Loading...
HomeMy WebLinkAbout20201401 Ver 1_ePCN Application_20201113DWR mrlslon of Water Resources Pre -Construction Notification (PCN) Form October 26, 2020 Ver 3.3 Initial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* G Yes r No Change only if needed. BIMS # Assigned 20201401 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification Reviewing Office * Raleigh Regional Office - (919) 791-4200 Information for Initial Review 1a. Name of project: Line 472 Replacement Project 1a. Who is the Primary Contact?* Tom Morris 1b. Primary Contact Email:* Tom. Morris2@duke-enery.com Date Submitted 11/13/2020 Nearest Body of Water Swift Creek Basin Neuse Water Classification C; NSW Site Coordinates Latitude: Longitude: 35.604052-78.552514 Pre -Filing Meeting Information ID# 20201401 Pre -fling Meeting or Request Date* 10/6/2020 Attach documentation of Pre -Filing Meeting Request here:* DEQ Pre -Filing Meeting Documentation. pdf Version#* 1 What amout is owed?* r $240.00 r $570.00 Select Project Reviewer* Stephanie Goss:eads\sagoss 1c. Primary Contact Phone:* (704)731-4245 Version 1 8.6MB A. Processing Information C^U County (or Counties) where the project is located: Johnston Is this a NCDMS Project r Yes r No Is this project a public transportation project?* r Yes r No la. Type(s) of approval sought from the Corps: W Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* r Yes r No Please provide the date of the previous submission.* 8/13/2020 1b. What type(s) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: 12 - Utility Lines NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: W 401 Water Quality Certification - Regular r Non-404 Jurisdictional General Permit r Individual Permit le. Is this notification solely for the record because written approval is not required? For the record only for DWR401 Certification: For the record only for Corps Permit: r 401 Water Quality Certification - Express P Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment Line 472 Replacement Project - Wetland SOA 11-13-2020.pdf 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? r Yes r No B. Applicant Information 1d. Who is applying for the permit? r Owner 9 Applicant (other than owner) le. Is there an Agent/Consultant for this project?* r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: Multiple, see attached parcel map 2b. Deed book and page no.: 541.09KB * r Yes r No r Yes r No 2c. Responsible party: 2d.Address Street Address multiple, see attached parcel map. Piedmont Natural Gas is acquiring an easement for the pipeline Address tine 2 C1ty State / Province / legion Clayton NC Postal / Zip Code Country 27520 USA 2e. Telephone Number: (704)731-4245 2g. Email Address:* Tom. Morris2@duke-enery.com 3. Applicant Information (if different from owner) 3a. Name: Tom Morris 3b. Business Name: Piedmont Natural Gas 3c.Address Street Address 4720 Piedmont Row Drive Address tine 2 city Charlotte Postal / Zip Code 28210 3d. Telephone Number: (704)731-4245 3f. Email Address:* Tom.Morris2@duke-energy.com 4. Agent/Consultant (if applicable) 4a. Name: Sara Kent 4b. Business Name: 4c.Address Street Address 3650 Mansell Road Address tine 2 Suite 300 City Alpharetta Postal / Zip Code 30022 4d. Telephone Number: (470)508-9904 4f. Email Address:* sskent@burnsmcd.com Agent Authorization Letter* 01_Authorized Agent Form.pdf 2f. Fax Number: State / Province / legion North Carolina Country USA 3e. Fax Number: State / Province / legion Georgia Country USA 4e. Fax Number: 108.71 KB C. Project Information and Prior Project History U 1. Project Information 1b. Subdivision name: (d appropriate) 1c. Nearest municipality/ town: Garner 2. Project Identification 2a. Property Identification Number: See attached parcel map 2c. Project Address Street Address Address tine 2 cfty Postal / Zip Code 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Swift Creek 3b. Water Resources Classification of nearest receiving water:* C; NSW 3c. What river basin(s) is your project located in?* Neuse 3d. Please provide the 12-digit HUC in which the project is located. 030202011004 4. Project Description and History 2b. Property size: 190 State / Rwince / Rion Country 4a. Describe the existing conditions on the site and the general land use in the vicinityof the project at the time of this application:* The area consists of mainly forested areas with multiple agricultural fields. Adjacent areas consist of both agricultural and developed residential and commercial facilities. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 4c. If yes, please give the DWR Certification number or the Corps Action ID (exp. SAW-0000-00000). Corps Action ID SAW-2020-00375 Project History Upload 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) PCN_NWI.pdf 1.19MB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) PCN_Soils.pdf 2.81 MB 4f. List the total estimated acreage of all existing wetlands on the property: 31.7 4g. List the total estimated linear feet of all existing streams on the property: 2991 4h. Explain the purpose of the proposed project:* The purpose of this project will be to relocate a portion of an epsting natural gas pipeline due to NCDOT improvements to the adjacent Highway 42. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* The Project includes the construction and operation of the Line 472 (8-inch steel) high pressure natural gas pipeline. The pipeline will be installed along an approximately 1.5-mile-long corridor. The beginning and ending coordinates are as follows: Beginning: (35.596568°,-78.561528°) and Ending: (35.612868°,-78.551433°). The pipeline will be installed between a new regulator station located approximately 350 feet east of Cleveland Road and approximately 1,000 feet south of the Interstate 40 overpass, and the Line 117 tie-in immediately north of Highway 42 and approximately 0.75-miles east of the current Interstate 40 interchange. The new regulator station is 0.4-acres and Will be graveled and fenced in. A 1,000-foot long and 20-foot wide gravel permanent access road will be constructed from the Cleveland Crossing Drive cul-de-sac to the pipeline corridor. The Line 472 pipeline is being constructed to replace the portion of Line 117 that extends along Highway 42 across the current Interstate 40 overpass, along Commerce Parkway, and south along Cleveland Road before terminating at an existing station. This portion of Line 117 will be decommissioned and removed to allow for the new Interstate 40/1-lighway 42 interchange NC DOT project. The DOT project includes widening and reconfiguring the Interstate 40 and Highway 42 interchange, and the existing Line 117 pipeline along the road needs to be relocated to allow for the expansion. The Line 472 pipeline route was driven by the NC DOT interchange design, steep topography in the area, and severe landowner resistance and condemnation proceedings. The southern portion of route (Parcel 163700-27-2782) was re-routed to the far eastern edge of the property boundaries during landowner condemnation proceedings. The pipeline will be installed using conventional open cut construction in most areas; however, the large wetland crossing in the northern portion of the route will be partially installed using the horizontal directional drilling (HDD) method. Conventional open cut construction of the line will require a 75-foot-wide to 125-foot-wide construction corridor. There are two additional temporary construction workspaces near the stream crossing where the corridor extends to 175-feet-wide and 225-feet-wide; these workspaces do not impact potentially jurisdictional waters. The additional workspace required is for safety concerns as open cut of anticipated loose flowing sands on steep terrain may require large excavations. The permanent operational width will be 50-feet-wide. However, the permanent operational width above the HDD will be 20-feet-wide. Construction will involve the use of common heavy construction equipment (e.g., excavators, dozers, scrapers, side booms) and will be in compliance with all necessary permits and regulatory conditions. The HDD crossing of the large wetland in the northern portion of the route will be approximately 1,480 feet; however, due to Piedmont's Integrity Management Guidelines, the forested wetland on the surface will be cleared with roots left in place, resulting in a conversion of PFO to PEM wetlands along a 20-foot-wide corridor. HDD construction does not require trenching as impacts are limited to the entry and exit points for the HDD. The remaining approximately 475 feet of the wetland crossing will be open cut. Construction and operation of the Project will result in the permanent conversion of approximately 0.86-acres of PFO wetlands to PEM wetlands and approximately 0.34-acres of PSS wetland to PEM wetlands. There will be no net loss of wetlands as a result of the Project. There will be a short-term direct impact to 80 linear feet of perennial stream during construction. The stream bed and bank will be returned to preconstruction conditions once the pipeline has been installed. Indirect impacts to waters should be minimal as Best Management Practices (BMPs) will be installed for the purposes of erosion and sediment controls. BMPs will be checked regularly to confirm they are functioning as designed and expected. Piedmont plans to begin construction in December 2020; and the anticipated in-service date is February 2021. 4j. Please upload project drawings for the proposed project. 03_Design Drawings.pdf 56.93MB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the propertyor proposed impact areas?* r Yes Comments: r No 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: SAW-2020-00375 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Patrick Meier Agency/Consultant Company: Burns & McDonnell Other: 5d1. Jurisdictional determination upload 05_PJD.pdf 6. Future Project Plans 6a. Is this a phased project?* r Yes r No 5.8MB r Unknown Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed projector related activity? D. Proposed Impacts Inventory C^U 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): W Wetlands W Streams -tributaries W Buffers r Open Waters r Pond Construction 2. Wetland Impacts 2a1 Reason (?) 2b. Impact type * (?) 2c. Type of W.