CONTROL NOTES C LAYTO N NC GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA SHEET(S) 19 OF 34 DWG SCALE A 03-02-2020 90% DESIGN SUBMITTAL ABR JTG CAM AREA CODE 1853 DATE N/A INITIALS NIA REGIONAL ENGINEER DWG DATE 03102/2020 SUPERSEDED - B 08-25-2020 ISSUED FOR BID ABR JTG CAM ACCOUNT NUMBER PROJECT NUMBER 0228711 DATE N/A INITIALS NIA MGR TECH REC & STD DRAWING NUMBER P N G -C-473-0001019 DRAWING BY ABR STATION ID I DATE 08/25/2020 INITIALS CAM PRINCIPAL ENGINEER CHECKER INITIALS CNS DISCIPLINE / RESOURCE CENTER / LINE NUMBER NIA REVISION B BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # C-1435 CLAUDE A McMULLAN NO IFC SUBMITTAL DATE A NORTH CAROLINA B SEAL 047852 PROFESSIONAL ENG/ARCH STAMP Im am \\ ITEMPORARY SILT FENCE ° \ i \ \ SFWB EXISTING PNG LINE 94 I ) \ e � I � O\ 1 ow T �T O � z w�A I T I I ° sFwB — — DA 1.36 AC _ w LINE 473 LAUNCHER 9� 0 �jSF = 882 LF ` AND MLV REFER TO T DAM 00 LF = �c5` PROJECT 0228708 c9 0 I / 0.15 AC/100LF / I a O / 1001+00 1001+38 1999+50 / u O+Oo = W O IL D LOD O — — O 05H04032F TRACT 2 / T I ( ) SFWB 3 ° z �� I I T m o` I I of I � � MATCH LINE THIS SHEET � o fit £ �� _ �o-pw L-- �� 37 DA = 1.36 AC 2 // SF = 882 LF IQ - DAJ100 LF l fQ 0.15 AC/100LF I I I w \ TEMPORARY SILT FENCE I �\ \ � I DA DELINEATION o � I DA = 0.33 AC 05HO4032F (TRACT 2) 05H03009 DA = 0.42 AC PROPOSED 8" PIPELINE SF = 333 LF DAM 00 LF = 0.13 AC/100LF r \ ► SF = 257 LF / D---- a0-1 -- TEMPORARY SILT FENCE — col — — — — — 001 ---- aoj - -- CIO-] ----- DA/100 LF = o \ I o 0.13 AC/100LF / 7_ _ _ o En z 2+00 IM 3+00 2 �I 4+00 Un 5+00 TD 6+00 7+00 8+00 o 41 I z—ao OHE —�az —L -— - — —--- o� -- a ao�-----ao�----0--- _H_aoOHE —ao1HE HE —OHE 3 � M/U MRi LOD DA = 3.72 AC SF --- SF = 2,288 LF C) LO DA/100 LF = + 3-� 0.16 AC/100LF z \ 9+00 M2i M21 M/ 0 Ml_� ivyf _ CONCRETE WASHOUT _i,�s-� , /TEMPORARY SILT FENCE WATTLE BARRIER — -- - WILDWOOD DRIVE s — ---- — WATTLE BARRIER —' _lvllc� M/ — M. \_ M/2i __MR� _ — — TEMPORARY CONSTRUCTION ENTRANCE, __� °� r ° SEE DETAIL 1, SHEET C-473-0001025 7 05HO3009 — — — — LOD — — — — — LOD — — — — — LOD — — — — — LOD — — — — — LOD — — — — — LOD — — — — — SOD — — — — — I nn ----- LOD — — — — — LOD — — — — — LOD -- LO1) = == COD ---- L 0 D \ \ DA = 3.72 AC SF = 2,288 LF \ LO s \ DA/100 LF = o \ \ b 0.16 AC/100LF / \ + W Z_ � 10+00 11+00 12+00 13+00 — 14+00 15+00 16+00 / 17+00 18+00 19+00 \ J _ 2 ULW----\ LOD---�LOD-----LOD----LOD-----LOD — ---LOD LOD----?LOD-----LOD --% —LOD --- —LOD-----LOD -----I HE HE OH / � OHE � -- OF E - b.,UHE�nn21 O E M2iOF TEMPORARY SILT FENCE =a1=7— — — — / 3 \ WILDWOOD DRIVE rticml)_ MAj MAJ MAJ — — MAJ MAJ M/2J _ M/R] _ --- MAJ _ _ — �Mrd _ I MAJ M2i _y I TEMPORARY SILT FENCE PROPOSED 8" PIPELINE 2 OHE —�— PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY W Z_ J LOD-----LOD — — — _ U M21 Q Mj I I NOTES: 1. CONTRACTOR SHALL INSTALL CONSTRUCTION EXIT AT ALL SITE ACCESS POINTS. 2. ALL TREES TO REMAIN SHALL BE PROTECTED WITH TREE PROTECTION FENCING. 3. ANY DISTURBED AREA LEFT IDLE FOR A PERIOD OF 14 DAYS OR LONGER SHALL BE STABILIZED WITH MULCHING AND TEMPORARY SEEDING WITH THE EXCEPTION OF AGRICULTURAL FIELDS WHICH ONLY NEED STABILIZATION TO THE EXTENT REQUIRED TO AVOID TOP SOIL WASHING AWAY. SEE DETAIL 1, SHEET C-473-0001026. 4. STABILIZE ALL DISTURBED AREAS OUTSIDE OF THE CULTIVATED FIELD WITH PERMANENT SEEDING IN ACCORDANCE WITH DETAIL 2, SHEET C-473-0001026. ALL OTHER DISTURBED AREAS SHALL BE RESTORED TO ORIGINAL CONDITIONS AS A CULTIVATED FIELD; PERMANENT SEEDING WILL NOT BE UTILIZED. 5. REFER TO SITE PLAN PNG-C-473-0001001 FOR OVERALL LIMITS OF DISTURBANCE, HDD ENTRY AND EXIT WORKSPACE, AND TEMPORARY AND PERMANENT ACCESS ROADS. LEGEND: R PROPERTY LINE TEMPORARY SILT FENCE 2 C-473-0001025 — LOD— - LIMITS OF DISTURBANCE �J TEMPORARY GRAVEL 1 CONSTRUCTION ENTRANCE C-473-0001025 PROPOSED 8" PIPELINE 8+00 9+00 SFWB SILT FENCE WATTLE BREAK 5 C-473-0001025 3 PROPOSED GRAVEL SURFACE COURSE C-473-0001025 N�� COIR WATTLE 4 C-473-0001025 3 CONCRETE WASHOUT C-473-0001026 LIMITS OF DISTURBED AREA PIPELINE PROJECT: 18.68 AC POINT OF CONTACT (CONSTRUCTION): CHARLIE GILMAN 252-339-1971 PRELIMINARY - NOT 0 50 10o FOR CONSTRUCTION 1IN = 50FT ISSUED FOR BID PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 DATE REVISION(S) DESCRIPTION BY CHK APPD I DESCRIPTION APPROVALS piN DUKE Piedmont *C ENERGY, �. Natural Gas I COPYRIGHT 2018 LINE 473 ES&PC PLAN C LAYTO N N GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA 3-02-2020 90% DESIGN SUBMITTAL ABR JTG CAM AREA CODE 1853 DATE N/A INITIALS NIA REGIONAL ENGINEER 3-25-2020 ISSUED FOR BID ABR JTG CAM ACCOUNT NUMBER PROJECT NUMBER 0228711 DATE N/A INITIALS N/A MGR TECH REC &STD I DRAWING BY ABR STATION ID DATE 08/25/2020 INITIALS CAM PRINCIPAL ENGINEER CHECKER INITIALS JTG REF. DWG(S) PNG-C-473-0001005, PNG-C-473-0001006 SHEET(S) 20 OF 34 1 DWG SCALE 1"=50' DWG DATE 3/02/2020 SUPERSEDED DRAWING NUMBER REVISION PNG -C-473-0001020 B DISCIPLINE / RESOURCE CENTER / LINE NUMBER BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # C-1435 CLAUDE A McMULLAN NO IFC SUBMITTAL DATE A NORTH CAROLINA B SEAL 047852 PROFESSIONAL ENG/ARCH STAMP 0 LU 0o LU LU LU z_ J U Q MATCH LINE SEE BELOW = 3.72 AC = 2,288 LF /100 LF = 6 AC/100LF o— Im z C� "s 0 Mq \ \ I� I I MATCH LINE 28+75 I\ o/ 0 IIII I I i / TOP=319.47 _ r INV N=316.29 m INV�UT 31 .19 �� c _ ,IL �II I I I I / m + � 3 ✓I III 9/— \ i- _ — TEMPORARY CONSTRUCTION ENTRANCE, J II SEE DETAIL 1, SHEET C-473-0001025 / II TEMPORARY SILT FENCE \ I _318 �- — M III I I / J II 0 I / 0 00 _ t DI SFWB 1N315.26 / / SFWB T2PN_ I=3109 o z05HO3009 / -1 I11 f I I I V — LOD --. `I \ii� lAv our=314.9s Il 21+00 / 0D --� V�66—�D �L_Jr -- — Ob 0D --- _ D\ Q ��/ / 22+00 23+00 \ 7s� 24+00 `' - w - I / � - � � 25+00 k � O I O rn / 26+00 I / J % M "r \ \� J I IIII I- I lc� I O •C/..�� — —LOD ---CLOD --�--- D ( II \�I- / I III IIII I h�FW � — LOD LOD-----LOD0 7\I4 051­104002C .y -- TEMPORARY SILT FENCE _ -n 1 1 1 1, 1N � 38.78 15. 1 � I TEMPORARY SILT FENCE t� -� w O m Q � -� I I LU I LU LU \ I ( U I IH J Q r LOD ---__ LOD --- — LOD — — — — i ---- �LOD — LOD -- -- LOD ---� — LOD ----� 0 \ DA = 3.72 AC \ SF = 2,288 LF MATCH LINE SEE ABOVE DA/100LF=—-------_/- 0.16 AC/100LF 0 / 05HO3009 i / / TEMPORARY SILT FENCE ---LOD-----LOD - - LOD — �LOD —---LOD — _ _ ---LOD-----LOD --- —LOD --- LOD —LODi! -L TEMPORARY SILT FENCE / // O� L0 + 00 N LU z_ J _ U H Q IE, WZA yXO° �° k I I R/W R/W \ \ 2 TEMPORARY SILT FENCE _ _ _a-27— — — — — -32__ 77 R/1A/,,R/W--- \ R/W R/W � r� R/W / R/W R/W R/W R/1W R/ \ \ EXlS71NG WA-rERLINE EASEMENT TO / \ JOHNSTON COUNTY PERT B 4102, PG 232 I I Ww�. yDA = 1.43 AC — o — — � m / __SF = 1,113 LF — DA/100 LF = _ m — / / 0.03 AC/100LF — — N o � z -- a --_00 -1 — — — — — U0 col --- — Q01 7-- 05H04002C \ DA = 2.57 AC N 1 N U-) > SF = 1,693 LF .V DAM 00 LF E= 1 0.15 AC/100LF --n 7 -----MCI SFWB _(17 I TEMPORARY SILT FENCE s PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY LID N O M W z J _ U _j NOTES: 1. CONTRACTOR SHALL INSTALL CONSTRUCTION EXIT AT ALL SITE ACCESS POINTS. 2. ALL TREES TO REMAIN SHALL BE PROTECTED WITH TREE PROTECTION FENCING. 3. ANY DISTURBED AREA LEFT IDLE FOR A PERIOD OF 14 DAYS OR LONGER SHALL BE STABILIZED WITH MULCHING AND TEMPORARY SEEDING WITH THE EXCEPTION OF AGRICULTURAL FIELDS WHICH ONLY NEED STABILIZATION TO THE EXTENT REQUIRED TO AVOID TOP SOIL WASHING AWAY. SEE DETAIL 1, SHEET C-473-0001026. 4. STABILIZE ALL DISTURBED AREAS OUTSIDE OF THE CULTIVATED FIELD WITH PERMANENT SEEDING IN ACCORDANCE WITH DETAIL 2, SHEET C-473-0001026. ALL OTHER DISTURBED AREAS SHALL BE RESTORED TO ORIGINAL CONDITIONS AS A CULTIVATED FIELD; PERMANENT SEEDING WILL NOT BE UTILIZED. 5. REFER TO SITE PLAN PNG-C-473-0001001 FOR OVERALL LIMITS OF DISTURBANCE, HDD ENTRY AND EXIT WORKSPACE, AND TEMPORARY AND PERMANENT ACCESS ROADS. 