Loading...
HomeMy WebLinkAbout20100494 Ver 1_401 Application_201006101111111 IIIII IIIII i?lll IIIII IIII IIII' FAST LANE- PICKUP DATE tQ?sC PICKUP TIME 28011 ._- DRIVER # OF PIECES I WEIGHT yw - - -. . SAME DAY BILL TO(.` SHIPPER 'RECEIVER 3RD PARTY raw NEXT DAY CAR VAN ROUND TRIP CHARGES FROM S & EC TO /6111 ACllhl a h 11010 RAVEN RIDGE ROAD RALEIGH, NC 27614 846-5900 PROJECTjSIGNATURE / PRINT DWQ 2321 CRABTREE BLVD RALEIGH, NC 27604 828- 0303 r f ?,r • ?'' ` l FY w ? 1 ? L r ? -t . DATE TIME Soil & Environmental Consultants, PA 11010 Raven Ridge Road • Raleigh, North Carolina 27614 • Phone: (919) 846-5900 • Fax: (919) 846-9467 www.SandEC.com June 22, 2010 S&EC Project # 11146.W6 To: N.C. Division of Water Quality 401 Oversight and Express Permits Unit Attn: Ian McMillan 2321 Crabtree Boulevard, Suite 250 Raleigh, NC 27604-2260 From: Nicole Thomson Soil & Environmental Consultants, PA 11010 Raven Ridge Road Raleigh, NC 27614 Re: Westpoint at 751 Durham County, NC 20100494 ?PgI? On behalf of the owner, Lee-Moore Oil Company Attn: Mr. Kirk J. Bradley, please find attached a complete appl*cation and supplemental information requesting written concurrence from the N.C. Division of Water Quality (DWQ) that the activities proposed below may proceed under General Water Quality Certification 3819. Please contact me at (919) 846-5900 if you have any questions or require additional information. PROJECT SUMMARY Project Name Wes point at 751 Project Type Sewer Installation Owner / Applicant Lee-Moore Oil Company Attn: Mr. Kirk J. Bradley County Durham Nearest Town Durham Waterbod Name New Hope Creek/Jordan Lake Basin / Sub-basin 03-06-05 Index Number 16-41-1- 11.5 Class WS-IV; NSW USGS Cataloging Unit Cape Fear River Basin USGS Cataloging Unit 03030002 IMPACT SUMMARY Stream Impact acres : 0.001 ac. (temporary) Wetland Impact acres : 0 Open Water Impact acres : 0 Total Impact to Waters of the U.S. acres 0.001 ac. (temporary) Total Stream Impact linear feet : 20 LF (temporary) Attachments: Pre-construction Notification (PCN) Application Form Agent Authorization Form USGS Topographic Quad Map Wake County Soil Survey Map Jurisdictional Determination (AID 2009-01398) Impact Maps (11X17) Wet Detention Pond Design Summary (2 copies - courtesy only) Storm Water Impact Analysis from CE Group (2 copies - courtesy only) Grading/Storm Drainage Plan (full sized sheet - 2 copies - courtesy only) Riser Basin Detail Sheet (full sized sheet - 2 copies - courtesy only) $240 Application Fee to DWQ Cc: Mr. Joe Faulkner, CE Group Rpgwf JUN 2 2010 MAIDSTW dU ?tl AMOVAN Charlotte Office: Greensboro Office: 248 LePhillip Court 3817-E Lawndale Drive Concord, NC 28025 Greensboro, NC 27455 Phone: (704) 720-9405 Phone: (336) 540-8234 Fax: (704) 720-9406 Fax: (336) 540-8235 2'v"100494 O?OF W ATF9QG v? 7 O T Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ? Section 404 Permit ? Section 10 Permit N/A - Non-Reporting NWP 12 1 b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 3819 1 c. Has the NWP or GP number been verified by the Corps? ® Yes ? No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ® Non-404 Jurisdictional General Permit *note: the impacts are below reporting threshold under the "Isolated Wetlands" rules, however, we are complying with the stormwater component (Condition No. 12) of the GP ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes ® No For the record only for Corps Permit: ? Yes ® No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ? Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: Westpoint at 751 2b. County: Durham 2c. Nearest municipality / town: Durham 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: N/A 3. Owner Information 3a. Name(s) on Recorded Deed: Lee-Moore Oil Company 3b. Deed Book and Page No. 00238/000340 & 006127/000195 3c. Responsible Party (for LLC if applicable): Kirk J. Bradley 3d. Street address: PO Drawer 9 3e. City, state, zip: Sanford, NC 27331 3f. Telephone no.: 919-895-6001 3g. Fax no.: N/A 3h. Email address: N/A Page 1 of 11 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ® Other, specify: Owner; please copy both owner and agent on all communications 4b. Name: Kirk J. Bradley 4c. Business name (if applicable): Lee-Moore Oil Company 4d. Street address: PO Drawer 9 4e. City, state, zip: Sanford, NC 27331 4f. Telephone no.: 919-895-6001 4g. Fax no.: N/A 4h. Email address: N/A 5. Agent/Consultant Information (if applicable) 5a. Name: Nicole J. Thomson 5b. Business name (if applicable): Soil & Environmental Consultants, PA 5c. Street address: 11010 Raven Ridge Road 5d. City, state, zip: Raleigh, NC 27614 5e. Telephone no.: (919) 846-5900 5f. Fax no.: (919) 846-9467 5g. Email address: NThomson@sandec.com Page 2 of 11 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 0718-03-13-5171 & 0718-03-12-6501 1 b. Site coordinates (in decimal degrees): Latitude: 35.9011 Longitude: - 78.9607 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: +/- 17 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to New Hope Creek/Jordan Lake proposed project: 2b. Water Quality Classification of nearest receiving water: WS-IV; NSW; 16-41-1-(11.5); 03-06-05 2c. River basin: Cape Fear (USGS Cataloging Unit 03030002) 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The site is currently forested. The surrounding land use is a mix of residential homes and commercial areas. Interstate 40 is the northern property boundary and Highway 751 is the eastern property boundary. 3b. List the total estimated acreage of all existing wetlands on the property: No jurisdictional wetlands; 0.05 acres of isolated wetlands 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: +/- 563 linear feet 3d. Explain the purpose of the proposed project: The purpose of the project is to connect to an existing sewer line off property to provide sewer to the subject property. 3e. Describe the overall project in detail, including the type of equipment to be used: The overall project will be to install an 8-inch sanitary sewer line and tie into an existing sewer line off property. The location of the existing manhole necessitates one temporary stream crossing. As this sewer line is within Durham County, the municipality requires that the sewer line maintenance easement be 30-feet wide. Equipment typical to sewer line installations will be used including impervious dikes, trackhoes and loaders. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ® Yes ? No ? Unknown Comments: Mr. Eric Alsmeyer signed the JD maps on 9/1/2009; AID 2009-01398 4b. If the Corps made the jurisdictional determination, what type ? Preliminary ® Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: S&EC Name (if known): Chris Flowers Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. See attached JD maps; AID 2009-01398 5. Project History 5a. Have permits or certifications been requested or obtained for ? Yes ®No ? Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. N/A Page 3 of 11 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 6. Future Project Plans 6a. Is this a phased project? ? Yes ® No 6b. If yes, explain. N/A Page 4 of 11 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ? Wetlands ® Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W1 ? P ? T ? Yes ? Corps ? No ? DWQ W2 ? P ? T ? Yes ? Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ? P ®T Utility installation UT to New Hope ® PER ® Corps +/-3 20 (temporary) Creek ? INT ? DWQ S2 ? P ? T ? PER ? Corps ? INT ? DWQ S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 20 3i. Comments: Page 5 of 11 PCN Form - Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individual) list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 0. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ? Neuse ? Tar-Pamlico ® Other: Cape Fear Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? 61 ?P?T ?Yes ? No B2 ?P?T ?Yes ? No B3 ?P?T ?Yes ? No 6h. Total buffer impacts 6i. Comments: Page 6 of 11 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The applicant cannot locate the sewer line without this one temporary stream impact due to the fact that the existing sewer line manhole exists off property, on the other side of the stream. Directional drilling or boring is not feasible due to elevation issues at the existing manhole tie in. The applicant recognizes that the proposed temporary impacts for the sewer line installation will be for the minimum period of time required to complete the activity and that the stream area must be returned to pre-impact conditions. The proposed sewer line construction corridor as well as the proposed permanent easement corridor is only 30 feet wide (i.e. does not exceed 40 feet in width). The proposed sewer line is not anticipated to interfere with navigation nor is it proposed to be aerial in nature. No rip-rap is proposed for the stream crossing for the proposed sewer line installation. Per previous discussion with Mr. Eric Alsmeyer (USACE), this project may proceed under a non-reporting Nationwide Permit 12 as there are no proposed wetland impacts associated with the sewer line. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. The sewer line installation will be for the minimum period required to complete the activity. The stream area will be returned to pre-impact conditions. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ? Yes ® No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps ? Mitigation bank 2c. If yes, which mitigation option will be used for this El Payment to in-lieu fee program project? ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan Page 7 of 11 PCN Form - Version 1.3 December 10, 2008 Version 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 8 of 11 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ? Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ? Yes ? No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? N/A % 2b. Does this project require a Stormwater Management Plan? ® Yes ? No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: There is a small pocket of Non-404 Wetlands identified on the property (see signed JD) that are in the bottom of a drained pond. The applicant plans to fill this Non-404 Wetland area. Due to the small amount of impact (i.e. less than 1/10th acre), notification to and approval from NC DWQ is not required, however, per Condition No. 12 of the Non-404 Wetland Permit, the applicant is required to submit a copy of the Stormwater Management Plan. As this project is in Durham County, and Durham has delegated SMP Approval authority, we have supplied DWQ with 2 courtesy copies of the plans that will be reviewed by Durham. ® Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? Durham ® Phase II 3b. Which of the following locally-implemented stormwater management programs ® NSW ® USMP apply (check all that apply): ® Water Supply Watershed ® Other: Jordan Lake Rules 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ® No attached? 4. DWQ Stormwater Program Review ? Coastal counties ? HQW 4a. Which of the following state-implemented stormwater management programs apply ? ORW (check all that apply): ? Session Law 2006-246 ? Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes ? No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 9 of 11 PCN Form - Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ? Yes ® No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ? No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ? Yes ? No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. We have reviewed the "DRAFT Internal Policy, Cumulative impacts and the 401 Water Quality Certification and Isolated Wetland Programs" document prepared by the NC Division of Water Quality on April 10, 2004, version 2.1. The proposed sewer line installation does not meet any of the "growth stimulating" criteria. Additionally, the proposed sewer line is within a developed landscape and there are already existing utility lines off the subject property. We anticipate that you will advise us if a qualitative or quantitative impact analysis is required. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. It is not anticipated that this project will generate any waste water. Further, the municipality will insure that the capacity of the subject facility for this sewer line connection will not be exceeded. Page 10 of 11 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) This section does not apply as we are not seeking USA CE Approval 5a. Will this project occur in or near an area with federally protected species or ? Yes ? No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ? No impacts? E:1 Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) This section does not apply as we are not seeking USA CE Approval 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ? No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) This section does not apply as we are not seeking USA CE Approval 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ? No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) This section does not apply as we are not seeking USA CE Approval 8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ? No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Nicole J. Thomson ' June 22, 2010 Applicant/Agent's Printed Name Applican gent's gnature Date (Agent's signature is valid only if an u orization letter from the applicant is provided.) Page 11 of 11 Environmental Consultants, AGENT AUTHORIZATION FORM All Blanks to be filled in by the current landowner Name: - Lee- /I?OOrp. Or 1 Cor-hpony Address: 10, 0. DI r a w C r 5o vi -?o rd, N c a7 3 31 Phone: 9/ 9- 8 ?5-- 6 0 0 Project Name/ Description: 7 5 / S 0 U'f S&EC Project # // / 4T& Date: The Department of the Army U.S. Army Corps of Engineers, Wilmington District P.O. Box 1890 Wilmington, NC 28402 Attn: N' 1P. ' a ? (- A LS ti 1 C \1 C Field Office: )A L C i tc ?l Re: Wetlands Related Consulting and Permitting To Whom It May Concern: I, the current ro er owner, hereby designate and authorize Soil & Environmental Consultants, PA to act in my behalf as my agent in the processing of permit applications, to furnish upon request supplemental information in support of applications, etc. from this day forward. The 4_ day of c-fiv b e- r , a 0c) This notification supersedes any previous correspondence concerning the agent for this project. NOTICE: This authorization, for liability and professional courtesy reasons, is valid only for government officials to enter the property when accompanied by S&EC staff. You should call S&EC to arrange a site meeting prior to visiting the site. K;rk s (radle? Print Property Owner's Name Prope wner's Signature cc: Mr. Chris Flowers Soil & Environmental Consultants, PA Charlotte Office: Greensboro Office: 236 LePhillip Court, Suite C 3817-E Lawndale Drive Concord, NC 28025 Greensboro, NC 27455 Phone: (704) 720-9405 Phone: (336) 540-8234 Fax: (704) 720-9406 Fax: (336) 540-8235 0 t: SITE C D i q- I, W E{ T ?Mt 11146.w2 Scale: 1•.