* 2d. W. name * 2e. Forested * [2fType of J1area" 2g. Impactrisdicition*(?) W-1 Pipeline installation P ff-mland Hardwood Forest W-1 Yes Both 0.220 (acres) W-1 Pipeline installation T Bottomland Hardwood Forest W-1 Yes Both 0.100 (acres) W-3 Pipeline installation P fforniand Hardwood Forest W-3 Yes Both 0.640 (acres) W-3 Pipeline installation T ffmiand Hardwood Forest W-3 Yes Both 0.280 (acres) W-3 Pipeline installation P Small -Basin Wetland W-3 Plo Both 0.340 (acres) W-3 Pipeline installation I Small -Basin Wetland W-3 ff7___1foth 0.150 (acres) 2g. Total Temporary Wetland Impact 0.530 2g. Total Wetland Impact 1.730 2h. Comments: Permanent conversion of PFO to PEM (W-1 and W-3) = 0.86 acres Permanent conversion of PSS to PEM (W-3) = 0.34 acres Total permanent conversion impacts = 1.2 acres No net loss of wetlands 3. Stream Impacts 2g. Total Permanent Wetland Impact 1.200 ❑ 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact* 3d. S. name * 3e. Stream Type * 3f. Type of 3g. S. width * 3h. Impact (?) Jurisdiction* length* Pipeline installation Tem orar Excavation S-1 ff�] Both E;Jnes S1 P p y feet) 31. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 0 31. Total stream and ditch impacts: 80 3j. Comments: 6. Buffer Impacts (for DWR) 6a. Project is in which protect basin(s)? Check all that apply. R Neuse r Catawba r Goose Creek r Other 31. Total temporary stream impacts: 80 r Tar -Pamlico r Randleman r Jordan Lake 6b. Impact Type 6c. Per or Temp 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact 6g. Zone 2 impact Allowable w/ mitigation T S-1 Yes 1,725 1,612 Allowable W mitigation P S-1 Yes 3,060 2,201 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: 1,725.00 1,612.00 Zone 1 Zone 2 Total Permanent impacts: 3,060.00 2,201.00 Zone 1 Zone 2 Total combined buffer impacts: 4,785.00 3,813.00 61. Comments: The pipeline will be constructed within a 75 foot corridor. 50 feet will be maintained as permanent easement with 25 feet as temporary workspace. Supporting Documentation 04_Neuse River Buffer.pdf E. Impact Justification and Mitigation 1. Avoidance and Minimization 286.44KB la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Wetlands, streams and forested areas were avoided to the greatest a)dent by siting the pipeline in agricultural fields and along the eastern most area of the wetlands and at the toe slope of the hill to avoid direct impacts to Swift Creek, which is habitat for federally protected species, and to reduce impacts to the surrounding wetlands. Since the original PCN was submitted on February 25, 2020, the southern portion of the project through Parcel 163700-27-2782 was re-routed during landowner condemnation proceedings. The new route runs along the eastern edge of the property. The route will still cross the unnamed tributary to Swift Creek and no new wetland or stream features are impacted by the change. Additionally, the HDD has been a)dended with the updated design from 780 feet to 1,480 feet, and the drill rig will be set up outside of the wetlands, resulting in less permanent and temporary impacts. Due to terrain and soil conditions, the stream crossing is designed to be open cut, but the workspace is necked down from over 100 feet to 75 feet at the crossing. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: For the largest wetland crossing, the pipeline will be partially installed using HDD, which means the permanent pipeline easement Will not require earth work. Tree clearing Will be required as part of PNG's Integrity Management Plan, however, stumps and root systems will remain in place. Construction matting will be used at the open cut stream crossing and in the northern open cut portion of the wetland to help minimize the disturbance. The project Will be constructed in accordance with state/local and federal guidelines pertaining to minimizing impacts during construction. An approved and certified erosion and sediment control plan Will be provided to the contractor for proper implementation of appropriate BMPs. Additionally, measures to minimize wetland and stream channel impacts from vehicle activity will be utilized. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2c. If yes, mitigation is required by (check all that apply): V DWR W Corps 2d. If yes, which mitigation option(s) will be used for this project? W Mitigation bank r Payment to in -lieu fee r Permittee Responsible program Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: McClenny Acres II Mitigation Site 3b. Credits Purchased/Requested (attach receipt and letter) Type: Quantity: Riparian wetland 1.71 Attach Receipt and/or letter Line 472 Replacement Project - Wetland SOA 11-13-2020.pdf 3c. Comments 541.09KB 6. Buffer mitigation (State Regulated Riparian Buffer Rules) - required by DWR 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? If yes, you must fill out this entire form - please contact DWR for more information. r Yes r No 6b. If yes, then identifythe square feet of impact. 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 Natural gas pipeline installation 4,785 3 14,355 Zone 2 Natural gas pipeline installation 3,813 1.5 5,720 6f. Total buffer mitigation required 20075 6g. If buffer mitigation is required, is payment to a mitigation bank or NC Division of Mitigation Services proposed? r Yes r No 6h. Attach the acceptance letter from the mitigation bank or NC Division of Mitigation Services. 6j. Comments: F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No What type of SCM are you providing? r Level Spreader r Vegetated Conveyance (lower SHWT) r Wetland Swale (higher SHWT) r Other SCM that removes minimum 30 % nitrogen W Proposed project will not create concentrated stormwater flow through the buffer Diffuse Flow Documentation 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? r Yes r No Comments: Pipeline will be installed through the protected riparian buffer zones. Trees will be cleared and grubbed within the 50' easement within the riparian buffer zone of the stream crossings There will be no change in stormwater runoff volume or velocity as no built upon area will be constructed within the buffers. Ground cover will remain unchanged from existing to post construction conditions. G. Supplementary Information v 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. The project is to relocation an existing natural gas pipeline due to a NCDOT project. The pipeline is not being construction specifically to support additional development. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?* r Yes r No 5e. Is this a DOT project located within Division's 1-87 r Yes r No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes r No 5h. Does this project involve the construction/installation of a wind turbine(s)?* r Yes r No f Unknown 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? An IPaC report was reviewed for the Project, and federally protected species are known to occur in Swift Creek, which is located in probmity to the Project. Swift Creek is proposed critical habitat for the Neuse River waterdog, Carolina madtom, Atlantic pigtoe, and dwarf wedgemussel. A protected species habitat assessment letter was prepared and sent to the U.S. Fish and Wildlife Service (USFWS) to request concurrence under the requirements of Section 7 of the Endangered Species Act. It was determined that the proposed Project is not likely to adversely affect federally listed species. The letter was emailed to USFWS on April 16, 2020 and concurrence was received on May 7, 2020. A follow-up concurrence letter for the re- route was provided to U.S. Fish and Wildlife on July 17, 2020. Concurrence was provided on July 29, 2020. Consultation Documentation Upload 06_USFWS Correspondence. pdf 5.27MB 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NOAA EFH Interactive Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* Burns & McDonnell prepared and submitted to SHPO project coordination letter for the Project on December 10, 2019. SHPO responded on January 2, 2020 and requested a comprehensive archaeology survey of the project area. Burns & McDonnell performed the comprehensive archaeology survey and submitted the results report to SHPO on March 3, 2020. SHPO provided concurrence on April 16, 2020 with clarifications. Burns & McDonnell provided the requested clarification information on May 5, 2020, and SHPO provided final concurrence on June 17, 2020. When the southern portion of the pipeline was re-routed, Burns & McDonnell performed a Phase I comprehensive archaeology survey of the re-route and identified a potentially eligible site within the pipeline route. Burns & McDonnell performed a Phase II assessment of the site and is recommending the site as ineligible. Burns & McDonnell submitted the Phase I/Phase II Addendum report to SHPO for concurrence on 10/14/2020. SHPO concurrence is pending. 7c. Historic or Prehistoric Information Upload 07_SHPO Correspondence_REV.pdf 18.27MB 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* r Yes r No 8b. If yes, explain how project meets FEMA requirements: No permanent fills or structures in the floodplain. Burns & McDonnell contacted the Johnston County Planning Department and confirmed a flood hazard permit is required for the project. Burns & McDonnell will prepare the permit application and coordinate with PNG to obtain the permit for the project. 8c. What source(s) did you use to make the floodplain determination?* FEMA GIS data Miscellaneous u Comments Other attachments: Additional figures, including the wetland delineation figure KMZ - Piedmont's permanently maintained corridor guidance Miscellaneous attachments not previously requested. 