6. ADJUST RIGHT-OF-WAY DIVERSIONS AND ASSOCIATED SILT FENCE OUTLETS AS NECESSARY TO DIVERT WATER DOWNSTREAM OF SECTION OF TRENCH THAT IS OPEN. MAINTAIN 125SPACING. LEGEND: 8+00 R _MI_WM_�: 9+00 PROPERTY LINE ( 2 1 TEMPORARY SILT FENCE C-473-0001025 LIMITS OF DISTURBANCE �J TEMPORARY GRAVEL ( 1 1 CONSTRUCTION ENTRANCE C-473- 000 1025 PROPOSED 8" PIPELINE SILT FENCE WATTLE BREAK 5 C-473-0001025 3 RIGHT-OF-WAY DIVERSIONS (SEE NOTE 6) C-473-0001027 �� LIMITS OF DISTURBED AREA PIPELINE PROJECT: 18.68 AC POINT OF CONTACT (CONSTRUCTION): CHARLIE GILMAN 252-339-1971 PRELIMINARY - NOT 0 50 100 FOR CONSTRUCTION 1IN = 50FT ISSUED FOR BID PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) *DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE* TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 DATE REVISION(S) DESCRIPTION BY CHK APPD I DESCRIPTION APPROVALS riN DUKE Piedmont 'C ENERGY:. �. Natural Gas COPYRIGHT 2018 LINE 473 ES&PC PLAN CLAYTORNIC GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA 3-02-2020 90% DESIGN SUBMITTAL ABR JTG CAM AREA CODE 1853 DATE N/A INITIALS NIA REGIONAL ENGINEER 3-25-2020 ISSUED FOR BID ABR JTG CAM ACCOUNT NUMBER PROJECT NUMBER 0228711 DATE N/A INITIALS N/A MGR TECH REC &STD DRAWING BY ABR STATION ID DATE 08/25/2020 INITIALS CAM PRINCIPAL ENGINEER CHECKER INITIALS JTG REF. DWG(S) PNG-C-473-0001007, PNG-C-473-0001008, PNG-C-473-0001009 SHEET(S) 21 OF 34 1 DWG SCALE 1"=50' DWG DATE 3/02/2020 SUPERSEDED DRAWING NUMBER REVISION PNG -C-473-0001021 B DISCIPLINE / RESOURCE CENTER / LINE NUMBER LID N + 00 M w Z_ J U H V R/W R/W /R/ STREAM, SEE WATERBODY CROSSING DETAILS ON SHEET C-473-0001028 / STREAM, SEE WATERBODY CROSSING DETAILS ON SHEET C-473-0001028 I / DA _ 2.57 AC EDGE OF ASPhIAL - - - -SF = 1,693 LF-327 DA/100LF= —��— �— 0.15 AC/100LF _ / — — — f— BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # C-1435 CLAUDE A McMULLAN NO IFC SUBMITTAL DATE A NORTH CAROLINA B SEAL 047852 PROFESSIONAL ENG/ARCH STAMP I LIV11 VI xr-Al\ 1 VIL I 1 LI YVL 1�1 v\ I f I TEMPORARY SILT FENCE 0 o� �2 WATTLE BARRIER II r TEMPORARY SILT FENCE A III � INV=322.61 \ — _ — WATTLE BARRIER % TEMPORARY CONSTRUCTION ENTRANCE, Rnnl F SEE DETAIL 1, SHEET C-473-0001025 r. R MATCH LINE 47+75 m � w 0 \ — 334- \ x - \ O — — — — rn 1 2— C-HF 094E \O1\E C ORE SFWB- 56+00 SFWB 1 \ r 57+00 58+00 T— �- � ok CO EDGE AL -TEMPORARY SILT FENCE rINV=309.65 I.I WATTLE BARRIER — SFWB �— OH O SF \ \ SFW\_' 1�� \ \1.. G 65+00 66+00, SFWB O _ 63 0 64+00 r. ski E PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY DA = 1.82 AC _0F=7()752I P \\ N CD W Z J I AInTCC- 1. CONTRACTOR SHALL INSTALL CONSTRUCTION EXIT AT ALL SITE ACCESS POINTS. 2. ALL TREES TO REMAIN SHALL BE PROTECTED WITH TREE PROTECTION FENCING. 3. ANY DISTURBED AREA LEFT IDLE FOR A PERIOD OF 14 DAYS OR LONGER SHALL BE STABILIZED WITH MULCHING AND TEMPORARY SEEDING WITH THE EXCEPTION OF AGRICULTURAL FIELDS WHICH ONLY NEED STABILIZATION TO THE EXTENT REQUIRED TO AVOID TOP SOIL WASHING AWAY. SEE DETAIL 1, SHEET C-473-0001026. 4. STABILIZE ALL DISTURBED AREAS OUTSIDE OF THE CULTIVATED FIELD WITH PERMANENT SEEDING IN ACCORDANCE WITH DETAIL 2, SHEET C-473-0001026. ALL OTHER DISTURBED AREAS SHALL BE RESTORED TO ORIGINAL CONDITIONS AS A CULTIVATED FIELD; PERMANENT SEEDING WILL NOT BE UTILIZED. 5. REFER TO SITE PLAN PNG-C-473-0001001 FOR OVERALL LIMITS OF DISTURBANCE, HDD ENTRY AND EXIT WORKSPACE, AND TEMPORARY AND PERMANENT ACCESS ROADS. 6. ADJUST RIGHT-OF-WAY DIVERSIONS AND ASSOCIATED SILT FENCE OUTLETS AS NECESSARY TO DIVERT WATER DOWNSTREAM OF SECTION OF TRENCH THAT IS OPEN. MAINTAIN 125' SPACING. LEGEND: R PROPERTY LINE 2 TEMPORARY SILT FENCE C-473-0001025 — — — LOD— — LIMITS OF DISTURBANCE . . — STREAM TEMPORARY GRAVEL 1 CONSTRUCTION ENTRANCE C-473-0001025 PROPOSED 8" PIPELINE 8+00 9+00 SFWB SILT FENCE WATTLE BREAK 5 C-473-0001025 RIGHT-OF-WAY DIVERSIONS 3 (SEE NOTE 6) C-473-0001027 4 COIR WATTLE C-473-0001025 TIMBER MATS 2 C-473-0001027 STREAM BUFFER WETLANDS L_ —1 LIMITS OF DISTURBED AREA PIPELINE PROJECT: 18.68 AC POINT OF CONTACT (CONSTRUCTION): CHARLIE GILMAN 252-339-1971 PRELIMINARY - NOT 0 50 100 FOR CONSTRUCTION 1IN = 50FT ISSUED FOR BID PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) *DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE* TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 DATE REVISION(S) DESCRIPTION BY CHK APPD I DESCRIPTION APPROVALS rf� DUKEr6ll[�Piedmont `C ENERGY:: . Natural Gas COPYRIGHT 2018 LINE 473 ES&PC PLAN C LAYTO N N GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA 3-02-2020 90% DESIGN SUBMITTAL ABR JTG CAM AREA CODE 1853 DATE N/A INITIALS NIA REGIONAL ENGINEER 3-25-2020 ISSUED FOR BID ABR JTG CAM ACCOUNT NUMBER PROJECT NUMBER 0228711 DATE N/A INITIALS NIA MGR TECH REC & STD DRAWING BY ABR STATION ID DATE 08/25/2020 INITIALS CAM PRINCIPAL ENGINEER CHECKER INITIALS JTG REF. DWG(S) PNG-C-473-0001010, PNG-C-473-0001011, PNG-C-473-0001012 SHEET(S) 22 OF 34 1 DWG SCALE 1"=50' DWG DATE 3/02/2020 SUPERSEDED — DRAWING NUMBER REVISION P N G -C-473-0001022 B DISCIPLINE / RESOURCE CENTER / LINE NUMBER MATCH LINE 80+25 — — o � � ITC - 42E STREAM, SEE ':•D CROSSINGON 000- — -- LILI•,!fir_ •io �• �•�••�i•��Di u'- c . f 'LOD - \ � I N `�\ 1 i �� I \ NC - 42E ALAI / TEMPORARY SILT FENCE z HE I HE I O OHE- WATTLE BARRIER —31� — OHE �CSHE OHE� OHE / OHE a 1 1 I — 5— HE — OHE —pHE � OHE (OHE — / DA DELINEATION �E O / — ter, — �,aFd + .,rvv " 75+00 73+00 76+00 77+00 78+00 i o 74+00 SFWB — I nD — LOD SFWB 05H03100C TEMPORARY SILT FENCE TEMPORARY SILT FENCE NOTES: 1. CONTRACTOR SHALL INSTALL CONSTRUCTION EXIT AT ALL SITE ACCESS POINTS. DSF - 816 LF AC 1 / 2. ALL TREES TO REMAIN SHALL BE PROTECTED WITH TREE PROTECTION DA/100 LF = 1 FENCING. 0.19 AC/100L 3. ANY DISTURBED AREA LEFT IDLE FOR A PERIOD OF 14 DAYS OR LONGER LOD-----LOD-----LOD — ---LOD — L�----LOD / SHALL BE STABILIZED WITH MULCHING AND TEMPORARY SEEDING WITH SFWB THE EXCEPTION OF AGRICULTURAL FIELDS WHICH ONLY NEED STABILIZATION TO THE EXTENT REQUIRED TO AVOID TOP SOIL WASHING TEMPORARY CONSTRUCTION ENTRANCE, AWAY. SEE DETAIL 1, SHEET C-473-0001026. SEE DETAIL 1, SHEET C-47�3�0001�025� 4. STABILIZE ALL DISTURBED AREAS OUTSIDE OF THE CULTIVATED FIELD WITH PERMANENT SEEDING IN ACCORDANCE WITH DETAIL 2, SHEET C-473-0001026. ALL OTHER DISTURBED AREAS SHALL BE RESTORED TO ORIGINAL CONDITIONS AS A CULTIVATED FIELD; PERMANENT SEEDING WILL NOT BE UTILIZED. i 5. REFER TO SITE PLAN PNG-C-473-0001001 FOR OVERALL LIMITS OF DISTURBANCE, HDD ENTRY AND EXIT WORKSPACE, AND TEMPORARY AND PERMANENT ACCESS ROADS. 6. ADJUST RIGHT-OF-WAY DIVERSIONS AND ASSOCIATED SILT FENCE 'Al 1 OUTLETS AS NECESSARY TO DIVERT WATER DOWNSTREAM OF SECTION DIRT DRIVEWAY OF TRENCH THAT IS OPEN. MAINTAIN 125' SPACING. TEMPORARY SILT FENCE — — / 1 � LEGEND: 325 SFWB OD -- -- LOD I - FDA _ 1.94 AC ' t PROPERTY LINE 1 / / 1 o SF 754 LF LINE 473 FLOWERS �' I TEMPORARY SILT FENCE 2 o _ DA/100 LF = \ PLANTATION RS w _ TEMPORARY SILT FENCE C-473-0001025 Y / 0.25 AC/100LF \ REFER TO PROJECT — — — LOD— — — LIMITS OF DISTURBANCE �J r / i o \ \ 0228708 / o -DA _ 0.80 AC / w \32, \ �STREAM 3 — — 1 SF 543 LF 32� z \ 327 1 DA/100 LF = — —w — — \ 86+22 j. I � TEMPORARY GRAVEL 1 1 0.15 AC/100LF o 1 81+0 / 82+00 83+00 84+00 ¢ 85+00 �86+00 I / CONSTRUCTION ENTRANCE C-473-0001025 1 - / / _ _ PROPOSED 8" PIPELINE _ Lem_ D� — LBB-- / D�— L@�� D o - 8+00 9+00 -- ---- SSF --- — SSFM--- SSFM-- -- SSFM---- SSFM-- �SAtI---- pq _ _ / 7 SSFM — — — — — SSF — — — SSI �— — — �� L'g571C FENCE — — SS M — — — SSFf X T— X x X X X X — -- X — �� �� �� — S — — �f— �� — — _ Fr' _ _ — — — — — SILT FENCE WATTLE BREAK 5 —R/W —_^G— -- — — -- --- _ -329 = G-- —G--- — —_ _- — —325-0 G' so_ca� Z C-473-0001025 E— — _ E— — — CONCRETE WASHOUT _ -i—• � � 7� � _ �e—1Nr--32� lNV-325.3� o 1 �� — 328- — — S L- — E — _ E _ E= Z - E / I _/I \ o 3 MATCH LINE 80+25 / / `�� I �� TEMPORARY CONSTRUCTION ENTRANCE N"2E \ tiF- o �... RIGHT-OF-WAY DIVERSIONS %' HwY 2 18" RCP CLASS III CULVERT, SEE NOTE 6 C-473-0001027 SEE DETAIL 1 SHEET C-473-0001025 EMERGENCY SIGNAL AHEAD > NNn NNn / min I NNn NNn NNn— — NNn- MNn � Y. � NNn NNn ��„REFER TO PROJECT 0228708 g \ �� _ _/ —0 3 NC - 42E , � PROPOSED GRAVEL O O SURFACE COURSE C-473-0001025 �� COIR WATTLE 4 C-473-0001025 TIMBER MATS 2 C-473-0001027 �� CONCRETE WASHOUT 3 C-473-0001026 �� STREAM BUFFER WETLANDS L - — - I LIMITS OF DISTURBED AREA PIPELINE PROJECT: 18.68 AC POINT OF CONTACT (CONSTRUCTION): CHARLIE GILMAN 252-339-1971 PRELIMINARY - NOT 0 50 100 FOR CONSTRUCTION 1IN = 50FT ISSUED FOR BID BURNS&McDONNELLCONSULTANTS, INC. STATE LICENSE # C-1435 PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 REF. DWG(S) PNG-C-473-0001013, PNG-C-473-0001014 CLAUDEA McMULLAN IFCSUBMITTAL DATE NORTH CAROLINA SEAL 047852 PROFESSIONAL ENG/ARCHSTAMP NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS r�� DUKEr6ll[�Piedmont `C ENERGY:: . Natural Gas COPYRIGHT 2018 LINE 473 ES&PC PLAN C LAYTO N , NC GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA SHEET(S) 23 OF 34 DWG SCALE 1"=50' A 03-02-2020 90% DESIGN SUBMITTAL ABR JTG CAM AREA CODE 1853 DATE N/A INITIALS NIA REGIONAL ENGINEER DWG DATE 3102/2020 SUPERSEDED — B 08-25-2020 ISSUED FORBID ABR JTG CAM ACCOUNT NUMBER PROJECT NUMBER 0228711 DATE N/A INITIALS NIA MGR TECH REC & STD DRAWING NUMBER PNG -C-473-0001023 REVISION B DRAWING BY ABR STATION ID DATE 08/25/2020 INITIALS CAM PRINCIPAL ENGINEER CHECKER INITIALS JTG DISCIPLINE / RESOURCE CENTER / LINE NUMBER INSTALLATION NOTES:- -AGGREGATE SIZE. 2-3" DIAMETER WASHED STONE. —PAD THICKNESS: 6" MINIMUM. —PAD