=2000- FIG. 1 - USGS TOPOGRAPHIC MAP SOURCE: • 11010 Raven Ridge Rd. Project Mgr. Drawn 6y: HWY 751 & 140 SW DURHAM/ ? Ralegn,NC 27614 Cl, MM DURHAM COUNTY NC USGS QUADRANGLE 919'8465900 DATED:1999 Date: 8/26/08 Wh �I J W WsE W 58 C,. �' r5 -------• Ch i n � � r _ y Gu MtD t$ I l \ ' GrB WE ph1 751 / / l Cr rc At ! WsE WVC2 3' y \ \ V �Q wsc `� wee WVE2 Aoo� (1.y All Ch i 1 — WsE GrB \\ \J �I �� P Wsc AIB PIC 1 Ch `� l tt / \\ \ / Gu 0 wsc \ �...,` E PIE � � s JB \/�.1 / L/ Ws8 Cre ,. Ems_ I / ...• sC W5E crc m / News --- — e+�. 7 Gu Wn Cc/ �c Wsc p Sc C,B CrC 0t \ G�, o WsB �a21z wssCrB --� I e f" / WSE / QJ SITE 1 ` o /` WsB �WsC 1 / Ws crc / Are w5c WsE Ch IWsc 1 WSE Mrs WsE \ wsc apo ,/ / Wsc �C WsB / WsB Ch Wsc WsC WsE �\ 0 r... Fa I O 4 _ Cre /.` 7 151 // / ~ `, WsB �..., 811 N ch Wsc !� \ I� W E 1 I BIC/IIIt� /Ch. -. FLOOD •\.• s to wse !\. 11146.w2 scale: 1'= 1320' FIG. 2 - SOIL SURVEY MAP SOURCE: ; 11010RavenPodgeRd. 1'r ect Mgr. Dram By: HWY 751 & 140 DURHAM COUNTY NC 27614 DURHAM COUNTY, NC SOIL SURVEY s Date: 8126108 U.S. ARMY CORPS OF ENGINEERS COPY WILMINGTON DISTRICT Action ID. 2009-01398 County: Durham U.S.G.S. Quad: Southwest Durham NOTIFICATION OF JURISDICTIONAL DETERMINATION Property Owner: Lee Moore Oil Co Agent: Soil & Environmental Consultants, Inc. Address: Attn: Kirk J. Bradlev ATTN: Chris Flowers PO Drawer 9 11010 Raven Ridge Road Sanford, NC 27331 Raleigh, NC 27614 Telephone No.: 919-895-6001 919-846-5900 Property description: Size (acres) 17.52 acres Nearest Town Durham Nearest Waterway UT to New Hope Creek River Basin Cape Fear USGS HUC 03030002 Coordinates N 36.005° W -78.882° Location description Parcel IDs 143369 & 143564, in the southwest quadrant of the intersection of NC 751 and I-40, southwest of Durham, NC, as shown on the attached plat. Indicate Which of the Following Apply: A. Preliminary Determination Based on preliminary information, there may be waters of the U.S. on the above described property. We strongly suggest you have this property inspected to determine the extent of Department of the Army (DA) jurisdiction. To be considered final, a jurisdictional determination must be verified by the Corps. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process ( Reference 33 CFR Part 331). B. Approved Determination _ There are Navigable Waters of the United States within the above described property subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. X There are waters of the U.S. on the above described property subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. We strongly suggest you have the wetlands on your property delineated. Due to the size of your property and/or our present workload, the Corps may not be able to accomplish this wetland delineation in a timely manner. For a more timely delineation, you may wish to obtain a consultant. To be considered final, any delineation must be verified by the Corps. The waters of the U.S. on your property have been delineated and the delineation has been verified by the Corps. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. X The waters of the U.S. have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on 9/1/ 2009. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. There are no waters of the U.S., to include wetlands, present on the above described property which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. Action ID. 2009-01398 Page 1 of 2 The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of Coastal Management in Washington, NC, at (252) 946-6481 to determine their requirements. Placement of dredged or fill material within waters of the US and/or wetlands without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Eric Alsmever at 919- 554-4884, ext. 23. C. Basis For Determination The propertv contains a relatively permanent water (RPW), with indicators of ordinarv hillh water marks, stream channels of an unnamed tributarv of New Hope Creek. New Hope Creek is a tributarv of Jordan Lake (Haw River), a Traditional Navigable Water. D. Remarks This JD was done as a desktop jurisdictional determination. The site also contains an isolated wetland that is not subject to Section 404 of the Clean Water Act. E. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B. above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: District Engineer, Wilmington Regulatory Division Attn: Jean Manuele, Project Manager, Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Ste. 105 Raleigh, North Carolina 27587 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the District Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by 10/30/2009. **It is not necessary to submit an RFA form to the District Office if you do not object to the determination in this correspondence.** Corps Regulatory Official: Date 9/1/2009 Expiration Date 9/1/2014 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at http://re 17ulatory.usacesurveY coin/ to complete the survey online. Copy furnished: Consultant: S&EC (C. Flowers) Page 2 of 2 NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: Lee Moore Oil Co File Number: 2009-01398 Date: 9/1/2009 At tached is: See Section below INITIAL PROFFERED PERMIT (Standard Permit or Letter of A permission) PROFFERED PERMIT (Standard Permit or Letter of permission) B PERMIT DENIAL C APPROVED JURISDICTIONAL DETERMINATION D PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at http://www.usace.army.mil/inet/functions/cw/cecwo/reg or Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional deterninations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein you , may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision If you only have questions regarding the appeal process you and/or the appeal process you may contact: may also contact: US Army Corps of Engineers, Wilmington District Mr. Mike Bell, Administrative Appeal Review Officer Raleigh Regulatory Field Office CESAD-ET-CO-R ATTN: Jean Manuele, Field Office Chief U.S. Army Corps of Engineers, South Atlantic Division 3331 Heritage Trade Drive, Suite 105 60 Forsyth Street, Room 9M15 Wake Forest, NC 27587 Atlanta, Georgia 30303-8801 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunity to participate in all site investigations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits and approved Jurisdictional Determinations send this form to: District Engineer, Wilmington Regulatory Division, Attn:Jean Manuele, Project Manager, Raleigh Regulatory Field Office, 3331 Heritage Trade Drive, Suite 105, Wake Forest, North Carolina 27587 For Permit denials and Proffered Permits send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Mike Bell, Administrative Appeal Officer, CESAD-ET-CO-R, 60 Forsyth Street, Room 9M15, Atlanta, Georgia 30303- 8801 18LB•L99(616)*41 0647L9£ (6161=wA B1gig 'O'N'tie?'014 o7d6' 1Ned o&n 00011 aNV-l log '? 11 L 0.31VOS N N ?NI??n?ns JNI?J??NIJN? -ii^1D CINVnJMM aNOd C33NIV1© z? O !D NINNb''1.=l ClN`d-l N ANddWOO SID 3H00W 33'1 ''? ° V Lr) ,out n0,10 a jos A3Abns aNVI13M m f) I h E W W 2 N }q W W E U< X _j W 7 Z''E V1HF pzH Wwp E?QWr ¢ W JO: D Vl?pJ } ZILY, I?y z W N m Oo cm L2 > W _5 zo¢zo}° uWOx0c°2a?>WXE Twz qa¢ C1 W?WNHW F-W?N?HFWR QO N U 6Y x0g0.4?¢ ZUyY fwil w ¢j?Q WHx UZ U DW... W¢Q4, 17 4'0.?q Y.y-.'„l7,W WZ?" yEA 2W??UU ty1Ff WZ?°'liW4 Nq?UJ ^ ¢ 042UF,.? typ?,.?VirNW JMW QD Wg WyQ W 3C7 x?2SZ¢ QX=.W.W- zzZ0 ViZ0.q ¢p, '"_'', }N0.~002' (L )0.¢M 58zwwz5 ?.Z.q}aw "'oa?UZ.< zD¢I-3aJ °.WWa}~Vi>R'g'?~a m Is qww ?KVI¢0.p WF- ? . _jr _j 0 F J <l."' oaX 13 11 !).W?f>,-W ?,W,)7 W4¢ Vi VIW Jfa Icy f-0 to <171 S-jO IAN W?T WgZD q?jWZ 22 ZDXF Q=W N?JZ xq? Z..Ud 2 :1420>2 mF? F-n an HOF- RNZ` ,,JJg nynOLn>q?nU. ? dO4SMC UX4'?^8KC1D}Z¢ Wr-.wW OIY.-??tD Z I I-,I-mow w?3 ?z?vm?z q 4 Wo \ A w w 3 3 w w w w w 3 3 3 3 3 Q ti n MV ° m o a N v I? (U 1r) W -? ¢ ? .1 o - A Q O p r W :t U'I T) pp W 04 M N zo N ^ r, I N ? N O ZO M N Q m O 3 Z Z Z 2 Z (n 0 Vl &1 (N?1 Vii 0 z A z x CL ~ m cu n ? a• q M n ? O `r N CL LZ m cu r< N N D N ? ? M V A W y o M 0 v 0 0 0 0 co 0 ° o Q Q I I I I I I I I I I I I I p W p O g o 0 0 o o 0 cD N M .h 0 N t0 r O ? Ij.? ° EIP t- I pvmpi a a m? 7n cl :r rn Q r uo Wv uNi r'0n10 oopp1:" Nro lnMNM Z2 ZN Zn NZ y.. , 'qt of-'. I I . . C1V^^ Z rMmNea?Nmam L 10 .- 00 •. ,°? ?V N?? ?S v '.. m r N ° N ° N N N N d' M EC ? lC .1? u7 Map EG fA '. • l•.IP BENT 0 /1 1 N 10 . / I I/ Q. J O J (? NJN1(S? 1f1bID m b bINO IbDb As, Lpp-. lll(il r gJ?"- ,?I A?, OJ\\...' EIP_. LU5002H 11. 115 LLJ F Z F- C9 'Oe 1 Si +? J W W W IW IW W W W W ICJ U_ i J ?. m wW3333333#3333w N f ZU.i ?"' Z W 11L 1] c?) I" a Nr01 a EON N? ?! V? m? iD p¢ lu w} (? - ?2, dl O a n ?n a v g .r o M o o_ m i0 m • :a a1 01 U i? in it :• +• oO ?Z 6 ^, 61 M M a a b N?• O i°10 Q?z?3D?p W inne.???{1°(^m °mmc?v?vai iao? rnN?nnPErp a1 (?QDOOU? ` M. am Oma Dzr( °(An Ul ln m ul ar V MM Z z z zzzZZZZ Z Ntn ln tv,ultnlnlnlnw gs z OG. x 3 II77?? ~ N p .i'H. •' .a I?^ Z M o a m O g a N u m „? N^ N rn r N a a w ?p ?p 2 W Q Z2??f (y('?. (7 ?Y 'd Nof O Nc`/O r Nr?a t? Y r1m N.-N?11N.- a a W zCOON a U _ _f•.4'0'(O J CV m N NNNa ryNN MN G Nqm Nm Y NNNNd zww Zu-U?lfl.. L q z 0?4?{ ??;((?(LL 1.- ) (a+?N ?o i? (m?(0?1 M0 •-N1?)Ma 1N?1 ?Or ED Of O N M ?a}N 1Vp'r d. 0 }OUJ>^' Q0 'V1 W Q IL \? 6,Y 'O JJ J JJ JJJ.M.1 JJJJ IJ? JJJ J J J J J ON?u?°S1UyOOQpo Y xn `I ?': Lf? v h 46 41n 1()?L?KZN u ?? N `J W Wa w W W W 3 W W W W W W I QJ ?' Q Z IA V'N V ?NN, Nr ."mm N uO? Mrnm r ?. tp Q? N• NN ON.-OMa v7N'-NO a M y?y .J 1 Q Mu1 S?{.?TM C\l to t^ m?1°`l :°oPM02INlon •$ G '(?'. 1-4.1 m NF7 M01 ONGO t r mm BOON F U11? OM?O et Y, z zz?z'zv^zv0 8Jizzrzzzz2zzzzzi J Q^ Nmn ?EOO?iOM a ON1 °b m O ?M aMp ?° ?baN --?- m r Y1 (y N m O F •F? Q. vr,or;ncilri lriviri°o'.NNi^.jNOiNrlNOO;vi m E v, no Z= J f?Ma ut br m01 r mOf ONNM 1 O?NMa1nb J(?(? I ,,I - J J J J J J J J J J J J .! ..1 J J J? J J I giREpM Ja - Y LUFRR EIP o _QQaUapp..EwnlZ ?_? W? KOZK'14 ? ® D v ,?2 3 UZU?? q (1z r -j z ch' L -,U)83p ` o ?zZp°o? Q C) o°pWOpQZ 4 U U Y! _ . ' ? ?GZQaZ ,?alU uz?' ? 0 W W c? x.19 cr. Q) 0 0 N ?t+ c? J I BL9-L9£ (61 B) "J 06LP19£ (616) ?A 615LE'0'N'A*'J'OlY glfl(''q+ed+pr,'?l100011 109 L 11 ?37d?S N m J N i kQ A-.m n s CI N d-1 cv JN123Q9)NIJNQ -11AID ddW SJUS 11VU3AC = U' J N I N N d-1 l C3 N Nv/-l fl- m •ow 4 MVdW00110 MOM 331 dno.zf) %jo& Amuns GNV IJ3M ® C.; o r!) I a L t to H yZ N wy<$ 6 ? § d ? ? m C dd.FIv N ?'=z W O tq 01 II ? Z r F ? r mCL O ? O<SS S N ? li-i yG1?? [.) W H W yUZ,y a? ?r 0.. n?i°w°p°ILI Fn?ina?? I z a-Oz O a °GW?Z?t? O II-w4 O rzam3N??o IIw ° CO W z?¢ O rQ n > uocf?QOz g Nj r tn - rlOddp¢Q o? Q Zz 70 o? D V 0 M O 0 o y' a r?? U I li} W w r } Y UQm?J Ha"" a (WOW W.? £ 7N?rAW U} 2?q J uE.t z W ¢ J a ?Z W ?(AH WF r?jawV ?ztj}Q Ja a W OdN W m Nq2 W MV ?"",O >z 6 A LWJ z IW.. CL{? JtY tK¢?Z3 oJa¢UWO LLI0 m~c3 J O¢z O)-0 Up bN(L 0> =F- 266 q¢a' '_-' rrgWw1.a F'W?N =mow ra ZZA Wr-a? ¢Y zwma gw?aa,,Zorroqq a =?IMIJjWrI= O<mm 3?i"r°n 4yjyr?pWg7V1aWY0 vlpyUaz 36 ?au??za qw=wlzWYarZZZ h>>a??i wp? ?HWI,WQjpcnw}UpWQO ???=WU? ¢O ?W,?jH??}?wzwyo Wzya?al-3 Ea aOW Y-y1a?p?q I"? gWMW 1-3 I-X Q<oW>- aQ-jYWW?NC]Hw C.)0?C>>QQ ya gQZgW ml6fj?z awl-aka GNU?H }Ma wa WWZ -)fp i NaQ K H ? I S-JO? OWQQTZR4, Umrl..?= pptxW =Ia. L.j V1 F-JZ SWI.. I.. Z2 frd2 w24 Z'D??W UF-b W ¢ rnyF-Z yMz ?r}fir)-1.1 L. r ??. ?I-n? 0 W F7ny ? tl I' J o e? nxsoo ux?173 - v 0 C2:O3I'mrOzE a o q wwa rn WW- ? ro z I- rrrm (/W/y OIl80d .37Btl1)IVAf:? :......... . Avmmuvd30NV99rjN3U . •'? 4: m i1 10 y p ? ?. Oz z Omar un, Q z Q VV?? Y tl a `.ice a 40 m m t w ZQ Z x OR LD d°0,o too i v ??o 1 A6777 O y IL C9 N `. .. ?aolio?' uNOOn d? cn?Hocn g Q 9 u UJ w )- r J m W (L W u m In a ¢ m W ? CJ a' L) -Q a ? J ?z z ¢ a 3 ?U sev cys s ei x?d 064e-c7ti cs sl d-,1o V SLC 7'N OOOI ????? 00 11 .000 Y^ ^ ?Nns aNd-l J N 12 CN LL. i N I J N 1 i n I .L33 HS ABM dV1A1 .LOVd 1A11 = J N I N N ,V--l ?A Cl N ,V-1 ?- 'Ul ' dno ? I9Z ld 1NIOd1S3M a0I ZLO W . W ddW lOVd W 1 17dU3A0 m a rn 0 Q Q W W U En U)i Q a g o o N tl a - N Q LL: N TTTr / _, .i i i ? r AMAd la - i' A - ,- L--------------J 0 a O z X Q Z y Za ado z d. N N T Q S RR D n G RoA ?- Uo 4 Z Z 55 LUO ox F V _ = U Z U) Q a - U ti?p6 %0 0 U Z ,1,; uNnoO 3JNv2/o C) lms.(emracd OW ,OC :31vas LO ?y? \ Y / aNd -l N LL 1' I0N9 -II/\ ID - Ned t ddW .LOVdWl 0 : d 1cA aNd-I ? LSL ld 1NIOd1S3M J0i z? w ddW lOddWl ll ?13A0 m a = ? N 22 ?d k ?J L ? Q 0o aWa M W v U) H W W Z 1 O n- I= W LLI z U) dw dca W I" 2 I ? I I M ? I 2 U U) ,(OIZI i ?I I M I J I I I I I i I I I I I zx M ai o ? I I oIx \ I a ?z ? ? I Z J W ,. co I \ W =Q I ww ?W, I I Ix Q Q 0 O _ I l I ? I I U cc ~ z Z Q W tr-- fn w 00 O M W CL Ln? - Wa)CL Z Z 0 U) IZ ; L.Li J 0 m W U) M M iu Q o ? I i I I I 1 I I 2Qj-ine Wb3a1S ,006 L I O M O J 0) ? N o cl) Q LIJ U cn co Q n. CL r N ? V. ?W (n J J_ F- D ?