02_Figures.pdf 1.34MB 1.2_0228178_20200731_LINE_472_IFC.kmz 67.81 KB O8_PNG Permanently Maintained Access Corridor.pdf 160.66KB Signature U By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Sara Kent Signature Date 11/13/2020 HWILD oiNGsOO Wetland Mitigation Statement of Availability November 13, 2020 Piedmont Natural Gas 4720 Piedmont Row Drive Charlotte, NC 28210 Attn: Mr. Tom Morris RE: Availability of Riparian Wetland Credits for the "Line 472 Replacement Project" project Bank Name: McClenny Acres II Mitigation Site Bank Sponsor: Wildlands Holdings III, LLC USACE Action ID No. SAW-2017-02527 Riparian Wetland Credits Needed: 1.71 acres Riparian Wetland Credits Available: 6.93 acres Neuse 03020201 River Basin Dear Mr. Morris, Wildlands Holdings III, LLC has the above -mentioned Riparian Wetland Credits from the Falling Creek Stream and Wetland Mitigation Bank: McClenny Acres II Mitigation Site to satisfy the mitigation requirements related to the above -mentioned project. The project is located within the service area (HUC 03020201) of the Bank. Credits may be reserved for a period of 12 months upon the receipt of a non-refundable deposit of 10% of the purchase price. Should credits not be reserved, they will be sold on a first come, first serve basis. Credit prices will be guaranteed for a period of 6 months from the date of this letter and are then subject to change. An invoice for this transaction will be sent upon your request and we will reserve the credits and price for a period of 30 days from invoice. This letter is a Statement of Availability as of the date provided — it is not a reservation of credits nor a guarantee of price. Credits will be sold on a first come, first serve basis. Final transfer of credits will occur upon completion of the Mitigation Responsibility Transfer Form within the completed 404 permit. We appreciate the opportunity to assist you with your mitigation requirements. Please contact me at (704) 332-7754 x124 or.avarsinske@wildlandseng.com if you have any questions or need any additional information. Wildlands Holdings III, LLC • Wildlands Engineering, Inc • 1430 South Mint Street, Suite 104, Charlotte, NC 28203 HWILD oiNGsOO Sincerely, Ashley N. Yarsinske Wildlands Engineering, Inc. Marketing & Credit Sales avarsinske@wildlandseng.com 0: (704) 332-7754 ext. 124 M: (757) 572-5269 Cc: Ms. Sara Kent, Project Manager, Environmental Services I Burns & McDonnell Wildlands Holdings III, LLC • Wildlands Engineering, Inc • 1430 South Mint Street, Suite 104, Charlotte, NC 28203 AGENT AUTHORIZATION FORM SAMPLE AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION: LOT NO. PLAN NO. PARCEL ID: STREET ADDRESS: Pipeline corridor (between Cleveland Road and Highway 42 in Johnston County) Please print: Property Owner: Piedmont Natural Gas holder of easement Property Owner: Tom Morris (Project Manager at Piedmont Natural Gas) The undersigned, registered property owners of the above noted property, do hereby authorize Sara Kent , of Burns & McDonnell (Contractor / Agent) (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owner's Address (if different than property above): P.O. Box 33068, Charlotte, NC 28233 Telephone: 704-731-4245 We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. Authorized Signature Authorized Signature Tom Morris Digitally signed by Tom i Morris, PE Date: _ Date:2020.04.09 15:38:41-04'00' Sara Kent Burns & McDonnell Date: _April 9, 2020 L O N O N 00 w l�J % 'oJ • •� O 4000, w • a HDD Centerline NWI Wetland Type Pipeline Centerline Riverine NWI, NHD, and Topographic Map NORTH Line 472 Replacement Project 32 Permanent Easement PSS **BURNS ' �MSDONNELL'° Duke Energy /Piedmont Temporary PFO Natural Gas �� Workspace PUB 0 400 80Johnston County, North Carolina NHD Stream eet Source: Esri, FWS NW, USGS NHD, Duke Energy / Piedmont Natural Gas, Burns & McDonnell Consulting, Inc. Issued: 8/6/2020 AaA - AsA - Altavista fine sandy loam, 0 to 2 percent slopes, occasionally flooded Augusta sandy loam, 0 to 2 percent slopes, occasionally flooded r4��s��� r'�r'' NkB - Nankin fine sand loam, 2 to 6 percent slopes Y p p , , t NI K" RnF - Rion sandy loam, 15 to 40 percent slopes To - Tomotley sandy loam, 0 to 2 percent slopes, rarely flooded�e®�Oa " UcC - Uchee loamy coarse sand, 6 to 12 percent slopes r����► ��W,�®�� } WaB - Wagram loamy sand, 0 to 6 percent slopes gB4 WoD - Wedowee sandy loam, 8 to 15 percent slopes VVt - Wehadkee loam, 0 to 2 percent slopes, frequently flooded rg 1A1 l � � 1 X*01114� J AWAs4ss•�ffi! r r ��+s0 �►®®+s • t,. " °yi ,� r� A�'�,}, ., P 1' i,�: sss♦®�s�ss sass®s� ��♦s.�♦� �s+ all rA �1 WoB NkB u w • A I � /:♦®� �®sue �• fi4 �4J. ;�a...W .nA s>�* 3♦ .s NkB is1s�sRn �s�s�s♦ WaB>j�j�j�♦�j 4�sssss♦ : � sssssss� � �. '�* �sssssss♦ ass? ►. sA���ssOsss "' ♦ssss osssss s _ �A"AIM,. W, 309 HDD Centerline Hydric Soil NORTH 709`_ Pipeline Centerline C Non-Hydric Soil SSURGO Soil Unit Map 1 Permanent Easement NBURNS MSDONNELL" Line 472 Replacement Project Duke Energy / Piedmont Temporary 0 400 800 Natural Gas 140 Workspace Johnston County, North Carolina J Feet Source: Esri, SSURGO, Duke Energy / Piedmont Natural Gas, Burns & McDonnell Consultinq, Inc. Issued: 8/6/2020 FIGURES now c� i .. ! 140 U;TO — .. n :•s o��.� C f u ELT=� �r5 1 - - yi �l HDD Centerline General Location Map Pipeline Centerline NORTH NBURNS Line 472 Replacement Project Permanent Easement M5DONNELL' Duke Energy / Piedmont 0 2,000 4,000 Natural Gas Temporary Workspace Johnston County, North Carolina Feet Source: Esri, Duke Energy / Piedmont Natural Gas, Burns & McDonnell Consultinq, Inc. Issued: 8/6/2020 0 0 iE z z l_J J n � � II' - - r R HDD Centerline NWI Wetland Type �— Pipeline Centerline Riverine Permanent Easement PSS Temporary PFO Workspace PUB 0 400 NHD Stream Fee Source: Esri, FWS NWI, USGS NHD, Duke Enerqy / Piedmont Natural Gas, Burns & McD i �, W 00 ell; r r 3 � r f' NWI, NHD, and Topographic Map NORTH Line 472 Replacement Project , BU_DORNS Duke Energy / Piedmont \\MNNELL Natural Gas 80 Johnston County, North Carolina t onnell Consulting, Inc. Issued: 8/6/2020 AaA - AsA Altavista fine sandy loam, 0 to 2 percent slopes, occasionally flooded Augusta 0 2 floodedeeoo�� �.� <:• - sandy loam, to percent slopes, occasionally NkB - Nankin fine sandy loam, 2 to 6 percent slopes RnF - Rion sandy loam, 15 to 40 percent slopes To - Tomotley sandy loam, 0 to 2 percent slopes, rarely flooded UcC - Uchee loamy coarse sand, 6 to 12 percent slopes WaB - Wagram loamy sand, 0 to 6 percent slopes WoD - Wedowee sandy loam, 8 to 15 percent slopes Wt - Wehadkee loam, 0 to 2 percent slopes, frequently flooded WOB,: V, 4A :.�X` ,•�`. '> _s fees MN t y000� -f' s �7 r - 'r RnF ;: r� Y •,may _ 4'?a •: �: _ �-� 0. ..��•ioioi�iiD�i.. T f% A IV , �� N e Oeeeeel 1fiy�fe"~ y . # w- ♦i '+'♦ Leo ��'. ►������ ��4���y►� 9 ,! o v� .000eoo i� ♦�+� gr e� NkB ���eoeoeoeoeoeo� UcC i�o�oeoeoe� 1 i 1�� �` ioeoeoeoeoeoeoet �e��.���.eoeoeoeoeoe�� .., �►` ' .+ .O oeoeoeoeoeo�oeoe� �eoeoeoeoeoeoeoeoeoeoep� RriF Mi .aa s e... Own �00000� ►eoOw o....e��oeo460000ioi',0000ioioioioi000 a ♦0000� >eeee� WaB eeeee s0000000000e0� s0000..00s000�+ �e0000♦ ►OeeeoeeeeeeeeWaB► ♦eeee� eleeoeeeeeeee..�.���eeee� phey►eeeeoeoeoeoeoeoeoeoeoeoeo�e�eeee®�eee� M • +��0000000. .tee. �♦00000000♦ .goo. r�'�000000000v.0000. � +00000000000�,e00000 �,o�ooe0000000.�00000° ^, � ,,^� � . �'�eoeo�oeoeoeoeoeo�oe00000eoeo�.�o�, ��~�^, -7A�l� eoeoeoeoeo�'� T.71 s.�.�0000000es00000♦ - �.,�s�+.,e„�oeoeoeoe000eoeoeoeoeoeo� -`',, a - ;,4��*eee�,>eeeeeoeeeeee�/ i%. • �00000 .:yooe000♦ o c - w o HDD Centerline Hydric Soil � z NORTH Pipeline Centerline Non-Hydric Soil SSURGO Soil Unit Map Permanent Easement % BURNS Line 472 Replacement Project � \WDONNELL Duke Energy / Piedmont Temporary 0 400 800 Natural Gas N N Workspace Johnston County, North Carolina M Feet a Source: Esri, SSURGO, Duke Energy / Piedmont Natural Gas, Burns & McDonnell Consulting, Inc. Issued: 8/6/202 z �i Z� % 00 OF Of \ w 1 .10 * • �'-� I11 U r� .00 — HDD Centerline FEMA 100-Year —Pipeline Centerline Floodway NORTH Floodplain Map Permanent FEMA 100-Year Line 472 Replacement Project ® Floodplain ��% BURNS Duke Energy / Piedmont Easement \\M_DONNELL Temporary 0 400 800 Natural Gas Workspace Johnston County, North Carolina Feet Source: Esri, FWS NWI, USGS NHD, Duke Enerqy / Piedmont Natural Gas, Burns & McDonnell Consulting, Inc. Issued: 8/6/2020 GENERALNOTES CIVIL AND STRUCTURAL NOTES 6pen %, a 12 EXISTING REGULATOR STATION #2, SEE PROJECT 0228138 ABANDON EXISTING PIPELINE IN PLACE PROPOSED CLEVELAND ROAD REGULATOR STATION SEE PROJECT 0228138 EXISTING SITE LOCATION MAP - LINE 472 TRANSMISSION SCALE: 1 "=2,000' 0 1000 2000 1IN=1000FT NOTES: 1) LAT/LONG TO BE VERIFIED BY AS BUILD SURVEY. 2) AS BUILD SURVEY LOCATION TIE IN POINT LATITUDE: TBD LONGITUDE: TBD DRAWING INDEX DRAWING NUMBER DRAWING TITLE REV. PAGE PNG-G-472-0001000 COVER / INDEX PAGE 0 1 OF 35 PNG-G-472-0001001 BILL OF MATERIALS 0 2 OF 35 PNG-C-472-0001000 GENERAL NOTES, LEGENDS & ABBREVIATIONS 0 3 OF 35 PNG-C-472-0001001 SITE ACCESS ROUTE PLAN 0 4 OF 35 PNG-C-472-0001002 ACCESS DETAILS FOR CLEVELAND CROSSING DRIVE 0 5 OF 35 PNG-C-472-0001003 ALIGNMENT PLAN & PROFILE - 8" PIPELINE 0 6 OF 35 PNG-C-472-0001004 ALIGNMENT PLAN & PROFILE - 8" PIPELINE 0 7 OF 35 PNG-C-472-0001005 ALIGNMENT PLAN & PROFILE - 8" PIPELINE 0 8 OF 35 PNG-C-472-0001006 ALIGNMENT PLAN & PROFILE - 8" PIPELINE 0 9 OF 35 PNG-C-472-0001007 ALIGNMENT PLAN & PROFILE - 8" PIPELINE 0 10 OF 35 PNG-C-472-0001008 ALIGNMENT PLAN & PROFILE - 8" PIPELINE 0 11 OF 35 PNG-C-472-0001009 ALIGNMENT PLAN & PROFILE - 8" PIPELINE 0 12 OF 35 PNG-C-472-0001010 ALIGNMENT PLAN & PROFILE - 8" PIPELINE 0 13 OF 35 PNG-C-472-0001011 ALIGNMENT PLAN & PROFILE - 8" PIPELINE 0 14 OF 35 PNG-C-472-0001012 JACK AND BORE DETAIL SHEET - HWY 42 0 15 OF 35 PNG-C-472-0001013 HDD DETAIL SHEET 0 16 OF 35 PNG-C-472-0001014 GEOTECHNICAL BORING LOGS 0 17 OF 35 PNG-C-472-0001017 ES&PC PLAN 0 18 OF 35 BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # C-1435 11111I .�•'�[K CAR0'' �° .o�F.ss o . �4 SEA - 047 - Ct •' •'�G � N �E.. y�2 PROFESSIONAL ENG/ARCH STAMP PROPOSED 8" PIPELINE 1� S In .11311L DRAWING INDEX DRAWING NUMBER DRAWING TITLE REV. PAGE PNG-C-472-0001018 ES&PC PLAN 0 19 OF 35 PNG-C-472-0001019 ES&PC PLAN 0 20 OF 35 PNG-C-472-0001020 LAYDOWN YARD ES&PC PLAN 0 21 OF 35 PNG-C-472-0001021 EROSION CONTROL NOTES 0 22 OF 35 PNG-C-472-0001022 EROSION CONTROL DETAILS 0 23 OF 35 PNG-C-472-0001023 EROSION CONTROL DETAILS 0 24 OF 35 PNG-C-472-0001026 RETIREMENT PLAN - PIPELINE 0 25 OF 35 PNG-M-472-0001001 TEMPORARY LAUNCHER PLOT PLAN 0 26 OF 35 PNG-M-472-0001002 TEMPORARY LAUNCHER SECTIONS AND ELEVATIONS 0 27 OF 35 PNG-M-472-0001003 TEMPORARY LAUNCHER BILL OF MATERIALS 0 28 OF 35 PNG-C-472-0001034 CONSTRUCTION DETAILS 0 29 OF 35 PNG-C-472-0001035 CONSTRUCTION DETAILS 0 30 OF 35 PNG-C-472-0001036 CONSTRUCTION DETAILS 0 31 OF 35 PNG-C-472-0001037 CONSTRUCTION DETAILS 0 32 OF 35 PNG-C-472-0001040 EROSION CONTROL DETAILS 0 33 OF 35 PNG-C-472-0001041 EROSION CONTROL DETAILS 0 34 OF 35 rPNG-C-472-0001050 CIVIL DETAILS 0 35 OF 35 1. INSTALLER SHALL FURNISH ALL MATERIALS AND SERVICES NOT PROVIDED BY THE COMPANY (UNLESS OTHERWISE NOTED ON DRAWINGS OR SPECIFICATIONS) INCLUDING EQUIPMENT, TRANSPORTATION, AND PERFORMANCE OF ALL NECESSARY WORK AS SHOWN ON THE DRAWINGS AND SPECIFIED HEREINAFTER. 