WIDTH: 24' MINIMUM. —PAD LENGTH: 100' MINIMUM. —PAD LOCATION: LOCATE CONSTRUCTION ENTRANCES AND EXITS TO LIMIT SEDIMENT FROM LEAVING THE SITE AND TO PROVIDE MAXIMUM UTILITY BY ALL CONSTRUCTION VEHICLES. AVOID STEEP GRADES AND ENTRANCES AT CURVES IN PUBLIC ROADS. MAINTENANCE NOTES: —MONITOR DAILY TO SUPPLEMENT STONE TO ENSURE ENTRANCE FUNCTIONS PROPERLY. —CLEAN ANY MATERIAL TRACKED ONTO PUBLIC ROADWAY IMMEDIATELY. —SCHEDULE ROUTINE SWEEPING AT THE END OF EACH WORK DAY. —WASHING: IF CONDITIONS AT THE SITE ARE SUCH THAT MOST OF THE MUD AND SEDIMENT ARE NOT REMOVED BY VEHICLES TRAVELING OVER THE GRAVEL, THE TIRES SHOULD BE WASHED. WASHING SHOULD BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT DRAINS INTO A SEDIMENT TRAP OR OTHER SUITABLE DISPOSAL AREA. A WASH RACK MAY BE USED TO MAKE WASHING STONE MORE CONVENIENT AND EFFECTIVE. TOP AND BOTTOM STRAND SHALL BE 10 GAUGE MIN. WIRE PLASTIC CAP — 6' MAX. WITH WIRE OVER POST INSTALLATION NOTES 4' MAX FOR TROUT WATERS —USE FILTRATION GEOTEXTILE A MINIMUM OF 36" IN WIDTH AND FASTEN ADEQUATELY TO THE POSTS AND WIRE AS DIRECTED. —USE WIRE A MINIMUM OF 32" IN WIDTH AND WITH A MINIMUM MIDDLE AND VERTICAL WIRES OF 6 LINE WIRES WITH 12" STAY SPACING. SHALL BE 121/2 GAUGE MIN. —PROVIDE 5'-0" STEEL POST OF THE SELF —FASTENER ANGLE STEEL TYPE. —FOR MECHANICAL SLICING METHOD INSTALLATION, GEOTEXTILE SHALL BE A MAXIMUM OF 18" ABOVE GROUND SURFACE. 24" MAX. (18" MIN.) �IIAIIAIF71 A11�1101A1AI�a.�ll.r...�....�...�. -.�. I '...�...�•-•^•^•^•^•-•^•• MAINTENANCE NOTES: -REMOVE AND DISPOSE OF SILT ACCUMULATIONS WHEN THE I I DEPTH REACHES ONE-HALF OF THE HEIGHT OF THE GEOTEXTILE. -REMOVE AND REPLACE DETERIORATED OR CLOGGED FILTRATION GEOTEXTILE1F�1��1 GEOTEXTILE. GEOTEXTILE FABRIC (NCDOT SECTION 1056, TYPE 1) 4" #57 STONE �00' FILTRATION GEOTEXTILE COMPACTED FILL GAO/ o�o�p� 0 Q o 00 op a — / �� —1 1 1 g y I 1 4� + �� 12" COMPACTED SUBGRADE COMPACTED TO 100% STANDARD — P�J��� PROCTOR MAX DRY DENSITY (ASTM D698) EXISTING SUBGRADE FILTRATION GEOTEXTILE TO STABILIZE FOUNDATION (ESPECIALLY IMPORTANT WHERE SOFT SOIL IS ANTICIPATED) 2-3" DIAMETER WASHED STONE, 6" DEEP BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # G1435 CLAUDE A MCMULLAN IFC SUBMITTAL DATE NORTH CAROLINA SEAL 047852 PROFESSIONAL ENG/ARCH STAMP ISOMETRIC VIEW 2' WOODEN FRONT VIEW PERSPECTIVE VIEW DETAIL SCALE: NTS CONSTRUCTION ENTRANCE INSTALLATION NOTES: —USE MINIMUM 18 IN. NOMINAL DIAMETER EXCELSIOR WATTLE AND LENGTH OF 10 FT. —EXCAVATE A 2 TO 3 INCH TRENCH FOR WATTLE TO BE PLACED. —DO NOT PLACE WATTLES ON TOE OF SLOPE. —USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL CROSS SECTION. —INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE STAKES AT AN ANGLE TO WEDGE WATTLE TO GROUND. —PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE FORMED INTO A U SHAPE NOT LESS THAN 12" IN LENGTH. —INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON BOTH SIDES OF WATTLE AND AT EACH END TO SECURE IT TO THE SOIL. —FOR BREAKS ALONG LARGE SLOPES (HEIGHT OF 15' OR MORE MEASURED ALONG THE SLOPE), USE MAXIMUM SPACING OF 25 FT SEE INSET A MAINTENANCE NOTES: -REMOVE AND DISPOSE OF SILT ACCUMULATIONS WHEN THE DEPTH REACHES ONE-HALF OF THE HEIGHT OF THE WATTLE. -REPLACE OR CLEAN THE WATTLE AS NEEDED TO ALLOW RUNOFF TO SLOWLY DEWATER THROUGH THE DEVICE BETWEEN RAIN EVENTS. -MONITOR THE WOODEN STAKES AND STAPLES TO ENSURE THAT THE WATTLE REMAINS SECURELY ANCHORED AFTER RAIN EVENTS. FILL •- �dP. r r A 11 INSET A i2"-3" TRENCH DETAIL 4 SCALE: NTS WATTLE BARRIER OF PSLOPE STAKE 18" WATTLE J \—DOWNSLOPE STAKE TOP VIEW EXTENSION OF GEOTEXTILE AND WIRE INTO TRENCH DETAIL 2 SCALE: NTS REINFORCED TEMPORARY SILT FENCE ISOMETRIC VIEW VIEW FROM SLOPE INSTALLATION NOTES: -USE MINIMUM 12 IN. DIAMETER EXCELSIOR WATTLE AND LENGTH OF 10 FT. -EXCAVATE A 1 TO 2 INCH TRENCH FOR WATTLE TO BE PLACED. -DO NOT PLACE WATTLE ON TOE OF SLOPE. —OFFSET SLIGHTLY OFF TOE. —USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL CROSS SECTION. —INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE STAKES AT AN ANGLE TO WEDGE WATTLE TO GROUND. —PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE FORMED INTO A U SHAPE NOT LESS THAN 12" IN LENGTH. —INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON BOTH SIDES OF WATTLE AND AT EACH END TO SECURE IT TO THE SOIL. INSET A FILL SLOPE DETAIL 5 SCALE: NTS SILT FENCE WATTLE BREAK 1"-2" TRENCH SIDE VIEW DETAIL 3 SCALE: NTS GRAVEL SURFACE COURSE MAINTENANCE NOTES: —REMOVE AND DISPOSE OF SILT ACCUMULATIONS WHEN THE DEPTH REACHES ONE—HALF OF THE HEIGHT OF THE WATTLE. —REPLACE OR CLEAN THE WATTLE AS NEEDED TO ALLOW RUNOFF TO SLOWLY DEWATER THROUGH THE DEVICE BETWEEN RAIN EVENTS. —MONITOR THE WOODEN STAKES AND STAPLES TO ENSURE THAT THE WATTLE REMAINS SECURELY ANCHORED AFTER RAIN EVENTS. —MONITOR THE WATTLE/SILT FENCE OVERLAP TO ENSURE THIS INTERFACE REMAINS SECURELY SEALED AFTER RAIN EVENTS. SILT FENCE POST INSET A DOWNSLOPE STAKE PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE IREVISION(S) DESCRIPTION A 03-02-2020 90% DESIGN SUBMITTAL B 08-25-20201 ISSUED FOR BID BY CHK JAPPD DESCRIPTION ABR JTG CAM AREA CODE 1853 ABR JTG CAM ACCOUNT NUMBER PROJECT NUMBER 0228711 DRAWING BY ABR STATION ID CHECKER INITIALS JTG APPROVALS DATE INITIALS NIA N/A REGIONAL ENGINEER DATE INITIALS MGR TECH NIA N/A REC & STD DATE INITIALS PRINCIPAL 08/25/2020 CAM ENGINEER '& DUKE r6lj�� Piedmont V ENERGY Natural Gas COPYRIGHT 2018 LINE 473 EROSION CONTROL DETAILS CLAYTON, NC GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA NOTE: 1. SEE NCDOT DESIGN STANDARDS, LATEST EDITION, AS INDICATED. ALL SUBSEQUENT AND RELEVANT STANDARDS AND SPECIFICATIONS SHALL APPLY. PRELIMINARY - NOT FOR CONSTRUCTION ISSUED FOR BID REF. DWG(S) SHEET(S) 25 OF 34 1 DWG SCALE 1"=50' DWG DATE 03/02/2020 SUPERSEDED DRAWING NUMBER REVISION P N G -C-473-0001025 B DISCIPLINE / RESOURCE CENTER / LINE NUMBER seeding mixture species Rate (lb/acre) Rye (grain) 120 Annual lespedeza (Kobe in Piedmont and Coastal Plain, Korean in Mountains) 50 Omit annual lespedeza when duration of temporary cover is not to extend beyond June. seeding dates Mountains —Above 2500 feet: Feb. 15 - May 15 Below 2500 feet: Feb. 1- May 1 Piedmont —Jan. 1 - May 1 Coastal Plain —Dec. 1 -Apr. 15 soil amendments Follow recommendations of soil tests or apply 2,000 lb/acre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer. mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, nettin or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. seeding mixture species German millet Rate (lb/acre) 40 In the Piedmont and Mountains, a small -stemmed Sudangrass may be I substituted at a rate of 50 lb/acre. seeding dates Mountains —May 15 - Aug. 15 Piedmont —May 1 - Aug. 15 Coastal Plain —Apr. 15 - Aug. 15 soil amendments Follow recommendations of soil tests or apply 2,000 lb/acre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer. mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, nettin or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. seeding mixture species Rye (grain) Rate (lb/acre) 120 seeding dates Mountains —Aug. 15 - Dec. 15 Coastal Plain and Piedmont —Aug. 15 - Dec. 30 soil amendments Follow soil tests or apply 2,000 lb/acre ground agricultural limestone and 1,000 lb/acre 10-10-10 fertilizer. mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, nettin or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. maintenance Repair and refertilize damaged areas immediately. Topdress with 50 lb/acre of nitrogen in March. If it is necessary to extent temporary cover beyond June 15, overseed with 50 lb/acre Kobe (Piedmont and Coastal Plain) or Korean (Mountains) lespedeza in late February or early March. BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # G1435 CLAUDE A McMIULLAN IFC SUBMITTAL DATE NORTH CAROLINA SEAL 047852 PROFESSIONAL ENG/ARCH STAMP TEMPORARY SEEDING NOTES: 1. COMPLETE GRADING BEFORE PREPARING SEEDBEDS, AND INSTALL ALL NECESSARY EROSION CONTROL PRACTICES SUCH AS, DIKES, WATERWAYS, AND BASINS. MINIMIZE STEEP SLOPES BECAUSE THEY MAKE SEEDBED PREPARATION DIFFICULT AND INCREASE THE EROSION HAZARD. IF SOILS BECOME COMPACTED DURING GRADING, LOOSEN THEM TO A DEPTH OF 6-8 INCHES USING A RIPPER, HARROW, OR CHISEL PLOW. SEEDBED PREPARATION 2. GOOD SEEDBED PREPARATION IS ESSENTIAL TO SUCCESSFUL PLANT ESTABLISHMENT. A GOOD SEEDBED IS WELL -PULVERIZED, LOOSE, AND UNIFORM. WHERE HYDROSEEDING METHODS ARE USED, THE SURFACE MAY BE LEFT WITH A MORE IRREGULAR SURFACE OF LARGE CLODS AND STONES. 