Loading...
HomeMy WebLinkAbout20201495 Ver 1_PreFiling 30-Day Clock Reached Email_20201116 Strickland, Bev From: laserfiche@ncdenr.gov Sent: Monday, November 16, 2020 12:01 AM To: halesjc@cdmsmith.com Subject: Pre-Filing Time Clock has been reached for Pinedell Avenue Culvert Replacement - 20201495 Ver 1 Attachments: DWR Pre-Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre-Filing Meeting Request Form for Pinedell Avenue Culvert Replacement that you submitted on 10/16/2020. The ID number for that project is 20201495, Version 1. Your Pre-Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. 1 DWR Pre-Filing Meeting Request Form NORTH CAROLINA EnYlmnal2nlrtl Qua fay ID#* 20201495 Version* 1 Regional Office* Mooresville Regional Office-(704)663-1699 Reviewer List* Donna Hood Pre-Filing Meeting Request submitted 10/16/2020 ......................................................................................................................................................................................................................................................................................................................................................................................................................................................... Contact Name* Jason Hales Contact Email Address* halesjc@cdmsmith.com Project Name* Pinedell Avenue Culvert Replacement Project Owner* City of Monroe Project County* Union Owner Address: Street Address 300 West Crowell Street, PO Box 69 Address Line 2 City State/Rovince/Region Monroe NC Fbstal/Zip Code Country 28112 USA Is this a transportation project?* r Yes r No Type(s)of approval sought from the DWR: I7 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express I— Individual Permit I— Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes (' No Do you know the name of the staff member you would like to request a meeting with? Alan Johnson Please give a brief project description below.* The project consists of replacement of the existing 8.3'x 6.7'x 16'culvert on Pinedell Avenue with a new double 10'x 8'x 60'precast concrete box culvert and the addition of a second travel lane. Standard construction and pipe installation equipment such as cranes, excavators, dump trucks,and similar vehicles will be used for the project. Please give a couple of dates you are available for a meeting. 10/26/2020 10/29/2020 11/5/2020 11/6/2020 Please attach the documentation you would like to have the meeting about. Figure 1 Location Highway Pinedell.pdf 1.22MB Figure 2 Project Area map Pinedell.pdf 1.28MB Figure 3 USGS Topo map Pinedell.pdf 1.65MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature 914tV1 )JWQ_$A Submittal Date 10/16/2020