2. IT SHALL BE THE RESPONSIBILITY OF THE INSTALLER TO VERIFY ALL DIMENSIONS GIVEN ON THE DRAWINGS. ANY ITEM IN QUESTION SHALL BE BROUGHT TO THE ATTENTION OF THE PROJECT MANAGER PRIOR TO PROCEEDING WITH THE WORK. 3. INSTALLER SHALL BE RESPONSIBLE FOR PROTECTION OF ALL SURROUNDING AREAS. 4. ALL BELOWGROUND WELDS SHALL BE COATED WITH HBE-95 OR SP-2888 PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS. 5. ALL ABOVEGROUND PIPING TO BE BLASTED TO CORRECT SOCIETY FOR PROTECTIVE COATINGS (SSPC) SURFACE PROFILE. PAINT SYSTEM TO BE UTILIZED SHALL BE PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS. 6. UPON BACKFILLING IN AREAS OF ROCK, BURIED PIPE SHALL HAVE 6" OF SAND PAD FILL PLACED AROUND THE PIPE'S CIRCUMFERENCE. 7. PRESSURE TESTING SHALL MEET THE REQUIREMENTS OF PNG'S PRESSURE TESTING STANDARD, PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS. 8. INSTALLER SHALL DEWATER ALL HYDROSTATICALLY TESTED PIPING, USING CLEANING PIGS AS REQUIRED, AND DRY TO A DEWPOINT OF -40OF PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS. CONSTRUCTION NOTES 1. EXISTING OVERHEAD AND BELOWGROUND FACILITIES MAY BE IN THE WORK AREA VICINITY. INSTALLER IS RESPONSIBLE FOR HAVING SUCH FACILITIES LOCATED AND IS RESPONSIBLE FOR MAINTENANCE AND PRESERVATION OF THESE FACILITIES. 2. PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS, INSTALLER IS REQUIRED TO CALL 811 FOR UTILITY LOCATES A MINIMUM OF 72 HOURS PRIOR TO COMMENCEMENT OF WORK. NO EXTRA COMPENSATION WILL BE ALLOWED FOR DELAYS FROM ANY WORK PROVIDED BY OTHER UTILITIES. 3. IF EXISTING UTILITIES OF ANY TYPE ARE ENCOUNTERED IN THE FIELD AND DEEMED TO BE IN CONFLICT WITH INSTALLATION OF FACILITIES, INSTALLER SHALL NOTIFY THE PROJECT MANAGER IMMEDIATELY SO THE CONFLICT MAY BE RESOLVED. 4. WHEN EXISTING DRAINAGE FACILITIES ARE DISTURBED, INSTALLER SHALL PROVIDE AND MAINTAIN TEMPORARY OUTLETS AND CONNECTIONS FOR PRIVATE DRAINS OR SEWERS. RESTORATION OF THESE FACILITIES IS TO BE PERFORMED ONCE CONSTRUCTION IS COMPLETE AND ARE CONSIDERED INCIDENTAL COSTS OF THE PROJECT. 5. ALL DRAWING MEASUREMENTS ARE TO BE TAKEN FROM EXISTING GRADE. FINAL GRADE SHALL BE MATCHED TO SURROUNDING GRADE AS PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS. 6. INSTALLER IS TO REMAIN WITHIN CONSTRUCTION WORKING LIMITS. ACCESS TO AREAS OUTSIDE WORKING LIMITS MUST BE COORDINATED WITH THE OWNER OR PIEDMONT PROJECT MANAGER. 7. ALL EXCESS EXCAVATION, CONSTRUCTION DEMOLITION DEBRIS AND UNSUITABLE MATERIALS THAT DO NOT CONTAIN ASBESTOS SHALL BE REMOVED FROM THE SITE AND PROPERLY DISPOSED. 8. STANDARD SPECIFICATIONS REFERENCED ON THIS SHEET AND CONSTRUCTION PLANS ARE CONSIDERED AS PART OF THE CONTRACT DOCUMENTS. INCIDENTAL ITEMS OR ACCESSORIES NECESSARY TO COMPLETE THIS WORK MAY NOT BE SPECIFICALLY NOTED, BUT ARE CONSIDERED TO BE A PART OF THIS CONTRACT. 9. BEFORE ACCEPTANCE BY THE OWNER AND FINAL PAYMENT, ALL WORK SHALL BE INSPECTED AND APPROVED BY PIEDMONT OR COMPANY REPRESENTATIVE. FINAL PAYMENT SHALL BE MADE AFTER ALL OF THE INSTALLER'S WORK HAS BEEN ACCEPTED AND APPROVED AND IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. 10. DURING CONSTRUCTION, ALL LOOSE MATERIALS THAT ARE DEPOSITED IN THE FLOW LINE OF GUTTERS, DRAINAGE STRUCTURES, DITCHES, ETC. SUCH THAT THE NATURAL FLOW LINE OF WATER IS OBSTRUCTED, SHALL BE REMOVED AT THE END OF EACH WORK DAY. 11. ALL FIELD TILE ENCOUNTERED DURING CONSTRUCTION SHALL BE EXTENDED TO OUTLET INTO AN EXISTING DRAINAGE WAY. A RECORD OF ALL FIELD TILE FOR ONSITE DRAIN PIPE ENCOUNTERED SHALL BE KEPT BY THE INSTALLER AND TURNED OVER TO THE PROJECT MANAGER UPON COMPLETION OF THE PROJECT. 12. INSTALLER IS REQUIRED TO MAINTAIN A SET OF ISSUED FOR CONSTRUCTION DRAWINGS AND ALL PERMITS AT THE JOB SITE. ANY MODIFICATIONS OR ALTERATIONS TO THE PLANS OR SPECIFICATIONS SHALL BE APPROVED BY THE PROJECT MANAGER. 13. INSTALLER IS SOLELY RESPONSIBLE FOR EXECUTION OF HIS/HER WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND SPECIFICATIONS. INSTALLER IS RESPONSIBLE FOR THE CONSTRUCTION METHODS AND TECHNIQUES, SEQUENCES, TIME OF PERFORMANCE, AND ALL SAFETY PRECAUTIONS. 14. MINIMUM DEPTH OF BURIAL SHALL BE PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS. 15. ALL PIPELINES BEING CROSSED ARE TO BE PROTECTED WITH A MINIMUM OF (3) 4 FEET X 18 FEET WOODEN MATS. 16. PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS, FOR OPEN DITCH EXCAVATION, A MINIMUM OF TWO FEET OF SEPARATION SHALL BE MAINTAINED BETWEEN ALL CROSSING STRUCTURES. SEPARATION BETWEEN CROSSING STRUCTURES AND PIPELINES THAT ARE INSTALLED VIA DIRECTIONAL DRILLING METHODS IS AT THE DISCRETION OF ENGINEERING. 17. DURING BACKFILLING, A SIX INCH CROWN SHALL BE PLACED ON ALL DISTURBED AREAS. COMPACTION REQUIREMENTS SHALL BE PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS. 18. BOLTS FOR FLANGES TO BE TORQUED PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS. 1. ADDITIONAL EXCAVATIONS BELOW FOOTINGS MAY BE NECESSARY TO REACH UNDISTURBED SOIL. SHOULD THIS OCCUR, THE EXCAVATION SHALL BE BROUGHT TO THE BOTTOM OF THE FOOTING ELEVATION WITH COMPACTED SAND FILL MEETING THE REQUIREMENTS OF MODIFIED PROCTOR COMPACTION TEST (ASTM D1557) TO 95% IN SIX INCH LIFTS. 2. ALL EXPOSED CONCRETE EDGES SHALL HAVE A 1" X 1" 450 CHAMFER. 3. CONCRETE SHALL BE MIXED AND POURED PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS. TESTING SHALL CONFORM TO ACI 318. INSTALLER TO SUPPLY ALL CONCRETE AND TESTING. 4. ALL STRUCTURAL STEEL SHALL CONFORM TO ASTM A36 SPECIFICATION. STEEL REINFORCING BAR SHALL CONFORM TO ASTM A615 GRADE 60 AND WELDED WIRE FABRIC SHALL CONFORM TO ASTM A185. TIE WIRE SHALL CONFORM TO ASTM A1064. 5. UNSUITABLE OR EXCESS EARTH SPOIL SHALL BE DISPOSED OF AT AN APPROVED WASTE LOCATION. SOIL BEING TRANSPORTED ONTO THE JOB SITE SHALL BE APPROVED BY EITHER THE PROJECT MANAGER OR CONSTRUCTION MANAGER. 6. ROCKSHIELD OR SIMILAR COMPANY APPROVED PRODUCT MUST BE INSTALLED BETWEEN ALL PIPE AND FITTINGS THAT COME INTO CONTACT WITH CONCRETE. A LAYER OF NON ABRASIVE MATERIAL SUCH AS FRP SHALL BE INSTALLED BETWEEN ALL PIPE SUPPORTS AND PIPING. 7. ALL FIELD BENDING OF REBAR SHALL BE DONE COLD. SOIL EROSION AND SEDIMENT CONTROL NOTES 1. INSTALLER IS TO CONSTRUCT ALL SOIL EROSION AND SEDIMENT CONTROL MEASURES AT THE COMMENCEMENT OF THE PROJECT, PROVIDE MAINTENANCE AND ASSURE EFFECTIVENESS THROUGHOUT THE DURATION OF THE PROJECT. 2. CARE SHALL BE TAKEN TO MINIMIZE DOWNSTREAM SILTATION. RAW BANKS MAY BE SEEDED AND MULCHED TO PREVENT EROSION. 3. ALL SPOILS INCLUDING ORGANIC SOILS, VEGETATION AND DEBRIS SHALL BE REMOVED FROM THE SITE AND PROPERLY DISPOSED OF IN SUCH A MANNER AS TO NOT ERODE INTO ANY BODY OF WATER OR WETLAND. 4. SILT FENCING SHALL BE PLACED WHERE NECESSARY TO PREVENT SEDIMENT FROM LEAVING THE WORK AREA. 5. CATCH ALL INLET FILTERS ARE REQUIRED AT ALL SEWER INLETS, GRATES AND MANHOLES FOR SEDIMENT CONTROL. 6. WETLAND AREAS SHALL HAVE SILT FENCING AND ONE LAYER OF STRAW LOG INSTALLED NO CLOSER THAN 50 FEET FROM POINT OF WETLAND DELINEATION. 7. TOPSOIL STOCKPILES SHALL BE LOCATED TO AVOID EROSION OF SAID STOCKPILE ONTO OFFSITE AREAS. 8. ALL ENVIRONMENTAL MEASURES SHALL BE PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS. PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD I DESCRIPTION APPROVALS DUKE r6ljl�Piedmont V ENERGY,: Natural Gas COPYRIGHT 2018 LINE 472 TRANSMISSION COVER / INDEX PAGE GARNER, N C GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA 0 07-31-2020 ISSUED FOR CONSTRUCTION MJD CNS CAM AREA CODE 1853 DATE N/A INITIALS NIA REGIONAL ENGINEER ACCOUNT NUMBER PROJECT NUMBER 0228178 DATE N/A INITIALS N/A MGR TECH REC & STD DRAWING BY MJD STATION ID DATE 7/31/2020 INITIALS CAM PRINCIPAL ENGINEER CHECKER INITIALS I CNS � BURNS �MSDONNELL CONSULTANTS, INC. SHEET(S) 1 OF 35 1 DWG SCALE NONE DWG DATE 7/31/2020 ISUPERSEDED DRAWING NUMBER REVISION PNG -G-472-0001000 0 DISCIPLINE / RESOURCE CENTER / LINE NUMBER LEGEND: R PROPERTY LINE TEMPORARY SILT FENCE - - - LOD- - - LIMITS OF DISTURBANCE PROPOSED CHAIN LINK SECURITY FENCE EXISTING CHAIN LINK FENCE EXISTING ELECTRICAL FENCE ABANDON IN PLACE PNG DISTRIBUTION / TRANSMISSION PIPELINE RELATED TO THIS PROJECT (NOT SURVEYED SEE PNG-C-472-0001026 AND OMPR-1800A) GROUT AND ABANDON IN PLACE PNG DISTRIBUTION / TRANSMISSION PIPELINE RELATED TO THIS PROJECT (NOT SURVEYED SEE PNG-C-472-0001026 AND OMPR-1800A) PROPOSED GRAVEL SURFACE COURSE WETLANDS MATTING TS CATHODIC PROTECTION TEST STATION 44 0 0 BORE PIT RECEIVING PIT GEOTECHNICAL BORING LOCATION CONTRACTOR HAUL ROUTE JACK AND BORE W HDD _ s�ecess; ENTRY PIT .. E STVIbt-kttk� 9+00 G i PROPOSED PIPELINE 8+00 PROPOSED PERMANENT EASEMENT PROPOSED TEMPORARY WORKSPACE PROPOSED TEMPORARY EASEMENT FOR FLARING EXISTING GAS LINE (SURVEYED) PROPOSED DISTRIBUTION WORK (BY PNG DISTRIBUTION) GENERAL NOTES: 1. THE EXISTING SITE UTILITIES AND FEATURES SHOWN ARE BASED ON A FIELD RUN TOPOGRAPHIC SURVEY PERFORMED BY MASER CONSULTING IN JULY, 2019. 2. ALL DIMENSIONS, ELEVATIONS, AND STATIONS ARE IN FEET, UNLESS INDICATED OTHERWISE. 3. CALLOUTS, COORDINATES, AND DIMENSIONS ARE POINTED TO OR MEASURED TO STRUCTURE CENTER, EDGE OF PAVEMENT, BACK OF CURB, OR OUTSIDE FACE OF FOUNDATION WALL, UNLESS INDICATED OTHERWISE. 4. ALL WORK SHALL BE SUBJECT TO INSPECTION BY AUTHORIZED PERSONNEL OF LOCAL AND GOVERNMENT REGULATORY AGENCIES AND THE CLIENT REPRESENTATIVE. 5. SEE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (NCDOT) DESIGN STANDARDS FOR REFERENCES TO NCDOT STANDARD DRAWINGS. ALL SUBSEQUENT SPECIFICATIONS AND STANDARDS SHALL APPLY. 6. ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS AND LOCAL AND GOVERNMENT CODES, ORDINANCES, AND REGULATIONS. IN CASE OF CONTRADICTION OR DISCREPANCY BETWEEN THE DRAWINGS AND PNG DESIGN AND CONSTRUCTION MANUALS, THE PNG DESIGN AND CONSTRUCTION MANUAL SHALL GOVERN. WHERE A QUESTION REMAINS ON WHICH REQUIREMENT SHALL GOVERN, CONTRACTOR SHALL SUBMIT ISSUE TO THE CLIENT REPRESENTATIVE IN WRITING. THE DECISION OF THE CLIENT REPRESENTATIVE SHALL BE CONSIDERED FINAL. 