3. LIMING —APPLY LIME ACCORDING TO SOIL TEST RECOMMENDATIONS. IF THE PH (ACIDITY) OF THE SOIL IS NOT KNOWN, AN APPLICATION OF GROUND AGRICULTURAL LIMESTONE AT THE RATE OF 1 TO 1 1/2 TONS/ACRE ON COARSE -TEXTURED SOILS AND 2-3 TONS/ACRE ON FINE -TEXTURED SOILS IS USUALLY SUFFICIENT. APPLY LIMESTONE UNIFORMLY AND INCORPORATE INTO THE TOP 4-6 INCHES OF SOIL. SOILS WITH A PH OF 6 OR HIGHER NEED NOT BE LIMED. 4. FERTILIZER —BASE APPLICATION RATES ON SOIL TESTS. WHEN THESE ARE NOT POSSIBLE, APPLY A 10-10-10 GRADE FERTILIZER AT 700-1,000 LB/ACRE. BOTH FERTILIZER AND LIME SHOULD BE INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL, IF A HYDRAULIC SEEDER IS USED, DO NOT MIX SEED AND FERTILIZER MORE THAN 30 MINUTES BEFORE APPLICATION. 5. SURFACE ROUGHENING —IF RECENT TILLAGE OPERATIONS HAVE RESULTED IN A LOOSE SURFACE, ADDITIONAL ROUGHENING MAY NOT BE REQUIRED, EXCEPT TO BREAK UP LARGE CLODS. IF RAINFALL CAUSES THE SURFACE TO BECOME SEALED OR CRUSTED, LOOSEN IT JUST PRIOR TO SEEDING BY DISKING, RAKING, HARROWING, OR OTHER SUITABLE METHODS. GROOVE OR FURROW SLOPES STEEPER THAN 3:1 ON THE CONTOUR BEFORE SEEDING (PRACTICE 6.03, SURFACE ROUGHENING). PLANT SELECTION 6. SELECT AN APPROPRIATE SPECIES OR SPECIES MIXTURE FROM TABLE 6.10A FOR SEEDING IN LATE WINTER AND EARLY SPRING, TABLE 6.10B FOR SUMMER, AND TABLE 6.10C FOR FALL. 7. IN THE MOUNTAINS, DECEMBER AND JANUARY SEEDINGS HAVE POOR CHANCES OF SUCCESS. WHEN IT IS NECESSARY TO PLANT AT THESE TIMES, USE RECOMMENDATIONS FOR FALL AND A SECURELY TACKED MULCH. SEEDING 8. EVENLY APPLY SEED USING A CYCLONE SEEDER (BROADCAST), DRILL, CULTIPACKER SEEDER, OR HYDROSEEDER. USE SEEDING RATES GIVEN IN TABLES 6.10A-6.10C. BROADCAST SEEDING AND HYDROSEEDING ARE APPROPRIATE FOR STEEP SLOPES WHERE EQUIPMENT CANNOT BE DRIVEN. HAND BROADCASTING IS NOT RECOMMENDED BECAUSE OF THE DIFFICULTY IN ACHIEVING A UNIFORM DISTRIBUTION. 9. SMALL GRAINS SHOULD BE PLANTED NO MORE THAN 1 INCH DEEP, AND GRASSES AND LEGUMES NO MORE THAN 1/2 INCH. BROADCAST SEED MUST BE COVERED BY RAKING OR CHAIN DRAGGING, AND THEN LIGHTLY FIRMED WITH A ROLLER OR CULTIPACKER. HYDROSEEDED MIXTURES SHOULD INCLUDE A WOOD FIBER (CELLULOSE) MULCH. MULCHING 10. THE USE OF AN APPROPRIATE MULCH WILL HELP ENSURE ESTABLISHMENT UNDER NORMAL CONDITIONS, AND IS ESSENTIAL TO SEEDING SUCCESS UNDER HARSH SITE CONDITIONS (PRACTICE 6.14, MULCHING). HARSH SITE CONDITIONS INCLUDE: • SEEDING IN FALL FOR WINTER COVER (WOOD FIBER MULCHES ARE NOT CONSIDERED ADEQUATE FOR THIS USE), • SLOPES STEEPER THAN 3:1, • EXCESSIVELY HOT OR DRY WEATHER, • ADVERSE SOILS (SHALLOW, ROCKY, OR HIGH IN CLAY OR SAND), AND • AREAS RECEIVING CONCENTRATED FLOW. 11. IF THE AREA TO BE MULCHED IS SUBJECT TO CONCENTRATED WATER FLOW, AS IN CHANNELS, ANCHOR MULCH WITH NETTING (PRACTICE 6.14, MULCHING). TEMPORARY SEEDING MAINTENANCE NOTES: 1. RESEED AND MULCH AREAS WHERE SEEDLING EMERGENCE IS POOR, OR WHERE EROSION OCCURS, AS SOON AS POSSIBLE. DO NOT MOW. PROTECT FROM TRAFFIC AS MUCH AS POSSIBLE. DETAIL SCALE: NTS TEMPORARY SEEDING PERMANENT SEEDING SCHEDULE: THE KINDS OF SEED AND FERTILIZER, AND THE RATES OF APPLICATION OF SEED, FERTILIZER, AND LIMESTONE, SHALL BE AS STATED BELOW. DURING PERIODS OF OVERLAPPING DATES, THE KIND OF SEED TO BE USED SHALL BE DETERMINED. ALL RATES ARE IN POUNDS PER ACRE. MARCH 1 - AUGUST 31 50# TALL FESCUE 10# CENTIPEDE 25# BERMUDAGRASS (HULLED) 500# FERTILIZER 4000# LIMESTONE PERMANENT SEEDING NOTES: SEPTEMBER 1 - FEBRUARY 28 50# TALL FESCUE 10# CENTIPEDE 35# BERMUDAGRASS (UNHULLED) 500# FERTILIZER 4000# LIMESTONE SOIL PREPARATION 1. PROPER SOIL PREPARATION IS NECESSARY FOR SUCCESSFUL SEED GERMINATION AND ROOT ESTABLISHMENT. IT IS ALSO NECESSARY FOR ESTABLISHMENT OF ROOTED SPRIGS, SOD AND WOODY PLANTS. HEAVILY COMPACTED SOILS PREVENT AIR, NUTRIENTS AND MOISTURE FROM REACHING ROOTS THEREBY RETARDING OR PREVENTING PLANT GROWTH, THE SUCCESS OF SITE STABILIZATION AND REDUCTION OF FUTURE MAINTENANCE ARE DEPENDENT ON AN ADEQUATELY PREPARED SOIL BED. FOLLOWING ARE THE REQUIREMENTS FOR PREPARATION OF AREAS TO BE VEGETATED BY GRASSING, SPRIGGING, SODDING, AND/OR PLANTING OF WOODY PLANTS: GENERAL REQUIREMENTS: 2. PREPARATION FOR PRIMARY/PERMANENT STABILIZATION SHALL NOT BEGIN UNTIL ALL CONSTRUCTION AND UTILITY WORK WITHIN THE PREPARATION AREA IS COMPLETE. HOWEVER, IT MAY BE NECESSARY TO PREPARE FOR NURSE CROPS PRIOR TO COMPLETION OF CONSTRUCTION AND INSTALLATION OF UTILITIES. 3. A NORTH CAROLINA DEPARTMENT OF AGRICULTURE SOILS TEST (OR EQUAL) SHALL BE OBTAINED FOR ALL AREAS TO BE SEEDED, SPRIGGED, SODDED OR PLANTED. RECOMMENDED FERTILIZER AND PH ADJUSTING PRODUCTS SHALL BE INCORPORATED INTO THE PREPARED AREAS AND BACKFILL MATERIAL PER THE TEST. 4. ALL AREAS TO BE SEEDED OR PLANTED SHALL BE TILLED OR RIPPED TO A DEPTH SPECIFIED ON THE APPROVED PLANS, CONSTRUCTION SEQUENCE AND/OR CONSTRUCTION BID LIST. RIPPING CONSISTS OF CREATING FISSURES IN A CRISS-CROSS PATTERN OVER THE ENTIRE SURFACE AREA, UTILIZING AN IMPLEMENT THAT WILL NOT GLAZE THE SIDE WALLS OF THE FISSURES. SITE PREPARATION THAT DOES NOT COMPLY WITH THESE DOCUMENTS SHALL NOT BE ACCEPTABLE. THE DEPTH OF SOIL PREPARATION MAY BE ESTABLISHED AS A RANGE BASED ON THE APPROVAL OF THE REVIEWING STATE OR LOCAL AGENCY. ONCE TILLED OR RIPPED ACCORDING TO THE APPROVED PLAN, ALL AREAS ARE TO BE RETURNED TO THE APPROVED FINAL GRADE. PH MODIFIERS AND/OR OTHER SOIL AMENDMENTS SPECIFIED IN THE SOIL TESTS CAN BE ADDED DURING THE SOIL PREPARATION PROCEDURE OR AS DESCRIBED BELOW. 5. ALL STONES LARGER THAN THREE (3) INCHES ON ANY SIDE, STICKS, ROOTS, AND OTHER EXTRANEOUS MATERIALS THAT SURFACE DURING THE BED PREPARATION SHALL BE REMOVED. AREAS TO BE SEEDED: 6. TILL OR DISC THE PREPARED AREAS TO BE SEEDED TO A MINIMUM DEPTH OF FOUR (4) INCHES. REMOVE STONES LARGER THAN THREE (3) INCHES ON ANY SIDE, STICKS, ROOTS AND OTHER EXTRANEOUS MATERIALS THAT SURFACE. IF NOT INCORPORATED DURING THE SOIL PREPARATION PROCESS, ADD PH MODIFIER AND FERTILIZERS AT THE RATE SPECIFIED IN THE SOIL TEST REPORT. 7. RE -COMPACT THE AREA UTILIZING A CULTIPACKER ROLLER. THE FINISHED GRADE SHALL BE A SMOOTH EVEN SOIL SURFACE WITH A LOOSE, UNIFORMLY FINE TEXTURE. ALL RIDGES AND DEPRESSIONS SHALL BE REMOVED AND FILLED TO PROVIDE THE APPROVED SURFACE DRAINAGE. SEEDING OF GRADED AREAS IS TO BE DONE IMMEDIATELY AFTER FINISHED GRADES ARE OBTAINED AND SEEDBED PREPARATION IS COMPLETED. AREAS TO BE SPRIGGED, SODDED, AND/OR PLANTED: 8. AT THE TIME OF PLANTING TILL OR DISC THE PREPARED AREAS TO A DEPTH OF FOUR (4) TO SIX (6) INCHES BELOW THE APPROVED FNISHED GRADE. REMOVE ALL STONES LARGER THAN THREE (3) INCHES ON ANY SIDE, STICKS, ROOTS AND OTHER EXTRANEOUS MATERIALS THAT SURFACE. IF NOT INCORPORATED IN THE RIPPING PROCESS, ADD PH MODIFIER, FERTILIZER, AND OTHER RECOMMENDED SOIL AMENDMENTS. 9. RE -COMPACT THE AREA UTILIZING A CULTIPACKER ROLLER AND PREPARE FNAL GRADES AS DESCRIBED ABOVE. INSTALL SPRIGS, SOD AND PLANTS AS DIRECTED IMMEDIATELY AFTER FINE GRADING IS COMPLETE. MULCH, MAT AND/OR TACK AS SPECIFIED. DETAIL 2 SCALE: NTS PERMANENT SEEDING t--10' - 0" MIN. --I z 0 0 L SANDBAGS (TYP.) OR STAPLES CLEARLY MARKED SIGNAGE CONCRETE NOTING DEVICE (18"X24" WASHOUT MIN.) INSTALLATION NOTES: -ACTUAL LOCATION DETERMINED IN FIELD. -CLEARLY MARK THE CONCRETE WASHOUT STRUCTURE WITH SIGNAGE NOTING DEVICE. MAINTENANCE NOTES: -MAINTAIN DEVICE WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE CAPACITY. PLAN BELOW GRADE WASHOUT STRUCTURE NOT TO SCALE HIGH H--10' - 0" MIN.--04 COHESIVE & LOW FILTRATION SOIL BERM 10 MIL 1:1 PLASTIC SANDBAGS (TYP.) SIDE SLOPE LINING OR STAPLES (TYP.) SECTION A —A 0 0 0 SANDBAGS (TYP.) OR STAPLES CLEARLY MARKED SIGNAGE CONCRETE NOTING DEVICE (18"X24" WASHOUT MIN.) PLAN 10 MIL PLASTIC LINING 1:1 SIDE SLOPE (TYP.) SECTION B-8 SANDBAGS (TYP.) OR STAPLES HIGH COHESIVE & LOW FILTRATION SOIL BERM. HAY BALES MAY BE SUBSTITUTED FOR SOIL BERM. INSTALLATION NOTES: -ACTUAL LOCATION DETERMINED IN FIELD. -CLEARLY MARK THE CONCRETE WASHOUT STRUCTURE WITH SIGNAGE NOTING DEVICE. MAINTENANCE NOTES: -MAINTAIN DEVICE WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE CAPACITY. DETAIL 3 SCALE: NTS CONCRETE WASHOUT NATIVE GRASS SEEDING SHALL BE PERFORMED ON THE DISTURBED AREAS OF WETLANDS AND RIPARIAN AREAS, AND ADJACENT TO STREAM RELOCATION CONSTRUCTION WITHIN A 50 FOOT ZONE ON BOTH SIDES OF THE STREAM OR DEPRESSION, MEASURED FROM TOP OF STREAM BANK OR CENTER OF DEPRESSION. THE STREAM BANK OF THE STREAM RELOCATION SHALL BE SEEDED BY A METHOD THAT DOES NOT ALTER THE TYPICAL CROSS SECTION OF THE STREAM BANK. NATIVE GRASS SEEDING SHALL ALSO BE PERFORMED IN THE PERMANENT SOIL REINFORCEMENT MAT SECTION OF PREFORMED SCOUR HOLES, AND IN OTHER AREAS AS DIRECTED. THE KINDS OF SEED, AND THE RATES OF APPLICATION OF SEED, SHALL BE AS STATED BELOW. DURING PERIODS OF OVERLAPPING DATES, THE KIND OF SEED TO BE USED SHALL BE DETERMINED. ALL RATES ARE IN POUNDS