- q a ua euo j y 6L9 'L9£ (616) * J 06L4 -L9£ (616) '? U I ?:LC - ti e0 I t- a.i-?S Ren???eL ?-?i,,r6a?1 0 00' i O 'O? " :31vos ', co E) N I J,;-:i /\-.-A n s a N `d-1 N 0 JNI?I??NI?N? 1InI? L 3-11?0Hd dVW LOVdWl ® ?a O ?D NINNd-l ?A aN`d-I Z SL ld 1NIOd1S3M d0I r L ® ?u dYlO? z m w ddW lOdd W 1 llVU3AO = r ,y NNV8 z N - w )33a0 MVB 9 0 Z f w U) a w X 0 0 w¢ Z w m a >W F H I O 04 G Q N111 LL1- r VJ O LO 04 z ¢ m O 0 z 0 H U w w w > cn 0 w U N W W O N ? m U) U W z 03 o O U < m W W >_ U o ? m ¢a ~ 0 a a Z N T of 3 w_ 1 z ¢ a O (V CD z O - F Z W LL II o~ U 0 ?o IL w of Q J ?Q W U LL Za ? o CO Ul r vJ 0 O N Of Uw O W = _F- LL wz z ?a O 0 Q o w w V V 3 ? w a J ? o ? oa w J ` ¢ U Q v? ? L Z f w u w LL w0? ? /1 v! o ¢ m(1)m z w ~ CL Z ¢ O 0 CL ¢ x ? m o < a WQ 111 0 W Q- w y U w z d ? w w > W w = W X w 0 O Z Z O O O w W > W W ? Q 0 ? a U Q w m a Z z U) J J w Q Ch W C7 = a m O U < z = zv N > Q wZ O?no ¢=WOw0 W U Z Q w y _ < N > ¢ Q WN a=te ? F' <,,, X_ 0 u U) wO U) y W w VDU Of 2 <O>?OF w ¢<x i 0 Q F < a LL ¢ LL H O Z V cli O M N Z £5Z ? I I 1 u- J a ?U ? > 11 I ?o I ? II 00 "917 =1f 10 NI Z"9 17Z=? ,NI" NI O" 5+ 1 1 "d S i --- - 1 - - - - -- I _- - Z HW ' 65Z 1 j 3 ? f18 ? VV 3b 1 S ? ? O L o j I ? 1 I I 1 -- - - - -- 1 66 7 =1 O"?NI 9'LtiZ 66" tiZ NI-ANI C7 L 10'9 "6 1+0 Z-V? Ib L VIS z 6 HWSS ? w w > co 1 1 z ? 1 ? 5"9vZ NVS 3 d 1 \ INd3 1 JO ?J 0 "Zj7 =1 O'/ NI 9?" bZ NI" NI NV d d 1 0 1 6 "0 Z=VJl1 J ' r o+ Vis -- -- r- --- - - I mN ss K3 V617Z i 1 1 1 1? 1 i j ! I Ij I0 cfl 04 0 LO N 0 'IT 04 o V OSZ CO 04 O O t N 3:: W W I U. O O 0 IL r LL Q U o o 0 j x 0 NT gi U DURHAM City of Durham Public Works Department Stormwater Services Divisions 1 8 6 9 101 City Hall Plaza, Durham, North Carolina, 27701 CRY OF MEDME Telephone (919) 560-4326 FAX (919) 560-4316 Wet Detention Pond Design Summary Stormwater Management Construction Plan Review: A complete stormwater management construction plan submittal includes a design summary for each stormwater BMP, design calculations, plans and specifications showing BMP, inlet and outlet structure details. I. PROJECT INFORMATION Project Name: _ westooint at 751 Phase PIN: 0718-03-13-5168/0718-03-12-6501 Case #: D1000107 Design Contact Person: Joe Faulkner Phone #: (919 ) 367 - 8790 ext.102 Legal Name of Owner:_Lee-Woore Capital Company Owner Contact: Kirk Bradley Phone #- l 919 1 895 - 6003 Owner Addres-.: PO Drawer 9 Sanford. NC 27330 Deed Book 340 1617 Page # 1081195 or Plat Book 1081153 Page# 1621225 for BM]) Property For projects with multiple basins, specify which pond this works et applies to: Does the proposed pond also incorporate stormwater detention. Ye No Detention provided for: 1-year 2-vear - 10-year _ other Dam Height: lo (feet) Dam Classification: B Elevations Pond bottom elevation Permanent pool elevation Temporary pool elevation 1-year storm orifice/weir elevation 1-year storm water surface elevation 2-year storm orifice/weir elevation 2-year storm water surface elevation 10-year storm orifice/weir elevation 10-year storm water surface elev. Emergency spillway elevation Top of embankment/dam Maximum water surface elevation ft. (floor of the pond) _ 252 _ ft. (invert elevation of the orifcce)- 253.37 _ ft. (elevation of the structure overflow) _ 253.40 ft. (invert elevation) 255.26 ft. _ 255.30 ft. (invert elevation) 255.81 ft. _ 255.30 _ ft. (invert elevation) 255.91 ft. _ 256.00 _ ft. (invert of emergency spillway) 258.10 ft. (elevation) _ 256.23 _ 4 ft. (max. storm pond can safely pass) Areas Permanent pool area provided Minimum required permanent pool area Design storm surface area Drainage area (10-acres min) _ 18,389 fit (water surface area at orifice invert elevation) _ 14.003 ft' (calculated surface area required) 25,879 ft2 (Specify frequency event. 1 _ year) 10.58 ac. (total drainage to the pond Discharges (Specify only applicable frequency events) At BUT 1-vear 2-year 10-vear Inflow 37.8 cfs 47.97 cfs 60.37 cfs Routed outflow 151 cfs 28.49 cfs 36.28 cfs At Analysis Point(s) that BMP Contributes to 1-vear 2-vear 10-year Pre-development 6.52 cfs 6.62 cfs 9.03 cfs Post-development w/o detention 37.8 cfs 47.97 cfs 60.37 cfs With detention 3.51 cfs 28.49 cfs 36.28 cfs Volumes Permanent pool volume Water quality pool storage volume Design storm storage volume Total Storage volume provided at design storm Total Storage volume provided at top of dam Forebay volume Hydraulic Depths 100 -near 101.00 ct's 90.65 cfs 100 -vear 14.0 CA 101.00 cfs 90.65 cfs 59.145 ft3 (volume of main pond and forebav) 28,122 ft3 (volume above permanent pool) 27,272 _ ft3 (volume above permanent pool) 99,993 $3 169,225 _ f}3 12,412 _ f}3 ( 20% of permanent pool volume) Volume of normal pool divided by surface area of normal pool 3.2 ft. Volumes at temporary pool plus normal pool divided by surface area of temporary pool 4.01 ft. Other Parameters SA/DA' _ 3.04 (from DWQ table) Diameter of orifice _ 2.75 in. (must provide draw down over 2 to S day period Draw-down time 56.0 hrs 1 When using the SA/DA tables from the Stormwater Best Management Practices Manual, linear interpolation may be used for values between table entries. Riser/Principal and Emerge 1-year storm orifice/weir 2-year storm orifice/weir 10-year storm orifice/weir _- year storm orifice/weir Principal spillway Emergency spillway icy Spillway In formation diameter 2.75 in. diameter 10 in. diameter in. diameter in. diame.er_yL__ in. width- 75 ft. length ft. length ft. length 20 fl.. length ft. side slopes 5 :1 slope 0 % II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. A cant's initials a. The permanent pool depth is between 3- and 6-feet (required minimum hydraulic depth of 3- feet). b. The forebay volume is approximately equal to 20% of the pond volume. c. The temporary pool controls runoff for water quality design storm. d. The temporary pool draws down in 2- to 5-days. e. The drainage area to the facility is at least 10-acres. f. Riprap outlet protection, if provided, reduces flow to non-erosive velocities (provide calculations). g. The pond length to width ratio is greater than or equal to 3:1. h. The pond side slopes above the permanent pool area are no steeper than 3:1. i. A submerged and vegetated shelf with a slope no greater than 6:1 is provided around the ,. perimeter of the pond (show on plan and profile and provide a vegetation plan). 44A j. Vegetative cover above the permanent pool elevation is specified. No woody vegetation is permitted on the embankment. _ k. A surface baffle, trash rack or similar device is provided for both the overflow and orifice. Flat top trash racks are not acceptable. Access hatch has been provided. 1. A recorded drainage easement is provided for each pond including access to the nearest right-of-way and is graded per Section 8.3, Stormwater Control Facilities BMPSI. ! e in. If the basin is used for sediment and erosion control during construction, a note requiring clean out and vegetative cover being established prior to use as a wet detention basin shall be provided on the construction plan. n. A mechanism is specified which will drain the pond for maintenance and emergencies. Valves used shall be plug valves. o. Anti-floatation calculations are provided for riser structure. p. A plan view of the pond with grading shown is provided. q. A profile through the forebay, main pond and spillway is provided. Water surface elevations are shown on the profile. r. Riser structure details are provided. s. Dam designed to account for a 5.00% settlement factor. t. Compaction specifications for the embankment are shown on the plan. u. The minimum top of dam width has been provided for the pond embankment top width per Section 8.3, Stormwater Control Facilities (BMPs). Note: Executed Stormwater Facility Operation and Maintenance Permit Agreement, payment of permit fee per facility and payment of surety are required prior to construction drawing approval. Westpoint at 751 7806 Highway 751 Durham, ETC Storm Water Impact Analysis April 2010 Revised May 2010 C6 Group,,, MONO L_.A. N ED L_A N N t N C' CIVIL ffNGtNF-f >*tZING LAN t? SU tZV>^YI NG 11000 Regnecy Parkway Suite 410 - Cary NC 27518 Voice (919) 367-8790 - fax (919) 3G7-8791 drainage a 100-foot long level spreader is provided along with an engineered vegetation filter strip. This will provide for sheet flow into the New Hope Creek / Jordan Lake 100-year flood plain for flows up to 10 cfs. All other flows will outlet through the principal spillway outlet and over the emergency spillway outlet. Manual input hydrographs utilizing SCS TR-55 time to peak and rational flows were utilized for routing of stormwater management pond. These were manually input into Hydraflow Hydrographs software, report has been included. The following is a comparison of the pre-developed flow rates with post-developed flow rates. 1-year 24 Hour Pre-developed 1-year 24 Hour Post-developed 2-year 24 Hour Pre-developed 2-year 24 Hour Post-developed 10-year 24 Hour Pre-developed 10-year 24 Hour Post-developed 6.52 cfs 3.51 cfs +/- 54% decrease 6.62 cfs 28.49 cfs +/- 430% increase 9.03 cfs 36.28 cfs +/- 402% increase We have also provided an overall USGS map of the area to show that the release point into the New Hope Creek is at a point where there are several square miles of drainage area and where 100-year flood plain for Jordan Lake exists. We have detained the 1-year 24 hour post-developed storm to pre-developed rate, which represents approximately 90% of storm events within a year. All other storm events are released at higher rates. There are no downstream structures which are affected by these increases. PRE-DEVELOPED RUNOFF RATE SOILS WSB White Store AREA HSG 460,865 sf D WsE White Store - sf D MfB Mayodan - sf B TOTAL DRAINAGE AREA = 460,865 sf 10.58 Ac. HSG D C-value Wooded 460,865 sf 10.58 Ac_ 0.23 Off-Site Developed Cond. - sf - Ac. 0.90 Impervious - sf - Ac. 0.95 Grass - sf - Ac. 0.35 HSG B Wooded - sf - Ac. 0.15 460,865 10.58 ac Return Period G H 1 Year 104 18 2 Year 132 18 10 Year 195 22 25 Year 232 23 50 Year 261 24 100 Year 290 25 TR-56 Time of concentration Segment 1 Sheet Flow ght Underbrush Mannings n = - - - Flow Length Lf. 2-yr 24hr. Rainfall, P = -s;e High Point Elev.= _ _ - -'-.ft• Low Point Elev.= _-• S= 0.01333333 ft.tft. 0.8 Tt = 0.007" (nL) = 0.32 hr. 0.5 0.4 P S Segment 2 Shallow Concentrated Flow tCa s'11p ht Underbrush Flow Length = High Point Elev.= Low Point Elev.= Watercourse Slope, s = Average Velocity, V = L = 3600`V Segment 3 Channel Flow = Channel Flow Length= High Point Elevation = Low Point Elevation = Channel Slope = Channel Depth (Bank Full Avg.) _ Channel Sideslopes (Avg.) _ Cross Sectional Flow Area, a = Wetted Perimeter = Hydraulic Radius = Mannings n = 0.670.5 V = 1.49 R S = n Tt = L - 3600*V 282 ft. 0.03333333 ft/ft 3.8 ft./sec. See fig 3-1 "Urban Hydrology for 0.02 hr. Small Watersheds" USGA TR-55 Y272 ft. 0.049 ft/ft ---------- - --- - Bottom 1.3 s f 10.05 ft. 0.12 ft. 0.82 ft/s 0.17 hr. So, Tc = Sheet Flow Tt + Shallow Concentrated Flow Tt + Channel Flow Tt Tc = 0.51 hr. 30.5 min. Drainage Area, (DA) = t#?a8f} acres Time of Concentration, (Tc) => 30.5 minutes Intensity, (I) = 2.72 inches/hr Areas 1) HSG D Off-site acres 2} HSG D Wooded = " _ = a t'1(» acres 3) HSG D Grass acres 4} HSG B Wooded acres "C" Coeffeicent - = Cl = '1 -AN C2 = _ 3 s C3 = C4 Composite Runoff Coefficient, (C) _> 0.23 Peak Discharge, (Q2) => 6.62 cfs Drainage Area, (DA) = 10.58 acres Time of Concentration, (Tc) => 30.5 minutes Intensity, (1) = 3.71 inches/hr Composite Runoff Coefficient, (C) => 0.23 Peak Discharge, (Q 10) => 9.03 cfs Drainage Area, (DA) = 10.58 acres Time of Concentration, (TO => 30.5 minutes Intensity, (I) = 4.33 inches/hr Composite Runoff Coefficient, (C) => 0.25 Peak Discharge, (Q25) => 11.60 cfs Drainage Area, (DA) = 10.58 acres Time of Concentration, (TO => 30.5 minutes Intensity, (1) = 4.79 inches/hr Composite Runoff Coefficient, (C) => 0.28 Maximum Release Rate, (Q50) => 14.0 cfs Drainage Area, (DA) = 10.58 acres Time of Concentration, (Tc) => 30.5 minutes Intensity, (1) = 2.14 inches Composite Runoff Coefficient, (C) => 0.29 Peak Release Rate, (Ql) --> 6.52 cfs IMPERVIOUS CALCULATIONS Post-developed water quality storage volume requirements Impervious Calculations Mazmum Allowed Lot 1 - s.f. 0 ao. Lot2 70,132 s.f. 1.61 ac. Lot 3 102,366 s.f. 2.35 ac. Lot 4 32,670 s.f. 0.75 ac. Lot 5 34,848 s.f. 0.8 ac. Loth 57,935 s.f. 1.33 ac. Lot? 40,075 s.f. 0.92 ac. 338,026 7.76 ac. Total Impervious Area 338,026 s.f. Total Project Area = 17.43 ac. Overall Project Impervious 44.5% Total Drainage Area to Pond= 10.58 so- Impervious Area to Pond = 7.76 ac. Impervious Percentage to Pond = 73.3% The storage volume for the 1" storm (Schueler Method) would be, Rv = _05+.9 (1) RV= 0.71 Volume = (Design Rainfall) ` (RV)'(Drainage Area) Volume = 0.6261 ac.ft. 27,272 cf 27,272 c f. storage required. 28,122 c.f. storage provided Average Pool Depth = 3 ft SA / DA ratio = 3.04 <- Interpolation of table 1.1 Required Surface Area = 0.32 ac. 14,003 sf Surface Area Provided 18,389 sf Permanent Pool Storage Volume Incremental Total EleV Area (s.f.) Volume (c.f.) Volume (c.f.) Depth (ft) 246 608 3,328 3,328 1 247 6,048 6,892 10,220 2 248 7,736 8,657 18,877 3 249 9,578 10,666 29,543 4 250 Bottom Shelf 11,753 13,233 42,775 5 251 14,712 10,561 53,336 5.67 251.67 Top Shelf 16,814 5,808 59,146 6 252 Perm Pool 18,389 28,122 28,122 1.4 253.4 Temp. Pool 21,785 13,497 41,619 2 254 23,206 24,262 65,881 3 255 25,317 26,403 92,283 4 256 27,488 28,603 120,886 5 257 29,718 30,856 151,742 6 258 31,994 15,997 167,739 5.6 259 - Average Depth = 3.2 Average Depth (Permanent Pool Volume 1 Surface Area) Average Depth = 4.2 Average Depth per DWO Method da=[.25x(1+Abot_shelf/Aperm_pooi))*[(Abot_shelf+Abot_pond)/2 x (depth1Abot shelf?) vacoruo-nwaomaosea*+rrsic,rescrossoaor?xoaeewe«-w.ry.oesw.am 1 of2 Forebay Volume = 20% of Permanent Pool Volume Permanent Pool Volume = 59,145 c.f. Forebay Volume Reqd.