7. ALL WORK SHALL BE CONDUCTED IN A PROFESSIONAL WORKMANSHIP MANNER USING USING QUALITY MATERIALS. WORK SHALL CONFORM TO THESE DRAWINGS, UNLESS INDICATED OTHERWISE OR AS DIRECTED BY THE CLIENT REPRESENTATIVE. 8. CONTRACTOR SHALL CONFINE ALL WORK TO BE WITHIN THE PERMANENT AND TEMPORARY EASEMENTS. 9. ALL GRADING, PAVEMENT WORK, AND ANY OTHER MISCELLANEOUS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE CURRENT NCDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION AND SUPPLEMENTAL SPECIFICATIONS. 10. CONTRACTOR SHALL TAKE CARE TO MAINTAIN THE SITE AND ADJACENT AREAS IN AS CLEAN A CONDITION AS POSSIBLE. ANY DEBRIS, DIRT, MUD, ETC. SHALL BE CLEANED DAILY, OR AS THE CLIENT REPRESENTATIVE DIRECTS, FROM ANY ADJOINING STREETS OR PROPERTIES BY THE CONTRACTOR AS A PART OF THE PRIMARY CONSTRUCTION WORK. THIS SHALL BE AT NO ADDITIONAL COMPENSATION TO THE CONTRACTOR. CONSTRUCTION DRAWING NOTES: 1. CONTRACTOR SHALL MAINTAIN UPDATED CONSTRUCTION DRAWINGS AT ALL TIMES THROUGH THE DURATION OF THE PROJECT. CONSTRUCTION RECORD DRAWINGS SHALL BE SUBMITTED TO THE CLIENT REPRESENTATIVE. 2. DURING CONSTRUCTION OF THE PROJECT, CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING TRACK OF ANY CLIENT REPRESENTATIVE -APPROVED FIELD CONSTRUCTION REVISIONS TO THE DESIGN DEPICTED ON APPROVED CONSTRUCTION DRAWINGS. 3. ALL VARIATIONS IN PROJECT CONDITIONS, LOCATIONS, AND CONFIGURATIONS, AND ANY OTHER CHANGES OR DEVIATIONS FROM THE INFORMATION PRESENTED ON THE ORIGINAL, APPROVED CONSTRUCTION DRAWINGS SHALL BE NOTED. THIS INCLUDES BURIED OR CONCEALED CONSTRUCTION AND UTILITY FEATURES THAT WERE REVEALED DURING CONSTRUCTION. 4. THE CLIENT REPRESENTATIVE SHALL REVIEW COMPLETENESS, ACCURACY, AND FORMAT OF SUBMITTED CONSTRUCTION DRAWINGS. IF THE CONSTRUCTION DRAWINGS ARE CONSIDERED UNACCEPTABLE, THEY SHALL BE RETURNED TO THE CONTRACTOR FOR CORRECTION AND RESUBMISSION. THIS SHALL BE AT NO ADDITIONAL COMPENSATION TO THE CONTRACTOR. COORDINATION AND COMMUNICATION 1. CONTRACTOR SHALL APPOINT A PRIMARY CONSTRUCTION SUPERINTENDENT, SUBJECT TO THE APPROVAL OF THE CLIENT REPRESENTATIVE, WHO SHALL BE PRESENT ON THE CONSTRUCTION SITE AT ALL TIMES DURING WORKING HOURS AND ACCESSIBLE AT ALL TIMES WHILE WORK IS IN PROGRESS. THE PRIMARY CONSTRUCTION SUPERINTENDENT SHALL BE DESIGNATED THE RESPONSIBLE CONTRACTOR'S REPRESENTATIVE WHO SHALL BE AVAILABLE ON A 24-HOUR BASIS. WHEN THE CONTRACTOR'S PRIMARY CONSTRUCTION REPRESENTATIVE IS NOT AVAILABLE ON THE CONSTRUCTION SITE, AN ALTERNATE REPRESENTATIVE SHALL BE PROVIDED. CONTRACTOR SHALL PROVIDE NAMES AND CONTACT INFORMATION OF REPRESENTATIVES TO THE CLIENT REPRESENTATIVE PRIOR TO THE START OF CONSTRUCTION ACTIVITIES. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING CONSTANT COORDINATION BETWEEN ANY SUBCONTRACTORS AND THE CLIENT REPRESENTATIVE. ALL CONSTRUCTION ACTIVITIES PLANNED BY THE CONTRACTOR SHALL BE REVIEWED AND APPROVED BY THE CLIENT REPRESENTATIVE. 3. THE FOLLOWING CONTACT INFORMATION IS PROVIDED FOR CONTRACTOR'S USE IN CASE OF AN EMERGENCY: a. EMERGENCY 911 b. PNG CONSTRUCTION SUPERVISOR (SHAWN EVERETTE) 910-334-9034 c. OTHER CONTACTS AS DIRECTED AT PRE -CONSTRUCTION MEETING EXCAVATION AND TRENCHES 1. CONTRACTOR SHALL COMPLY WITH THE MOST CURRENT EDITION OF OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) REGULATIONS AND THE STATE OF NORTH CAROLINA LAWS CONCERNING EXCAVATION. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT ALL EXCAVATION, TRENCHING AND SHORING ARE PERFORMED IN A MANNER THAT COMPLIES WITH LOCAL REGULATIONS AND OSHA REGULATIONS FOR CONSTRUCTION. 3. OPEN TRENCHES AND EXCAVATIONS AT THE CONSTRUCTION SITE SHALL BE PROMINENTLY MARKED WITH ORANGE BARRICADES WITH FLASHING RED LIGHTS ACCEPTABLE TO THE CLIENT REPRESENTATIVE. 4. CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 48 HOURS TO THE CLIENT REPRESENTATIVE AND ASSOCIATED UTILITY COMPANIES AND AGENCIES BEFORE PROCEEDING WITH ANY EXCAVATION. 5. DEWATERING OF UTILITY TRENCHES AND OTHER EXCAVATIONS MAY BE REQUIRED. 6. OPEN ONLY THOSE TRENCHES FOR WHICH MATERIAL IS ON -HAND AND READY FOR PLACING THEREIN. AS SOON AS POSSIBLE AFTER THE MATERIAL HAS BEEN PLACED AND WORK APPROVED, BACKFILL AND COMPACT TRENCHES AS SPECIFIED. 7. NO SPECIAL PROVISIONS WILL BE MADE FOR ROCK EXCAVATION, ANY BOULDERS ENCOUNTERED SHALL BE REMOVED AND DISPOSED OF OFF SITE. 8. ALL TOPSOIL SHALL BE REMOVED FROM AREAS TO BE GRADED. ALL USEABLE TOPSOIL SHALL BE STOCKPILED DURING GRADING AND REAPPLIED IN 3" LAYERS TO ALL SLOPES IMMEDIATELY AFTER GRADING IS COMPLETE. OTHER SAFETY REQUIREMENTS 1. CONTRACTOR SHALL MAINTAIN SAFETY PRACTICES THAT CONFORM TO OSHA REGULATIONS. 2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN AND PAY FOR ALL APPLICABLE PERMITS, FEES AND LICENSES FOR CONSTRUCTION AND EQUIPMENT. 3. THE CONTRACTOR SHALL PERFORM ON -SITE INSPECTIONS THROUGHOUT THE PROJECT AND REMEDY ANY SAFETY CONCERNS IMMEDIATELY. 4. THERE SHALL BE NO PERMANENT WASTE SITES ON SITE PROPERTY. ANY TEMPORARY WASTE AREA SHALL BE APPROVED BY THE CLIENT REPRESENTATIVE AND SHALL BE KEPT IN AN ORDERLY CONDITION. REMOVAL OF WASTE THAT IS NOT PROPERLY MAINTAINED IS SUBJECT TO THE DIRECTION OF THE CLIENT REPRESENTATIVE. 5. EROSION CONTROL DEVICES SHALL BE USED FOR THE ACCESS AND HAUL ROUTES, STAGING AREA, AND ANY MATERIAL STOCKPILES WHEN NECESSARY TO CONTROL EROSION AND STORM WATER RUNOFF. SEE DRAWINGS PNG-C-472-0001017 THROUGH PNG-C-472-0001023 FOR EROSION AND SEDIMENT CONTROL REQUIREMENTS. 6. STOCKPILED MATERIAL SHALL BE CONSTRAINED IN A MANNER TO PREVENT MOVEMENT RESULTING FROM WIND CONDITIONS. 7. CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO LIMIT DUST CAUSED BY CONSTRUCTION ACTIVITIES TO A LIMIT ACCEPTABLE TO PROJECT SITE OPERATIONS. THE CONTRACTOR SHALL CONTROL BLOWING DUST ON THE PROJECT SITE FROM ANY HAUL ROUTE OR WORK AREA REGARDLESS OF SOURCE. 8. WILDLIFE ATTRACTANTS, SUCH AS TRASH AND FOOD SCRAPS, FROM CONSTRUCTION PERSONNEL AND ACTIVITIES SHALL BE REMOVED FROM THE PROJECT LIMITS. 9. GASOLINE, DIESEL FUEL, OIL, AND HAZARDOUS WASTE RESULTING FROM CONTRACTOR'S OPERATIONS OR ACTIVITIES SHALL BE PROPERLY DISPOSED OF IN ACCORDANCE WITH THE SPECIFICATIONS AND LOCAL REGULATORY REQUIREMENTS AND PROPERLY REMOVED FROM THE PROJECT PROPERTY. IF HAZARDOUS MATERIALS ARE ENCOUNTERED OR UNCOVERED DURING CONSTRUCTION ACTIVITIES, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE CLIENT REPRESENTATIVE. 10. FAILURE TO COMPLY WITH THE CLIENT REPRESENTATIVE SAFETY REQUIREMENTS SHALL RESULT IN THE SUSPENSION OF CONSTRUCTION ACTIVITIES UNTIL ALL SAFETY CONCERNS ARE ADDRESSED BY THE CONTRACTOR TO THE SATISFACTION OF THE CLIENT REPRESENTATIVE. 11. ANY WORKERS AND EQUIPMENT NOT IN COMPLIANCE WITH SAFETY PLAN SHALL IMMEDIATELY BE REMOVED FROM THE WORK AREA. 12. THE CONTRACTOR SHALL NOT BURN OR BURY DEBRIS WITHOUT PERMISSION FROM THE SITE INSPECTOR. SURVEY AND SUBSURFACE INVESTIGATION NOTES: 1. SURVEY CONTROL POINTS WILL BE PROVIDED PRIOR TO CONSTRUCTION. IF THE CONTRACTOR SHOULD NEED TO DISTURB THE CONTROL POINTS DURING CONSTRUCTION, REQUEST SHALL BE GIVEN TO THE SURVEYOR TO HAVE THE CONTROL POINTS RESET. 2. IF BENCHMARKS SHOWN ARE IN AREAS THAT REQUIRE DEMOLITION, OTHER BENCHMARKS SHALL BE ESTABLISHED BEFORE DEMOLITION AND CONSTRUCTION WORK BEGINS. CONTRACTOR SHALL GIVE REQUEST TO THE SURVEYOR. HORIZONTAL CONTROL IS BASED ON NAD83 NORTH CAROLINA STATE PLANES, US FOOT VERTICAL CONTROL IS BASED ON NAVD 88. EXISTING CONDITIONS NOTES: 1. THE LOCATIONS OF STRUCTURES AND UNDERGROUND UTILITIES AS INDICATED HAVE BEEN OBTAINED FROM EXISTING RECORDS AND FIELD SURVEYS. UNDERGROUND STRUCTURES AND UTILITIES MAY BE PRESENT WHICH ARE NOT DOCUMENTED OR LOCATED. 2. THE CONTRACTOR SHALL FIELD -CHECK ALL EXISTING CONDITIONS AND BE THOROUGHLY FAMILIAR WITH THE SITE BEFORE ANY WORK COMMENCES. ANY DISCREPANCIES IN THE DRAWINGS SHALL BE IMMEDIATELY REPORTED TO THE CLIENT REPRESENTATIVE BEFORE ANY FURTHER WORK COMMENCES. 3. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FIELD -VERIFY EXISTING STRUCTURES, UTILITIES, AND SURVEY INFORMATION, AND TO TAKE NECESSARY PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR SHALL VERIFY EXISTENCE AND MARK LOCATIONS OF ALL UTILITIES, INCLUDING SERVICE CONNECTIONS TO UNDERGROUND UTILITIES, PRIOR TO BEGINNING WORK. CONTRACTOR SHALL CONTACT THE CLIENT REPRESENTATIVE AND ALL ASSOCATED UTILITY COMPANIES AND AGENCIES TO IDENTIFY THE LOCATION OF UTILITIES. THERE IS NO GUARANTEE, EITHER EXPRESSED OR IMPLIED, THAT THE LOCATIONS, SIZE AND TYPE OF MATERIAL OF EXISTING UNDERGROUND UTILITIES INDICATED ARE REPRESENTATIVE OF THOSE TO BE ENCOUNTERED DURING CONSTRUCTION. 4. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE CLIENT REPRESENTATIVE OF OPERATIONAL PLANS. IN THE EVENT AN UNEXPECTED UTILITY OR STRUCTURE INTERFERENCE OR CONFLICT IS ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE CLIENT REPRESENTATIVE. ANY UTILITY SERVICES OR STRUCTURES DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE RESTORED IMMEDIATELY AT CONTRACTOR'S EXPENSE TO THE SATISFACTION OF THE OWNER. 5. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ITEMS NOT TO BE DAMAGED DURING DEMOLITION AND CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE DAMAGED OR DISTURBED ITEMS TO THE SATISFACTION OF THE CLIENT REPRESENTATIVE. GENERAL GRADING NOTES 1. ALL GRADING, PAVEMENT WORK, AND ANY OTHER MISCELLANEOUS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE CURRENT NC DOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION AND SUPPLEMENTAL SPECIFICATIONS. 2. THE GRAVEL SURFACE COURSE SHALL BE CONSTRUCTED IN ACCORDANCE WITH SECTION 520 OF THE NC DOT STANDARD SPECIFICATIONS. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR GRADING INCLUDING EXCAVATION, EMBANKMENT, AND BACKFILLING AS NECESSARY TO CONSTRUCT ALL AGGREGATE ACCESS ROADS, AS OUTLINED IN THESE TECHNICAL SPECIAL PROVISIONS AND AS DIRECTED BY THE CLIENT REPRESENTATIVE. 4. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY DAMAGE DONE TO STORM MANHOLES OR OTHER UTILITIES DURING GRADING. 5. THE CONTRACTOR SHALL DISTRIBUTE EXCESS SOIL ON SITE AT THE DIRECTION OF THE CLIENT REPRESENTATIVE. CONTRACTOR SHALL NOT ALTER DIRECTION OF SURFACE DRAINAGE PATTERNS. 6. THE TOLERANCE OF THIS WORK SHALL BE TO WITHIN TO 0.1 FT OF THE EXISTING GROUND SURFACE ELEVATIONS. 7. THE ACCESS ROAD SUBGRADE SHALL HAVE SUFFICIENT STABILITY TO ACCOMMODATE CONSTRUCTION TRAFFIC WITHOUT EXCESSIVE SUBRADE RUTTING OR SHOVING. AT THE TIME OF PLACEMENT OF THE PAVEMENT, THE IN -SITU SUBGRADE SHALL HAVE A CALIFORNIA BEARING RATIO (CBR) OF AT LEAST 6 PERCENT IN THE TOP 12 INCHES OF SUBGRADE. THE CBR PERCENTAGE WILL BE ASCERTAINED BY THE CONTRACTOR. 