PER ACRE. MARCH 1 - AUGUST 31 18# CREEPING RED FESCUE 6# INDIANGRASS 8# LITTLE BLUESTEM 4# SWITCHGRASS 25# BROWNTOP MILLET APPROVED CREEPING RED FESCUE CULTIVARS: ABERDEEN BOREAL EPIC CINDY LOU SEPTEMBER 1 - FEBRUARY 28 18# CREEPING RED FESCUE 6# INDIANGRASS 8# LITTLE BLUESTEM 4# SWITCHGRASS 35# RYE GRAIN DETAIL 4 SCALE: NTS WETLAND & RIPARIAN SEEDING PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE IREVISION(S) DESCRIPTION A 03-02-2020 90% DESIGN SUBMITTAL B 08-25-20201 ISSUED FOR BID BY CHK JAPPD DESCRIPTION ABR JTG CAM AREA CODE 1853 ABR JTG CAM ACCOUNT NUMBER PROJECT NUMBER 0228711 DRAWING BY ABR STATION ID CHECKER INITIALS JTG DATE INITIALS NIA N/A DATE INITIALS N/A N/A DATE INITIALS 08/25/2020 CAM APPROVALS REGIONAL ENGINEER MGR TECH `:fj DUKEr6111 Piedmont REC & STD ENERGY.. Natural Gas PRINCIPAL ENGINEER I COPYRIGHT 2018 LINE 473 EROSION CONTROL DETAILS CLAYTON, NC GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA PRELIMINARY - NOT FOR CONSTRUCTION ISSUED FOR BID REF. DWG(S) SHEET(S) 26 OF 34 DWG SCALE DWG DATE 03/02/2020 SUPERSEDED DRAWING NUMBER P N G -C-473-0001026 DISCIPLINE / RESOURCE CENTER / LINE NUMBER 1 "=50' REVISION B STREAM CHANNEL CLASS B STONE NATURAL GROUND GEOTEXTILE FOR DRAINAGE BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # C-1435 CLAUDE A McMULLAN IFC SUBMITTAL DATE NORTH CAROLINA SEAL 047852 PROFESSIONAL ENG/ARCH STAMP 10:1 VAR. CONSTRUCTION ACCESS ROAD 6" #5 OR #57 STONE IN ACCORDANCE WITH SECTION1005 OF NCDOT STANDARD SPECIFICATION PLAN VIEW �12" MIN. CLASS B STONE #5 OR #57 STONE, 6" DEPTH (MIN.) CLASS B STONE .. GROUND _ I CROSS PIPE(S) (SEE NOTE) VAR.. DOUBLE WALL CORRUGATED METAL PIPE SECTION A -A NOTE: NOT TO SCALE 1. PIPE(S) FOR TEMPORARY STREAM CROSSING SHALL BE DESIGNED TO PASS THE PEAK OR BANKFULL FLOW, WHICHEVER IS LESS, FROM A 2-YEAR PEAK STORM, WITHOUT OVER TOPPING. DETAIL SCALE: NTS TEMPORARY STREAM CROSSING \A►ATTI CO T!•\ v Vll I I LLV I V r-luv I I IIVILJLI\ IVIlII V. USE 1 FOOT OVERLAP ON ADJOINING WATTES MAINTENANCE NOTES: 1. REMOVE AND DISPOSE OF SILT ACCUMULATIONS WHEN THE DEPTH REACHES ONE-HALF OF THE HEIGHT OF THE PERIMETER WATTLES. 2. REPLACE OR CLEAN THE WATTLES AS NEEDED TO ALLOW RUNOFF TO SLOWLY DEWATER THROUGH THE DEVICE BETWEEN RAIN EVENTS. 3. MONITOR THE WOODEN STAKES AND STAPLES TO ENSURE THAT THE WATTLES REMAIN SECURELY ANCHORED AFTER RAIN EVENTS. 4. MONITOR DAILY TO SUPPLEMENT / REFURBISH / REPLACE MATS TO ENSURE PROPER FUNCTIONALITY. 5. CLEAN ANY ERODIBLE MATERIAL OR POLLUTANT TRACKED ONTO THE MATS IMMEDIATELY. 6. TIMBER MATS AND ALL OTHER MATERIALS SHALL BE COMPLETELY REMOVED DURING FINAL CLEAN-UP. REMOVAL OF THIS STRUCTURE IS NOT CONTINGENT UPON ESTABLISHMENT OF PERMANENT VEGETATION. 7. ATTEMPT TO USE NO MORE THAN TWO (2) LAYERS OF TIMBER MATS IN WETLANDS. 8. TIMBER MATS SHALL EXTEND A MINIMUM OF 15 FEET OUTSIDE OF WETLAND BOUNDARIES. 9. INSTALL EARTHEN RAMP APPROACHES TO TIMBER MATS. EARTHEN RAMPS TO BE CONSTRUCTED OF UPLAND MATERIAL. TOP SOIL SHALL NOT BE USED. 10. INSTALL TIMBER MATS IN WORK AREA AS NEEDED. POSITION A SERIES OF TIMBER MATS AS NEEDED TO CREATE A SAFE, FLAT, WORK AREA. MATS SHALL BE POSITIONED TO BUTT UP AGAINST EACH OTHER AND INTERLOCK OR ATTACH TO EACH OTHER. 11. EROSION CONTROL DEVICES SHALL BE INSTALLED ADJACENT TO TIMBER MATS AS SHOWN ON THE PLAN DRAWINGS. 12. CONTRACTOR SHALL PREVENT THE INTRODUCTION OF UPLAND SOILS OR OTHER MATERIALS INTO WETLANDS. DETAIL 2 SCALE: NTS TIMBER MATS cd 67 ��r •K�(� 66 \U1 k1jil,w-- - tS�_1 w"G rA2.rrti1,,.,, I w•..� • .�++�Fr r' .A /:M�iV+,Wni: rr.p'1�. \\�i..• - 1•`�'''� � k, '�/Ar � �' 04. • lu 41Pikl4r`r�'Ull,,,al ILIA` 1 1,ih r n•rYt��IWullll � y, \ �u r =� Ii�IuIMAA4111� to vu,,..r I.,J�Uta4i '1Aw+l�nur+ wl �4ruiq,yi t r. ,.>J+ IIIfill ,.��fflly Itij• -+1►N I ``illllrr�!4..r IF jY t;, r I. W,r i11119,11 1 r Ilk MINI L1Wy11 7 r rrr rl �r f Iltllll ly, 111` 11? I it,I 111101, �,,, a ur, hl t �,, uui�rry�'�{ih�a � ��1� ;� 1. � I'+t �411Qij,1,�11�I1+��i�li I'4t a IYllll- 1r �r� r tl,�`.`,4 ti)r h Yj1111��1Yn. �i.��..rrih ♦ rr r r 1...1\\\��}iiq�� ' I +�� ►N 1. 1111�»..- r Ntil/ 141(�i�d;11�1rtt� 1,I,,,•k A nl;j:/rlr.. �rr''n,. f.l,\4,•r\� ��`y �`Illr �l/ ._� tf41 r. 1 ilj11 M�I,� III 11 II ail PERSPECTIVE VIEW -4 6ft 0-1 PROFILE VIEW ! Earthen ridge Slope CONSTRUCTION SPECIFICATIONS 1. INSTALL THE DIVERSION AS SOON AS THE RIGHT-OF-WAY HAS BEEN CLEARED AND GRADED. 2. DISK THE BASE FOR THE CONSTRUCTED RIDGE BEFORE PLACING FILL. 3. TRACK THE RIDGE TO COMPACT IT TO THE DESIGN CROSS SECTION. 4. LOCATE THE OUTLET ON AN UNDISTURBED AREA. ADJUST FIELD SPACING OF THE DIVERSION TO USE THE MOST STABLE OUTLET AREAS. WHEN NATURAL AREAS ARE NOT DEEMED SATISFACTORY, PROVIDE OUTLET PROTECTION. 5. IMMEDIATELY SEED AND MULCH THE PORTIONS OF THE DIVERSIONS NOT SUBJECT TO CONSTRUCTION TRAFFIC. STABILIZE WITH GRAVEL AREAS TO BE CROSSED BY VEHICLES. MAINTENANCE PERIODICALLY INSPECT RIGHT-OF-WAY DIVERSIONS FOR WEAR AND AFTER EVERY HEAVY RAINFALL FOR EROSION DAMAGE. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA, AND REPAIR THE DIKE. CHECK OUTLET AREAS, AND MAKE TIMELY REPAIRS AS NEEDED. WHEN PERMANENT ROAD DRAINAGE IS ESTABLISHED AND THE AREA ABOVE THE TEMPORARY RIGHT-OF-WAY DIVERSIONS IS PERMANENTLY STABILIZED, REMOVE THE DIKE, AND FILL THE CHANNEL TO BLEND WITH THE NATURAL GROUND, AND APPROPRIATELY STABILIZE THE DISTURBED AREA. DETAIL 3 SCALE: NTS �� RIGHT-OF-WAY DIVERSION PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE IREVISION(S) DESCRIPTION A 03-02-2020 90% DESIGN SUBMITTAL B 08-25-20201 ISSUED FOR BID BY CHK JAPPD DESCRIPTION ABR JTG CAM AREA CODE 1853 ABR JTG CAM ACCOUNT NUMBER PROJECT NUMBER 0228711 DRAWING BY ABR STATION ID CHECKER INITIALS JTG APPROVALS DATE INITIALS N/A N/A REGIONAL ENGINEER p � DUKE DATE INITIALS N/A N/A MGR TECH V ENERGY,: REC & STD DATE INITIALS PRINCIPAL 08/25/2020 CAM ENGINEER r6ljlPiedmont � Natural Gas COPYRIGHT 2018 LINE 473 EROSION CONTROL DETAILS CLAYTON, NC GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA PRELIMINARY - NOT FOR CONSTRUCTION ISSUED FOR BID REF. DWG(S) SHEET(S) 27 OF 27 OF 341DWG SCALE 111=50SCALE 111=50' DWG DATE 03/02/2020 SUPERSEDED DRAWING NUMBER REVISION P N G -C-473-0001027 B DISCIPLINE / RESOURCE CENTER / LINE NUMBER CONSTRUCTION R.O.W. WIDTH BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # C-1435 CLAUDE A McMULLAN IFC SUBMITTAL DATE NORTH CAROLINA SEAL 047852 PROFESSIONAL ENG/ARCH STAMP PEf COI � (D) MINIMUM DISTANCE TO BE 25% OF TOTAL WIDTH (W) OF THE STREAM. CONSTRUCTION NOTES: FILTER CLOTH PI AN l DEWATERING DEVICE mr"MRA 0 L_S I I TRENCHLINE L-------------------------------- SECTION A -A 1. PREPARE THE CHANNEL AND OVERBANKS FOR INSTALLATION. 1.1. REMOVE ALL BRANCHES AND DEBRIS FROM LOCATION OF THE STONE DIKE. 1.2. MAKE SURE THAT THERE ARE NO SHARP ROCKS OR ROOTS THAT CAN PUNCTURE THE FABRIC. 1.3. DO NOT EXCAVATE THE EXISTING CHANNEL OR BANKS. 2. PLACE THE HIGH TENSILE IMPERVIOUS FABRIC WITH THE CENTER OVER THE CENTER OF THE PROPOSED DIKE. UTILIZE A SMALL AMOUNT OF STONE TO HOLD DOWN THE FABRIC WHILE ADJUSTMENTS ARE BEING MADE. ENSURE THERE IS ENOUGH EXTRA FABRIC ON EACH SIDE OF THE DIKE TO WRAP UP AND OVER THE STONE DIKE TO MAKE IT IMPERVIOUS. 3. PILE STONE ON TOP OF THE FABRIC TO CREATE DIKE. 4. ROLL FABRIC UP OVER THE STONE TO FORM AN IMPERVIOUS DIKE. MAKE SURE THE TOP LAYER IS ROLLED FROM THE UPSTREAM TO DOWNSTREAM DIRECTION. SECURE FABRIC WITH METAL FENCE STAKES OR OTHER SUITABLE MATERIAL. MAINTENANCE NOTES: 1. INSPECT THE DIKE REGULARLY FOR DAMAGE AND LEAKAGE. 2. REMOVE IMPOUNDED TRASH AND SEDIMENT DAILY. DETAIL SCALE: NTS COFFERDAM CROSSING TRENCI-I-► )IL PILE AMENT o ZRIER ')TREAM )IL a 10, I I 1. SOFT PLUG (SEE NOTE 10) )I R WATTLE IN -STREAM SPOIL::'::.;.` EXTRA TEMPORARY WORKSPACE (TYP. ) TOPSOIL SEDIMENT BARRIER SEE NOTE ---------, 25' (TYP.) ; ;, I WATTLES (SEE NOTE 6) • " ---" " ...._______ ..._ .... •.. zI ` J�O Q 0 0 � WATERBODY Paz a�iw Owl w 10, (TYP.) WATTLES (SEE NOTE 6) ;:; r, ::':: °_: f==3 v• 1 L SEDIMENT BARRIER i TOPSOIL PIPE WELDED COATED AND WEIGHTED (IF NECESSARY) NOTES: 1. METHOD APPLIES TO WATERBODIES THAT ARE NOT STATE -DESIGNATED FISHERIES WHERE FLUME CROSSINGS ARE NOT REQUIRED. 1.1. IF TOPOGRAPHY PERMITS TEMPORARY EQUIPMENT BRIDGE INSTALLATION, THE CONTRACTOR SHALL TRENCH, STRING, WELD, COAT, WEIGHT (IF NECESSARY), LOWER IN AND BACKFILL UTILIZING THE MAIN LINE CREW TRAVELING OVER THE BRIDGE. 1.2. IF TOPOGRAPHY PROHIBITS INSTALLATION OF A TEMPORARY EQUIPMENT BRIDGE, CONTRACTOR SHALL TRENCH UP TO BOTH SIDES OF CROSSING; STRING, WELD, COAT AND WEIGHT (IF NECESSARY) USING THE MAINLINE CREW. IN STREAM EXCAVATION, LOWER IN, AND BACKFILL WILL UTILIZES A CLAM OR HOES WORKING FROM THE BANKS. 