Loading...
HomeMy WebLinkAbout20190210 Ver 2_A-11_Clay_Permit Renewal Request Narrative_20201113 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER J. ERIC BOYETTE GOVERNOR SECRETARY Mailing Address: NC DEPARTMENT OF TRANSPORTATION Division 14 253 Webster Road Sylva, North Carolina 28779 Telephone: (828)586-2141 Fax: (828)586-4043 Customer Service: 1-877-368-4968 Website: www.ncdot.gov Location: NC DEPARTMENT OF TRANSPORTATION Division 14 253 Webster Road Sylva, North Carolina 28779 November 13, 2020 Mrs. Crystal Amschler U. S. Army Corps of Engineers NCDOT Regulatory Project Manager 151 Patton Avenue, Room 208 Asheville, NC 28801-2714 Subject: General Permit 31 Renewal for TIP No. A-11, State Project No. 32574.1  SAW-2019-00437  DWR 2019-0210 Dear Mrs. Amschler: The North Carolina Department of Transportation (NCDOT) is requesting reauthorization of GP 31 (or authorization under GP 50) for stream and wetland impacts that are necessary for improvements to the 3.79-mile long NC Highway 69 project near Hayesville in Clay County, NC. Approximately half of the permitted impacts have been completed to date (see table below). The contractor has been working without undue delay after starting construction in permitted areas. However, staging, traffic control changes, utility work, and other conflicting tasks inherent to a project of this scope have prevented completion of all necessary stream work since the project was permitted in July 2019. The overall project completion is expected to be September 2023, though stream work should be completed much earlier. Table. Summary of A-11 404/401 Permitted Site Status as of November 12, 2020 Site#1= complete Site#2= complete Site#3= not started Site#4= 50% complete Site#5= complete Site#5A= complete Site#5B= complete Site#6= 75% completed (Needs to complete Headwall at Outlet) Site#7= complete Site#8= not started Site#9= not started Site#10= complete Site#10A= complete Site#10B= complete A-11, Clay County Page 2 November 13, 2020 Site#11= complete Site#12= not started Site#13= not started Site#14= under construction Site#15= not started Site#16= not started Site#17= not started Site#17A= not started Proposed impacts to complete the project have not changed from already authorized impacts. Section 7 Section 7 issues have not changed since the project was authorized. Section 106 Section 106 issues have not changed since the project was authorized. Please contact me at (828) 586-2141 if you have any questions or need additional information to evaluate this request. Your prompt attention to this request is greatly appreciated. Sincerely, Dave McHenry Division 14 Environmental Officer Enclosures cc: Ms. Amy Chapman, Division of Water Resources, DEQ, Raleigh Ms. Kristie Lynn Carpenter, Division of Water Resources, DEQ, Raleigh Mr. Kevin Mitchell, Division of Water Resources, DEQ, Asheville Mrs. Marla Chambers, Western NCDOT Coordinator, NCWRC Mr. Adam Dockery, NCDOT Division 14, Acting District 3 Resident Engineer 11/13/2020