Loading...
HomeMy WebLinkAbout20170508 Ver 2_PreFiling 30-Day Clock Reached Email_20201113 Strickland, Bev From: laserfiche@ncdenr.gov Sent: Friday, November 13, 2020 12:00 AM To: Doliber, Brian C Subject: Pre-Filing Time Clock has been reached for Southdock Basin Expansion 2020-2021 - 20170508 Ver 2 Attachments: DWR Pre-Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre-Filing Meeting Request Form for Southdock Basin Expansion 2020-2021 that you submitted on 10/13/2020. The ID number for that project is 20170508, Version 2. Your Pre-Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. 1 tie R•.'. DWR Pre-Filing Meeting Request Form NORTH CAROLINA EnYlmnal2nlrtl Qua fay ID#* 20170508 Version* 2 Regional Office* Washington Regional Office-(252)946-6481 Reviewer List* Garcy Ward Pre-Filing Meeting Request submitted 10/13/2020 ......................................................................................................................................................................................................................................................................................................................................................................................................................................................... Contact Name* Brian Doliber Contact Email Address* bcdoliber@ncdot.gov Project Name* Southdock Basin Expansion 2020-2021 Project Owner* Brian Doliber-NC DOT Ferry Division Project County* Hyde Owner Address: Street Address 159 Lucinda Lane Address Line 2 City State/Rovince/Region Powells Point NC Fbstal/Zip Code Country 27966 USA Is this a transportation project?* r Yes r No Type(s)of approval sought from the DWR: rJ 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express I— Individual Permit I— Modification r- Shoreline Stabilization Does this project have an existing project ID#?* (' Yes r No Please list all existing project ID's associated with this projects.* 20170508 Do you know the name of the staff member you would like to request a meeting with? Garcy Ward Please give a brief project description below.* NC DOT Ferry is looking at expanding the permitted limits for the Southdock basin. It is estimated that approximately 60,000 cubic yards of sand is needed to restore the dunes on Highway 12 on Ocracoke and only about 40,000 cubic yards can be removed during our upcoming maintenance dredging event. During the past couple of storm events the spoil site has experienced significant erosion and the material has been deposited along the western side of the basin.The expanded permitted area would allow us to reclaim that material and use it primarily to complete the work along 12, but also utilize any remaining material for rebuilding the spoil site berm.A rough sketch has been attached and we estimate that expanding 150'on the northwest side would create approximately 1.6 additional acres of channel bottom and expanding 100'on the northwest side would create approximately 1 acre. More specific limits and amount of material to be excavated would be generated as we moved forward in the process. The widening of the channel would also have public safety impacts as it would allow for easier navigation into the basin and keep the vessels further from the sheet pile wall. Furthermore, it would cut down on the frequency of dredging events since more material could be removed from a larger area during each event. Please give a couple of dates you are available for a meeting. 10/15/2020 10/16/2020 10/20/2020 10/21/2020 10/22/2020 Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. . I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature Submittal Date 10/13/2020