= 11,829 c.f. Forebay Volume Provided = 12,412 c.f. 21.0% Forebay Volume Provided Incremental Total Elev. Area (sT) Volume (c.f.) Volume (c.f.) Depth (ft) 247 1,056 1,290 1,290 1 248 1,524 1,801 3,091 2 249 2,078 2,398 5,489 3 250 2,717 3,079 8,568 4 251 3,441 3,844 12,412 5 252 4,247 R=(6eeMoft M UP".751 Car?sumanYrdcs eswyeiss?orraae oemg4?DO-8eweter-diefib P,PoMXe 2of2 DESIGN REQUIREMENTS: Hydaulic Soil Group Soils - White Store D Composite C C-Value Area = 10.58 ac. Grass Area = 0.35 122,839 Wooded Area = 0.25 - Impervious = 0.95 338,026 Total = 460,865 Composite Runoff Coefficient, (C) _> Composite CN Area = 10.58 ac. Composite CN=> Drainage Area, (DA) _ Overland Flow Elevation of most remote point, Elevation of point of design, (H2) _ Length of travel, (L) _ Mult. factor = Travel Time (Overland) _ Channel Flow Elevation of most remote point, (H1) _ Elevation of point of design, (H2) _ Length of travel, (L) _ Mult. factor = Travel Time (Channel) _ Channel Flow Elevation of most remote point, (111) _ Elevation of point of design, (1-12) _ Length of travel, (L) _ Muh. factor = Travel Time (Pipe) _ Time of Concentration, (Tc) => Intensity, (1) Composite Runoff Coefficient, (C) _> Peak Release Rate, (Q7) _> 0.79 Composite CN Value Grass Area = 27% 122,839 80.00 21 Wooded Area = 0 - Impervious = 73% 338,026 98.00 72 Total = 460,865 93 10.58 acres k0„feet feet feet 1.0.. 0.0 minutes feet feet 1.0 feet 1.0 0.0 minutes Use 5.0 min aU 31 1 M21mIC5Wos4dMWP@64rino"ydroyeph.xls Drainage Area, (DA) = 10.58 acres Overland Flow Elevation of most remote point, (H1) _ Elevation of point of design, (112) _ Length of travel, (L) _ Mult. factor = Travel Time (Overland) _ Channel Flow Elevation of most remote point, (Hl) _ Elevation of point of design, (H2) _ Length of travel, (L) _ Mult. factor = Travel Time (Channel) _ Pipe Flow Elevation of most remote point, (H1) _ Elevation of point of design, (H2) _ Length of travel, (L.) _ Mult. factor= Travel Time (Pipe) _ 1.0 feet 0.9 feet 1.0 feet 1.0 0.0 minutes 1.0 feet 0.9 feet 1.0 feet 1.0 0.0 minutes. 0.9 feet 0.8 feet 1.0 feet 1.0 0.0 minutes use 5.0 min Time of Concentration, (Tc) y Intensity, (I) = Composite Runoff Coefficient, (C) => 5.0 minutes 7.22 inches/hr 0.79 Peak Release Rate, (Q16) => 60.37 cfs Post-De,,elopnient Runoff- Drainage Area, (DA) = 10.58 acres Time of Concentration, (TO => Intensity, (1) _ Composite Runoff Coefficient, (C) 5.0 minutes 5.74 inches/hr 0.79 Peak Release Rate, (Q2) => 47.97 cfs Drainage Area, (DA) - 10.58 acres Time of Concentration, (Tc) => 5.0 minutes Intensity, (1) = Composite Runoff Coefficient, (C) => Peak Release Rate, (Q100) => 9.67 inches 0.99 With 1.25 Correction Factor 101.00 cfs S,xisi?eoozme sae, e?opea h now nr aW+.xrs Peak Inflow, (Q1) 37.8 cfs Time to Peak Calculation: CN= 93:2022783- P- 3 in. S= 0.73 in. Q'= 2.27 in. (depth of runoff Vol= 87,304 cf (vol. of runoff) Time to Peak, (Tp) 27.70 minutes (SCS TR-55) 02 QLQR t Q min cfs 0.00 0.000 0 0.00 0.11 0.029 3 1.08 0.22 0.111 6 4.21 0.32 0.239 9 9.02 0.43 0.396 12 14.97 0.54 0.565 15 21.36 0.65 0.727 18 27.47 0.76 0.863 21 32.60 0.87 0.957 24 36.16 0.97 0.998 27 37.74 1.08 0.983 30 37.16 1.19 0.912 33 34.48 1.30 0.801 36 30.27 1.41 0.696 39 26.30 1.52 0.604 42 22.84 1.62 0.525 45 19.84 1.73 0.456 48 17.24 1.84 0.396 51 14.97 1.95 0.344 54 13.01 2.06 0.299 57 11.30 2.17 0.260 60 9.81 2.27 0.226 63 8.52 2.38 0.196 66 7.40 2.49 0.170 69 6.43 2.60 0.148 72 5.59 2.71 0,128 75 4.85 2.82 0,112 78 4.22 2.92 0.097 81 3.66 3.03 0.084 84 , 3.18 3.14 0.073 87 2.76 3.25 0.064 90 2.40 3.36 0.055 93 2.09 3.47 0.048 96 1.81 3.57 0.042 99 1.57 3.68 0.036 102 1.37 3.79 0.031 105 1.19 3.90 0.027 108 1.03 4.01 0.024 111 0.90 4.12 0.021 114 0.78 4.22 0.018 117 0.68 4.33 0.016 120 0.59 4.44 0.013 123 0.51 4.55 0.012 126 0.44 4.66 0.010 129 0.38 4.77 0.009 132 0.33 4.87 0.008 135 0.29 4.98 0.007 138 0.25 5.09 0.006 141 0.22 5.20 0.005 144 0.19 5.31 0.004 147 0.17 5.42 0.004 150 0.14 5.52 0.003 153 0.12 5.63 0.003 156 0.11 5.74 0.002 159 0.09 5.85 0.002 162 0.08 5.96 0.002 165 0.07 6.07 0.002 168 0.06 s.11311WIM21caIMU5*sf-developed-Inflow-hydmgraph ,ds 6.17 0.001 171 0.05 6.28 0.001 174 0.05 6.39 0.001 177 0.04 6.50 0.001 180 0.04 6.61 0.001 183 0.03 6.72 0.001 186 0.03 6.82 0.001 189 0.02 6.93 0.001 192 0.02 7.04 0.000 195 0.02 7.15 0.000 198 0.02 7.26 0.000 201 0.01 7.37 0.000 204 0.01 7.47 0.000 207 0.01 7.58 0.000 210 0.01 7.69 0.000 213 0.01 710 0.000 216 0.01 7.91 0.000 219 0.01 8.02 0.000 222 0.00 8.12 0.000 225 0.00 8.23 0.000 228 0.00 8.34 0.000 231 0.00 8.45 0.000 234 0.00 8.56 0.000 237 0.00 8.67 0.000 240 0.00 8.77 0.000 243 0.00 8.88 0.000 246 0.00 8.99 0.000 249 0.00 9.10 0.000 252 0.00 9.21 0.000 255 0.00 9.32 0.000 258 0.00 9.42 0.000 261 0.00 9.53 0.000 264 0.00 9.64 0.000 267 0.00 e:1131110002ka1ce1 W-d8vebpe Ow4lYdm9rA*AS Peak Inflow, (Q2) = 48.0 cfs Time to Peak Calculation: CN= 93.2022783 P= 3.5 in. S= 0.73 in. Q•= 2.76 in. (depth ofiunoff) Vol= 105,809 cf (vol. of nmoft) Time to Peak, (Tp) 26.45 minutes (SCS TR-55) t/tv Q/Ov t Q min cfs 0.00 0.000 0.00 0.00 0.08 0.014 2.00 0.67 0.15 0.055 4.00 2.66 0.23 0.122 6.00 5.84 0.30 0.204 8.00 10.04 0.38 0.313 10.00 15.03 0.45 0.428 12.00 20.51 0.53 0.546 14.00 26.20 0.61 0.662 16.00 31.76 0.68 0.769 18.00 36.88 0.76 0.860 20.00 41.28 0.83 0.932 22.00 44.71 0.91 0.979 24.00 46.97 0.98 0.999 26.00 47.94 1.06 0.992 28.00 47.57 1.13 0.956 30.00 45.87 1.21 0.895 32.00 42.94 1.29 0.816 34.00 39.14 1.36 0.739 36.00 35.48 1.44 0.670 38.00 32.15 1.51 0.607 40.00 29.14 1.59 0.551 42.00 26.41 1.66 0.499 44.00 23.94 1.74 0.452 46.00 21.70 1.82 0.410 48.00 19.67 1.89 0.372 50.00 17.83 1.97 0.337 52.00 16.16 2.04 0.305 54.00 14.64 2.12 0.277 56.00 13.27 2.19 0.251 58.00 12.03 2.27 0.227 60.00 10.90 2.34 0206 62.00 9.88 2.42 0.187 64.00 8.96 2.50 0.169 66.00 8.12 2.57 0.153 68.00 7.36 2.65 0.139 70.00 6.67 2.72 0.126 72.00 6.04 2.80 0.114 74.00 5.48 2.87 0.104 76.00 4.97 2.95 0.094 78.00 4.50 3.03 0.085 80.00 4.08 3.10 0.077 82.00 3.70 3.18 0.070 84.00 3.35 3.25 0.063 86.00 3.04 3.33 0.057 88.00 2.75 3.40 0.052 90.00 150 3.48 0.047 92.00 2.26 3.55 0.043 94.00 2.05 3.63 0.039 96.00 1.86 3.71 0.035 98.00 1.68 3.78 0.032 100.00 1.53 3.86 0.029 102.00 1.38 3.93 0.026 104.00 1.25 4.01 0.024 106.00 1.14 4.08 0.021 108.00 1.03 4.16 0.019 110.00 0.93 4.24 0.018 112.00 0.85 5-11311100021cAIC$Wa -devebped kYr whydrogrephxls 4.31 0.016 114.00 0.77 4.39 0.014 116.00 0.70 4.46 0.013 118.00 0.63 4.54 0.012 120.00 0.57 4.61 0.011 122.00 0.52 4.69 0.010 124.00 0.47 4.76 0.009 126.00 0.43 4.84 0.008 128.00 0.39 4.92 0.007 130.00 0.35 4.99 0.007 132.00 0.32 5.07 0.006 134.00 0.29 5.14 0.005 136.00 026 5.22 0.005 138.00 0.24 5.29 0.004 140.00 0.21 5.37 0.004 142.00 0.19 5.45 0.004 144.00 0.18 5.52 0.003 146.00 0.16 5.60 0.003 148.00 0.14 5.67 0.003 150.00 0.13 5.75 0.002 152.00 0.12 5.82 0.002 154.00 0.11 5.90 0.002 156.00 0.10 5.97 0.002 158.00 0.09 6.05 0.002 160.00 0.08 6.13 0.002 162.00 0.07 6.20 0.001 164.00 0.07 6.28 0.001 166.00 0.06 6.35 0.001 168.00 0.05 6.43 0.001 170.00 0.05 6.50 0.001 172.00 0.04 6.58 0.001 174.00 0.04 6.66 0.001 176.00 0.04 6.73 0.001 178.00 0.03 6.81 0.001 180.00 0.03 6.88 0.001 182.00 0.03 6.96 0.001 184.00 0.02 7.03 0.000 186.00 0.02 7.11 0.000 188.00 0.02 7.18 0.000 190.00 0.02 7.26 0.000 192.00 0.02 7.34 0.000 194.00 0.02 7.41 0.000 196.00 0.01 7.49 0.000 198.00 0.01 7.56 0.000 200.00 0.01 7.64 0.000 202.00 0.01 7.71 0.000 204.00 0.01 7.79 0.000 206.00 0.01 7.87 0.000 208.00 0.01 7.94 0.000 210.00 0.01 8.02 0.000 212.00 0.01 8.09 0.000 214.00 0.01 8.17 0.000 216.00 0.01 8.24 0.000 218.00 0.00 8.32 0.000 220.00 0.00 8.39 0.000 222.00 0.00 8.47 0.000 224.00 0.00 sal1941NOD02YSksMPod4mtoped4nRow4 y"raph.xs Peak Inflow, (Qio) = 60.4 cfs Time to Peak Calculation: CN= 912022783 P= 5.1 in. S= 0.73 in. Q*= 4.32 in. (depth of runoff) Vat= 165,849 cf (Vol, of runoff) Time to Peak, (Tp) => 32.94 minutes (SCS TR-55) tho O/Qn t 4 (m?n) efs 0.00 0.000 0.00 0.00 0.09 0.020 3.00 1.23 0.18 0.080 6.00 4.81 0.27 0.173 9.00 10.45 0.36 0.293 12.00 17.70 0.46 0.430 15.00 25.97 0.55 0.573 18.00 34.57 0.64 0.709 21.00 42.83 0.73 0.829 24.00 50.05 0.82 0.922 27.00 55.66 0.91 0.980 30.00 59.19 1.00 1.000 33.00 60.37 1.09 0.979 36.00 59.09 1.18 0.919 39.00 55.47 1.28 0.827 42.00 49.94 1.37 0.735 45.00 44.36 1.46 0.653 48.00 39.41 1.55 0.580 51.00 35.01 1.64 0.515 54.00 31.10 1.73 0.458 57.00 27.63 1.82 0.407 60.00 24.54 1.91 0.361 63.00 21.80 2.00 0.321 66.00 19.37 2.09 0.285 69.00 17.21 2.19 0.253 72.00 15.28 228 0.225 75.00 13.58 2.37 0.200 78.00 12.06 2.46 0.177 81.00 10.71 2.55 0.158 84.00 9.52 2.64 0.140 87.00 8.46 2.73 0.124 90.00 7.51 2.82 0.111 93.00 6.67 2.91 0.098 96.00 5.93 3.01 0.087 99.00 5.27 3.10 0.077 102.00 4.68 3.19 0.069 105.00 4.16 3.28 0.061 108.00 3.69 3.37 0.054 111,00 3.28 3.46 0.048 114.00 2.91 3.55 0.043 117.00 2.59 3.64 0.038 120.00 2.30 3.73 0.034 123.00 2.04 3.83 0.030 126.00 1.81 3.92 0.027 129.00 1.61 4.01 0.024 132.00 1.43 4.10 0.021 135.00 127 4,19 0.019 138.00 1.13 4.28 0.017 141.00 1.00 4.37 0.015 144.00 0.89 4.46 0.013 147.00 0.79 4.55 0.012 150.00 0.70 4.64 0.010 153.00 0.63 4.74 0.009 156.00 , 0.56 4.83 0.008 159.00 0.49 4.92 0.007 162.00 0.44 5.01 0.006 165.00 0.39 5.10 0.006 168.00 035 b1131 Iwoazleawxwosf-cavelo a ntlow-i ydrayraph.xis 5.19 0.005 171.00 0.31 5.28 0.005 174.00 017 5.37 0.004 177.00 0.24 5.46 0.004 180.00 0.22 5.56 0.003 183.00 0.19 5.65 0.003 186.00 0.17 5.74 0.003 189.00 0.15 5.83 0.002 192.00 0.13 5.92 0.002 195.00 0.12 6.01 0.002 198.00 0.11 6.10 0.002 201.00 0.09 6.19 0.001 204.00 0.08 6.28 0.001 207.00 0.07 6.38 0.001 210.00 0.07 6.47 0.001 213.00 0.06 6.56 0.001 216.00 0.05 6.65 0.001 219.00 0.05 6.74 0.001 222.00 0.04 6.83 0.001 225.00 0.04 6.92 0.002 228.00 0.03 7.01 0.000 231.00 0.03 7.10 0.000 234.00 0.03 7.19 0.000 237.00 0.02 7.29 0.000 240.00 0.02 7.38 0.000 243.00 0.02 7.47 0.000 246.00 0.02 7.56 0.000 249.00 0.01 7.65 0.000 252.00 0.01 7.74 0.000 255.00 0.01 7.83 0.000 258.00 0.01 7.92 0.000 261.00 0.01 8.01 0.000 264.00 0.01 8.11 0.000 267.00 0.01 8.20 0.000 270.00 0.01 8.29 0.000 273.00 0.01 8.38 0.000 276.00 0.00 8.47 0.000 279.00 0.00 8.56 0.000 282.00 0.00 8.65 0.000 285.00 0.00 8.74 0.000 288.00 0.00 8.83 0.000 291.00 0.00 8.93 0.000 294.00 0.00 9.02 0.000 297.00 0.00 9.11 0.000 300.00 0.00 9.20 0.000 303.00 0.00 9.29 0.000 306.00 0.00 9.38 0.000 309.00 0.00 9.47 0.000 312.00 0.00 9.56 0.000 315.00 0.00 9.65 0.000 318.00 0.00 9.75 0.000 321.00 0.00 9.84 0.000 324.00 0.00 9.93 0.000 327.00 0.00 10.02 0.000 330.00 0.00 10.11 0.000 333.00 0.00 5.\1311=02Wvl SV )og-dwebpW4mlow-hyftVWh.ds Peak Inflow, (Q1oo) = 101.00 efs Time to Peak Calculation: CN= 932022783 P= 7.4 in, S Q*= 6.59 in. (depth of runoff) Vol= 253,146 cf (vol. of runoff) Time to Peak, (Tp) => 30.05 minutes (SCS TR-55) kt2 QQH t 4 min cfs 0.00 0.000 0.00 0.00 0.10 0.024 3.00 2.46 0.20 0.095 6.00 9.61 0.30 0.205 9.00 20.75 0.40 0.344 12.00 34,79 0.50 0.499 15.00 50.37 0.60 0.653 18.00 65.95 0.70 0.792 21.00 80.03 0.80 0.903 24.00 91.23 0.90 0.975 27.00 98.46 1.00 1.000 30.00 101.00 1.10 0.976 33.00 98.62 1.20 0.906 36.00 91.55 1.30 0.803 39.00 81.12 1.40 0.705 42.00 71.25 1.50 0.620 45.00 62,58 1.60 0.544 48.00 54.96 1.70 0.478 51.00 48.27 1,80 0.420 54.00 42.40 1.90 0.369 57.00 37.24 2.00 0.324 60.00 32.70 2.10 0.284 63.00 28.72 2.20 0.250 66.00 25.23 2.30 0.219 69.00 22.16 2.40 0.193 72.00 19.46 2.50 0.169 75.00 17.09 2.60 0.149 78.00 15.01 2,70 0.131 81.00 13.18 2.80 0,115 84.00 11.58 2.90 0.101 87.00 10.17 2.99 0.088 90.00 8.93 3.09 0.078 93.00 7.85 3.19 0.068 96.00 6.89 3.29 0.060 99.00 6.05 3.39 0.053 102,00 5.32 3.49 0.046 105,00 4.67 3.59 0.041 108.00 4.10 3.69 0.036 111.00 3.60 3.79 0.031 114.00 3.16 3.89 0.028 117.00 2.78 3.99 0.024 120.00 2.44 4.09 0.021 123.00 2.14 4,19 0.019 126.00 1.88 4.29 0.016 129.00 1.65 4.39 0.014 132.00 1.45 4.49 0.013 135,00 1.28 4.59 0.011 138.00 1.12 4.69 0.010 141.00 0.98 4.79 0.009 144.00 0.86 4.89 0.008 147.00 0.76 4.99 0.007 IS0.00 0,67 5.09 0.006 153.00 0.59 5.19 0.005 156.00 0.51 5.29 0.004 159.00 0.45 5.39 0.004 162.00 0.40 5.49 0.003 165.00 0.35 5.59 0,003 168.00 0.31 0.73 in. BA1311 a002kal=W W-deveroped-innmwnydrogmpn.)ds Hydrograph Summary Report Hyd. No. Hydrograph type, (origin) Peak now (cfs) Time interval (min) Time to peak. (min) Volume (cuff) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cult) Hydrograph description 1 Manual 37.74 3 27 87,752 --- Inflow Hydrograph 2 Reservoir 3.506 3 81 87,533 1 255.26 73,706 WO Pond Final Pond Design.gpw Return Period: 1 Year Thursday, Apr 8 2010, 8:48 PM Hvdraflow HvdmaraDhs by Intellsolve Hydrograph Plot Hydraflow Hydrographs by Intelisolve Thursday, Apr 8 2014, 8:48 PM Hyd. No. 2 WQ Pond Hydrograph type = Reservoir Peak discharge = 3.506 cfs Storm frequency = 1 yrs Time interval = 3 min Inflow hyd. No. = 1 Max. Elevation = 255.26 ft Reservoir name = Water Quality Pond 1 Max. Storage = 73,706 cuft Storage Indication method used. Hydrograph Volume = 87,533 cult WQ Pond a (`fs) Hyd. No. 2 --1 Yr Q (cfs) 40.00 40.00 -- ---------- - -- - - -- - - ---------- - -- -------------- 30.00 30.00 - - ----------- --- ------------- ------------------------- 20.00 20.00 10.00 10.00 -- ----- ----- -- - ------- ------ --------------- ------------- 0.00 0.00 0 7 14 21 28 35 42 49 56 63 70 Time (hrs) Hyd No. 2 Hyd No. 1 3 Pond Report Hydraflow Hydrographs by Intelisolve Thursday, Apr 8 2010, 8:48 PM Pond No. I - Water Quality Pond 1 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage I Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cult) 0.00 252.00 18,389 0 0 1.00 253.00 21,785 20,087 20,087 2.00 254.00 23,206 22,496 42,583 3.00 255.00 25,317 24,262 66,844 4.00 256.00 27,488 26,403 93,247 5.00 257.00 29,718 28,603 121,850 6.00 258.00 31,994 30,856 152,706 Culvert I Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (In) = 36.00 2.75 10.00 0.00 Crest Len (ft) = 20.00 0.00 74.00 0.00 Span (in) = 36.00 2.75 10.00 0.00 Crest El. (ft) = 255.30 0.00 256.00 0.00 No. Barrels = 1 1 1 0 Weir Coeff. = 3.33 0.00 3.00 0.00 Invert El. (ft) = 247.00 252.00 253.40 0.00 Weir Type = Riser --- Broad - Length (ft) = 94.00 50.00 0.50 0.00 Multi-Stage = Yes No No No Slope (%) = 0.70 0.50 0.01 0.00 N -Value = .013 .013 .013 .000 OrM Coeff. = 0.60 0.60 0.60 0.00 Multi-Stage = n/a Yes Yes No Exfiltration = 0. 