2. SCHEDULE CROSSING DURING LOW FLOW PERIOD IF POSSIBLE. 3. COMPLETE ALL IN -STREAM ACTIVITIES WITHIN 24 HOURS IF FEASIBLE. 4. NO REFUELING OF MOBILE EQUIPMENT WITHIN 125 FEET OF WATERBODY. REFUEL STATIONARY EQUIPMENT AS PER THE SPCC PLAN. 5. INSTALLATION OF TEMPORARY EQUIPMENT CROSSING IS REQUIRED AT ALL STATE -DESIGNATED FISHERIES AND IS OPTIONAL AT THE DISCRETION OF THE COMPANY'S INSPECTOR AT ALL OTHER CROSSINGS. IF A TEMPORARY EQUIPMENT CROSSING IS INSTALLED, IT MUST BE BUILT IN ACCORD WITH SECTION PERMITS. 6. IN AGRICULTURAL LAND, STRIP TOPSOIL FROM SPOIL STORAGE AREA. 7. CONSTRUCT WATTLES ALONG THE SIDES OF STOCKPILES AND ACROSS THE ENTIRE CONSTRUCTION R.O.W. TO PREVENT SILT LADEN WATER AND SPOIL FROM FLOWING BACK INTO WATERBODY. BARRIERS MAY BE TEMPORARILY REMOVE TO ALLOW CONSTRUCTION ACTIVITIES BUT MUST BE REPLACED BY THE END OF EACH WORK DAY. 8. IN -STREAM SPOIL TO BE STORED OUT OF THE STREAM CHANNEL A MINIMUM OF 10 FEET FROM THE WATER EDGE AND WITHIN THE CONSTRUCTION R.O.W. UNLESS DEPICTED OTHERWISE IN SITE SPECIFIC CROSSING PLANS. TEMPORARY WORKSPACE MUST BE A MINIMUM OF 25FROM THE WATERS EDGE. 9. TRENCH THROUGH WATERCOURSE USING MAINLINE EXCAVATION EQUIPMENT WHERE PRACTICAL. 10. INSTALL SOFT PLUGS AT THE EDGE OF STREAM BANKS UNTIL JUST PRIOR TO PIPE INSTALLATION TO CONTROL WATER FLOW & TRENCH SLOUGHING. 11. MAINTAIN STREAM FLOW THROUGHOUT CROSSING CONSTRUCTION. 12. BACKFILL WITH NATIVE MATERIAL. 13. RESTORE WATERBODY CHANNEL TO APPROXIMATE PRE -CONSTRUCTION PROFILE AND SUBSTRATE. 14. RESTORE AND SLOPE BACK STREAM BANKS TO A SLOPE OF NO GREATER THAN 2:1, SEED WITH RIPRARIAN SEED MIX, AND STABILIZE WITH EROSION CONTROL MATTING THAT DOES NOT CONTAIN POLYPROPHYLENE/PLASTIC NETTING. 15. ALL DIMENSIONS INDICATED SHALL BE DETERMINED BY ACTUAL CONSTRUCTION CONDITIONS. DETAIL 2 SCALE: NTS N_.� TYPICAL FLOWING WATERBODY CROSSING OPEN CUT TRENCHING WATTLES (SEE NOTE 6) WATTLES (SEE NOTE 6) NOTES: 1. METHOD APPLIES TO CROSSINGS WHERE NO FLOWING WATER IS PRESENT AT THE TIME OF CROSSING. 2. CONTRACTOR MAY "MAINLINE THROUGH" THE CROSSING OR UP TO BOTH SIDES OF THE CROSSING; STRING, WELD, COAT, AND WEIGHT (IF NECESSARY), USING THE MAINLINE CREW WITH THE PIPE SKIDDED OVER THE CROSSING. 3. NO REFUELING OF MOBILE EQUIPMENT WITHIN 125 FEET OF DRY CHANNEL. REFUEL STATIONARY EQUIPMENT AS PER THE SPCC PLAN. 4. INSTALLATION OF TEMPORARY EQUIPMENT CROSSING IS OPTIONAL AT THE DISCRETION OF THE COMPANY'S REPRESENTATIVE. 5. IN AGRICULTURAL LAND, STRIP TOPSOIL FROM SPOIL STORAGE AREA. STOCKPILE TOPSOIL AND SPOIL SEPARATELY. TOPSOIL AND SPOIL WILL NOT BE STOCKPILED IN THE CROSSING CHANNEL AND WILL BE PLACED A MINIMUM OF 10 FEET FROM CROSSING BANKS WITHIN THE CONSTRUCTION R.O.W. 6. CONSTRUCT WATTLES ACROSS THE ENTIRE CONSTRUCTION R.O.W. FOLLOWING CLEARING AND GRADING AND MAINTAIN UNTIL CONSTRUCTION OF THE CROSSING. EROSION CONTROL MEASURES SHALL BE REINSTALLED IMMEDIATELY FOLLOWING BACKFILLING OF TRENCH AND STABILIZATION OF BANKS. BARRIERS MAY BE TEMPORARILY REMOVED TO ALLOW CONSTRUCTION ACTIVITIES BUT MUST BE REPLACED BY THE END OF EACH WORK DAY. 7. IN -STREAM SPOIL TO BE STORED OUT OF THE STREAM CHANNEL A MINIMUM OF 10 FEET FROM HIGH BANK AND WITHIN THE CONSTRUCTION R.O.W. UNLESS DEPICTED OTHERWISE IN SITE SPECIFIC CROSSING PLANS. 8. BACKFILL WITH NATIVE MATERIAL. 9. RESTORE CROSSING CHANNEL TO APPROXIMATE PRE -CONSTRUCTION PROFILE AND SUBSTRATE. 10. RESTORE AND SLOPE BACK STREAM BANKS TO A SLOPE OF NO GREATER THAN 2:1, SEED WITH RIPRARIAN SEED MIX, AND STABILIZE WITH EROSION CONTROL MATTING THAT DOES NOT CONTAIN POLYPROPHYLENE/PLASTIC NETTING. 11. ALL DIMENSIONS INDICATED SHALL BE DETERMINED BY ACTUAL CONSTRUCTION CONDITIONS. DETAIL 3 SCALE: NTS N_.� TYPICAL NOW FLOWING WATERBODY CROSSING OPEN CUT TRENCHING PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY REF. DWG(S) PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PRELIMINARY - NOT FOR CONSTRUCTION ISSUED FOR BID NO. DATE REVISION(S) DESCRIPTION BY CHK APPD I DESCRIPTION APPROVALS Piedmont DUKEr6ljl� �C ENERGY:.. Natural Gas COPYRIGHT 2018 LINE 473 EROSION CONTROL DETAILS C LAYTO N NC GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA SHEET(S) 28 OF 34 DWG SCALE A 03-02-2020 90% DESIGN SUBMITTAL ABR JTG CAM AREA CODE 1853 DATE N/A NI/A NIA REGIONAL ENGINEER DWG DATE 03102/2020 SUPERSEDED - B 08-25-2020 ISSUED FOR BID ABR JTG CAM ACCOUNT NUMBER PROJECT NUMBER 0228711 DATE N/A INITIALS NIA MGR TECH REC & STD DRAWING NUMBER P N G -C-473-0001028 DRAWING BY ABR STATION ID I DATE 08/25/2020 INITIALS CAM PRINCIPAL ENGINEER CHECKER INITIALS JTG DISCIPLINE / RESOURCE CENTER / LINE NUMBER 1 "=50' REVISION B Page 1 of 6 DEMLR Monitoring Form Rev. 08082019 INSPECTION AND MONITORING RECORDS FOR ACTIVITIES UNDER STORMWATER GENERAL PERMIT NCG010000 AND SELF -INSPECTION RECORDS FOR LAND DISTURBING ACTIVITIES PER G.S. 113A-54.1 Project Name Land Quality or Local Program Project/Permit # Approving Authority Date of Plan Expiration Date, Approval if applicable Date of Issuance NCGO10000 Certificate of Coverage Number Coverage under the NCG010000 permit must be renewed annually, if issued after April 1, 2019 until Notice of Termination is filed and approved. PART 1A- Rainfall Data Day / Date Rain Amt {inches) Daily Rainfall Required, except for Holidays or Weekends. If no rain, indicate with a "zero" M T W Th F Sat (Optional) Sun (Optional) Are there any site or project conditions that limit completion of inspection? If yes, explain conditions and areas of site that were inaccessible. DEMLR Monitoring Form Rev. 08082019 PART 1 B: Phase(s) of the Plan Check ALL applicable box(es) that apply to completed & current phases X Installation of perimeter erosion and sediment control measures Clearing and grubbing of existing ground cover Completion of any grading of slopes or fills Installation of storm drainage facilities Completion of all land -disturbing activity, construction or development Permanent ground cover sufficient to restrain erosion has been established Page 4 of 6 PART 3A: EROSION AND SEDIMENTATION CONTROL MEASURES: Measures must be inspected at least ONCE PER 7 CALENDAR DAYS AND WITHIN 24 HOURS OF A RAINFALL EVENT EQUAL TO OR GREATER THAN 1.0 INCH PER 24 HOUR PERIOD. Erosion and Sedimentation Control Measures Inspected p Inspection Date Describe Actions Needed Corrective actions should be performed as soon as possible Date Noted as Corrected Measure ID or Location and Description Reference(s) Operating Properly? (YIN) and before the next storm event PART 313: STORMWATER DISCHARGE OUTFALLS (SDOs): SDOs must be inspected at least ONCE PER 7 CALENDAR DAYS AND WITHIN 24 HOIJRS OF A RAINFALL EVENT EQUAL TO OR GREATER THAN 1.0 INCH PER 24 HOUR PERIOD. Stormwater Discharge Outfalls Inspected Inspection Date Describe Actions Needed Corrective actions should be performed as soon as possible and Date Noted as Corrected Stormwater Discharge Outfall ID or Location Any Visible Sedimentation in Streams, Wetlands or Outside Site Limits? (Y/N) Any Increase in Stream Turbidity from Discharge? (Y/N) Any Visible Erosion below SDO? Y/N Any visible ail sheen, floating or suspended solids or discoloration? (YIN) before the next storm event Report visible sedimentation into streams or wetlands to the appropriate DEQ Regional Office via phone call or email within 24 hours of discovery. https:lldeg.nc.gov/contactiregional-offices BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # C-1435 CLAUDE A MCMULLAN IFC SUBMITTAL DATE NORTH CAROLINA SEAL 047852 PROFESSIONAL ENG/ARCH STAMP Page 2 of 6 DEMLR Monitoring Form Rev. 08082019 PART 2: STORMWATER PLANS AND CONTROLS: For each question below, mark the corresponding box as Yes, No or N/A. For all items marked "No", note in Part 2A or 3A the Reference letter and provide the Corrective Action and location of the deficiency, the original date noted, and the date it was noted as being rorrerted. NOTE- Reference letters may he used multinle times_ Reference Part 2A: Storm Water Plans and Related Documents Yes No NIA A Is the approval letter or certificate, COC and a copy of the NPDES Construction General Permit (CGP) on site? (Readily available electronic copy of CGP is acceptable) B Is the approved plan on site and current? C Is the construction sequence being followed? D Have all areas within the approved limits of disturbance been inspected? Reference Corrective Actions Inspection Date Date Noted as Corrected Reference Part 213: Stormwater Pollutant Controls Yes No NIA E Are erosion and sediment controls that are shown on the approved plan installed and operating properly with no repairs needed? F Are stormwater controls that are shown on the approved plan installed and