8. IF SOFT SPOTS ARE IDENTIFIED IN THE SUBGRADE SOIL, THE SUBGRADE SHALL BE SCARIFIED AND PROOF -ROLLED TO THE DEPTHS REQUIRED BY THE OWNER'S CONSTRUCTION INSPECTOR TO COMPACT AREAS TO THE DENSITY REQUIREMENTS OF THIS DOCUMENT. IF THE SOFT AREAS CANNOT BE ADEQUATELY COMPACTED, THE SOFT SOIL SHALL BE REMOVED AND REPLACED PER THE DESIGN PLANS WITH SUITABLE SOIL MATERIAL AND COMPACTED TO THE DENSITY REQUIREMENTS IN ACCORDANCE WITH THIS DOCUMENT. 9. THE QUALITY OF THE SOIL TO BE USED AS FILL MATERIAL SHALL BE AS SPECIFIED IN THIS DOCUMENT. ALL BACKFILL SHALL BE SPREAD IN LOOSE LIFTS NOT EXCEEDING 8" INCHES IN THICKNESS WHEN SELF-PROPELLED EQUIPMENT IS USED AND NOT EXCEEDING 6" WHEN HAND GUIDED EQUIPMENT IS USED. ALL ROOTS, WOOD, AND VEGETATION SHALL BE REMOVED FROM THE LAYER OF FILL PRIOR TO COMPACTION. ALL FILL AND EXPOSED SOIL IN CUT AREAS SHALL BE COMPACTED AS SPECIFIED IN THIS DOCUMENT. SOIL COMPACTION TESTS WILL BE REQUESTED BY THE OWNER AT APPROPRIATE INTERVALS DURING GRADING OPERATIONS. 10. ALL HAUL -IN MATERIAL SHALL BE FREE OF ROCKS 3" IN DIAMETER AND LARGER. THE OWNER'S CONSTRUCTION INSPECTOR SHALL APPROVE ALL HAUL -IN MATERIAL TO ENSURE THE QUALITY AND THE ABSENCE OF ENVIRONMENTAL HAZARDS. 11. THE FILL AREA SHALL BE CONSTRUCTED TO THE LINES AND GRADES SHOWN ON THE DESIGN DRAWINGS WITH MATERIAL SPECIFIED IN THIS DOCUMENT. THE OWNER'S CONSTRUCTION INSPECTOR WILL PROVIDE ALL NECESSARY BENCHMARKS, SURVEY MONUMENTS, AND BASE LINES REQUIRED FOR THE WORK. THE CONTRACTOR SHALL LAY OUT ALL LINES AND GRADES FOR THE BACKFILL AREAS. ANY PROPOSED CHANGES TO THE SLOPES AND GRADES SHALL REQUIRE THE APPROVAL OF THE OWNER'S CONSTRUCTION INSPECTOR IN ADVANCE. THE CONTRACTOR SHALL BE REQUIRED TO REMOVE, AT HIS OWN EXPENSE, ANY COMPACTED MATERIAL PLACED OUTSIDE OF THE APPROVED LINES OR GRADES. 12. SPOIL MATERIAL SHALL BE TOPSOIL AND OTHER SOIL MATERIALS CONTAINING GREATER THAN 5 PERCENT ORGANIC MATERIAL, SOIL WHICH IS TOO WET, SOIL WHICH DOES NOT MEET THE PLASTICITY AND/OR GRADATION LIMITS FOR SELECT MATERIAL AS SPECIFIED IN THIS DOCUMENT, OR OTHER SOIL MATERIAL DESIGNATED BY THE OWNER'S CONSTRUCTION INSPECTOR TO BE UNSUITABLE FOR SELECT MATERIAL. 13. SELECT SOIL MATERIAL SHALL BE THAT MATERIAL CLASSIFIED AS SM, SP, SC, SW AND CL, OR SW AND SC IN ACCORDANCE WITH ASTM D2487, AND SHALL HAVE A MAXIMUM LIQUID LIMIT OF 35, A MAXIMUM PLASTICITY INDEX OF 8, AND A MAXIMUM OF 35 PERCENT PASSING THE #200 SIEVE. 14. THE TOP SURFACE OF EACH LIFT OF BACKFILL SHALL BE PROTECTED FROM PUMPING, PONDING, AND GULLYING. 15. COMPACTION TESTING WILL BE PROVIDED AT THE EXPENSE OF THE CONTRACTOR. COMPACTION REQUIREMENTS OF SOIL BACKFILL SHALL BE AS INDICATED IN THE FOLLOWING TABLE: LOCATION OF FILL MINIMUM REQUIRED COMPACTION LEVEL STANDARD PROCTOR A. GENERAL YARD AREA 98%(ASTM D698) B. UPPER 18 INCHES OF SOIL TO BE USED AS 98%(ASTM D698) ROAD SUBGRADE MATERIAL AND EXTENDING A MINIMUM OF 5 FEET BEYOND THE EDGE OF DEFINED ROADWAYS (IMMEDIATELY UNDER BASE MATERIAL) 15. CRUSHED STONE IN DRIVE AREAS SHALL BE COMPACTED WITH A STATIC STEEL DRUM ROLLER (APPROXIMATELY 8 TONS). IF A VIBRATORY COMPACTOR IS USED, NO MORE THAN FOUR (4) PASSES SHALL BE ALLOWED. 16. APPROVAL SHALL BE RECEIVED FROM THE CLIENT REPRESENTATIVE FOR EACH FILL TYPE TO BE USED PRIOR TO PROCEEDING WITH BACKFILL OPERATIONS WITH THE MATERIAL IN QUESTION. 17. BACKFILL TO BE IMPORTED SHALL BE TESTED IN ACCORDANCE WITH THIS DOCUMENT AND APPROVED BY THE PROJECT MANAGER PRIOR TO DELIVERY OF MATERIAL TO THE SITE. THE OWNER'S CONSTRUCTION INSPECTOR ACCEPTS NO LIABILITY FOR ANY OUT OF SPECIFICATION MATERIAL ACCEPTED AND STOCKPILED BY THE CONTRACTOR. 18. INSPECTION AND TESTING OF MATERIAL SHALL BE PERFORMED AS REQUIRED BY THIS DOCUMENT AT THE EXPENSE OF THE CONTRACTOR. 19. TESTS AND ANALYSIS OF MATERIAL SHALL BE PERFORMED IN ACCORDANCE WITH THE APPLICABLE STANDARDS REFERENCED IN THIS DOCUMENT FOR THE SPECIFIC TEST. FIELD INSPECTION SHALL BE PERFORMED AS REQUIRED BY THIS DOCUMENT. 20. THE BACKFILL AND EXPOSED SOIL IN CUT AREAS SHALL BE COMPACTED AS SPECIFIED ON THIS DOCUMENT. FIELD DENSITY TESTS SHALL BE PERFORMED BY THE CONTRACTOR TO VERIFY COMPACTION REQUIREMENTS HAVE BEEN ACHIEVED. IN -PLACE FIELD DENSITY TESTING OF THE COMPACTED BACKFILL SHALL BE CONDUCTED ACCORDING TO THE PROCEDURES OF THE SAND CONE METHOD (ASTM 1556), NUCLEAR METHOD (ASTM D3017), OR ACCORDING TO THE PROVISIONS OF THIS DOCUMENT. TEST RESULTS REPORTED SHALL INCLUDE BOTH THE MOISTURE CONTENT AND DRY DENSITY, ALONG WITH OTHER PERTINENT DATA SUCH AS LOCATION, ELEVATION, PROCTOR CURVE USED FOR COMPARISON, ETC. THE TESTING FREQUENCY SHALL BE ONE TEST FOR EACH 5,000 SQUARE FEET OF LIFT AREA OR PORTION THEREOF FOR EACH LIFT. IN ISOLATED AREAS OF LESS THAN 5,000 SQUARE FEET, TEST AT LEAST EVERY THIRD LIFT. WHEN BACKFILL OPERATIONS ARE CONCENTRATED IN SMALL AREAS USING LIGHT MANUALLY -GUIDED EQUIPMENT AND RELATIVELY THIN LIFTS, THE FREQUENCY OF DENSITY TESTING MAY BE REVISED AS DIRECTED BY THE OWNER'S CONSTRUCTION INSPECTOR. TEST LOCATION SHALL BE THE WEAKEST APPEARING AREA OF THE TOP LIFT DETERMINED BY TRACKING ACTION OF THE EQUIPMENT. 21. SUITABILITY OF SOIL MATERIAL FOR USE AS BACKFILL SHALL BE DETERMINED FOR EACH FILL TYPE BY THE RESULTS OF THE FOLLOWING TESTS: A. LIQUID LIMIT IN ACCORDANCE WITH ASTM D4318. B. PARTICLE SIZE ANALYSIS IN ACCORDANCE WITH ASTM D422. C. MOISTURE -DENSITY RELATIONS (STANDARD PROCTOR) IN ACCORDANCE WITH ASTM D698. D. MOISTURE CONTENT IN ACCORDANCE WITH ASTM D2216. E. SAMPLING OF SOIL SHALL BE IN ACCORDANCE WITH ASTM D2216. F. SOIL SHALL BE CLASSIFIED IN ACCORDANCE WITH ASTM D2487. 22. FREQUENCY OF TESTS: TESTS OF MATERIALS TO BE USED IN THE OPERATIONS COVERED IN THIS DOCUMENT SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS GIVEN IN THIS DOCUMENT. FREQUENCIES OF IN -PLACE DENSITY TESTS SHALL BE AS STATED IN THIS DOCUMENT. 23. IF QUESTIONABLE COMPACTION RESULTS ARE OBTAINED, THE CLIENT REPRESENTATIVE MAY REQUIRE THE CONTRACTOR TO PERFORM PROCTOR CHECKS (ON DRY SIDE OF OPTIMUM) TO VERIFY THAT THE PROPER PROCTOR CURVE IS BEING REFERENCED. IF NOT, A NEW PROCTOR CURVE DETERMINED BY A FIVE -POINT TEST SHALL BE REQUIRED. IF THE COMPACTION REQUIREMENTS FOR A LIFT HAVE NOT BEEN ACHIEVED, THE LIFT SHALL BE REWORKED OR REPLACED AT THE CONTRACTOR'S EXPENSE. 24. TESTING OF IN -PLACE DENSITY AND MOISTURE CONTENT BY NUCLEAR METHODS IN ACCORDANCE WITH ASTM D2922 AND ASTM D3017, RESPECTIVELY, WILL BE ALLOWED PROVIDED: A. ACCEPTABLE CORRELATION WITH SAND CONE DENSITY AND LABORATORY DETERMINED MOISTURE CONTENT TEST RESULTS CAN BE OBTAINED ACCORDING TO THE GUIDELINES OF "CALIBRATION" SECTIONS OF ASTM D2922 AND ASTM D3017. B. THE INITIAL CORRELATION RESULTS ARE REVIEWED AND USE OF THE NUCLEAR DEVICE IS APPROVED BY THE OWNER'S CONSTRUCTION INSPECTOR. C. THE CONTRACTOR INSURES THAT THE REPRESENTATIVE FROM THE TESTING AGENCY OPERATING THE NUCLEAR DENSITY TESTING HAS THE NECESSARY STATE AND/OR FEDERAL LICENSES TO OPERATE THE DEVICE AND CARRY A NUCLEAR ENERGY SOURCE. EMBANKMENT FILL NOTES: 1. EMBANKMENT FILL SHALL CONSIT OF AN INORGANIC, NON -PLASTIC, GRANULAR SOIL CONTAINING LESS THAN 10% MATERIAL PASSING THE NO.200 MESH SIEVE WITH UNIFIED SOIL CLASSIFICATION OF SP, SP-SC, OR SP-SM. EMBANKMENT FILL SHALL BE PLACED IN LIFTS NOT EXCEEDING 8 INCHES WHEN USING A STATIC DRUM ROLLER WITH A MINIMUM OPERATING WEIGHT OF 5 TONS WITH A DRUM DIAMETER OF 3 TO 4 FEET. WHERE LIGHTWEIGHT VIBRATORY COMPACTION METHODS ARE UTIILIZED MAXIMUM LOOSE LIFT THICKNESS SHALL BE 6 INCHES. COMPACTION SHALL MEET A MAXIMUM DRY DENSITY OF 98% STANDARD PROCTOR DRY DENSITY. 2. ANY GRADING TO CORRECT SLOPES SHALL BE COMPACTED PER THIS DOCUMENT. GENERAL EXCAVATION REQUIRED FOR CONSTRUCTION 1. THIS ITEM SHALL CONSIST OF FURNISHING ALL LABOR, MATERIALS, MACHINERY, TOOLS, AND SUPERVISION FOR EXCAVATION AND GRADING REQUIRED TO PREPARE THE ROADWAY, AND GRADING REQUIRED TO COMPLETE THE FINAL GRADING OF AREAS ADJACENT TO THE ROADWAY AS SHOWN ON THE PLANS IN ACCORDANCE WITH THE PROVISIONS OF SECTION 225 OF THE NC DOT STANDARD SPECIFICATIONS INSOFAR AS THEY ARE NOT AMENDED BY THE PLANS AND THESE SPECIAL PROVISIONS, AND IN ACCORDANCE WITH THE FOLLOWING SPECIAL PROVISIONS, SUBGRADE COMPACTION VERIFICATION 1. THE CONTRACTOR SHALL EMPLOY AN INDEPENDENT CONSTRUCTION MATERIAL ENGINEERING TESTING FIRM TO MONITOR THE PROOFROLLING OF THE SITE AFTER THE STRIPPINGS HAVE BEEN REMOVED TO INSPECT AND TEST THE COMPACTED FILL AREAS IN THE ACCESS ROAD AREAS AS INDICATED ON THE BID DOCUMENTS AND/OR AS SPECIFIED BY THE OWNER'S DESIGNATED REPRESENTATIVE. COPIES OF THE TEST RESULTS SHALL BE FURNISHED TO THE OWNER'S DESIGNATED REPRESENTATIVE AND OTHERS AS INDICATED BY OWNER'S DESIGNATED REPRESENTATIVE, THE OWNER'S DESIGNATED REPRESENTATIVE MUST APPROVE THE INDEPENDENT CONSTRUCTION MATERIAL ENGINEERING TESTING FIRM. INCLUDED WITH THE BID PROPOSAL, THE CONTRACTOR SHALL FURNISH THE NAME, ADDRESS AND A PHONE NUMBER OF THE INDEPENDENT CONSTRUCTION MATERIAL ENGINEERING TESTING FIRM FOR APPROVAL. ABBREVIATIONS: ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS BOC BACK OF CURB CB CATCH BASIN CBR CALIFORNIA BEARING RATIO C/L CENTERLINE COMB COMBINATION BEND (VERT. & HOR. DIRECTIONAL CHANGE) CONC CONCRETE CI CURB INLET CMP CORRUGATED METAL PIPE DB DEED BOOK DI DROP INLET DR DRIVE ELEC ELECTRICAL EOP EDGE OF PAYMENT EX EXISTING FT FEET FTG FITTING JAB JACK AND BORE GIS GEOGRAPHIC INFORMATION SYSTEM LL LAND LOT LOD LIMITS OF DISTURBANCE MAX MAXIMUM MIN MINIMUM MISC MISCELLANEOUS NTS NOT TO SCALE PG PAGE PVC POLYVINYL PLASTIC PIPE NCDEQ NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY NCDOT NORTH CAROLINA DEPARTMENT OF TRANSPORTATION N/F NOW OR FORMERLY NPDES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM NTS NOT TO SCALE OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION PC POINT OF CURVATURE P/L PROPERTY LINE PT POINT OF TANGENCY RCP REINFORCED CONCRETE PIPE R/W RIGHT OF WAY SAG SAG (PIPE DIRECTION UP) SBL SIDE BEND LEFT SBR SIDE BEND RIGHT SSMH SANITARY SEWER MANHOLE STMH STORM MANHOLE BURNS&McDONNELLCONSULTANTS, INC. PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY STATE LICENSE # C-1435 ",,kIlM PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 ;.