000 in/hr (Contour) Tailwater Elev. = 0.00 ft Note: Culvert/Orifice adlaws have been analyzed under inlet and outlet control. Weir riser checked for orifice conditions Stage (ft) 6.00 5.00 ------------- ---- -------------- 4.00- 3.00 --- - ------- - --- 2.00 1.00 0.00 0.00 70.00 Total Q Stage I Discharge Stage (ft) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 140.00 210.00 280.00 350.00 420.00 490.00 560.00 630.00 700.00 770.00 Discharge (cfs) 4 Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cTs) Time Interval (min) Time to peak (min) Volume (tuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cult) Hydrograph description 1 Manual 47.94 3 26 106,189 --- - - Inflow Hydrograph 2 Reservoir 28.49 3 60 159,057 l 255.81 88,268 WO Pond Final Pond Design.gpw Return Period: 2 Year Thursday, Apr 8 2010, 8:48 PM Hvdraflnw Hvdroaranhs by Intelisolve Hydrograph Plot Hydraflow Hydrographs by Intelisoh7e Thursday, Apr 8 2010, 8:48 PM Hyd. No. 2 WQ Pond Hydrograph type = Reservoir Peak discharge = 28.49 cfs Storm frequency = 2 yrs Time interval = 3 min Inflow hyd. No. = 1 Max. Elevation = 255.81 ft Reservoir name = Water Quality Pond 1 Max. Storage = 88,268 cuft Storage Indication method used. Q (cfs) 50.00 WO Pond Hyd. No. 2 - 2 Yr 40.00 30.00 Hydrograph Volume =158,057 cutt Q (cfs) 50.00 20.00 10.00 0.00 -y- 0.0 1.0 2.0 Hyd No. 2 3.0 4.0 5.0 Hyd No. 1 6.0 7.0 8.0 40.00 30.00 20.00 10.00 0.00 9.0 10.0 11.0 12.0 Time (hrs) 6 Pond Report Hydraflow Hydrographs by Intelisolve Thursday, Apr 8 2010, 8:48 PM Pond No. 1 - Water Quality Pond 1 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage 1 Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cuff) 0.00 252.00 18,389 0 0 1.00 253.00 21,785 20,087 20,087 2.00 254.00 23,206 22,496 42,583 3-00 255.00 25,317 24,262 66,844 4.00 256.00 27,488 26,403 93,247 5.00 257.00 29,718 28,603 121,850 6.00 258.00 31,994 30,856 152,706 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 36.00 2.75 10.00 0.00 Crest Len (ft) = 20.00 0.00 74.00 0.00 Span (in) = 36.00 2.75 10.00 0.00 Crest El. (ft) = 255.30 0.00 256.00 0.00 No. Barrels = 1 1 1 0 Weir Coeff. = 3.33 0.00 3.00 0.00 Invert El. (ft) = 247.00 252.00 253.40 0.00 Weir Type = Riser --- Broad - Length (ft) = 94.00 50.00 0.50 0.00 Multistage = Yes No No No Slope (%) = 0.70 0.50 0.01 0.00 N-Value = .013 .013 .013 .000 Orif. Coeff. = 0.60 0.60 0.60 0.00 Multistage = n/a Yes Yes No Exflkratlon = 0. 000 in/hr (Contour) Tailwater Elev. = 0.00 It Note: Culvert/Orifice outflowe have been analyzed under inlet and outlet control. Weir riser checked for orifice conditions Stage (ft) 6.00 5.04 ----- ---- -------- -- ----- - ------------ - -------- 4.00 ---- ---------- - - - ------------- 3.00 - ........... ...._. 2.00 . 1.00 "- - _.- 0.00 0.00 70.00 Total 0 Stage / Discharge Stage (ft) 6.00 5.00 4.00 3.00 2.00 1.00 -1 1 0.00 140.00 210.00 280.00 350.00 420.00 490.00 560.00 630.00 700.00 770.00 Discharge (cfs) Hydrograph Summary Report Hyd, No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cult) Hydrograph description 1 Manual 60.37 3 33 166,664 - --- ------ Inflow Hydrograph 2 Reservoir 36.28 3 51 166,440 1 255.91 90,979 WO Pond Final Pond Design.gpw Return Period: 10 Year Thursday, Apr 8 2010, 8:48 PM HvdraRnw Hvdroaranhs by Intellsolve Hydrograph Plot Hydraflow Hydrographs by Intelisolve Thursday, Apr 8 2010, 8:48 PM Hyd. No, 2 WQ Pond Hydrograph type = Reservoir Peak discharge = 36.28 cfs Storm frequency = 10 yrs Time interval = 3 min Inflow hyd. No. = 1 Max. Elevation = 255.91 ft Reservoir name = Water Quality Pond 1 Max. Storage = 90,979 cuft Storage Indication method used. WQ Pond Hydrograph Volume =166,440 cult Q (cfs) Hyd. No. 2 - 10 Yr Q (cfs) 70.00 70.00 ____---.--...---._.--_.- - 60.00 60.00 50.00 50.00 - - - -- ----..- _ T - - ----- - - -- --- --- --- - -- - - ..--- _ _.... 40.00 40.00 -------------- --- -------- --- - --- ------ ---- ----- - - ----- ------ -- - -- 30.00 30.00 - ---- - - ---- ---------- - 20.00 20.00 ----------------------- ------ 10.00 10.00 -------------- 0.00 0.00 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 Hyd No. 2 Hyd No. 1 Time (hrs) 9 Pond Report Hydraflow Hydrographs by Intelisolve Thursday, Apr 8 2010, 8:48 PM Pond No. 1 - Water Quality Po nd 1 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cult) 0.00 252.00 18,389 0 0 1.00 253.00 21,785 20,087 20,087 2.00 254.00 23,206 22,496 42,583 3.00 255.00 25,317 24,262 66,844 4.00 256.00 27,488 26,403 93,247 5.00 257.00 29,718 28,603 121,850 6.00 258.00 31,994 30,856 152,706 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] ID] Rlse (in) = 36.00 2.75 10.00 0.00 Crest Len (ft) = 20.00 0.00 74.00 0.00 Span (in) = 36.00 2.75 10.00 0.00 Crest El. (ft) = 255.30 0.00 256.00 0.00 No. Barrels = 1 1 1 0 Weir Coeff. = 3.33 0.00 3.00 0.00 Invert El. (ft) = 247.00 252.00 253.40 0.00 Weir Type = Riser - Broad - Length (ft) = 94.00 50.00 0.50 0.00 Multi-Stage = Yes No No No Slope (%) = 0.70 0.50 0.01 0.00 N-Value = .013 .013 .013 .000 Orif. Coeff. = 0.60 0.60 0.60 0.00 Multi-stage = n/a Yes Yes No Exfiltration = 0.000 in/hr (Contour) Tailwater Elev. = 0.00 ft Note: Culvwffirifice outflows have been analyzed under inlet and outlet control. Weir riser checked for orifice conditions Stage (ft) 6.00 5.00 ?----- -.. - - 4.00 3.00 ----- ------------ ------------- ---- ---------- - ---- 1.00 ----------- ---- 0.00 0.00 70.00 Total 0 Stage / Discharge Stage (ft) 6.00 5.00 4.00 3.00 2.00 1.00 I i I i i I i i i 1 0.00 140.00 210.00 280.00 350.00 420.00 490.00 560.00 630.00 700.00 770.00 Discharge (cfs) 10 11 Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 Manual 101.00 3 30 255,739 - ----- -- Inflow Hydrograph 2 Reservoir 90.65 3 36 255,513 1 256.24 99,993 WQ Pond Final Pond Design.gpw Return Period: 100 Year Thursday, Apr 8 2010, 8:48 PM Hvdraflow Hvdrooraohs by Intelisolve Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 2 WQ Pond Hydrograph type = Reservoir Storm frequency = 100 yrs Inflow hyd. No. = 1 Reservoir name = Water Quality Pond 1 Storage Indication method used. Q (cfs 120.00 100.00 80.00 60.00 40.00 20.00 Thursday, Apr 8 2010, 8:48 PM Peak discharge Time interval Max. Elevation Max. Storage = 90.65 cfs =3min = 256.24 ft = 99,993 cult Hydrograph Volume = 255,513 cult WQ Pond Hyd. No. 2 -- 100 Yr - ----------- - ---------- --- - - ----- - ---- ---------------------------- ------ - ---- ----------------- -- ----------------- - - ---------- ----------- -------------------------- - ------------- - ------ -- - - - -- - --- - - - - ------ ------------------- ----- --------------- ------- - ------ - - -------- --------- -------------------- --- --------- -- - --------------------------------- ------ - - --------- f- I --------- -------- - - -- -- --------- ---------------- --- ---------- ------ --------------- - ------------ ------- ------ ------------- -------------------- ----------- ----------------- ------------ ----------- ---------- ------ -------------------- ---------- --- Q (cfs) 120.00 100.00 80.00 60.00 40.00 20.00 0,00 0.00 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 Hyd No. 2 Hyd No. 1 Time (hrs) 12 Pond Report Hydraflow Hydrographs by Intelisolve Thursday, Apr 8 2010, 8:48 PM Pond No. 1 - Water Quality Pond 1 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (tuft) Total storage (tuft) 0.00 252.00 18,389 0 0 1.00 253.00 21,785 20,087 20,087 2.00 254.00 23,206 22,496 42,583 3.00 255.00 25,317 24,262 66,844 4.00 256.00 27,488 26,403 93,247 5.00 257.00 29,718 28,603 121,850 6.00 258.00 31,994 30,856 152,706 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 36.00 2.75 10.00 0.00 Crest Len (ft) = 20.00 0.00 74.00 0.00 Span (In) = 36.00 2.75 10.00 0.00 Crest El. (ft) = 255.30 0.00 256.00 0.00 No. Barrels = 1 1 1 0 Weir Coeff. = 3.33 0.00 3.00 0.00 Invert El. (ft) = 247.00 252.00 253.40 0.00 Weir Type = Riser --- Broad --- Length (ft) = 94.00 50.00 0.50 0.00 Multi-Stage = Yes No No No Slope (%) = 0.70 0.50 0.01 0.00 N -Value = .013 .013 .013 .000 oft Coeff. = 0.60 0.60 0.60 0.00 Mutti-Stage = n/a Yes Yes No ExfiItration = 0 .000 in/hr (Contour) Ta itwater Elev. = 0.00 ft Note! Cutvert/Orlfice outflows have been analyzed under inlet and outlet control. Weir riser checked for orifice conditions Stage (ft) 6.00 5.00 4.00 ---------- 3A0 2.00 1.00 0.00 0.00 70.00 Total Q Stage / Discharge Stage (ft) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 140.00 210.00 280.00 350.00 420.00 490.00 560.00 630.00 700.00 770.00 Discharge (cfs) 13 Contour Contour Incr. Accum. Stage Elev. Area Storage Storage (S) (Z) (ft) (sfl (of) (cf) (ft) In (S) In (Z) Z eet 2510 10,89 - - 0.00 253.0 21,785 20,087 20,087 1.00 9.91 0.00 1,06 254.0 ?23 ?06. 22,496 42,583 2.00 10.66 0.69 2.02 255.0 25,317;: 24,262 66,844 3.00 11.11 1.10 2,98 256:0 27,488 26,403 93,247 4.00 11.44 1.39 3.96 2,57.0_ 29;718- ` 28,603 121,850 5.00 11.71 1.61 4.99 258-0 31,994 30,856 152,706 6.00 11.94 1.79 6.06 Regression Output: b- 1.160896805 (X Variable Coal Ks- 18,850 (e' °°`P ) Stage - Storage Equation is of the form: S - (Ks)M" Check of Ks and b : S - Ks z Storagne Area Stage 18,850 1 42,148 2 67,483 3 94,240 4 Barrel None Area Dia.ofOrifice r 2.75 inches 0.041247004 Page 1 of 2 TIME INFLOW STORAGE STAGE min Lem fa LAI Control TOTAL BARREL OUTFLOW L£11 W&I 0.00 0.00 27272 137 0.23 0.23 60.00 0.00 27272 1.37 0.23 0.23 120.00 0.00 26434 1.34 0.23 0.23 180.00 0.00 25607 1.30 023 0.23 240.00 0.00 24791 1.27 0.22 0.22 300.00 0.00 23986 1.23 022 0.22 360.00 0.00 23193 1.20 0,22 022 420A0 0.00 22411 1.16 0.21 0.21 480.00 0.00 21641 1.13 0.21 021 540.00 0.00 20882 1.09 0.21 021 600.00 0,00 20135 1.06 0.20 0.20 660.00 0.00 19400 1.03 020 0.20 720.00 0.00 18676 0.99 0.20 010 780.00 0.00 17964 0.96 0.19 0.19 840.00 0.00 17263 0.93 0.19 0.19 900.00 0.00 16575 0.90 0.19 0.19 960.00 0.00 15898 0.86 O.1S 0.18 1020.00 0.00 15234 0.83 0.18 0.18 1080.00 0.00 14582 0.80 0.18 0.18 1140.00 0.00 13942 0.77 0.17 0.17 1200.00 0.00 13314 0.74 0.17 0.17 1260.00 0.00 12698 0.71 0.17 0.17 1320.00 0.00 32095 0.68 0.16 0.16 1380.00 0.00 11504 0.65 0.16 0.16 1440.00 1 0.00 10926 0.63 0.16 0.16 1500.00 0.00 10361 0.60 0.15 0.15 1560.00 0.00 9809 0.57 0.15 0,15 1620.00 0.00 9269 0.54 0.15 0.15 1680,00 0.00 8742 0.52 0.14 0.14 1740.00 0.00 8229 0.49 0.14 0.14 1800.00 0.00 7728 0.46 0.14 0.14 1860.00 0.00 7241 0.44 0.13 0.13 1920.00 0.00 6768 0.41 0.13 0.13 1980.00 0.00 6308 0.39 0.12 0.12 2040.00 0.00 5862 037 0.12 0.12 2100.00 0.00 5430 0.34 0.12 0.12 2160.00 0.00 5011 032 0.11 0.11 2220.00 0.00 4607 0.30 0.11 0.11 2280.00 0.00 4217 0 28 0.10 0.10 2340.00 0.00 3842 0.25 0.10 0.10 2400.00 0.00 3482 023 0.10 0.10 2460.00 0.00 3136 0.21 0.09 0.09 2520.00 0.00 29% 0.19 0,09 0.09 2580.00 0.00 2491 0.17 0.08 0.08 2640.00 0.00 2392 0.16 0,08 0.08 2700.00 0.00 1909 0.14 0.07 0.07 2760.00 0.00 1643 0.12 0.07 0.07 2820.00 0.00 1393 0.11 0.06 0.06 2880.00 2 0.00 1160 0.09 0.06 0.06 2940.00 0.00 945 0.08 0.05 0.05 3000.00 0.00 748 0.06 0.05 0.05 3060.00 0.00 570 0.05 0.04 0.04 3120,00 0.00 411 0.04 0.04 0.04 3180.00 0.00 274 0.03 0.03 0.03 3240.00 0.00 158 0.02 0-03 0.03 3300,00 000 67 0.01 0.02 0.02 3360.00 0.00 4 0.00 0.01 0.01 56.00 hours 2.33 days Temp Pool drains completely down at time 3,240 minutes or 2.3 days. Page 2 of 2 Table of Contents Final Pond Design Clogged.gpw Hydraflow Hydrographs by Intelisolve Thursday, Apr 8 2010, 9:21 PM Hydrograph Return Period Recap ................................................................... 1 100 - Year Summary Report .............................................................................................................. 2 Hydrograph Reports ........................................................................................................ 3 Hydrograph No. 2, Reservoir, WQ Pond ....................................................................... 3 Pond Report .............................................................................................................. 4 Hydrograph Return Period Recap Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type (origin) Hyd(s) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100 Yr description 1 2 Manual Reservoir 1 37.74 0.000 47.94 28.42 ------ ------ --- 60.37 36.40 - - -- - 101.00 87.99 Inflow Hydrograph WQ Pond Proj. file: Final Pond Design Clogged.gpw Thursday, Apr 8 2010, 9:21 PM Hwirafinw Hvrlrnnranhs by Intelisolve Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cult) Hydrograph description 1 Manual 101.00 3 30 255,739 ---- - - Inflow Hydrograph 2 Reservoir 87.99 3 39 166,380 1 256.54 108,648 WO Pond Final Pond Design Clogged.gpw Return Period: 100 Year Thursday, Apr 8 2010, 9:21 PM Hvdraflow Hvdroaraohs by Intelisolve Hydrograph Plot Hydraftow Hydrographs by Intelisolve Thursday, Apr 8 2010, 9:21 PM Hyd. No. 2 WQ Pond Hydrograph type = Reservoir Peak discharge = 87.99 cfs Storm frequency = 100 yrs Time interval = 3 min Inflow hyd. No. = 1 Max. Elevation = 256.54 ft Reservoir name = Water Quality Pond 1 Max. Storage = 108,648 cuft Storage Indication method used. Hydrograph Volume = 166,380 cult Q (cfs) 120.00 100.00 80.00 60.00 40.00 20.00 0.00 1" 1 I 1 0.0 0.3 0.5 0.8 1.0 1.3 Hyd No. 2 Hyd No. 1 WQ Pond Hyd. No. 2 - 100 Yr Q (cfs) 120.00 100.00 80.00 60.00 40.00 20.00 0.00 1.5 1.8 2.0 2.3 2.5 2.8 Time (hrs) 3 Pond Report Hydraflow Hydrographs by Intelisolve Thursday, Apr 8 2010, 9:21 PM Pond No. 1 - Water Quality Pond 1 Pond Data Pond storage is based on known contour areas. Average end area m ethod used. Stage If Storage Table stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cuff) 0.00 252.00 18,389 0 0 1.00 253.00 21,785 20,087 20,087 2.00 254.00 23,206 22,496 42,583 3.00 255.00 25,317 24,262 66,844 4.00 256.00 27,488 26,403 93,247 5.00 257.00 29,718 28,603 121,850 6.00 258.00 31,994 30,856 152,706 Culvert I Orifice Structures Weir Structures [A] IB] [C] [D] [A] [B] [C] ID] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 0.00 0.00 74.