Construction staff have indicated the work will not be completed before next April, so I am applying for the permit
renewal. Wanted to give you heads-up. I will be doing this via on-line PCN as required by DWR and will include a cover
letter.
Thanks
Dave
From:Amschler, Crystal C CIV USARMY CESAW (US) <Crystal.C.Amschler@usace.army.mil>
Sent:Tuesday,April 28, 2020 10:18 AM
To: McHenry, David G <dgmchenry@ncdot.gov>; Mitchell, Robert K<kevin.mitchell@ncdenr.gov>
Cc: Breedlove, Patrick J <pjbreedlove@ncdot.gov>
Subject: RE: [External] RE: A=11 GP 31 renewal
External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
report.spam(c@nc.gov
Thanks for the explanation. I just want to make sure that individual water impact sites are not remaining open for
extended lengths of time. As long as the contractors are starting a site, completing the work and then closing it out, and
the issue is spreading out when each site is started and completed vs spreading out the time it takes to complete each
site, then I'm ok with the work exceeding permitting timeline thresholds and reissuing a new permit.
I appreciate that you are trying to stay ahead of this. Whenever you want to request the permit reissue is fine with me.
Crystal C.Amschler
Project Manager
Asheville Regulatory Field Office
151 Patton Avenue, Room 208
Asheville, NC 28403
(828)-271-7980 Ext 4231
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at:
http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0
From: McHenry, David G <dgmchenry@ncdot.gov>
Sent: Monday, April 27, 2020 5:09 PM
To:Amschler, Crystal C CIV USARMY CESAW (US) <Crystal.C.Amschler@usace.army.mil>; Mitchell, Robert K
<kevin.mitchell@ncdenr.gov>
1
Cc: Breedlove, Patrick J <pjbreedlove@ncdot.gov>
Subject: [Non-DoD Source] RE: [External] RE: A=11 GP 31 renewal
Work began about month ago and I believe they are doing some stream relocation work right now. I believe the
contract was let in December-ish. It is about 4 miles long, so yeah, it is not huge, but still pretty large. Due to staging
and traffic shifts on the large projects that I have seen, contractors have not been able to knock-out all stream work
upfront. Instead they may do say half of the crossing and other stream work initially, then concentrate on road work,
and then come back the next year and finish remaining culverts, or something like that. I don't know the contract time
off-hand, but I am guessing they have at least a couple years on completing construction.
So, I apologize, I should not have said certainly, but rather likely. My plan with the 1-year"grace" period is to wait till
much later this year to see if they actually would not get done, as I am guessing,then reapply if needed. Would that be
okay? Sorry, not trying to create more work,just trying to make sure I do not miss anything.
Thanks
Dave
From: Amschler, Crystal C CIV USARMY CESAW (US) <Crystal.C.Amschler@usace.army.mil>
Sent: Monday, April 27, 2020 4:36 PM
To: Mitchell, Robert K<kevin.mitchell@ncdenr.gov>; McHenry, David G <dgmchenry@ncdot.gov>
Cc: Breedlove, Patrick J <pjbreedlove@ncdot.gov>
Subject: RE: [External] RE: A=11 GP 31 renewal
External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
report.spam@nc.gov
Dave,
Just to follow up on this, why won't it be done in the next year. its not a huge permit or a huge stretch of road
corridor. Has any work already began? If construction in waters has already started, we certainly wouldn't want to see
construction in the waters drawing out for over a year.
Crystal C.Amschler
Project Manager
Asheville Regulatory Field Office
151 Patton Avenue, Room 208
Asheville, NC 28403
(828)-271-7980 Ext 4231
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at:
Blockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0
From: Mitchell, Robert K<kevin.mitchell@ncdenr.gov>
Sent: Friday, April 24, 2020 1:01 PM
To:Amschler, Crystal C CIV USARMY CESAW (US) <Crystal.C.Amschler@usace.army.mil>; McHenry, David G
<dgmchenry@ncdot.gov>
Cc: Breedlove, Patrick J <pjbreedlove@ncdot.gov>
Subject: [Non-DoD Source] RE: [External] RE: A=11 GP 31 renewal
2
Dave,
I checked into this and unfortunately you will have to resubmit the information to the Division with the fee. If Crystal
gives you a grace period then you wouldn't need to apply until that time is over. Feel free to contact me if you have
questions.
Kevin Mitchell
Environmental Specialist II
Division of Water Resources
401 & Buffer Transportation Permitting
NC Department of Environmental Quality
828-296-4650 Office
828-231-1580 Mobile
Email Kevin.mitchell@ncdenr.gov
NC DEQ Asheville Regional Office
2090 U.S. Hwy. 70
Swannanoa, N.C. 28778
IC • `No#hlr.Q Compares. ..
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19,the Department of Environmental Quality has
adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or
are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to
appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your
requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging
time.
From:Amschler, Crystal C CIV USARMY CESAW (US) [mailto:Crystal.C.Amschler@usace.army.mil]
Sent: Friday, April 24, 2020 11:36 AM
To: McHenry, David G <dgmchenry@ncdot.gov>; Mitchell, Robert K<kevin.mitchell@ncdenr.gov>
Cc: Breedlove, Patrick J <pibreedlove@ncdot.gov>
Subject: [External] RE: A=11 GP 31 renewal
External email. nless you verify.Send all suspicious email as an attachment to
report.spam@nc.gov
Just a cover letter providing the information that NCDOT doesn't expect the project construction to be complete and
why, and stating that there are no changes to the information provided in PCN and requesting a new authorization
works for me.
Crystal C.Amschler
3
Project Manager
Asheville Regulatory Field Office
151 Patton Avenue, Room 208
Asheville, NC 28403
(828)-271-7980 Ext 4231
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at:
BlockedBlockedhttp://corlcorpsmapu.usace.army.millpsmapu.usace.army.mil/cm_apex/f?
[corpsmapu.usace.army.mil]p=136:4 [corpsmapu.usace.army.mil]:0
From: McHenry, David G <dgmchenry@ncdot.gov>
Sent:Thursday, April 23, 2020 7:37 AM
To:Amschler, Crystal C CIV USARMY CESAW (US) <Crystal.C.Amschler@usace.army.mil>; Mitchell, Robert K
<kevin.mitchell@ncdenr.gov>
Cc: Breedlove, Patrick J <pjbreedlove@ncdot.gov>
Subject: [Non-DoD Source] A=11 GP 31 renewal
Folks,
While they are working steadily, we are fairly certain that the impacts for this project cannot be completed by next year
around this time. So, can you please provide some guidance on how and when we should go about the
renewal? Should we resubmit all the information, which has not changed, via on-line PCN? Or do this via email with an
updated permit narrative only?
I see too that this would now be a GP50 I believe as GP31 will only cover going forward merger projects?
Thanks for guidance.
Dave McHenry
NCDOT Division 14 DEO
828/586-2141 office
828/246-7078 cell
Email correspondence to and from this sender is subject to the N.C.Public Records Law and may be disclosed to third parties.
Email correspondence to and from this sender is subject to the N.C.Public Records Law and may be disclosed to third parties.
4