•''tH CAR ty�OF�SS�OO(fy NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS DATE INITIALS LINE 472 TRANSMISSION SHEET(S) 3 OF 35 DWG SCALE NONE SEA - 0 07-31-2020 ISSUED FOR CONSTRUCTION MJD CNS CAM AREA CODE 1853 REGIONAL �47 ACCOUNT NUMBER N/A N/A ENGINEER DWG DATE 07/31/2020 SUPERSEDED PROJECT NUMBER 0228178 DATE INITIALS MGR TECH /r�jDUKE I Piedmont GENERAL NOTES, LEGENDS & ABBREVIATIONS DRAWING NUMBER REVISION '�GrneE.••' vQ,ti' N/A N/A � ENERGY Natural Gas GARNER NC %"01 M��v ,,• DRAWING BY MJD REC & STD PNG-C-472-0001000 0 `'�/31/2020 STATION ID DATE INITIALS PRINCIPAL � PROFESSIONALENG/ARCH STAMP CHECKER INITIALS CNS 07/31/2020 CAM ENGINEER COPYRIGHT 2018 GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA DISCIPLINE RESOURCE CENTER /LINE NUMBER �A ,. 00m; { 7 Y *' • mr ' l yy •"i � T r ? .. O 7 rr JJ ,•� T CONTRACTOR HAUL ROUTE .,� VN I -a 4" DISTRIBUTION PIPING, LOCATION APPROXIMATE, CONTRACTOR SHALL GROUT AND ABANDON IN PLACE. APPROXIMATELY 4000' TIE IN PLAN AT HIGHWAY 42 v\�g2+13 ACCESS OFF SEWER SERVICE RD Avy REFER TO PNG-M-472-0001001 . A ABANDON EXISTING PIPELINE IN PLACE SEE PNG-C-472-00001026 ;� ,r' GRAVEL CONSTRUCTION EXIT / ENTRANCE (TYP) Gj�/ h �+C rt, � +' e'o-Z A � �M1 i Ar tit ,ti ra CONTRACTOR HAUL ROUTE EXISTING REGULATOR STATION #2, SEE PROJECT 0228138 ' CONTRACTOR r ,,-,A TEMPORARY CONSTRUCTION EASEMENT (PARKING) = = HAUL ROUTE _ EXISTING REGULATOR STATION #1 ry',i' .'r / -- TO BE REMOVED BY CONTRACTOR ''' ' / \ 80+00 JACK AND BORE HWY 42 - `'` \ 163700-37-9630 163700-37-4905 HDD EXIT 0 ..,, :; :•' _ -' - EXISTING i COLONIAL •+� r 163700-36-6576 I ; PIPELINE EASEMENT 1+ ' �'` 163700-35-2989 0 CD PERMANENT ACCESS ROAD I T/ � •........ INSTALLED BY CONTRACTOR ` rw .46 �-� ' � � I i"" �. •r HDD ENTRY .........:...... .';'•': - / REFER TO PNG-C-472-0001001°X° M r FOR CULVERT DESIGN J - �x IIl 163700-13-3191 I j j -- =____- 163700-27-2782 TEMPORARY CONSTRUCTION EASEMENT (SPOIL STORAGE FOR SLOPE CUTTING) 4' • ` ' "q 14 op" . .k .' j i. IV 4t EXISTING DUKE ENERGY POWER EASEMENT " ' ACCESS AND STAGING 1. ACCESS AND HAUL ROUTES FOR ALL CONTRACTOR PERSONNEL, VEHICLES, EQUIPMENT, AND DELIVERIES ARE ILLUSTRATED ON THIS DRAWING AND ARE SUBJECT TO THE APPROVAL OF THE CLIENT REPRESENTATIVE. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE OFF -SITE HAUL ROUTES WITH THE APPROPRIATE OWNER WHO HAS JURISDICTION OVER THE AFFECTED ROUTE. ACCESS ROUTES AND HAUL ROUTES ARE SUBJECT TO CHANGE AT THE DIRECTION OF THE CLIENT REPRESENTATIVE AND MAY CHANGE BASED ON OPERATIONAL REQUIREMENTS OF THE SITE. 2. CONTRACTOR SHALL COORDINATE ACTIVITIES AND MAINTAIN ALL ACCESS AND HAUL ROUTES IN A MANNER THAT ALLOWS UNOBSTRUCTED EMERGENCY ACCESS TO ALL PROJECT AREAS AND EXISTING ROADWAYS AT ALL TIMES WITHOUT DELAY TO EMERGENCY AND SECURITY VEHICLE RESPONSE TIME. 3• IF ANY EMERGENCY ROUTES REQUIRE CLOSURE DUE TO CONSTRUCTION ACTIVITIES, CONTRACTOR SHALL NOTIFY THE CLIENT REPRESENTATIVE, POLICE, LOCAL FIRE AUTHORITY, AND ALL OTHER EMERGENCY SERVICES OF THE CLOSURE, 4. CONTRACTOR SHALL MAINTAIN ACCESS AND HAUL ROUTES TO BE FREE FROM DEBRIS CAUSED FROM CONSTRUCTION ACTIVITIES ON A DAILY BASIS. 5. CONTRACTOR SHALL RESTRICT ALL OPERATIONS TO AREAS WITHIN THE CONSTRUCTION LIMITS UNLESS COORDINATED OTHERWISE WITH THE CLIENT REPRESENTATIVE. 6. CONTRACTOR IS RESPONSIBLE FOR ESTABLISHING A STAGING AND STOCKPILE AREA FOR MATERIALS AND EQUIPMENT. LOCATION OF CONTRACTOR'S STAGING SHALL BE AS ILLUSTRATED ON THIS DRAWING, AND IS SUBJECT TO THE APPROVAL OF THE CLIENT REPRESENTATIVE. CONTRACTOR MAY SUBMIT ALTERNATIVES TO THE STAGING AREA LOCATIONS AS SHOWN. CONTRACTOR'S STAGING AREA IS SUBJECT TO CHANGE AT THE DIRECTION OF THE CLIENT REPRESENTATIVE AND MAY CHANGE BASED ON OPERATIONAL REQUIREMENTS OF THE PROJECT SITE. 7. WHEN NOT ENGAGED IN CONSTRUCTION ACTIVITIES, CONTRACTOR'S EQUIPMENT AND VEHICLES SHALL BE PARKED IN THE STAGING AREA. 8. ACCESS POINTS, HAUL ROUTES, STAGING AREA, AND ANY OTHER AREAS DISTURBED BY THE CONTRACTOR SHALL BE RESTORED TO THEIR ORIGINAL CONDITION OR BETTER TO THE SATISFACTION OF THE CLIENT REPRESENTATIVE. 9. CONTRACTOR SHALL IMPROVE THE EXISTING ACCESS ROAD AS REQUIRED AND AS DIRECTED BY AND APPROVED BY OWNER. ROAD SHALL BE 6" GRAVEL SURFACE COURSE OVER 12" COMPACTED SUBGRADE AND AT LEAST 12' IN WIDTH. TRAFFIC CONTROL 1. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL CORDON OFF THE CONSTRUCTION WORK AREA AND ASSOCIATED ROADWAYS BY USING BARRICADES APPROVED BY THE CLIENT REPRESENTATIVE. 2. ALL CONSTRUCTION EQUIPMENT AND VEHICLES SHALL BE MARKED WITH COMPANY DESIGNS, INSIGNIAS, OR OTHER MARKINGS, WHICH ARE CLEARLY VISIBLE. 3. CONSTRUCTION EQUIPMENT SHALL HAVE AUTOMATIC SIGNALING DEVICES TO SOUND AN ALARM WHEN MOVING IN REVERSE. 4. NO PEDESTRIAN TRAFFIC SHALL BE ALLOWED INSIDE THE CONSTRUCTION LIMITS. 5. ANY DAMAGE TO ROADS AND PAVEMENTS -TO -REMAIN DUE TO CONSTRUCTION EQUIPMENT OR TRAFFIC SHALL BE REPAIRED TO RESTORE THE ROADS AND PAVEMENTS TO THEIR ORIGINAL CONDITION TO THE SATISFACTION OF THE CLIENT REPRESENTATIVE. PIPELINE CONSTRUCTION PHASING 1. NOTIFY NCDEQ AT LEAST 48 HOURS PRIOR TO PROJECT MOBILIZATION. 2. CONSTRUCTION AND LAND DISTURBANCE ACTIVITIES TO BEGIN JUNE 2020. PREPARE PROPOSED LINES WITH STORMWATER BMPS. SEE PHASED APPROACH BELOW: a. PHASE I: CLEARING AND GRUBBING ROW i. INSTALL PERIMETER CONTROLS - CONSTRUCTION ENTRANCES, COMPOST SOCK, SILT FENCE ii. BEGIN CLEARING AND GRUBBING OPERATIONS. iii. TEMPORARY STABILIZATION WITH TEMPORARY SEEDING, SEE ES&PC PLANS b. PHASE II: GRADING OF ROW FOR ACCESS AND DITCH EXCAVATION i. MAINTAIN EXISTING PERIMETER MEASURES AND INSTALL ADDITIONAL PERIMETER MEASURES AS NEEDED. ii. PRIOR TO GRADING OPERATIONS INSTALL EARTHEN BERMS OR COMPOST SOCKS ON THE ALONG THE UPGRADIENT EDGE OF THE ROW TO DIVERT CLEAN WATER AROUND OR THROUGH DISTURBED AREAS. iii. BEGIN GRADING ROW IN PREPARATION OF PIPE INSTALLATION. iv. DURING GRADING OPERATIONS MANAGE EROSION AND SEDIMENT CONTROL FROM WITHIN THE DISTURBED AREAS BY INSTALLING SILT FENCE OUTLETS, SEDIMENT TRAPS, ETC. INSTALL DEWATERING FEATURES AT IDENTIFIED LOCATIONS. MAKE SURE STOCKPILED MATERIAL IS PROTECTED WITH SILT FENCE ALONG THE DOWNSTREAM EDGE. v. PRIOR TO INSTALLING THE PIPE INSTALL TRENCH PLUGS IN THE OPEN DITCH IN AREAS WHERE SLOPES WARRANT TRENCH PLUGS. THE TOP OF THE DOWNSTREAM TRENCH PLUG WILL BE AT THE SAME ELEVATION AS THE BOTTOM OF THE UPSTREAM TRENCH PLUG. vi. TEMPORARY STABILIZATION OF DISTURBED AREAS WITH TEMPORARY SEEDING AND MATTING, SEE ES&PC PLANS. c. PHASE III: PIPE INSTALLATION i• MAINTAIN INSTALLED EROSION AND SEDIMENT CONTROL MEASURES. ii. MAINTAIN DEWATERING OPERATIONS OF OPEN DITCH, iii. BEGIN PIPE INSTALLATION OPERATIONS WHICH INCLUDE STAGING OF PIPE, WELDING OF PIPE, AND LOWERING OF PIPE INTO THE OPEN DITCH. iv. AS PIPE IS INSTALLED DITCH IS TO BE BACKFILLED AND IMMEDIATELY PERMANENTLY STABILIZED WITH PERMANENT SEEDING. v. IN AREAS OF PROPOSED TRENCH PLUGS, SEDIMENT WITHIN THE DITCH TRAPPED BEHIND THE TRENCH PLUGS SHOULD BE REMOVED, TRENCH PLUGS SHALL BE TEMPORARILY REMOVED, PIPE IS TO BE INSTALLED, AND TRENCH PLUGS ARE TO BE REINSTALLED. 3. FOLLOWING CONSTRUCTION ACTIVITIES, AND AFTER INSPECTION BY NC DEQ, REMOVE TEMPORARY EROSION AND SEDIMENT CONTROL BMPS, AND SEED ANY AREAS DISTURBED DURING BMP REMOVAL ACCORDING TO THE SPECIFICATIONS IN APPENDIX D; SEE BELOW: a. PHASE 4: FINAL CONDITIONS i. CONTINUE STABILIZING DISTURBED AREAS. ii. CONTRACTOR TO PROVIDE SEED, FERTILIZER, SOIL AMENDMENTS, AND WATER UNTIL PERMANENT VEGETATION IS ESTABLISHED IN ACCORDANCE TO NCDEQ STANDARDS. iii. ONCE AREAS ARE PERMANENTLY STABILIZED IN ACCORDANCE TO NCDEQ STANDARDS, REMOVE REMAINING E&SC MEASURES AND CLOSE PERMIT IN ACCORDANCE TO NCDEQ REQUIREMENTS 4. UPON ESTABLISHMENT OF PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION, AN INSPECTION BY THE DEMLR-LQS SHALL BE REQUESTED TO VERIFY THE ADEQUACY OF THE GROUND COVER. PERMIT COVERAGE WILL END UPON ELECTRONIC SUBMITTAL OF THE NOTICE OF TERMINATION (NOT). N 0 400 800 11N = 40OFT BURNS&McDONNELLCONSULTANTS, INC. PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY STATE LICENSE # C-1435 ` .y1k1 k I r JPIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 .�•'�[ K cA NO. DATE REVISIONDESCRIPTION BY CHK APPD DESCRIPTION APPROVALS <S DATE INITIALS LINE 472 TRANSMISSION SHEET(S) 4 OF 35 DWG SCALE 1 —400, SEA - 0 07-31-2020 ISSUED FOR CONSTRUCTION MJD CNS CAM AREA CODE 1853 REGIONAL 047 - ACCOUNT NUMBER N/A N/A ENGINEER DWG DATE 7/31/2020 SUPERSEDED :•.� PROJECT NUMBER 0228178 DATE INITIALS Piedmont MGR TECH :DUKE fl SITE ACCESS ROUTE PLAN DRAWING NUMBER REVISION IN�E.• .��' NIA N/A REC &STD ENERGY Natural Gas GJti,; DRAWING BY MJD GARNER , N PNG -C-472-0001001 0 STATION ID DATE NITIALS PRINCIPAL PROFESSIOWL ENCVARCH STAMP CHECKER INITIALS CNS 0713112020 CAM ENGINEER COPYRIGHT 2018 GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA DISCIPLINE / RESOURCE CENTER / LINE NUMBER N PARCEL No: 163700-27-2782 � OWNER: DEED BOOK / PAGE: WILLIAMS 2006 FAMILY LIMITED PARTNERSHIP } Q o 3144 / 760 0 ACREAGE c� or EASEMENTS REF. DWG. NO. c� z w 00 z z = = m co c� 0 Of Of z z c.� z z m m = Of of z c� z z CD W z w w w m O O Ol w w w z O O O° z z Q w w w w Q w w LijQ Lf> 00 CO Lf> Lf> z 00 O — w M M f� M co c0 M Q M M M M M Q Q Q Q o Q CD V Q Q Q Q - PROPOSED ADDITIONAL ■■NMI TEMPORARY WORKSPACE - - ■�j°■■°°°°° Ing,°■°°°°°����■■°°°° °°°°■°° ■°°°°° PROPOSED ADDITIONAL TEMPORARY WORKSPACE ■e■° °■®®°°°° °■■����e°°■ °°°■■■■� MEN mom mna— win NMnow :� ■ ■■■■■e °°°■°°°°°■■e rye■ eee°e■ °°■■■■■■°°°■■�■■ ■■���=...■■■■ \■■■°°°° °°°°°■■ °° O P RO PO S E D 8" PIPELINE ��°■°■°�:�■®■■°��°°■■°°°�■■■■eee - w 3 \■■■° ■■■■■■°°°�°°°° o N PROPOSED50 ■■■■■■ ■°■° °°° °■ ■■ ■■■■°°■°° °°°■ ■ ■■■■e■■ ■ ■.■° ■■■■■■■■° ee°■■°° ■■■■°°■� `s' _____— eeeee■■■■■■■■■■:°■■■� ���' ■° °■ ° ■ o ■■ ■ ■ ■■■■■■■ °■■°■ ■■° ^° ■�� '��■■ ■� ■■° ■ 7 _ TEMPORARY WORKSPACE ]®e ■���°°°°°■■° 3� / ■■■■■■■ ���■°°■° ►7■■■■°°■■■ �■Now■°° ■°■■°■■°■ °°� °■■■■°�. ��■■■■° ■°°°°°°° z O ■■■■��� ■■■■■ °e°°°°■:■■°°■■■e■ O,■ °■■ am_ . i e ■°°°°° ■■ Mai °■■■■■ ■ °°■■■■■°°■■■ I J ■■■°°°°Mom ■°°° ° ■eee° —a orgasms °°° ■ ■■■■■■°°°° ■■■■■mamnnn­ ■■■ ■■■■°°°°.■■eeee ■ °°°°�■°■■■■■■.■■■■■■■■■■\■e■ ® ■ ■ ee- ■■■■°����e■■°°�.\■e°°�j���°°° j%%fie°°�� . 