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 0.00 0.00 256.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 3.33 0.00 3.00 0.00 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = - --- Broad - Length (ft) = 0.00 0.00 0.00 0.00 Multi-Stage = No No No No Slope (%) = 0.00 0.00 0.00 0.00 N -Value = .013 .013 .013 .000 Orif. Coeff. = 0.60 0.60 0.60 0.00 Multi-Stage = n/a No No No Exfiltration = 0.000 in/hr (Contour) Tailwater Elev. = 0.00 ft Note: Culvert/Orifice outflows have been analyzed under Inlet and outlet control. Weir riser checked for orNks conditions. Stage (ft) 6.00 5.00-- 4.00- 3.00-- 2.00-- 1.00-- 0.00 0.00 Stage I Discharge Stage (ft) 6.00 5.00 4.00 3.00 2.00 1.00 - r I- I I I I I I 0.00 60.00 120.00 180.00 240.00 300.00 360.00 420.00 480.00 540.00 600.00 660.00 Discharge (cfs) Total Q 4 WESTPOINT AT 751- NITROGEN CALCULATIONS TOTAL SITE AREA = 17.43 ac. Exisitna Condititons Undisturbed Open Space = 17.43 ac Proposed Condition without Treatment Total Site Area = 17.43 ac impervious Area = 7.76 ac Managed Open Space = 5.48 ac Undisturbed Open Space = 4.19 ac 17.43 ac Nitrogen Loading (lb/ac/yr) = 7.0 Ibs/ac/yr 122.0 Ibs/yr See attached Worksheet - Total Site - Developed no Treatment Proposed Drainage to WQ Train without Treatment Drainage Area to WQ Train = 10.58 ac Impervious Area = 7.76 ac Managed Open Space = 2.82 ac Undisturbed Open Space = 0 ac 10.58 ac Nitrogen Loading (lb/ac/yr) = 13.8 Ibs/ac/yr 145.9 Ibs/yr See attached Worksheet - Area to WQ Train, Developed no Treatment Remainder of Site Area without Treatment Remainder Site Area = 6.85 ac Impervious Area = 0 ac Managed Open Space = 2.66 ac Undisturbed Open Space = 4.19 ac 6.85 ac Nitrogen Loading (lb/ac/yr) = 0.5 Ibs/ac/yr 3.3 Ibs/yr See attached Worksheet - Remainder Site Area SUMMARY -Total Post-Developed Nitrogen Loading Per City of Durham Worksheet : 122.0Iblyr or 7.0 lb/aclyr - All of Impervious and roughly half of Managed Open Space will drain through an on-site Water Quality. Train (Wet Pond and Level Spreader with Engineered Vegetated Filter Strip [LS-VFS]) The Area flowing through the WO Train Nitrogen Loading = 145.9 Ibs/ac/yr The following is a break down of the Nitrogen Reduction for each Device: Initial WO Train Loading = 145.9 Ibs/yr Wet Pond provides 25% reduction = 36.5 Ibs/yr Total Loading after Wet Pond = 109.4 Ibs/yr LS-VFS 30% reduction *= 32.8 Ibs/yr Total Loading after WQ Train = 76.6 Ibs/yr Now add back on-site areas that recevied no treatment = 3.3 Ibs/yr TOTAL NITROGEN LOADING AFTER REDUCTION = 79.9 Ibs/yr or 4.6 lbs/ac/yr So, overall Nitrogen Reduction provided On-site = Total minus Post 122.0 Ibs/yr - 79.9 Ibs/yr = 42.1 Ibs/yr or . 2.4 Ibs/ac/yr * - New DWQ Rules provide a 30% Nitrogen reduction for Level Spreaders with an Engineered Vegetated Filter Strip. Reference NCDENR BMP Manual Chapter 8 DONOR EASEMENT REQUIRED TO OFFSET REMAINING NITROGEN LOAD - Now Determine minimum Donor Easement required to meet 2.2 lbs/actyr total Loading requirement per Zoning Committed Element. Initial Total Loading Rate = 7.0 lbs/actyr Target Rate to Achieve = 2.2 lbs/ac/yr Amount Required to Mitigate 4.8 Ibs/ac/yr Nitrogen mitigated thru WQ Train = 2.4 lbs/actyr 50% on-site Amount required to migitate thru 2.4 Ibs/aclyr off-site easement - Resolve In spreadsheet to obtain: 7.0 lbs/actyr - 2.4 Ibs/ac/yr = 4.6 Ibslac/yr Per the updated worksheet it will require a total of 10.60 acres of Undisturbed Open Space of which 4.19 is already provided therefor the off-site area requried would be: 10.6 acres - 4.19 acres = 6.41 acres Required The Westpoint project proposes to need 6.41 AC of off-site donor or 12.82 credits. The Proposed Old Hope Valley Farm Road Donor Bank should provide the available credits required. Nitrogen Loading Calculation Worksheet Project Name: Westpoint at 751-Total Site - Developed no Treatment Date: 319110 BY: CE Group, Inc. Checked By: Method A for Quantifying TN Export from Residential ! Industrial J Commercial Developments when Footprints of all Impervious Surfaces are Shown, City of Durham Step 1: Determine area for each type of land use and enter in Column (2). Step 2: Total the areas for each type of land use and enter at the bottom of Column (2) at "Total Area = . Step 3: Calculate the fraction of the total area that is impervious area and enter in space provided (col 1) Step 4: Using the impervious surface fraction in step 3 as °I,° calculate (0.43 + 7.7 I) and enter in Column (4). Step 5: For each row, multiply columns (2) (3) and (4) and enter in column (5). Ste 6: Sum the rows of column 5) and enter at the bottom as total loading. Predevelo meet typ Z' t :410.d .4 Impervious surface 000 2.6 0.43 0.0 Managed open space 000 1.36 0.43 0.0 Undisturbed open space 17 M 0,95 0.43 7.1 ';r€€ -..?.:.:.: .:.:.:.:.::.:.: 7.43 aid °o ..sit...........: 7, 1 :?.. .g. 0.4 "..taiE.ra..:.... i€?riETis? 0.00 - Postdevelo ment tier€i=€ Impervious surface 7 76 2.6 3.86 77.8 Managed open space 5.118 1.36 3.86 28.8 Undisturbed open space 11.19 0.95 3.86 15.4 ?.. .. .......:.:.:.:.:..:.:.... 17.43 5.?.... 122.0 ???13(i???ll# . 7. . ta?fdts: sit 0.45 :' Nitrogen Loading Calculation Worksheet Project Name: Wes oint at 751- Area to WQ Train, Developed no Treatment Date: 319/10 By: CE Group, Ina Checked By. Method A for Quantifying TN Export from Residential I Industrial I Commercial Developments when Footprints of all Impervious Surfaces are Shown, City of Durham Step 1: Determine area for each type of land use and enter in Column (2). Step 2: Total the areas for each type of land use and enter at the bottom of Column (2) at "Total Area ='. Step 3: Calculate the fraction of the total area that is impervious area and enter in space provided (col 1) Step 4: Using the impervious surface fraction in step 3 as "I," calculate (0.43 + 7.7 I) and enter in Column (4). Step 5: For each row, multiply columns (2) (3) and (4) and enter in column (5). Step 6: Sum the rows of column (5) and enter at the bottom as total loading. Predevelo ment 2 0 - >ioililtiiig Impervious surface. 000 2.6 0.43 0.0 Managed open space 0 00 1.36 0.43 0.0 Undisturbed open space 17.43 0.95 0.43 7.1 :T:•:•:•::•:•:•:•:• ....... 7.43 ital L6 d a ..,:?..?... .1 0.4 $: 0.00 Postdevelo ment =`€ .. • Imo . #, tiiin . . Impervious surface 776 2.6 6.08 122.6 Managed open space 2.82 1.36 6.08 23.3 Undisturbed open space 000 0.95 6.08 0.0 `: I € td ...................... 58 10 . ?€ ota`Eo s :i ....•:.. '9.?..•. .. 145.9 a as e _ .mod{ tA .9. .9 3.8 y ••• Vi.T::::::: 0.73 Nitrogen Loading Calculation Worksheet Project Name: Westpolnt at 751- Remainder Site Area Date: 319/10 By: CE Group, Inc. Checked By: Method A for Quantifying TN Export from Residential / Industrial ! Commercial Developments when Footprints of all Impervious Surfaces are Shown, City of Durham Step 1: Determine area for each type of land use and enter in Column (2). Step 2: Total the areas for each type of land use and enter at the bottom of Column (2) at "Total Area =". Step 3: Calculate the fraction of the total area that is impervious area and enter in space provided (col 1) Step 4: Using the impervious surface fraction in step 3 as Ni," calculate (0.43 + 7.7 n and enter in Column (4). Step 5: For each row, multiply columns (2) (3) and (4) and enter in column (5). Ste 6: Sum the rows of column 5 and enter at the bottom as total loading. Predevelo ment '` r : • r: .. T. ifriD! -11tilil . • ? . ? F il ..t Impervious surface 000 2.6 0.43 0.0 Managed open space 0 00 1.36 0.43 0.0 Undisturbed open space 17 M 0.95 0.43 7.1 ' s #?I ... ' ....................... 7.43 d . 02 F#_:.t ; Q> .. .. ?..-Y .1 g. . 0.4 /1,? EE 44r 0.00 *. Postdevelo ment NO C. 0. Impervious surface 000 2.6 0.43 0.0 Managed open space 266 1.36 0.43 1.6 Undisturbed open space y,19 0.95 0.43 1.7 Fi ...:.........:.:.::: 6.85 .z?; T...t.I.d. #.... •.: 3 :'?r?it:• .Iii:..?/?Gl.•'•••'•.•l??•....•:•• 0.5 *?1rd .rea -: O.oo Nitrogen Loading Calculation Worksheet Project Name: Wes oint at 751 Additional Open Space Iteration, 22#/aa,yr Date: 319/10 BY: CE Group, In Checked By: Method A for Quantifying TN Export from Residential I Industrial / Commercial Developments when Footprints of all Impervious Surfaces are Shown, City of Durham Step 1: Determine area for each type of land use and enter in Column (2). Step 2: Total the areas for each type of land use and enter at the bottom of Column (2) at 'Total Area ='. Step 3: Calculate the fraction of the total area that is impervious area and enter in space provided (col 1) Step 4: Using the impervious surface fraction in step 3 as 'I,' calculate (0.43 + 7.7 I) and enter in Column (4). Step 5: For each row, multiply columns (2) (3) and (4) and enter in column (5). Step 6: Sum the rows of column (5) and enter at the bottom as total loading. Predevelo ment ` 'yri ?k t Impervious surface 2.6 Managed open space 1.36 Undisturbed open space 0.95 T s ia .......:.......:..... 0.00 .. ?i` .-` °. ... - .. Fr# ND = = Postdevelopment i`o". sl< .. ?. IE. . i Impervious surface 776 2.6 2.94 59.2 Managed open space 15 y? 1.36 2.94 21.9 Undisturbed open space 1060 0.95 2.94 29.6 23.84 110.7 ..9.. 4 .6 Fr#s: ttCa!-::::: 0.33 WESTPOINT AT 751- NITROGEN CALCULATIONS TOTAL SITE AREA = 17.43 ac. Exisifn„a Condifitons Undisturbed Open Space = 17.43 ac Proposed Condition without Treatment Total Site Area = 17.43 ac Impervious Area = 7.76 ac Managed Open Space = 5.48 ac Undisturbed Open Space = 4.19 ac 17.43 ac Nitrogen Loading (lb/ac/yr) _ 7.0 Ibs/ac/yr 122.0 Ibs/yr See attached Worksheet - Total Site - Developed no Treatment Proposed Draina_e to WQ Train without Treatment Drainage Area to WQ Train = 10.58 ac Impervious Area = 7.76 ac Managed Open Space = 2.82 ac Undisturbed Open Space = 0 ac 10.58 ac Nitrogen Loading (lb/ac/yr) = 13.8 lbs/ac/yr 145.9 ibs/yr See attached Worksheet - Area to WO Train, Developed no Treatment Remainder of Site Area without Treatment Remainder Site Area = 6.85 ac impervious Area = 0 ac Managed Open Space = 2.66 ac Undisturbed Open Space = 4.19 ac 6.85 ac Nitrogen Loading (lb/ac/yr) _ 0.5 Ibs/ac/yr 3.3 Ibs/yr See attached Worksheet - Remainder Site Area SUMMARY - Total Post-Developed Nitrogen Loading Per City of Durham Worksheet : 122.0Iblyr or 7.0 lb/ac/yr - All of Impervious and roughly half of Managed Open Space will drain through an on-site Water Quality Train (Wet Pond and Level Spreader with Engineered Vegetated Filter Strip [LS-VFS]) The Area flowing through the WQ Train Nitrogen Loading = 145.9 Ibs/ac/yr The following is a break down of the Nitrogen Reduction for each Device: Initial WQ Train Loading = 145.9 Ibs/yr Wet Pond provides 25% reduction = 36.5 Ibstyr Total Loading after Wet Pond = 109.4 Ibs/yr LS-VFS 30% reduction *= 32.8 Ibstyr Total Loading after WQ Train = 76.6 lbstyr Now add back on-site areas that recevied no treatment = 3.3 Ibstyr TOTAL NITROGEN LOADING AFTER REDUCTION = 79.9 Ibs/yr or 4.6 Ibs/ac/yr So, overaill Nitrogen Reduction provided On-site = Total minus Post 122.0 Ibs/yr - 79.9 Ibstyr = 42.1 Ibstyr or 2.4 Ibs/aclyr * - New DWQ Rules provide a 30% Nitrogen reduction for Level Spreaders with an Engineered Vegetated Filter Strip. Reference NCDENR BMP Manual Chapter 8 DONOR EASEMENT REQUIRED TO OFFSET REMAINING NITROGEN LOAD - Now Determine minimum Donor Easement required to meet 2.2 lbs/ac/yr total Loading requirement per Zoning Committed Element. Initial Total Loading Rate = 7.0 Ibs/ac/yr Target Rate to Achieve = 2.2 Ibs/ac/yr Amount Required to Mitigate 4.8 Ibs/ac/yr Nitrogen mitigated thru WQ Train = 2.4 lbs/ac/yr 50% on-site Amount required to migitate thru 2.4 Ibs/ac/yr off site easement - Resolve in spreadsheet to obtain: 7.0 Ibs/ac/yr - 2.4 Ibs/ac/yr = 4.6 Ibs/ac/yr Per the updated worksheet it will require a total of 10.60 acres of Undisturbed Open Space of which 4.19 is already provided therefor the off-site area requried would be: 10.6 acres - 4.19 acres = 6.41 acres Required ~ ~ r ~ ~ ~ \ 30' WIDE NATURAL us.A. f~~~ f ~ sl o O w ` , ` rn" ~ N ~ ; o; - . PROJECT BOUNDARY U.S. ATTORNEY ° BUFFER 0.6 OPACITY ARCEL IC:14337a r., P ~r ~i O O W ~ 1~ ;e~- ( } D641ia 46i FLOW SPUTTER BOX - ~y D~? USE: VACANT COMMUNITY SERVICE 100' LEVEL _ - x ; ~ ZONED: RR SPREADER p \ ,~.Y.= RBANTIERFIJ-B 1 ~ a O ~ N- '1 yS i ~ ~ , r ^ . - ,heh,g pEyd~ a~~ t ~ lF• d0 ~ ~ r f~ g p - f d ' ~ < tV" t , 1'g J ~ f it / ;+x _ • • . , , Z - N U.SA. _ - m _ =~..o_.._. - PARCELN):143585 < Z , , ' m ~o..-= ® - - , ' _ DB 365 p.823 Yab~ , , _ _ LID: 143685 , a i z h~~ Ia `s~ ~ ~t ~ ~ F , I a_,,.., _ X1,'1. ~ ~ yro -w. - - :u= , ,y o USE:4ACANT•COMMUNITY3ERVICE ~ . , ~ i " _ ~ , ~ ~ n_,,_-. ~ t:~,iN ~r~ n , ZONED RS 20 roM11UNITY3ERVICE ^.u_.°- ..,,Y 'gip ! r ~ 1 i ,a ~ t w w ED: RS•20 r sr'" ~ t 4~,CD 1 ' ~ r . ' / 1! d ' - , ) 1 ~ SUBURBAN TIER P!J•8 ~r m ^ ~ ~ ~ F`~0 't, ~ ~ 9 ~ . ~,i.m ~ V~ a ~ 1-, a~ ~ t° :,f r ! !dF r~~,.°...