operating properly with no repairs needed? G Are BMPs needed on any areas of the site where not otherwise indicated on the approved plan? H Vehicle Tracking: Are construction entrances operating properly with no repairs needed? Soil Stabilization: Are areas of the site where construction activities have ceased been properly stabilized within the required timeframes? J Are earthen stockpiles protected from sediment loss and/or stabilized, and located away or downhill from drainage paths to water sources? Page 5 of 6 DEMLR Monitoring Form Rev. 08082019 PART 3C: GROUND STABILIZATION: Must be recorded. at a minimum. after each Dhase. Site area description and location where construction activities have temporarily or permanently ceased Time Limit for Ground Cover (see table below Have stabilization measures been Installed? Y/N Temporary or Permanent Stabilization (T/P) Is Ground Cover Sufficient to Restrain Erosion? Y/N Original Inspection Date Describe Actions Needed Corrective actions should be performed as Date Noted as Corrected soon as possible and before the next storm event GROUND STABILIZATION TIMEFRAMES Site Area Description Stabilization Timeframe Variations Perimeter dikes, swales and slopes 7 Days None High Quality Water HQW Zones 7 Days None Slopes Steeper than 3:1 7 Days 7 days for perimeter dikes, swales, slopes and HWQ zones 14 days for slopes 10 ft or less in length and not steeper than 2:1 10 days for Falls Lake Watershed Slopes 3:1 to 4:1 14 Days 7 days for perimeter dikes, swales, slopes and HWQ zones 7 days for slopes greater than 50 ft in length 10 days for Falls Lake Watershed All other areas with slopes flatter than 4:1 14 Days 7 days for perimeter dikes, swales, slopes and HWQ zones 10 days for Falls Lake Watershed Page 3 of 6 DEMLR Monitoring Form Rev. 08082019 Reference Part 2C: Non -Storm Water Pollutant Controls Yes No NIA K Concrete, stucco, paint, etc. washouts: Are washouts properly located, installed, posted and operating with no repairs needed? L Solid & hazardous wastes: Are trash, debris, and hazardous materials properly managed? M Sanitary waste: Are portable toilets properly located and operating with no visible repairs needed? N Equipment fluids: Are fuels, lubricants, hydraulic fluids, etc. contained so as not to enter surface and ground waters? For any items listed in this section, a full description of sedimentation is required in Part 3A. This includes, but may not be limited to: location, estimated amount of sediment that has left the site and/or entered waters, apparent causes of the sediment loss, and what corrective actions need to be taken to prevent this from recurrina. Reference Part 2D: Sedimentation Yes No NIA O Are sediment or other pollutants noted beyond site boundaries? P Are BMPs detected as releasing sediment or other pollutants into receiving waters? Page 6 of 6 DEMLR Monitoring Form Rev. 08082019 PART 31): NEW OR REVISED MEASURES: Erosion and sedimentation control measures, installed since the last inspection and as approved, should be documented here or by initialing and dating each measure or practice shown on a copy of the approved erosion and sedimentation control plan. Revisions or removal of measures should also be documented. List dimensions of measures such as Sediment Basins and Dissipator Pads. Corrective actions should be included in Part 3A. Measure ID or Location and Description Proposed Dimensions (ft.) Actual Dimensions (ft.) Significant Deviation* from Plan? (Y/N) Date measure noted as installed, revised or removed Installed (1) Revised (R) Removed (X) *Significant deviation means any omission, alteration or relocation of an erosion or sedimentation control measure that prevents it from performing as intended. PART 4: Sianature of Insoector Financially Responsible PartFRP / Permittee County INSPECTOR Name Employer Inspector Type (Mark) X Address FRP/Permittee Agent/Designee Phone Number Email Address By this signature, I certify in accordance with the NCG010000 permit & G.S. 113A-54.1 that this report is accurate and complete to the best of my knowledge. Financially Responsible Party / Permittee or Agent / Designee Date & Time of Inspection PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE IREVISION(S) DESCRIPTION A 03-02-2020 90% DESIGN SUBMITTAL B 08-25-20201 ISSUED FOR BID BY CHK JAPPD DESCRIPTION ABR JTG CAM AREA CODE ABR JTG CAM ACCOUNT NUMBER PROJECT NUMBER DRAWING BY APPROVALS 1853 DATE N/A INITIALS NIA REGIONAL ENGINEER 0228711 DATE N/A INITIALS N/A MGR TECH REC & STD ABR STATION ID I DATE INITIALS CHECKER INITIALS I JTG 08/25/2020 CAM PRINCIPAL ENGINEER LINE 473 /r�DUKEr6111 Piedmont EROSION CONTROL DETAILS ENERGY,, Natural Gas CLAYTON NC COPYRIGHT 2018 GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA PRELIMINARY - NOT FOR CONSTRUCTION ISSUED FOR BID REF. DWG(S) SHEET(S) 29 OF 34 1 DWG SCALE DWG DATE 03/02/2020 SUPERSEDED DRAWING NUMBER P N G -C-473-0001029 DISCIPLINE / RESOURCE CENTER / LINE NUMBER 1 "=50' REVISION B BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # C-1435 CLAUDE A McMULLAN IFC SUBMITTAL DATE NORTH CAROLINA SEAL 047852 PROFESSIONAL ENG/ARCH STAMP GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The perm ittee shall comply with the Erasion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently s❑ that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tacicifiers other mulches and tacicifiers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcement matting without temporary grass seed • Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/FIocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1, Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient nurn ber and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds Or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. -�► '•° NORTH. :CAROLINA { Envrronmentat, Quality ��•.IV VA ar►NLY � � P�� 1FpT" LW'Hgi' KIM MAE ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER Vff.h6LAhEX_CQQ A ill -A 6L LGGTaI � N rau HR L �M STAPL[aCWa FAC LSCATM ACreMuca IN ro" IOTa�G QS' I�LT E 7W comcla S ►AAPQ[r STSUCTI M SHALL : YAWAND WNW Tit ma awl a" RJAHM M Or IM iiFU1CTISFEi COMM To PAW_ AaEdLFTE HaXJM C5M VXH A %POW IPAHr ELM le FRECIMM ABIlVE GRA II J WASFIPUT To NW" 31a NQLm ar4m STRUCTURE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. if a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. ❑o not store hazardous chemicals, drums or bagged materials directly on the ground. NCGO I GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE IREVISION(S) DESCRIPTION A 03-02-2020 90% DESIGN SUBMITTAL B 08-25-20201 ISSUED FOR BID BY CHK JAPPD DESCRIPTION APPROVALS ABR JTG CAM AREA CODE 1853 DATE N/A INITIALS NIA REGIONAL ENGINEER ABR JTG CAM ACCOUNT NUMBER PROJECT NUMBER 0228711 DATE N/A INITIALS N/A MGR TECH REC & STD DRAWING BY ABR STATION ID I DATE 08/25/2020 INITIALS CAM PRINCIPAL ENGINEER CHECKER INITIALS JTG "h� DUKE I Piedmont ENERGY Natural Gas COPYRIGHT 2018 LINE 473 EROSION CONTROL DETAILS CLAYTON, NC GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA PRELIMINARY - NOT FOR CONSTRUCTION ISSUED FOR BID REF. DWG(S) SHEET(S) 30 OF 34 1 DWG SCALE DWG DATE 03/02/2020 SUPERSEDED DRAWING NUMBER P N G -C-473-0001030 DISCIPLINE / RESOURCE CENTER / LINE NUMBER 1 "=50' REVISION B BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # C-1435 CLAUDE A. McMULLAN IFC SUBMITTAL DATE NORTH CAROLINA SEAL 047852 PROFESSIONAL ENG/ARCH STAMP 2" X 2" WOODEN STAKE (TYP.) I 2 LAYERS OF 2' X 2' X 4' SECURELY TIED BALES OF HAY OR STRAW GEOTEXTILE FABRIC I 1 \ I 1 I INSTALL A LAYER OF "HIGH EFFICIENCY AIR FILTER MEDIA" BETWEEN ROWS OF HAY OR STRAW BALES CHICKEN SIRE FENCE SECURED TO 2" X 2" WOODEN POSTS. WIRE TO EXTEND BENEATH BALES. :OTEXTILE FABRIC TO BE STALLED BEHIND WIRE FENCE NATURAL GRADE NOTES: INSTALL GEOTEXTILE FABRIC BENEATH ENTIRE DEWATERING STRUCTURE TO PREVENT SCOURING 1 900 2 1. STAKES SECURING "HIGH EFFICIENCY AIR FILTER MEDIA" AND CHICKEN WIRE FENCE ARE NOT SHOWN FOR CLARITY PROPOSES SECTION rA NOT TO SCALE 111,_j o1% r%II ran /r-r1Tr-ram rllrlr- SECTION B NOT TO SCALE NOTES: 1. STRUCTURE SHALL BE PLACED ON A SUITABLE, WELL VEGETATED SITE SUCH THAT WATER WILL FLOW AWAY FROM STRUCTURE AND ANY WORK AREAS. 2. FLOW RATES THROUGH DISCHARGE AND DIVERTER PIPES SHALL BE SUCH THAT STRUCTURE WILL NOT OVERFLOW OR AT A RATE NOT GREATER THAN SPECIFIED BY ANY AGENCY PERMIT IF APPLICABLE. 3. WHERE CONDITIONS WARRANTED, A 30" X 30" RECTANGULAR STRUCTURE MAY BE SUBSTITUTED FOR THE CIRCULAR CONFIGURATION SHOWN. 4. DIMENSIONS SHOWN ARE THE MINIMUM ACCEPTABLE VALUES AND MAY VARY DEPENDING ON SPECIFIC LOCATION. 