Loading...
HomeMy WebLinkAbout20020919 Ver 1_Time Ext Request_20100218RE: Extension of Time, FERC Request, Roanoke RApids Peaking Effect on Downstream ... Pagel of 3 RE: Extension of Time, FERC Request, Roanoke RApids Peaking Effect on Downstream Water Quality 2005- 2009 Report Kay, Stratford Sent: Thursday, February 18, 2010 1:16 PM To: James Thornton Dames.thornton@dom.com] Cc: Dorney, John; Karoly, Cyndi; Strickland, Bev Dear Mr. Thornton: I have reviewed your request for the schedule change in the FERC-approved plan mentioned below. This proposed change is acceptable to DWQ, with the following minor changes: 1. Please indicate on the first page of the final draft that this is a revision to the September 30, 1995 Downstream Water Quality Monitoring Plan. 2. Please indicate on p. 8 in section 3.3.1.4 that a copy of the letter also will be provided to my office, as it has been done previously. Thank you, Stratford H. Kay CC: John Dorney Cyndi Karoly Bev Strickland **** PLEASE NOTE THE NEW E-MAIL ADDRESS. MY OLD ADDRESS AT ncmail.net NO LONGER IS VALID. PLEASE UPDATE YOUR ADDRESS FILE ACCORDINGLY. Stratford H. Kay, Ph.D. Environmental Senior Specialist Watershed Assessment Team Division of Water Quality 2321 Crabtree Blvd. Raleigh NC 27604 Phone (919) 733-9716 Fax (919) 733-6893 Stratford.Kay@ncdenr.gov ------------------------------------------------------------------------- E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: James Thornton [mailto:james.thornton@dom.com] Sent: Monday, February 15, 2010 2:40 PM To: Kay, Stratford; Dorney, John; Karoly, Cyndi Cc: Bob Graham Subject: FW: Extension of Time, FERC Request, Roanoke RApids Peaking Effect on Downstream Water Quality 2005- 2009 Report https://mail.nc.gov/owa/?ae=Item&t=IPM.Note&id=RgAAAAAAOgPoLNIPQZ06vHVR... 6/24/2010 RE: Extension of Time, FERC Request, Roanoke RApids Peaking Effect on Downstream ... Page 2 of 3 Stratford, John and Cyndi, Back in November I sent out the request below. I am unable to find record that NCDWQ did or did not concur. Stratford, you may remember our discussing this in our November meeting with USGS. At that time I was going to request an extension of time from FERC. However, since this looks like it could be a recurring theme every 5 years, I am suggesting a schedule change in the FERC approved plan. Therefore, I need your concurrence or comment before I submit to FERC as a revised plan. I'd appreciate a response by the end of the month. I have attached a revised plan draft. It only shows revised dates (redline/strikeout version of original plan). Thanks for your help. . jc*m ?warn t&VV Technical Consultant Dominion Generation 5000 Dominion Blvd., In 1NE Glen Allen, VA 23060 w - (804) 273-3257 c - (804) 350-5057 james.thornton@dom.com From: bennett wynne [mailto:wynnemb@suddenlink.net] Sent: Monday, November 23, 2009 11:02 AM To: James Thornton (Generation - 3); Stratford.Kay@ncdenr.gov; 'Karoly, Cyndi'; 'Dorney, John'; Bob Graham (Services - 6) Cc: 'Loren L Wehmeyer'; 'Al Hodge'; 'Nisely, Myrl'; Bill Bolin (Services - 6); Kornegay Pete Subject: RE: Extension of Time, FERC Request, Roanoke RApids Peaking Effect on Downstream Water Quality 2005- 2009 Report Jim, The NC Wildlife Resources Commission does not object to revision of the Dominion Virginia Power/ North Carolina Power Downstream Water Quality Monitoring Plan's reporting schedule to accommodate the US Geological Survey's internal review and publishing requirements. Thank you, Bennett Wynne Get NC Wildlife Update -- news including season dates, bag limits, legislative updates and more -- delivered to your Inbox from the N.C. Wildlife Resources Commission. -----Original Message----- From: James Thornton [mailto:james.thornton@dom.com] Sent: Monday, November 09, 2009 1:10 PM To: bennett wynne; Stratford.Kay@ncdenr.gov; Karoly, Cyndi; Dorney, John; Bob Graham Cc: Loren L Wehmeyer; Al Hodge; Nisely, Myrl; Bill Bolin Subject: Extension of Time, FERC Request, Roanoke RApids Peaking Effect on Downstream Water Quality 2005- 2009 Report Folks, As we discussed in our meeting last week, I need to ask FERC for an extension of time not only for the 1998 - 2005 draft now being finalized by USGGS, but also for the 2005 - 2009 report of which we discussed the scope. One of the action items for that meeting was to follow up with https://mail.nc. gov/owa/?ae=Item&t=IPM.Note&id=RgAAAAAAOgPoLNIPQZ06vH VR... 6/24/2010 RE: Extension of Time, FERC Request, Roanoke RApids Peaking Effect on Downstream ... Page 3 of 3 an extension of time request. My thought at that time was to ask for the extension next year sometime. However, once I reviewed the plan, the best way would be to ask for a revision to the plan. That way we will not need to ask for an extension of time every 5-years (assuming the study continues beyond the first cycle). To that end, I have revised the 2005 version of the plan and am attaching a draft of a revised plan. Please note revisions in the consultation section (2.2.2) and the schedule section (5.0). Please send any comments to me by December 9, 2009. Let me know if you have any questions. jctw 771'&ryLt- -YV Technical Consultant Dominion Generation 5000 Dominion Blvd., In 1NE Glen Allen, VA 23060 w - (804) 273-3257 c - (804) 350-5057 james.thornton@dom.com CONFIDENTIALITY NOTICE: This electronic message contains information which may be legally confidential and or privileged and does not in any case represent a firm ENERGY COMMODITY bid or offer relating thereto which binds the sender without an additional express written confirmation to that effect. The information is intended solely for the individual or entity named above and access by anyone else is unauthorized. If you are not the intended recipient, any disclosure, copying, distribution, or use of the contents of this information is prohibited and may be unlawful. If you have received this electronic transmission in error, please reply immediately to the sender that you have received the message in error, and delete it. Thank you. https://mail.nc.gov/owa/?ae=Item&t=IPM.Note&id=RgAAAAAAOgPoLNIPQZ06vHVR... 6/24/2010