-4; ~ 11I~ ~ ~ ~ Z AN TIER F!J•B ~ 9 a , , _ J " ' ~ d r r j,/~ Fn ~ gp p w.u _ . ~d - ; . „ - "`"ter... ~ - _ r, - _ - ~ - ; era=.z4s'bD _ ® _ _ ~ ~ - o ~g ~ / 1 1 I1 r/~ `P ~ - '"'°ti ~ ° ~ ~ ~ , ~ ~ ~ S I t1F~a'''sI+~N ~ ~7 ' ~ _ 257:00 ~ T 2 5 50.;::"~'_ V •.3 ~Q ~ - AM- = - N _ , . Sl . _ , .m. j t BNB= < ` , I r~ of ~ x~ aJ ~ ~ ~ ~ I ,r;.f! # .k ,u ~~,nt J a~ ~lf i ~ fr ~ p~ ^a P a u _ TN+.._za9:oo:4 I° Dt $ ,.mob 0 p ~ _ ~ 1 _ - - - _ ° I ~ [ ~ 'r ~ ~'1 ~ .,o ~ ,1 ro ~ ~i~ tr ~ f~ I ~I~ ~ N e- PROPOSED ~ 1 z ,~6 r• ~ - : _ .ror rm •254 4 sz m • ~ ~ , p~- - EMERGENCY c ~r F- , - - : ~ - \ ,:m:1fl`~TOP TH:..,.,w k _ = p :m ~ ` ~ 1 ~ , ~ °L , f-. ~ ~ f ~ ~ ~ ~ ~ L~ „ SPILLWAY a _ , , . a, . .51.00 .,m . t J ; , 258.. ~ z5too ~ - _ - o" ; zstl _ ,,,.;eat _ (0 . . a # 25 BPS i t , 5 ix f ~ _ ; 1 ~ ~ , t ~ 1 ~ ~ ~ iC~ ~t~ " ~ :Ff t p d - s2 $ - ARMORED - o . 25 F 1 t , - - T, , - _ I _ _ , , ~ : 26T:85 ta.' i t ~ ° /1 ~ .~_I t ~°'~J;J( : s* E ~ 1d~d~ p~ ~ ~ ~ g 11 t~ xt ~ `~t6 f~ t~ I It {~~~~rt' ;7J r7 ? .8.50 - - _ n,. % f ' is _ _ u.. u ro ~ ~ ~ - ~ fr t jtt G O ~ si mot: ~I , r ~ I NIF ~ , , - - x~ _ r ' ' } y J . ° - - ~ U.S.ATTORNEY , I ,.~-u,. -•..k, : ; ' - t ` " - - - ! , . , - PARGELID.143366 4 y ~ I • . - 1 `Y w _ N•,:. , ' _ : _ - - - PR_OFSOSER.R TA)NI G ~ y _ { a 5 .179 ; , r: , ~ $TRUCTURE.-_. F~~zz s _ _ F ~ € } I. r~ F 1`: FF i < : _ a • r~ f i~ d U U r' ~ ~ - - ~j > 4~ { •1 _.s y ~1U ~ ~ ,_?,...{g.'~ ,r - ~.'~a ~t ~ ~ )~f ~g a~t~s W W Y z. ; S#9 . _ EI~~ETfUNIN~ . , : RLL"~" ,,:1. , USEiVACANT-COMMUNITYSERVIC~. t 1' f V; '-•-STORMWAT-ER.,.~-_. ~ .:t i r~_ _ 4 ;,,,t , _ ) ~ _ - - i, .4`. - A ~ G7 F ~ ~ ~ r r , 7 g ,a-~~ ~ rr l S6 t d ! r, _ 5ED TREE. , . r. i ~ F 1 r g fL s o G , NEDRR 1 ~ 1 t i v.. . L ~ Irk If = _ tia,~t^,3. to I 3 I, POND ~ - DI# , ~-_r ~ - ~ ~ - ~ _ ~ t I SUBUR9ANTIERFWB ~ a. ,r. - I,, •P NDI F, • ; CTION FE r ~ ~ 1 ~ j ter ~ rl1 _ i _ _ fig - , z l 1 - r _ ED LIMI NE , -..k ~ ~ ~ ~ ~ a I ' ~ a , B - - ~ yet ' ~ ~ § ~ ~ l'~~ ~ ~ i "'ym ~ -4 3 t € ~^CI( f ( ~PI 17YR \~R ~ - :265 4 , ; ~,r , ~ f t _ •r ~ ' 1. : ~ ~=yam- - _ € ~ , r=. ~ ` _ - II _ 1 , , _ - r _ 3s - - - , , ~I t g r ~ i 6 ;y, ;ro - w - } ~ - _ ; , - : b- _ BAY= ~ : , , Y~ , , ~ : , 1 --_"~C-25 ' T 63.00 I# 6 - ~ w. - - - - _ - - m ~ a f~ I it - ltiE MAJOR . ~ ~ m fs~ ~ ~~r~ l a I Eta ~ - _ ~ ..r- - v r _ _.TRANSPORTAT ~ ~ . - ~ ` ` r ~ ~ ~t f~ ! ~ ' f ~ xx ~ . _ \ d t~ ~ • _ - ; : r , r, R 1DOR r r j I t I ~ EFER Ifs " ~ ~ ' ` , ~ ~ ` ( ~ e~ I ` ~ ~ ~ a _ ~ r ;a' t~ ~ ~ , ~ _ ~ +x , ~ - 1 _ =rte _ - r ,.O w, _ p i 1~ 1 ~ ~ ~t"' t o I I g t ~ t i c~ a ~i.ii r'~ ~ ~ I y - ~ - - - - . L I - ~ ~~~T~" ti~ }_¢L la I` ~y ~f lj tl tl ~ i m. ~ ~ ~ ' , t - / ~Sa^, 0; , ~ „ } TrN 262. . _ = ? 4 ~ Z ,r~:.a-.,= p(~p • r. _ - "1' Ill r 1. ~ aL - r~fi.,,. y: : ~ ~ `2d' MPACGES - - f - - ~ r ,5: - , y,.. ~ g $ 1 rte' ~ ~9 FJ` {f I ~4 Z N Q1 (7, .r „ rf ,~S tl ~~J fJ[3F 4 v~ ~ t ~ PoM4 ~ ~ _ m ~ _ p SEMENT ITY z , . - _ - _ _ I 9 Z - i c76' f +~p ~ INTERSTATHIe~IWAY'400FP:AMP - 0~ f z• 1 - - i ' is s ~ ! - x ~ zm > ' ~ 3 z o.,, 'a P NARIABLEF'UBLIC I e l~ m,-, ~ - A : - - Y d i F~ , `3. ° - , z~ } a _ _ ` _ • ( ~ ~ ,y- E b: x I : . ~ ..vim' _ - _ : ~ r`^ ~ , ~ 273 00.~~ t ~ w a ~ ~ J .a ~ ~ ~ 63 y, I ~ - - 'TREE RA'G~, ` n~ ' I== ~ 273 r ~~A i i - ` ~ ~ r\ l " _ N4= 283. 1 t' ~ : ' , , - UN DRIVE A - ° , _ ^ ~ , ~ , J . a 1 Z V I 1 = , ` ' ~ g r,J7, .v ~KALUMINUM IIn, m m > ~ ~ ~ TI~E'~EO~ERAG R.v , ~ _ Q CASTANSELL o, ~ I I s ;s +'''L~ < ~ _ - _ _ - BLAKE 7160 C t r,.^ ~ , , f, 1 _ _ : P OSEDRETAINING ~ ' TT~>'6:i5 N+ ARE#~ vFRSALOK NeREtE ar zPDEe MwjLL ~ _j Q ~m U -._F ie ~ TC TOP IAIIT WITR _ 10 „ RCEL ID. ` . ' i ~ DMl=-,. 7 . ; t31.o it S . j1 z 4 r , , ~ 3 PA .000049 : I, Th'J='2 .00 I :IpP , _ _ _ _ 985 P ~ ~ ~ I , d I ~ ~d t ~ .T ~ , - .4 ! ' t ~ WALL°E" j~ h ~ I I aaroPSlcoNC~re ,f- 5' ¢ ~ Q , ~ 1-..- AOi&8NE WOIING APPRO%IMATE EXCAVA?K7N z ~ 3BT ~ ~ 18 , . pB169P FAMILY ~ ..f ~ y r f€t: , ~ ~ _ n ~ , SINGLE ` ® \ s , _ ~ _ LINE (PER OSHf~ ~ > 0 Q r - "°,.°,t 275 ~ { ~ ~ ~ Z USE: RESID .5.10 i ~ r £ t _ ~ ' - - - - ~ _ - - , g~W , { ' ` ZONED. R ~'g i k y ,,.r-. 3 'i + , # ?58.80 ~ ' _ = ~ _ , TIERFI _ T =264. _ _ _ - RBA - s:. ~ NJ. ; _ N j~ _ 27s _ J ~ a~. ~ , ~ ~ = m - I p _ - - ; , x ~ y - _ ,a.~ . . ' .-FILTER FASRIC (OVERLAP - 1 ~ - ~r., ,:.L ~ ~ ' : EOGRID I2"MIN.) GEOGR'A REINPp{QGEMENT _ _ - . OK G r , _ _ a ~ „ _ - _ y - ~ ~i ry, mI MOOUTAR CON~ETE ~ 3 l .L 3Y~ - ~ ® ~ fACMO UNITS OkkkkkkEOll ~ ~ - _ g ~ a d ="u^' A ~ ~ , f , ~ 1 $ 1 4e 'l 4. 's 1 - - i I e _ - 1-. a ~2 ti ~C6LOR=BEIOF~AN ' ~ C7 m RETAIFED601L ~ ~ } ~ ~ _ y - F ~ - DRAINAGE ~._-r ...-^'t,..S s1P t8°YHICKMN ~T`' a i- ~ t ~ , ~ ' - ' - ~MNL - d57 WASHED STO I .v CJiT „ 1 ~ ~ , i T' ~ !05 rn i ~ BIW=2 .00 :r 'p ' ~ ` f .i ~ L w ; ~ . I n G4 - ; _ <; ~ 1 RCP y - 'C . - F, MI k ~ ; ~ CB# 161 ~ a 3 - _ - = - { , ' W"~•., li', y". mil a n - - + ,t.- , 's , s`i " SOTH ENDS WALL _ ~ _ ~ I , ` \ _ 0., ~i ,f ~ ~i-:,e , 1, - =a..=' = ' r_ ~ _ ~ 24"R COMMO: - . r ° _ ! DN c - : ;f s - , - - 4 _a f' s/^ nx ~ ' ml ,N Sg6Ri81 `~(t s ~ w, I m ~ z ~ env-261.30 =-~37~`- WED + p ' _ _ m:.~; I E _ - - a r ~ ° rrrr- 263.66 LDING ~ - = ~ - O d1, Tgy ..a I~ z CRANL'URRI ~`IFd2CFD 8ACIffiLL k. ~t~ f" r } 100 WIDE MAJQ.R V ~ ~ ` I ( FI cDMPACIED~~oPMnxINUM ;i~'' _ I y \ I ; OT ~ <:,,z . - TH pF TWS _ _ ~ ' - 269 ` i , ~ J , _ r 4 g. LTER FASft~ STANDARD PROCTORDENS(tY.. e() s TRANS('ORT TIdN.. J ~ + _ r - ~ _ ~ , , NIF x , r _ _ _ - _ - - u Lp{NG E HITE 1,,' - 7 - UI - SDMH# - Y• - C 12 NNW ~ _ .BIW 25 B ~ LY , Y „ I . _ _ - COMMON 0 : ~ , : I 1.02 AC t ~ I • CORRICIOR _ ~ ~ 9 - BORADE COMPACTED SU ~ ~ - UNCISTU ADAM JAM ~ ~ : - _ y RCELID:197151 = _ , PA ~ _ _ _ 4';,: y ~ ~ ~ ~ 0_ - - . ~ _ SOIL e \R \l _ . , .~Ay` _ - ~ •=w ~ ~ d.., ~ -GI~rN ^L ,RIEVELINC PAD ~?~+~~©1'~• D"~0048~ P.360087 ~ . , . - V.~~ HC ar, ~ , , ( ~ _ , , y } , _ ~ , 1 ~ ~ "I PB 159 P INLEE FAMILY ~q _ _ , - ~ ~ 50' IDE N 50' WIDE NATURAL - ~ - , (j 'Vi'a s`°a. ESIDENTIAL , w 1 ' ; , PROPOSED RETAINING ~ - °D ~ t "'CB# 11 , N ~ w : ~ x ~ in T I zo ~ 9 ° ^ PROJEC N TIER FIJ-B j h ~ WALL "A : ~6 I - - , ; , `1 I._ FR~tALWA1l Q65IGN i08';PROVW'eDBY DTHERS. "*~P,+y~PJ V PROJEC ~ BOUNOA ) ~ y _ ~ ~ ' 6~ BUFFER 0:6 OP TTY ~€tltnlr~~~ ' N r , ~ BUFFE ~ ~ ~ :gym t ~ - ~ ' , , ~ ~ - - I , ` ~:i $ Y : . , ~ _ ~ 1.08 C _ ` z TYPICAL SECTION-SEGMENTAL BLtJCK WALL . _ 2 ~ _ n j _ ~ N T.S, } k s • ~ ' 'Q. s; ~ ~ ~ ~ ~ ' ~ ' m~aa ~ k ; 3 B1W-258 D . ~ w, • ~ . o.. s. ~ t. ,~!Od.O _ k, ~ _ rn4=z65. , , F CB#.~0 C ~ _ ~ ' ~ I ; ; ~ ~ ~ PP~OPO E Ti~EE N~ ~ c ~ 3 _ I i r : , _ , , 3 ~ Z°~ 50'Y1+IDENAT ~ _ m~. N - p?,IES:INC. ,:4,. .~M1 . ~....:,k . - :,,i „4 ~ ~ , . ' ' ~ o - _ ~ ' ! IAMONCN y:.- i _ ; PR05ECT BOUNDARY o ~ . , I - CONTR6L,40GESSEENCE;' EA~T~t~ q, N GRAY O 97162 0 . ,w , f ; L ID.1 ; ~ ' , r,. ' ~ ~ t : 4 , G o 7 ? 3i s m gcE ~ , _ . 57 ,BUFFER 08OPAGITY A ` 3 D' c , 004188 p• 'i :v 4 . ' , 't A ~ ~ ' 2 P:80 1 • ~ ' - - _ ~ _ o get i` 6a~. =e ~ _ aYA ~ .~.g_ `I- ~ 1 ~y~" . I r.. 169 P.3 y y . i ,:,c,. 's ' 4 . O PB AL , . 4:, , 1 ~ ` _ ` i _ ~ i f sb r 'Q ~rF± IDEWTI , ~ ,W< < , : . ~ ,o r = I ~ ' , D ~ m -o - tl..: ANT.RES ~ , ` , ,v , , ~ _ I , - =>_z - , ~ - ~ ~ ~ _ n r Q, . , NEO. n is , . • . • _ ! . , - - ~ 1 ~ r`mm,.. , - xa ~ ' - - - ' f.'~ . „ a,~,., 3 ~m P , _ B _ : , a _ ~ i U BA v. : . , s : ~ , _ _ _ r R ~ - _ , ,'x ~ ~ ~i , r. , _ ~ ~ I,: ~ ._s. ~,~t: _ : °:'a E _ r 0 y 3. ~ • . x w, h= , , , FREE I_ s~~_" _ _ _ 2g - r - Ti 71 its - ~,a. t..; 1 5 } _ `4 °i tit T7 - _ _ _ f/_tw , : • - r., _ a r ~ , ~~~..-rte , Z ,Y ~ ~p;~iS U) _ ~ - m i"' ; - - JO 7155 . ~ , - , ~ , . _ , , I I A = 1 - - - r _ QAaWA e ` ~ ti 1062. . 1 . , z•.<. : Y . , ~ _ - r TL _ - - r-' EY ~ SID a -:a - ' . - , . , , 2 A ' : -fi>= ~ ~ l ~s.-- _ U - _ . r~ f, p'fIERFI Z-~. i ,.gym . ~ m ' . , • r Q cJT G~3 z ~ ~~°a: z = i i = - _ _ ` t o ' . SOBURBA m ~ f~'~ o.:, , 5. ~ .F 1 mb,..-m _ Cl! r.. T ~ _ c,: - _ - : , ~ I ~ ~~NS _ _ - I. ~S _ ~A~E -A. : - ~ - i T_ m,.:,- L3-~ , n f , _ : ,,.rte. " ' ~..n - ~ 4 - _ ai. - _ = ~~8' _ _ ~ ~ ° s R , - - ~ - , - - i _r =ri l J - - a m - _ • c ~ _ - gl~T, _r t. ~ . H. ~ - - _ : Y - - , BRAG :1971 , m ~ ..0.m ~ ~ - ' - _ CEL ID ,y _ _ _ _ _ P 065 ~ - ~ ~ _ , , . _ , 1~'T"`~ ; ` ' ° ' r 00 . ` ` Y ~ an r~ ~ ~r _ . , . 5110 P• . , i ~ ~ - _ ~ - - - . 1 • i - - - _ B ; F~ A _ : - -="gy"m : , 15 L ~ - - - - - , OEN>i - - - - - .RL~ Zt .,.Y„~. ter. _ , _ - _ , . y , _ ~ ~ _ r.• A _e f .VAC , m _ . _ . - ~ : - - : - _ ; r - - _ _ _ USE. 10 ~ ,ef=:, 6 v~ - _t-- _:a+. - - - _ - - ~¢e - - - z - ta.6,. ~ _ ~ ~,,.a . - - s, . t . ~ , I ~ I' /f ~ ~ , z _ „ _ UBURBAN. m - ~ - S ~ - . . - - ~ - f~'~ { -L-°- - _ - ~ ~j_ ti - - _ _ -i ~ fy SITE DATA k 't~ ~ :....~ry ~ ,I ' , , ~ TOTAL SITE AREA: t 17.43 AC. (t 759,251 S.F.) ~ , p ~ t- ( ~ .M1 7 . , - - - - - r 4_ g TRACT 1 ~ .e - _ _ : - _ ~ , 1 - . - ~#+y~ - _ Lu Q SITE AREA: 9,02 AC.(±392,911) ZONING:CC(D) ~ i; 'R ~ s P - _ . ~ . Nr~ CURRENT USE: VACANT DB: 2388 PG: 340 ;°s r----- ~ .pt`s . - - _ - _ - R ~n < - _ - ~ _ - PAR E r ,SIT p~ p ~ - - , MKSL HOTEL, LCC; LOCATION: 7806 NC 751 HWY; TRIANGLE TOWNSHIP, PIN#; 0718-03.13-5168 ~ry I PARCEL ID:143672 DURHAM COUNTY, NORTH CAROLINA WATERSHED OVERLAY: F!J-B . Y ~ J.. _ - r • ~ , , #YI _ . DB 006958 p. 000634 Pi3173 p. un DEVELOPMENT TIER; SUBURBAN ' ~ I f1~ , ;ARE ~ <<_ ; r CO _ ~ p _ _ - _ USE , RED ~E~' t _ _ C ~ _ _ r ~ ~ - - u3E: cot~IERDIa-! HotE~ CAPE FEAR RIVER BASIN ~ c4 L~• 20NED:b1U(D) PROPERTY OWNERlAPPLICANT E • C9AT _ _ SUBU - - c NIF . , ~ r • . s t , SOUTHPOINT OWNERS I ~ i _ } SUBURBAN TIER FIJ-B LEE-MOORE OIL COMPANY CONTACT: KIRK BRADLEY ~ P.O. BOX: DRAWER 9 PHONE: (919) 775.2301 t E 9 .ter-. d . ; , ° I I ASSOCIATION, INC 'I = - ~ _ . , _ PARCEL 10:1435T8 t • _-~~Y - rs~ I r ~E< ~ , r ~ i ~ ~ r u: ~ • °i DB008290 p.OD0832 SANFORD, NC 27331 FAX; (919) 774-6967 v 4 - _ w...., . 1 ~ i - , - 6~'{ Ci 7 :~~_,'4- ~ $ s k ~ P8145 p 123 ' t - z E _ Y' _ USEiVAbANTlCOMMERCIAL 1 ~ _ SITE AREA. S 41 AC. (t 366;340) TRACT 2 ZONING, CC(Oj k. ~ ~ VL Date: k 'Y } ~ APr~i~ 2o~a ~ r , _ i',: '1' I : ZONED: MU{0) ~ I`I'' : f F ~•$m~,v? I`r ~,:,^~p}=M~`' ~ i, ~ ~I ° ~ ' t SUBURBAN TIERFlJ•B L TAREA/ IMPERVI( - - ZEA / IMPERVIOUS AREA CURRENT USE: VACANT DB: 6127 PG:195 ~ ? ~ ~ ~ I ~ ' ' LOCATION: 7906 NC 751 HWY, TRIANGLE TOWNSHIP, PIN#:0718-03-12-6501 ~ ~ ~ ;~~''9 _ r ~ _ t ~I n , . t . : LOT AG. LOT AC; IMPERUIOU5 DURHAM COUNTY,NORTH CAROLINA WATERSHED OVERLAYi FlJ-6 } ;r} ,,a g~~`,; 14 ~ h i.., SCSIe: ~ _~O {7~1I:6...,i ar~•;t:r(.G4 ,Jl~Plld=~~f,-~~ _ LOT#1= 6;84 AC, DEVELOPMENT TIER: SUBURBAN 4 y ^t ` ,y 6,84 AC, 0.00 AC. I. l a s CAPE FEAR RIVER BASIN t Drawn: NIF ~ ~ - I__-Ct1 =_1~ I r:,.r'll i~9'~ L"1UT SOUTHPOINTTERRACEOWNER9 N(F ~ LOT#2 2:13 AG. 2.13 AC: 1.61 AG. PROPERTY OWNER! APPLICANT 3.05 AC: 2.35 AC: LEE•MOORE CAPITAL COMPANY CONTACT: KIRK BRADLEY ~,I a ~ 1 ~ BfFw . ~ ~ ~ Is!,r ~,11)l'°: ~':.ti.1'R Asl~oclATloN, INC LOT#3= 3.05 AG: 1300 KNOLL CIRCLE APARTMENTS r ;~st :r1~ _ ~ PARCEL ID:193723 INVESTORS, LLC a LDT#4= 1.06 AC: tl R.:,~ r, ~ P~. , 1.08 AC: 0.75 AC: P.O. BOXi DRAWER 9 PHONE: (919) 775-2301 ~ } , ij BPD ly,,~~ ,~k~*rJ3 OB005508p.000639 PARCEL ID: 143580 _ LOT#5= 1.02 AC: PB 181 p.154 D8 004208 p. 000678 LOT#6= 2.17 AG 1.02 AC. 0.80 AG: SANFORD, NC 27331 FAX: (919} 774.6967 ~ ° ~ ~ Checked: 2.17 AC. ' 1.33 AC. Lit ~ ~ USE: VACANTIRESIOENTIAL P8148 p 027 HOMEOWNERS ASSOCIATION USE: COMMUNITYIAPARTMENT•GARDEN LOT#7- 1.08 AG: 1.08 AC. 0.92 AC. TREE COVERAGE REQUIRED: 1.74 AG. (10.00% OF SITE) BUILDING SETBACKS: , ~ } `3'~,:, ' t' ` ry MPA zoi1ED:PORS.z79 zaNeo:RS:M(D) NOTE: R,O,WDEDICATION O,O6AC:: LEGEND SUBURBAN TIERFlJ•B SUBURBAN TIERFtJ-B EROSION CONTROL NOTES -STORM WATER MANAGEMENT STRUCTURE AND TOTAL= 17.43 AC ICATION 0,06 AC. 0.00 AG. TREE COVERAGE PROVIDEDi 3.26 AC. (18.829'° OF 51TE} STREET; 25' -OPPOSITE MU(D) 1~~ ~ SUBSURFACE DRAINAGE SYSTEM OWNED / 17.43 AC. 7.76 AC. SIDE: 50' - OPPOSITE PDR , ~ Project No. IMPERVIOUS AREA: t 1.66 AC. (t 9.52°k) 4 200-$8 - DISTURBED LIMB LINE (fYP.} ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH STATE AND MAINTAINED BY OWNERS ASSOCIATION. NO TpF TREE PROTEOTVON FENCE(TYP.) LOCAL REQUIREMENTS, THROUGH DRAINAGE STORM EASEMENTS FUTURElMPERVIOUSRREA: t 6.10 AC. (t 35.00°k) LANDSCAPE BUFFERS: E, STORM DRAIN PIPE (TYP:) REQUIRED. MAXIMUM AREA OF IMPERVIOUS SURFACE: ± 7.76 AC. ±44,52% RR i RS-20 -VACANT: 30' ( ) ~ Computer Dwg. Name RS-10 -DEVELOPED; 50' PLAN SHOULD INCLUDE PROVISIONS FOR GROUNDCOVER ON CATCH BASIN (OB) EXPOSED SLOPES WITHIN 21 CALENDAR DAYS FOLLOWING DISTURBED AREA: t11,40AC. MTCBUFFER: 100' ' 200-88_Sht-O6-Grading-Plan COMPLETION OF ANY PHASE OF GRADING; PERMANENT J GROUNDCOVER FOR ALL DISTURBED AREAS WITHIN 15 WORKING ® DROP INLET (Dlf ~ DAYS OR 90 CALENDAR DAYS HICHEVER IS 5HORTER} STORMWATER POND ACCESS NOTE PREEDEVELOPMENTTRRNSPORTATION-RELATED IMPERVIOUS AREA (ACRES)= 0 ~ ~ ~ Q PRE-DEVELOPMENT NON-TRANSPORTATION-RELATED IMPERVIOUS AREA (ACRESj= 0 ! Sh4@( NO; FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. 1) THE ACCESS EASEMENT TO THE TOP OF AND AROUND TOP OF THE OF THE POST-DEVELOPMENT TRANSPORTATION-RELATED IMPERVIOUS A;~EA (ACRES}= 1:21 FLAREDfND SECTION{FES) - - NORTH DAM SHALL BE A MINIMUM OF 10 FEET WIDE, SHALL HAVE A MAXIMUM FI J R ~ C V ~ E V V O I V LY / D Q 7 ~4 D 771 MAINTENANCE: ALL EROSION. AND 5ED(MENT CONTROL PRACTICES CPNTERLINE GRADE AND CROSS•SLOPE OF LESS THAN OR EQUAL TO t EQUAL TO POST DEVELOPMENT NON TRANSPORTATION-RELATED IMPERVIGUS AREA (ACRESj= 0.39 ~ , • - t ~ h , j BC= BACK OF CURB t~ u. r . GL.l1 TO BE INSPECTED WEEKLY AND AFTER EVERY RUNOFF PRODUCING 5.1 (H:V) AND 10:1 (H V) RESPECTIVELY. ACCESS ACROSS THE imrcnv VuVtA m \ ruiul\r W-W THE PRE-DEVELOPMENT TRANSPORTATION-RELATED IMPERVIOUS AREA (ACRES)= 0 TP= TOP OF PAVEMENT NOT RELEASED RAINFALL EVENT. NEEDED REPAIRS WILL BE MADE IMMEDIATELY. EMERGENCY SPILLWAY WILL BE PROVIDED SUCH THAT AN PRE-DEVELOPMENT NON-TRANSPORTATION-RELATED IMPERVIOUS AREA (ACRES)= 0 ' TS= TOP OF SIDEWALK + + 50' 0 50 100, ALL-WEATHER SURFACE CAPABLE OF SUPPORTING HEAVING VEHICLES FG= FINISHED GRADE FOR CONSTRUCTION MAXIMUM GRADED SLOPE SHALL NOT EXCEED THREE (3) TO ONE (1). WILL BE PROVIDED. THE SIDE SLOPES OF THE SPILLWAY SHALL BE 5:1 VEHICLES 'HALL POST-DEVELOPMENT TRANSPORTATION-RELATED IMPERVIOUS AREA (ACRES)-- 4.21 SBE 5:1 POST-DEVELOPMENT NON-TRANSPORTATION-RELATED IMPERVICUS AREA (ACRES)= 1.89 ®f- OR MILDER. HP= HIGH POINT TOTAL DISTURBED SOIL AREA IS 11.50 ACRES. SCALE.1 -50 (Honz,) DOMED TRASH RACK N0.6 REBAR W! MAXI 12" HORIZONTAL OPENING, MOUNTED WITH HINGES AND W , : ,I N!F tR. - y U.S.A. HOLD DOWN CLASP WITHIN THE INSIDE LIP OF PRE-CAST BOX. LID SHOULD OPEN AWAY FROM DAM.. ~ 4 m _ - - - U.S. ATT®RNEY SEE DETAIL ON THIS SHEET. ' 4" ~ y,, n yew.: FLOW SPUTTER BOX ~n , , _ z.