HomeMy WebLinkAbout20201495 Ver 1_PreFiling 30-Day Clock Reached Email_20201116 Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Monday, November 16, 2020 12:01 AM
To: halesjc@cdmsmith.com
Subject: Pre-Filing Time Clock has been reached for Pinedell Avenue Culvert Replacement -
20201495 Ver 1
Attachments: DWR Pre-Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre-Filing Meeting Request Form for Pinedell Avenue
Culvert Replacement that you submitted on 10/16/2020. The ID number for that project is 20201495, Version 1.
Your Pre-Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored.
1
DWR Pre-Filing Meeting Request Form
NORTH CAROLINA
EnYlmnal2nlrtl Qua fay
ID#* 20201495 Version* 1
Regional Office* Mooresville Regional Office-(704)663-1699
Reviewer List* Donna Hood
Pre-Filing Meeting Request submitted 10/16/2020
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Contact Name* Jason Hales
Contact Email Address* halesjc@cdmsmith.com
Project Name* Pinedell Avenue Culvert Replacement
Project Owner* City of Monroe
Project County* Union
Owner Address: Street Address
300 West Crowell Street, PO Box 69
Address Line 2
City State/Rovince/Region
Monroe NC
Fbstal/Zip Code Country
28112 USA
Is this a transportation project?* r Yes r No
Type(s)of approval sought from the DWR:
I7 401 Water Quality Certification- I— 401 Water Quality Certification-
Regular Express
I— Individual Permit I— Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes (' No
Do you know the name of the staff member you would like to request a meeting with?
Alan Johnson
Please give a brief project description below.*
The project consists of replacement of the existing 8.3'x 6.7'x 16'culvert
on Pinedell Avenue with a new double 10'x 8'x 60'precast concrete box
culvert and the addition of a second travel lane. Standard construction and
pipe installation equipment such as cranes, excavators, dump trucks,and
similar vehicles will be used for the project.
Please give a couple of dates you are available for a meeting.
10/26/2020
10/29/2020
11/5/2020
11/6/2020
Please attach the documentation you would like to have the meeting about.
Figure 1 Location Highway Pinedell.pdf 1.22MB
Figure 2 Project Area map Pinedell.pdf 1.28MB
Figure 3 USGS Topo map Pinedell.pdf 1.65MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an
application.
Signature
914tV1 )JWQ_$A
Submittal Date 10/16/2020