5. CONTRACTOR SHALL PROPERLY REMOVE AND DISPOSE OF DEWATERING STRUCTURE IMMEDIATELY UPON COMPLETION OF DEWATERING PROCEDURE. UNDER NO CIRCUMSTANCES SHALL USED DEWATERING STRUCTURES BE LEFT IN PLACE FOR ANY PERIOD OF TIME GREATER THAN 48 HOURS AFTER TO COMPLETION OF DEWATERING PROCEDURE. DETAIL SCALE: NTS DEWATER DETAIL PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE IREVISION(S) DESCRIPTION A 03-02-2020 90% DESIGN SUBMITTAL B 08-25-20201 ISSUED FOR BID BY CHK JAPPD DESCRIPTION MJD CNS CAM AREA CODE MJD CNS CAM ACCOUNT NUMBER PROJECT NUMBER DRAWING BY APPROVALS 1853 DATE N/A INITIALS NIA REGIONAL ENGINEER 0228711 DATE N/A INITIALS NIA MGR TECH REC & STD MJD STATION ID I DATE INITIALS CHECKER INITIALS I CNS 08/25/2020 CAM PRINCIPAL ENGINEER LINE 473 p/r� DUKEr6lj�Piedmont CONSTRUCTION DETAILS �C ENERGY,: Natural Gas CLAYTON, NC COPYRIGHT 2018 GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA PRELIMINARY - NOT FOR CONSTRUCTION ISSUED FOR BID SHEET(S) 31 OF 34 1 DWG SCALE DWG DATE 03/02/2020 ISUPERSEDED DRAWING NUMBER P N G -C-473-0001033 DISCIPLINE / RESOURCE CENTER / LINE NUMBER NONE REVISION B TEMP. R.O.W. BOUNDARY TRENCH, SPOIL AND /OR TRAVEL LANE - TEMPORARY FILL 12" MAXIMUM (SEE NOTE 3) q TRENCH 05 (AS REQUIRED SEE NOTE 3) 15' IL SIDE 50' PERMANENT EASEMENT (SEE NOTE 2) WORKING SIDE TOPSOIL SALVAGE LIMIT DE 25' TEMPORARY WORKSPACE 75' CONSTRUCTION RIGHT-OF-WAY (SEE NOTE 2) NOTES: TEMP. R.O.W. BOUNDARY TEMPORARY CUT 1. SIDE HILL CONSTRUCTION CUT AND FILL SHALL BE ALLOWED WHENEVER, IN THE OPINION OF THE CONTRACTOR, STEEP SIDE HILL CONSTRUCTION IS WARRANTED FOR PERSONNEL AND/ OR EQUIPMENT SAFETY CONSIDERATIONS. 2. CONSTRUCTION RIGHT-OF-WAY WILL TYPICALLY BE 80 FEET WIDE CONSISTING OF 50 FEET OF PERMANENT EASEMENT AND 25 FEET OF TEMPORARY WORKSPACE. 3. THIS DRAWING REFLECTS "TRENCH, SPOIL, AND WORKING SIDE" TOPSOIL STRIPPING PROCEDURES AS NEEDED FOR HILL SIDE LEVELING. SALVAGE TOPSOIL OVER TRENCH UNDER THE SPOIL PILE AND FROM TEMPORARY CUT AND FILL AREAS AT LOCATIONS IDENTIFIED ON THE CONSTRUCTION ALIGNMENT SHEETS OR AS DIRECTED BY THE COMPANY'S INSPECTOR. 4. STOCKPILE TOPSOIL AS SHOWN OR IN ANY CONFIGURATION APPROVED BY THE COMPANY'S REPRESENTATIVE. KEEP TOPSOIL CLEAN OF ALL CONSTRUCTION DEBRIS. 5. LEAVE GAPS IN TOPSOIL AND SPOIL POLES AT OBVIOUS DRAINAGES. DO NOT PUSH TOPSOIL INTO CREEKS OR WETLANDS. DO NOT USE TOPSOIL FOR PADDING. AVOID SCALPING VEGETATED GROUND SURFACE WHEN BACKFILLING TOPSOIL PILE. 6. TEMPORARY SUSPEND TOPSOIL HANDLING OPERATIONS DURING INORDINATELY WINDY CONDITIONS UNTIL MITIGATIVE MEASURES TO MINIMIZE WIND EROSION CAN BE IMPLEMENTED. 7. EROSION AND SEDIMENT CONTROL PROVIDED ON SEPARATE DETAILS. 8. ALL DIMENSIONS INDICATED SHALL BE DETERMINED BY ACTUAL CONSTRUCTION CONDITIONS. BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # C-1435 CLAUDE A. McMULLAN IFC SUBMITTAL DATE NORTH CAROLINA SEAL 047852 PROFESSIONAL ENG/ARCH STAMP DETAIL SCALE: NTS �� TYPICAL FULL TOPSOIL SEPARATION SIDE HILL I TEMP ESMT BOUNDARY R/W C/L R/W BOUNDARY TRENCH BOUNDARY SILT FENCE AS REQUIRED I i I TRENCH SPOIL SEE NOTE 7 SILT FENCE I I I AS REQUIRED TOPSOIL I o a I-1T-III-111 I�- o I IIIII-III-III-III= I -I= � I OPTIONAL / ADDITIONAL w TOPSOIL STORAGE +/- 32' I 1 +/-12' +/- 57' WORKING SIDE +/-25' MIN. / VARIES TEMPORARY WORKSPACE +/- 18' SPOIL SIDE +/- 50' PERMANENT EASEMENT +/- 75' CONSTRUCTION RIGHT-OF-WAY NOTES: 1. CONSTRUCTION RIGHT-OF-WAY WILL TYPICALLY BE 100 FEET WIDE CONSISTING OF 70 FEET OF PERMANENT EASEMENT AND 30 FEET OF TEMPORARY WORKSPACE. EXTRA TEMPORARY WORK SPACE MAY BE NECESSARY AT MAJOR ROAD AND OTHER SPECIAL CIRCUMSTANCES, AS REQUIRED. CERTAIN SITUATIONS MAY REQUIRE A NARROWER WIDTH. 2. STOCKPILE TOPSOIL AS SHOWN OR IN ANY CONFIGURATION APPROVED BY THE COMPANY'S INSPECTOR. KEEP TOPSOIL CLEAN OF ALL CONSTRUCTION DEBRIS. 3. LEAVE GAPS IN TOPSOIL AND SPOIL PILES AT OBVIOUS DRAINAGE LOCATIONS. DO NOT PUSH TOPSOIL INTO CREEKS OR WETLANDS. DO NOT USE TOPSOIL FOR PADDING. 4. AVOID SCALPING VEGETATED GROUND SURFACE WHEN BACKFILLING SPOIL AND TOPSOIL PILES. 5. SAME LAYOUT APPLIES WHERE CONSTRUCTION R/W DOES NOT ABUT EXISTING R/W. 6. TEMPORARILY SUSPEND TOPSOIL HANDLING OPERATIONS DURING INORDINATELY WINDY CONDITIONS UNTIL MITIGATIVE MEASURES TO MINIMIZE WIND EROSION CAN BE IMPLEMENTED. 7. TOPSOIL AND TRENCH SPOIL RELATIVE POSITIONS CAN, AS DIRECTED BY THE COMPANY'S INSPECTOR, BE REVERSED. DETAIL 2 SCALE: NTS TYPICAL WORKSPACE t.. I r & T cap— efto Wad to ft4 UK000 F&-ictrode Antenna a&I am • -m■dw milli Noon: I E Ectfib Lead Wre, ra. jo-0 -% i,�rF zd—�Z a r► r� f w do cap ■ ir to -F, III. qp 4 jr -�M ip 01 % 11101, 00 1p * V ft % 4P 69 ok ap W 6% 0:60 a IP 0 ft ft ft ip IV r aw ■ �# f do �# db � , i � 111101, ' # ce dp 9p iVff 9p .ift. �'k # i db qw ,�0 --6ii # ii%# � Nib# * ik i• ii i** 40 M ' ' - . Aw dp % is 10*ap % *lp #01 # i + # 41111111 r ,f, i S} ■ R i V IP .0%0 v IL 4%, ir%X .ter JP wo, I& , w ow Ono, W do 40joft% 6111 0"jb'. &* 40 # # � _ t om -ft _ _ � ; _� _ � _ � # -� _ �" - E ft r1i ai i i �i - - i i i - - - - - - - L DETAIL 3 SCALE: NTS �� TYPICAL CP TEST STATION PRELIMINARY - NOT FOR CONSTRUCTION ISSUED FOR BID PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD I DESCRIPTION APPROVALS /rONDUKEr6111 Piedmont � ENERGY: Natural Gas COPYRIGHT 2018 LINE 473 CONSTRUCTION DETAILS CLAYTON� NC GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA SHEET(S) 32 OF 34 DWG SCALE A 03-02-2020 90% DESIGN SUBMITTAL MJD CNS CAM AREA CODE 1853 DATE N/A INITIALS NIA REGIONAL ENGINEER DWG DATE 03102/2020 SUPERSEDED - B 08-25-2020 ISSUED FOR BID MJD CNS CAM ACCOUNT NUMBER PROJECT NUMBER 0228711 DATE N/A INITIALS NIA MGR TECH REC&STD DRAWING NUMBER P N G - C- 473-0001034 DRAWING BY MJD STATION ID DATE 08/25/2020 INITIALS CAM PRINCIPAL ENGINEER CHECKER INITIALS CNS DISCIPLINE / RESOURCE CENTER / LINE NUMBER NONE REVISION B PROFILE VIEW 2 BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # C-1435 CLAUDE A McMULLAN IFC SUBMITTAL DATE NORTH CAROLINA SEAL 047852 PROFESSIONAL ENG/ARCH STAMP PLAN PROFILE VIEW 1 SEE NOTE 9 ---------- Q------ PROFILE VIEW 2 1. THIS TYPE OF BRIDGE IS GENERALLY USED ON NARROW CROSSINGS, LESS THAN 20 FEET WIDE WITH APPROPRIATE BANK CONFIGURATION. MULTIPLE MATS MAY BE LAYERED FOR HEAVIER EQUIPMENT CROSSINGS. 2. BRIDGE IS ANCHORED AND/OR TIED OFF TO ANCHOR BLOCKS FOR STABILITY. BRIDGE SHOULD BE TEMPORARILY REMOVED IF HIGH WATER RENDERS IT UNSAFE TO USE. 3. IF REQUIRED, UTILIZE APPROACH FILLS OF CLEAN GRANULAR MATERIAL, SWAMP MATS, SKIDS OR OTHER SUITABLE MATERIALS TO AVOID CUTTING THE BANKS WHEREVER FEASIBLE. ENSURE ADEQUATE FREEBOARD. AS REQUIRED, ENSURE THAT FILL MATERIAL IF USED DOES NOT SPILL INTO WATERCOURSE INCLUDING REMOVAL OF DIRT FROM DECK DURING OPERATION. 4. CONSTRUCT SEDIMENT BARRIERS ACROSS THE ENTIRE CONSTRUCTION R.O.W. TO PREVENT SILT LADEN WATER AND SPOIL FROM FLOWING BACK INTO WATERBODY. BARRIERS MAY BE TEMPORARILY REMOVED TO ALLOW CONSTRUCTION ACTIVITIES BUT MUST BE REPLACED BY THE END OF EACH WORK DAY. SILT FENCE, COIR WATTLES OR SANDBAGS MAY BE USED INTERCHANGEABLY. 5. REMOVE BRIDGES AS SOON AS POSSIBLE AFTER PERMANENT SEEDING UNLESS OTHERWISE DIRECTED BY COMPANY REPRESENTATIVE. THE STRUCTURE IS TO BE REMOVED IF THERE IS MORE THAN ONE MONTH BETWEEN FINAL GRADING AND SEEDING, AND ALTERNATIVE ACCESS TO THE CONSTRUCTION R.O.W. IS AVAILABLE. 6. DISPOSE OF ANY ROCK AS DIRECTED BY COMPANY REPRESENTATIVE. 7. RESTORE AND STABILIZE BED AND BANKS TO APPROXIMATE PRE -CONSTRUCTION CONDITIONS. 8. TIMBER MATTING BOARDS SHALL BE PLACED IN TWO LAYERS, ONE AFTER ANOTHER ALONG THE ENTIRE LENGTH OF BRIDGE SUCH THAT THE TWO LAYERS ARE PERPENDICULAR TO EACH OTHER 9. GEOSYNTHETIC FABRIC SHALL BE PLACED BETWEEN THE TWO PERPENDICULAR LAYERS OF MATS AND WRAPPED UP THE SIDES OF THE TOP MAT. RUNNING BOARDS SHALL BE INSTALLED ALONG THE LENGTH OF BRIDGE TO PREVENT SEDIMENT LOSS OVER THE EDGES OF THE TOP MAT. DETAIL � SCALE: NTS TYPICAL TIMBER MAT WATERBODY BRIDGE PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE IREVISION(S) DESCRIPTION A 03-02-2020 90% DESIGN SUBMITTAL B 08-25-20201 ISSUED FOR BID BY CHK JAPPD DESCRIPTION MJD CNS CAM AREA CODE MJD CNS CAM ACCOUNT NUMBER PROJECT NUMBER DRAWING BY APPROVALS 1853 DATE N/A INITIALS N/A REGIONAL ENGINEER 0228711 DATE N/A INITIALS N/A MGR TECH REC & STD MJD STATION ID I DATE INITIALS CHECKER INITIALS I CNS 08/25/2020 CAM PRINCIPAL ENGINEER LINE 473 "DUKE Piedmont CONSTRUCTION DETAILS '"ENERGY, Natural Gas CLAYTON, NC COPYRIGHT 2018 GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA PROFILE VIEW 1 PRELIMINARY - NOT FOR CONSTRUCTION ISSUED FOR BID SHEET(S) 33 OF 34 I DWG SCALE DWG DATE 03/02/2020 ISUPERSEDED DRAWING NUMBER P N G -C-473-0001035 DISCIPLINE / RESOURCE CENTER / LINE NUMBER NONE REVISION B