„<""^"'~•.. . ,,,,n~.:, INV OUT= 246.30 EXTEND WHEEL ABOVE TOP OF RISER EL: 255.30 PARCEL ID:143370 ~r _ . ° DB 404 .491 p PRE-CASTBOX .w~~ --.W.:: _ ~ "z°e•.,_,„ USE: VACANT-COMMUNITY SERVICE AND TRASH RACK © STEPS ~ a,. 3 ~ _ _ ,z .~-.~_wz.... UBURBA - v. Yt n_m..~,a _ . 5" TEMPORARY PLUG FOR ~ 5'x5' INSIDE DIA. : ~ TED - , FUTURE 10"DRAIN CONCRETE RISER ..y, , - - - ~ A ROWN EL:= 253:40 " A wl6 THICK SOLID WALLS TEP . . - TEMPORARYPLUGFOR o 0000000 00®®00® ~ FUTURE 2 314" DRAIN 15" MIN. WEIGHT= A _ ~ _ . _..~a ..,...,.-~,.u - _ _ _ D _ - DOWN EL.= 252:00. _ _ - z., o KLAN SIDE ELEVATION ~ _ EX r . ~ ~ _ EXTENDED VALVE ~j r.~~. _ i ~w-y =4 ~ - - SASS n7~Rl I_ -w,-.~ P-RAP - _ , a ° STEM W/SUPPORT o WATERPROOF tY I _ .:r. DISSAPATOR - ~ t ~ f 3' O.C. MASTIC (TYP.) 3 I ~ `T-., - ~ _ o:~~~ f ~ k . ~ tt~ x x - ~j_ - _ ST STAINLESS STEEL ~ SLIP RESISTANT CLEATS ,5 ~ - -D59=1D" .DMAX=15" ~.TM 'PROPOSED? _ - . n~ ~ , • P £ r. - q . ~ u~.. _ _ , STEIN GUIDES (TYF.) PRIVATE 5T RM ' y--~_ , f, - g. f ~ . ~ ~ CLAS - _ ~ ~ a ,_-n. ~P = r ~ 8"PLUG VALVE- GROUT TO DRAINAGE I T m.,- , --.v,. _ `y6,: 8 DIP DEWATERING ~a_ ; .z , EASEMENT V r ~x.__ ~ ~ _T ~q_ 1 t. ~ - - - _ )EWATERING INVERT'..: 36" BARREL.-- 'i2"____~_----.- ,s ~ , . ,_,_F. . 2a 4D 5 , _ _ - - _ t. J= 247.00 - I INV. OUT= 246.90 ELEVATION w~ ; PROPOSE 74 = NV.IN- 247.00 MAX ~5 v - ; , WIDE MME GENCY: - - ~ - #3 OR #4 REBAR n.~_ ' TOP 0 . ~ . E - - - .-j- .P SPILLWAY E CORROSION RESISTANT MATERIAL TOP OF PAD EL.= 346.30 • " (RUBBER, PLASTIC} I ~ - - - OF?O U 7 -SHEET 14 ~ ~ - 258 _ _ _ _ 7i1NING,IN n _ ~ _ - . , „ , p 1.5' DEPTH . C I f r , : _ , _ FTOP°OF~DAM~=258.10.-_.~._,~_ _ - C" - ~ ,.s, ~ - - _ _ ,,TM _ _ - _ _ - - _ j' _ 3"CLEAR Q { :._.,5,,,~, -a-~ ss~T__. a~:e~ ~ _ _ _ - - _ _ _ - NOTE. INUOUS RUBBE s> 25 ..u T ~ _ _ ' ~ WNT I - - - p~. _ y ~ n - , - ~n a: _ ONTINUOUS RUBBER WATERSTOPS SHALL eE #4 @ 12" EACH WA,Y 7` d 1, i f s _ PROVIDED AT ALi: GON . - 1 ~ l ~ .,4 - ~ :..,:.w. p,. -„w- _ v_ - a _ - : - AND SECTIONS SHALL )VIDED AT ALL CONSTRUCTION JOINT5IN RISER SECTION A-A 1 SECTIONS SHALL BE STRAPPED TOGETHER SQUARE 1 d ~ ~ , a_ :e- ~ - _ __.:-Q-. - . WlSTAINLESS STEEL H~ w , . I ~ ~ ~ _ , - _ _ _ - TAINLESSSTEELHARDWARE. STANDARD SIP gp~Ea,~1~3TpAgT - I , .T } _ M1. - y:,. w.--- " T _:_X d a C1Rl=BAY . w,.. u . _ - - _ E D 4a_, _ RISE ETAIL MANHOLE STEM ®ETAiL _ 11+ , , - U OUT= -43~, ~ _ - ~ I - - - s . ~ E ~ _ _ ` y ~ s _ _ 314" HINGE PIN NTS ~ ~ ~ -V7 v ` 8 ~ _ . _ _ ,t ~ . w - _ ~~a- ' p , ,ti I ~ E - - _h-m Z Z~ ~ ~ ~ - k _...U ~ t. ' ; 1 ~ _ - 9 T • I _ x, S R IC I _ _ 314" LOCK BOLT ~ j~ ~ Z ~ ~ - _ ,r~.... t-,~ _ ~ _ _ _ , 4M1= 1 RISER BA~iN _ 4,~_LL _ ~ _ : 4 ~s , ~ : 8 TYPICAL r 4~~~ m U _ , . - - B ~ _ - - i ~ COAT ALL STEEL SURFACES Wl FOX ~ U ~ ~ - i _ , ~ \ ~ RI,VI= 257.50 _-r..-_ , - - _ ~ ~ ~ ~ iNDUSTRIE$ FX~}20 COAL TAR EPOXY ~ ~ ~ ~ ---IPEDIAMETER 2,-0, ~ `1 0 _ ~ I . _ e 1 , ~ ~ _ ~ ' : ~ NU IN= 249.5!1 COATING OR APPROVED EQUAL. 2'-0" O.D P ~ ~ '~p11 ~ J N o ~ 5 ~ ~ ~ ~ ~ 60 ~ r ~ _ ; E , _ ti_ , ® F~ ~ ] 6~ J 16" SQ. STEEL SURFACES WHICH ARE TO ~ Z r(~ 3 ~ ~ ~ : _ .,t . a r ~ RECEIVE FX-240 COAL TAR EPOXY ~R. ~ U 1 R m p ~1 ~ .4: f n t.; Y #5 REBAR ENTRY F.. COATING SHOULD BE PREPARED BY ~ ~ ~R ENTRY ABRASNE BLASTING TO A , 4 " w Ate a t , t; ~ ~ r, - - - g_. _ GUARD • 2' COMMERCIAL GRAY METAL SP-6 ~ ~ ~ ~ s 0 MYi ' _ s L j q e - ~ I _ f i ~ ~ , i~ _ , ` STANDARD. ANY SURFACE BLASTED ~ > ~ o ~ 0 SHOULD BE COATED THE SAME DAY. Q .r Q _ > Z , G ' , ~ _ m_ _ _ IF PREPARED SURFACES ARE _ ~ ' i h~!a., . ~ ROp ; CONTAMINATED BY RUST OR OTHER 28 DAY:3000 PSI CONTAMINANTS, THEY MUST BE ~ 36° RCP CLASS "3" CONCRETE CRADLE I ` , 2 _ _ ~ e e : i_ RE-BLASTED. W! "0" RING LOCKIN i ~ - ` ~ ~.,,a : _ _ _ _ a ~ ~ - {.x-J-c 113 PIPE ~ JOINTS SEE PLAN DIAMETER ' _ - ~ : - - 1= ' ~•s ~ . , r ~ ti ; ~ ~ ~ ~ - - 314" DOWEL LOC _ r 314".DOWEL LOCKING 314" HANDLE , , . ~ , f ~ _ - - - - - - , - w MINUM PIN ALU , , , - - _ _ , ~ , . ALUMINUM PIN - ~ _ fg y 4 k, r 9 ~ , • , I.._ 16._d,,,.l 3"PLATE v,~i~rtdrr RIM- 0.4~~-s _ _ - „ - 9a~~~,aa~ ~ ei~sr - ~ ~ ~ ~~f . n . INV IN- 55.90 (CB# 1 - . F4 = - „ , , w~ ~ ~ INV 1N= 51.20 DI# 6Y i. 9 "fpfP P"y ~ ~ ~ ~ j w 3 _ _ _ , - x, ~ _ INV 2 .79.. pp~~ .t 44 yS ~IF x: 'k1~1 r \ ei t~',,~ 1 ~ ~.h '-,S '.I - _ 3l4" HANDLE 27" IPE BEDDING/CUE CRADLE DETAI JDLE + © ~ ~ 314" HINGE NQT TO SCALE .,d©, EXTERIOR SLOPE ~ 4®"""„¦"®"'® " o NU. 67 WASHED STONE ENCASED ~kq~gt~gy~~15, 3"ANGLE (TYP:) IN NONWOVEN FILTER FABRIC PROPOSED HEADWALL (MIRAFI 180N) ii (SEE DETAIL THIS SHEET) 1 ~ ~ y ~ , " ' e. 314" I:OCK BOLT ii ~ 8 TYPICAL - - a I.__-...___ _ . ~ _S - 274 274 _ - I I S ~ - - E ~ - E ' . _ - - b ~ i a ~ ~ ~ h 272 - - e____ D------..__ 72 _ ~ ~ 2 , _ ! I RACK DETAIL N c~ v Y ~I fi - - - t z7o ~ _d~..w ~~~..M~ rFm.. , ~ . ~ ~ 27o NOTES I , I )TESL trrs - E J , ~ z ~r _ _ a ~ ? 1 CITY DRAINAGE EA5EMI DRAINAGE EASEMENTS. CENTERLINE OF 20' WIDE PUBLIC 5tam WATER DRAINAGE EASEMENTS. OWNERSHIP OF, SPILLWAY PIPE _ _ _ ' _ _ _ _ _ _ - _ _ 268 268: _ . ___I_:. _ _ _ AND RESPON5181LITY Ff ~ , ~ I RESPONSIBILITY FOR IMPROVEMENT AND MAINTENANCE OF STORM WATER FACILITIES IN THIS EASEMENT REMAINS t ` , ~ 4"0'WEEPHOLE ON i THE GRANTOR. IF THE PROPERTY IS WITHIN OR BECOMES A PART OF THE CITY, THE EASEMENT AND ACCESS POINTS ' ~ Q a..--- . ~ _ WITH THE GRANTOR. IF 1 ~ s I I ' TO THE EASEMENT ARE HE EASEMENT ARE SUBJECT TO THE TERMS AND RESTRICTIONS STATED IN THE "REVISED DECLARATION OF RIGHTS E _ EACH SIDE OF ILLWAY I ~.I 266 : _ . _ ; ~ 66 AND PRNILEGESOFTHI s I EXISTING GRADE , ~ z.. _ _ PRNILEGES OF THE CITY OF DURHAM IN STORM WATER MANAGEMENT FACILITY EASEMENTS" RECORDED IN REAL ~ a z~ 3. ° - ESTATE BOOK 2298, PA( ~m,~,a~e:,..~.~-. m: , :r.,..,, ,a~~ m-. .mz ~ r_c:,r,, w,,~~ _.z.~~, .-~_.n:.~ ~z,,_,=_:., m _ _.,-3~:. _ ~.,rr.:r . - _ j M I t DO NOT CREATE THE OI 1TE BOOK 2298, PAGE 208, WHICH DOCUMENT IS INCORPORATED HEREIN. THIS EASEMENT AND REVISED DECLARATION IOT CREATE THE OBLIGATION TO PROVIDE PUBLIC MAINTENANCE. NO BUILDING, STRUCTURES, FILLS, EMBANKMENTS ~ ~ ~ U) - _ t 264 ORQBSTRUCTIONSPEF 3 264 3 1BSTRUCTIONS PERMITTED WITHIN THE EASEMENTS EXCEPT ACCORDING TO THOSE TERNS. r, > _ t_ _ ~ - . _ ~ , 2 PROTECTION OF EXISTII 9 ~ I iECTION OF EXISTING VEGETATION: AT THE START OF GRADING INVOLVING THE LOWERING OF THE EXISTING GRADE - _ - ~ _ _ ~ 262 AROUND ATREE OR 5TI 262 _ _ , _ 4 ° ~ ~ PROPOSED GRADE UND A TREE OR STRIPPING OF TOPSOIL, A CLEAN; SHARP, VERTICAL CUT SHALL BE MADE AT THE EDGE OF TREE fl ~ 0 I' i I i a r. - ; _ - - - - - - SAVE AREA AT THE SAN , _ ~ t I FENGiNGSHALLBEINS-. c AREA AT THE SAME TIME AS OTHER EROSION CONTROL MEASURES ARE INSTALLED. THE TREE PROTECTION L~•1 ~iNG SHALL BE INSTALLED ON THE SIDE OF THE FARTHEST AWAY FROM THE TREE TRUNKAND SHALL REMAIN IN W ~v_.,-~ ~ - _ _ 10 a. 4 - 2 PLACE UNTIL ALL CONS' 260 ~ I ° j~ I ~ ~ ~ SPILLWAY ;E UNTIL ALL CONSTRUCTION IN THE VICINITY OF THE TREE5IS COMPLETE. NO STORAGE OF MATERIALS, FILL, OR ~ ~ ® ~ EQUIPMENT AND NO TR . DiAPI-1RAGM FINER TAP-- OF-DAM-€L,=258,10 I- _ - _ r-- - 10' LITT IPMENT AND NO TRESPASSING SHALL BE ALLOWED WITHIN THE BOUNDARY OF THE PROJECTED AREA 4'-0" i U ~ Q _ / - - - . - fi - - _ _ . _ W 258 3 CONSTRUCTION PLANS 258 =.,=.r. ,,:w_.~,~nn~~=~. ~ .-,.,-,,~~=.,.N~,.: n~,.a.~, _ . ,.,=s, ,~,-u..: , :,,sz-~,,. s=. x,-,:,~~~q3='fOQ S=TORM=E~ ~5~2~~~ T,_.-.,:~T ~ . _TT_,__ -SHELF - .#:n_ s AND MAINTENANCE PEF STRUCTION PLANS WILL NOT BE APPROVED PRIOR TO RECEIVING AN EXECUTED STORMWATER FACILITY OPERATION MAINTENANCE PERMIT AGREEMENT, PAYMENT OF THE STORMWATER FACILITY PERMIT FEE ($2,000 PER - r _ - - - - - - -F-----._ - s._. _ ENGINEERED5TORMWP PROPOSEQ CONCRETE INEERED 5TORMWATER CONTROL), AND PERPETUAL SURETY FOR THE CONTINUED OPERATION AND MAINTENANCE NOTE; EXTEND FILTER N0.67 WASHED STONE ENCASED ~ 2 _----TOP-OF RISER-EL.=X55-30 F : - - - 256 OF THE FACILITY (SURE 256 I - - i ~ 1 HF~tDWALL'78PLITTER BOX t. I 3 - - - ~ - - _r - _ - - DIVISION OF THE PUBLIC HE FACILITY (SURETY BASED ON FINAL DESIGN OF POND/DEVICE). CONTACT THE STORMWATER SERVICES 3'°0" DRAIN TO 3' ON EACH SIDE {N NON-WOVEN FILTER FABRIC, ~ f- yy 3 4 iION OFTHE PUBLIC WORKS DEPARTMENT. ~ OF PIPE (MIRAFI 18ON) ® ~ O m N, ~ - -L _ 2r~ ALL CONSTRUCTION SH, I ' , 254 _ _ . _ - ; - , . CONSTRUCTION SHALL BE IN ACCORDANCE TO CITY OF DURHAM STANDARDS AND SPECIFICATIONS. _ ~ f1 ~ _ r---. - - I I ~ 56 LF 36" RCP : , 25__ - a ~ . _ _ ~ 252 DA ELBA F : N EMBANKMENT CONSTRUCTION NOTES ' ~ _ _24".MAX- 5~P-E-RIu~ANE-NT-P©OL---- - > _._-__-_24n MAX- _ : _ _ ' _ 1. CONTROLLED FILL,Iu _ ~ ----_,-----FDREBAY_----- - ~ 6-INCH LOOSE LAYEI ~NTROLLED FILL, AS SPECIFIED BY THE GEOTECHNICAL ENGINEER, IN THE DAM EMBANKMENT SHALL BE PLACED IN ~ W. INCH LOOSE LAYERS (3-INC LOOSE LAYERS WITHIN 3-FEET OF EITHER SIpE OF 1HE PRINCIPAL SPILLWAY PIPE TO A ~ W = _ 2 aym..,ar.._-s--a ,::r..:ac~:,umvcz~.._ m s .=..sa,:.cssz ...,,..a n, A - mm~..,.: , ;::n=~,=, w,= _ ~ ; _ _ 50 DEPTH OF 2-FEET 01 250 - ,m~~ .=:;~e~... , - .gin-~.:,,:_ 120 WEIR cPTH OF 2-FEET OVER THE PIPE) AND SHALL BE COMPACTED TO A DENSITY OF NO LESS THAN 95°k OF THE - 3 I ~ l_[--- _ - ~ _ - _ . - _ - - _ STANDARD PROCTO fANDARD PROCTOR MAXIMUM DENSITY AT A MOISTURE CONTENT OF + OR-TWO PERCENTAGE POINTS OF THE ~ ~ _ , 'TIMUM MOISTURE CONTENT IN ACCORDANCE WITH ASTM D698.2. ALL VISIBLE ORGANIC DEBRIS SUCH AS ROOTS ~ I ~ ~ ° ~ G s OPTIMUM MOISTURE 248 _ . _ = - - , ~ ~ € i _ - 248 AND LIMBS SHALL BI VD LIMBS SHALL BE REMOVED FROM THE FILL MATERIAL PRIOR TO COMPACTION TO THE REQUIRED DENSIT". SOILS p ' a t _ _ - _ iNV€RT-BUT=-246:30- wiitl oRGANic MAT _ _ ITH ORGANIC MATTER CONTENT EXCEEDING 5% BY WEIGHT SHALL NOT BE USED. STONES GREATER THAN 3-INCH (IN 36" RCP CLASS "3" ~ I B , I _ BOTTOMEL.=246.00 •=:-~r~_t;;`:;': ~ ANYDIRECTION)SHi 1.0_LITTORAL _ _ 2'46 - -_-I- - - - E ~ w, :::.:.:...:::_."'2:`::'-:~•s-•._. _ _ _ 246 3. FILL MATERIAL PLACE DIY DIRECTION) SHALL BE REMOVED FROM THE FILL PRIOR TO COMPACTION. € ' W/ "O° RING LOCKIN L MATERIAL PLACED AT DENSITIES LOWER THAN SPECIFIED MINIMUM DENSITIES DR AT MOISTURE CONTENTS d~ JOINTS ~ SHELF 6:1 _ _ _ _ ~'dlf~ - - - - 10:-,,.R,.~~ ~ (_>~t C©NNE-C-T-4--,.,, . . - - _ _ _ OUTSIDE THESPECII JTSIDE THE SPECIFIED RANGES OR OTHERWISE NOT CONFORMING TO SPECIFIED REQUIREMENTS SHALL BE ~ , ~ ~ I I ~ SLOPE) T MP Y KI~AMER ' REMoveo aND REPt I _ I _ _ _ _ _ _ -------8-DIP-EMERGENCY - _ _ _ E- S 244 244 - - - ' _ n n - 4. ANY FILL LAYER THA' :MOVED AND REPLACED WITH ACCEPTABLE MATERIALS. Date: Y FILL LAYER THAT IS SMOOTH DRUM ROLLED TO REDUCE MOISTURE PENETRATION DURING A STORM EVENT SHALL APRIL, ZO1® ~ TO 8" EMERGENCY _ I _ _ ~ ~ DRAIN -15L.F. _ _ . __._CL~SS _ RIP_RAP _ t _ _ _ BE PROPERLY SCAR q DRAIN I INV IN= 247.00 DI3$APATOR 5. SURFACE WATERANI :PROPERLY SCARIFIED PRIOR TO THE PLACEMENT OF THE NEXT SOIL LIFT. Q N _ - - - - - - - - - - - 242 _ _ W_ . _ - _ _ _ _ ~ _ 24`1~ x ~NX ~4T 242 PLACEMENT OF CON LL I RFACE WATER AND STREAM FLOW SHALL BE CONTINUOUSLY CONTROLLED THROUGHOUT CONSTRUCTION AND THE ~ SCale. ACEMENT OF CONTROLLED FILL. 4"n0'WE~PHOLES ~N~s ~ p_ p_ , - i ` ANTI_FLOTATION...___ _ _ _ FU Y WRAP P 6. FOUNDATION AREAS _ _ _ - I - R a-10°_DMIkX"15" _ ; - ~ ~ _ _-JOINT~VIOTH FICTE D5 - - ~ - F PAD 7 x 7 x 1.5 UNDATION AREAS MAY REQUIRE UNDERCUTTING OF COMPRESSIBLE ANDIOR UNSUITABLE SOILS IN ADDITION TO ~ EACH SIDE OF SPILLWAY' b ~ -3O (HOrz.) x 1 -5 (Vert.) - I THAT INDICATED ON 240 ,~„.-v„,~.~;,~w L~.-Mme.-~....,,.P2..--~m w.-,i ~..~.,~.,a_.~~~.,..n,m„-:~,. ;..-~~„~:.~r~m-m-._:~ 3 ..~,s~~ y ~...,.=m~,.,~~~~e_.,,...-.~.:~„~_~~.~.,. .-....a.m-na.~.~,.,._.~,~.N,a,.,a.~~__ ~ f=ABRfG~(f~JiRAFI:~.,~T.:,.-~ E - - - 40 GEOTECHNIGAL ENc 9AT INDICATED ON THE PLANS. ALL SUCH UNDERCUTTING SHALL BE PERFORMED AT THE DISCRETION OF THE _ :OTECHNICAL ENGINEER AND SHALL BE MONITORED AND DOCUMENTED. IN NO CASE SHALL THERE BE AN ATTEMPT D~~' I~..____.:.---... a.._ ' _ CONCE~ETE - __1BON-OR-EQUAL T05TA61uzEANYPi STABILIZE ANY PORTIONS OF THE FOUNDATION SOILS WITH CRUSHED STONE. `nI JPD 9 ~ ~ _ _ 7. TREATMENT OFSEEF 238 :_L_ . _ ~ ~ ; _ _ 238 PREPARATION {LE.,1. EATMENT OF SEEPAGE AREAS, SUBGRADE PREPARATION, FOUNDATION DEWATERING AND ROCK FOUNDATION S P I L L Y Y A~ I LT E ETS"1~ L 2EPARATION {LE., TREATMENT WITH SLUSH GROUTING, DENTAL CONCRETE, ETC.) MAYBE REQUIRED AT THE Checked: -I--- - . _ _ - _ - ' - _ _ _ _ _ - DISCRETION OF THE SCRETION OF THE GEOTECHNICAL ENGINEER. ALL SUCH ACTIVITIES SHALL BE CLOSELY MONITORED AND T V PL I 1 T I°~ MPA I ' I r~ DOCUMENTED BY TE I _ a . : _ 236 236 - _ _ . _ d )CUMENTED BY THE GEOTECHNICAL ENGINEER. I ~ ( , _ NOT TO SCALE Project No. - ~ I I : : 234 - I _ _ 34 n 200-88 `FS ~ ~.s, i 's , { R Computer Dwg. Name S p 1 3 - - 2 232 _ - ~ . _ _ - 32 - ~ " CITY OF DURHAM Zoo-ae_snt-ll-Wq-Pond I 9 ' _ s - _ - _ . _ - R _ ~ _ _ _ _ _ _ _ _ ~ f ~ ~ PUBLIC WORKS DEPARTMENT : ~ P ; I ~ s Q = 230 230 ~ , NORTH APPROVED Sheet Noy - ~ ~ N N N ~ 07 t7) td) c0 NUT RELEASED (P.B. ~~J3 P. 225 ENGINEERING DATE N LO LO (Q to t0 N N r v 1 V"m Y8? A I _R VH I C N N R N fV N N N N FOR CONSTRUCTION 20' 0 20' 40' TRANSPORTATION DATE DATE 10+00 11+00 12+00 13+00 14+00 15+00 SCALE: 1 "=30' (Noriz.) DATE Of 1 "=5' (Vert.)