1 z e°�■e®■e°�� o_I■e■�%%eee°%%•' 3a ai 'd �°■■°■■°■■°■ ��°°°°■°e �■ :°■°° V::::■■■ e■■■■■e: 1� .':,��e�e:ee°°■■�°�■°■■e■°:■■■e:::eeee / SI■e■ 27-2782 ,a ��eeee°.e°:e°°°°°°■■°■°°■■e�■■■ ■r°e■■■�°°'' >a •■■■e xoQ n ,■■■■e ■■■�� ��3 °°■e° ■■ee 6a ,a °°.:■■■■.: ■ ,a / / °°■■ rr a ,\�°■■eeee \ aIa l�■e•• ■■ eee■ /,a Z W 3gk04 �,� ,a ,a PROPOSED 50' PROPOSED ADDITIONAL 4 ! �� PERMANENT EASEMENT TEMPORARY WORKSPACE -, z z o o< �aNr o �� �LEfM� o J C� N N O O 240 240 II R 235 EXISTING 235 \ GRADE ------------------- N 230 230 J -- -- - — - - L 0 225 --- 225 w U_ LL = Q \\ \ \ -------- --- - w J U_ � N 220 \ ___ -- �� 220 Ir a_ - \ N 215 PROPOSED 8" PIPELINE ,-'------- 215 \`, _ 210 - \ ---- 210 \ — ,, 205 - - EO - 205 - 0 200 200 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 MATERIAL 1200' 0 10 10 CONST. METHOD OPEN CUT CLASS / MAOP CLASS 3 / 1000 PSIG BURNS&McDONNELLCONSULTANTS, INC. STATE LICENSE # C-1435 PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY REF. DWG(S) ,,.101 k i l 1, H cAq�''. PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 ,.•'�� �tsa'.Orf5s�0 • �fif= �¢ �9� •9 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS LINE 472 TRANSMISSION SHEET(S) 10 OF 35 ��_ ��_ ' DWG SCALE H: 1 -50, V: 1 -10 0 07-31-2020 ISSUED FOR CONSTRUCTION MJD CNS CAM AREA CODE 1853 DATE INITIALS SEA N/A N/A REGIONAL DWG DATE 07/31/2020 SUPERSEDED 047 :��� = ACCOUNT NUMBER ENGINEER DUKE Piedmont p ENERGY,: Natural Gas �C EN� ALIGNMENT PLAN & PROFILE - 8" PIPELINE — PROJECT NUMBER 0228178 DATE N/A INITIALS NIA MGR TECH DRAWING NUMBER REVISION DRAWING BY MJD � 'A ,f,•`, REC&STD GARNER, NC PNG -C-472-0001007 0 STATION ID DATE 07/31/2020 INITIALS CAM PRINCIPAL ENGINEER 0rir�,N%%li31/2020 PROFESSIONALENG/ARCH STAMP COPYRIGHT 2018 GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA CHECKER INITIALS CNS DISCIPLINE / RESOURCE CENTER / LINE NUMBER PARCEL NO: 163700-27-2782 163700-35-2989 C 163700-36-6576 OWNER: WILLIAMS 2006 FAMILY LIMITED PARTNERSHIP CAROLINA PROPERTY DEVELOPMENT LLC JOE MIKE BAREFOOT AND BILLY RAY BAREFOOT o DEED BOOK /PAGE: 3144 / 760 3657 / 830 1593 / 797 0 ACREAGE c� EASEMENTS REF. DWG. NO. PNG-C-472-0001002, PNG-C-472-0001013 w z > Z Q z U co Z Z O of o r Z O Q LU w > ~ p O Q cq p z co CD M co + + + 1n Ln co L() Ln GO Q Q Q U) U) U) 163700-27-2782 _ PROPOSED 50' PERMANENT EASEMENT PERMANENT ACCESS EASEMENT 3p� PROPOSED 100' DEEP BORE c Z SEE PNG-C-472-0001002 LOCATION, TREMMIE GROUT FROM n PROPOSED ADDITIONAL BOTTOM UP UPON COMPLETION 1 TEMPORARY WORKSPACE STA: 57+50, OFF: 25' L i f e0 5 + ` PI HORIZONTAL CURVE ♦����at M STA =63+48 x w z o _zNO k M = 57+0u 58+00 59+00 60+00 TS 61+00 62+00 = 63+00 64+00 r m Z CLEARING SHALL BE LIMITED + PROPOSED 8" PIPELINE HDD ENTRY TO 10' EACH SIDE OF PIPELINE cn D STATION 57+75 TEST STATION #2 410THROUGH LENGTH OF HD _ _ 163700-36-6576 INSTALL (3) BLACK #12 STRANDED THHN WIRES ONTO PIPE. \ ' INSTALL STEALTH7 REFERENCE ELECTRODE AT PIPE DEPTH l ACCORDING TO MANUFACTURERS SPECIFICATIONS. BRING \ 163700-35-2989 ALL WIRES UP INTO FINK ABOVE GRADE TEST STATION AND r PLACE IN SAFE LOCATION WITH CATTLE GUARD. Z z o �aNr o< Uj co o Ji �LEfM� CL o J C� N N 0o 210 HDD ENTRY AT 16' _ EXISTING 170 210 170 \ STA:57+50, EL:206.0' �" GRADE \ II ------- -� -� - ----_ 165 165 205 - Z ---- -------- 205 Lo -�-�- 160 160 cn 200 200 ---_ a 9 — 155 \ 155 N 195 \ 195 \ o ` J b x PROPOSED 150 150 J „� or_b 190 8" PIPELINEIL 190 0 — CM \ \ a c 185 145 185 145 - ` \ N \` 140 140 c CJ i 180 180 � N 135 -IzPI HORIZONTAL CURVE 135 175 175 STA =63+48 _ W > 1 � 130 130 -�---- 170 170 - 64+00 57+00 58+00 59+00 60+00 61+00 62+00 63+00 0 MATERIAL 100, 700' 0 10 0 CONST. METHOD OPEN CUT HDD CLASS / MAOP CLASS 3 / 1000 PSIG BURNS&McDONNELLCONSULTANTS, INC. PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY REF. DWG(S): PNG-C-472-0001002 STATE LICENSE#G1435 ,,,, �, PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PNG-C-472-0001013 ' .,,,Ca . , :,t��� OFfcSS►O'��'��'; NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET(S) 12 OF 35 ��_ ��_ DWG SCALE H: 1 -50 , V: 1 -10 - SEA LINE 472 TRANSMISSION 0 07-31-2020 ISSUED FOR CONSTRUCTION MJD CNS CAM AREA CODE 1853 DATE INITIALS REGIONAL �47 N/A N/A ENGINEER rj�DUKE Piedmont '"ENERGY, ALIGNMENT PLAN & PROFILE - 8" PIPELINE DWG DATE 07/31/2020 SUPERSEDED — ACCOUNT NUMBER PROJECT NUMBER 0228178 DATE INITIALS MGR TECH DRAWING NUMBER REVISION ••Nc E.� w: N/A N/A REC&STD �i Natural Gas ;•�EA'Me %%'o' DRAWING BY MJD GARNER, NC PNG -C-472-0001009 0 STATION ID DATE INITIALS PRINCIPAL ��It���111% ��/31/2020 PROFESSIONALENG/ARCH STAMP 07/31/2020 CAM ENGINEER COPYRIGHT 2018 GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA CHECKER INITIALS CNS DISCIPLINE / RESOURCE CENTER / LINE NUMBER PARCEL NO: 163700-36-6576 163700-27-6098 OWNER: JOE MIKE BAREFOOT AND BILLY RAY BAREFOOT GARNER DEVELOPMENT PARTNERS LLC } ¢ o DEED BOOK / PAGE: 1593 / 797 3500 / 659 0 ACREAGE CD EASEMENTS 50' COLONIAL EASEMENT REF. DWG. NO. PNG-C-472-0001013, PNG-C-472-0001014 z � o o < wCL cn w JOINT .� LENGTH .� a CL �. .. O J 9 9 0 170 0 c II 165 R 160 J �z 155 0 N ir J = 150 U O IL OIL G N c 145 N 140 o N 135 c� W 130 CLEARING SHALL BE LIMITED TO 10' EACH SIDE OF PIPELINE THROUGH LENGTH OF HDD 50' COLONIAL - PIPELINE r""rMENT FE 1 / / / / / r / i w CD > o o 0 M z U m ¢ o � ~ > w 0 O o w ti 00 + ON f� N ¢ ¢ ¢ H � � �/ P STATION 72+00 TEST STATION #3 INSTALL 3 BLACK #12 STRANDED THHN WIRES ONTO PIPE. INSTALL STEALTH7 REFERENCE ELECTRODE AT PIPE DEPTH ACCORDING TO MANUFACTURERS SPECIFICATIONS. BRING ALL WIRES UP INTO FINK ABOVE GRADE TEST STATION AND �PLACE IN SAFE LOCATION WITH CATTLE GUARD. A 163700-36-6576I mmki 106 Elm 'me Islam so woullosell me EENI � 70+00 71+00 163700-27-6098 i PI HORIZONTAL CURVE PROPOSED 80' DEEP BORE PROPOSED 80' DEEP BORE STA =67+45 LOCATION, TREMMIE GROUT FROM LOCATION, TREMMIE GROUT FROM BOTTOM UP UPON COMPLETION BOTTOM UP UPON COMPLETION STA: 68+30, OFF: 70' R STA: 71+50, OFF: 125' R 30' SEWER EASEMENT ® `30CONTRACTOR TO PROTECT SE f'ER PER EASE/M a -� -_Dg 3Nr MANHOLES AT ALL TIMES / 0 CURVE 67+45 — PI HORIZONTAL STA = /- 170 165 195 13 -Na �c, / / a.— PROPOSED 25' TEMPORARY WORKSPACE -�� i� -• F PROPOSED I 8 PIPELINE HDD EXIT 73+00 w 02 PROPOSED HDD PULL STRING (2 STRINGS) L=760' 0 2 75+00 r +00 Z mCn z J ♦� Cn O !1pWv_ML*M*_1p_p1wM "oil PM WIMOIX10wo- 200' — — — — / SEINER EASEMENT 30' G 231 PER DB 861 PG 976 — — ADDITIONAL J TEMPORARY WORKSPACE - 160 190 HDD EXIT AT 10' STA:72+28, EL:184.7' t i 150 180 145 175 140 170 135 165 130 160 195 190 EXISTING GRADE ------- ------------ -185 Z 10 — 180 - - 175 PROPOSED 8" PIPELINE - - 170 165 160 NOTES: 1. COLONIAL LINES ARE LIQUID PETROLEUM. 2. CONTRACTOR SHALL PROTECT MANHOLES AT ALL TIMES. �— 65+00 66+00 67+00 68+00 69+00 70+00 71+00 72+00 73+00 74+00 75+00 MATERIAL 778' 322' ( 10 0 CONST. METHOD HDD OPEN CUT CLASS / MAOP CLASS 3 11000 PSIG BURNS&McDONNELLCONSULTANTS, INC. STATE LICENSEICENSE# G1435 PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY a kI Ir,, PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 ,.•'�.1H C5ARor, �tsaf.5j ' C , QO� Ortryf�9, NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS 0 07-31-2020 ISSUED FOR CONSTRUCTION MJD CNS CAM AREA CODE 1853 DATE INITIALS REGIONAL LINE 472 TRANSMISSION SEA N/A NIA 047 ` ACCOUNT NUMBER ENGINEER DATE INITIALS j` DUKE Piedmont s N E ..y��,= PROJECT NUMBER 0228178 N/A NIA MGR TECH 'ENERGY Natural Gas ALIGNMENT PLAN & PROFILE - 8" PIPELINE REC &STD DRAWING BY MJD GARNER, NC z •'rrr;,11 yy�� 131/2020 STATION ID DATE INITIALS V PRINCIPAL PROFESSIONALENG/ARCH STAMP ICHECKER INITIALS 07/31/2020 CAM CNS ENGINEER COPYRIGHT 2018 GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA J w J U_ O a REF. DWG(S): PNG-C-472-0001013 PNG-C-472-0001014 SHEET(S) 13 OF 35 DWG SCALE H: 1"=50', V: 1"=10' DWG DATE 07/31/2020 SUPERSEDED DRAWING NUMBER REVISION PNG -C-472-0001010 0 DISCIPLINE / RESOURCE CENTER / LINE NUMBER PARCEL NO: 163700-27-6098 163700-37-4905 163700-37-9630 >_ Q OWNER: GARNER DEVELOPMENT PARTNERS LLC BROUGHTON, CHRISTINE WAND OTHERS NC HIGHWAY 42 WEST, DONALD RAY AND JUNE Q ILL p DEED BOOK /PAGE: 3500 / 659 4897 / 669 100' R/W 4425 / 352 ILL p ACREAGE c� or EASEMENTS REF. DWG. NO. PNG-C-472-0001012, PNG-C-472-0001013 cD Q 0 0 0 0 z z z z w LU LU LU 0 = U z m co M m _ w _ Of 01f Ofz CD w w = w = �z w = LU < O O c� > cD w 0 c.D 1 CD z O cn z O z M ¢ z:D w p cnu w w w w L w w Ofw u _ o z Q cn V Co N 6) N Co CD w 6O) V) co CD LC> M = M O CV � O V M in O O (V in O O w w r- ono 0o U ao co ccoo Q w H H H H Q Q Q Q J Q Q Q~ cn cn cn cn cn cn cn c U cn cn cn M — y pL • ZI - J. pip - 140' d PROPOSED ADDITIONAL ♦�♦� _ ���PL � _X I _ TEMPORARY WORKSPACE ♦♦.♦�♦♦`♦� _'ter PROPOSED HDD PULL I ♦�♦♦♦♦♦♦♦♦♦�♦♦♦♦♦ `` • I 163700-37-9630 PROPOSED 50 ` I ♦♦♦♦♦♦♦♦♦♦♦♦� o � STRING (2 STRINGS) L=760' r ♦ I♦♦♦♦♦♦♦♦♦♦♦ ,�,�.� , 1 PERMANENT EASEMENT oo ♦ ♦ ♦♦♦♦♦♦♦ • PROPOSED TEMPORARY LAUNCHER ♦�♦ ♦ ♦ ♦ ♦ � U) / _♦ , LOCATION. SEE DRAWING _ ♦1 ♦� ♦ � ♦ ♦ ♦ � J ♦� � •• �• •�♦♦♦♦� � II I I I PNG-M-472-0001001 FOR DETAIL II 163700-37-4905 PROPOSED HDD PULL ♦ u I I I _ 6a A♦♦♦ STRING (2 STRINGS)♦♦♦♦1♦♦♦♦♦♦� a PROPOSED 8" PIPELINE �t L=760♦♦♦ (n I i 3 WAY SPHERICAL 1 �,-� ��:1♦�� 163700-27-6098 ,♦♦♦♦ TEE CONNECTION TO "Al a� 1 ♦♦♦♦♦♦�►r �. �������*♦�♦♦♦♦♦♦♦♦ I EXISTING 8 PIPELINEpit . ♦ ♦ice♦ ♦♦♦�-: �� _.�.♦�♦♦♦♦�♦♦♦♦♦♦••� �' ♦♦♦♦♦♦♦♦��♦�♦ ♦♦♦�♦�♦���♦♦•♦♦♦♦♦♦♦♦♦♦♦♦♦ ♦♦♦♦ ♦♦� PROPOSED ♦♦♦� '' m I i ` 58' ♦♦♦♦��i►a�� O ♦♦♦♦♦♦♦♦♦♦♦♦ ♦♦♦♦ 0 x �,n ♦♦♦♦♦♦♦♦♦♦♦♦♦ ♦ ♦♦� CONSTRUCTION �♦ ♦♦♦� _.�♦♦♦♦♦����� 1 N ♦♦♦♦♦♦♦♦ ♦�♦� ♦ �� ♦�� ��� �'♦ ♦♦�� +♦�♦♦: ENTRANCE ♦♦♦♦♦♦ IA�� �°' ', I♦♦��♦ T -� �`" • ' ♦ � n c� • 78+00 / mm Z111111I 3 0 1gx i oj� s NOTE 2 82+0,/ ���♦�♦'♦♦♦♦♦ I I J m i p R A" I i. ♦♦♦♦♦♦♦♦♦♦♦♦ 81+00 ��� TS- i Ln WE a ♦ ♦ ♦ � I • \ � I i 82 _1 3 ♦° � � --♦♦♦♦♦ N♦♦♦ ♦ ♦♦♦♦ �r •�,%J'��� STATION 82+00 TEST STATION #4 - ♦ ♦ � :�.�♦♦♦♦♦♦♦♦ I �r �_s� I I 5 /11 PE 87AP 9M6 30' SEWER EASEMENT ♦� !�♦ ♦ ♦ �• •{" % �f .;INSTALL (3) BLACK #12 STRANDED THHN WIRES ONTO PIPE. INSTALL � r•- ` F STEALTH7 REFERENCE ELECTRODE AT PIPE DEPTH ACCORDING TO '^ � � I CONTRACTOR TO PROTECT • _ •+��-�-�,-_ — � i y,' ' MANUFACTURERS SPECIFICATIONS. BRING ALL WIRES UP INTO FINK MANHOLES AT ALL TIMES APPROXIMATE RECTIFIER AND DEEP WELL d _ -Id PROPOSED JACK AND BORE SEE I � � , ABOVE GRADE TEST STATION AND PLACE IN SAFE LOCATION WITH GROUNDBED LOCATION. FINAL LOCATION TO BE 'd - ,d A PNG-C-472-0001012 CATTLE GUARD. DETERMINED BY PNG INTEGRITY DURING PIPELINE PROPOSED - �a �� / 0- d CONSTRUCTION. ALL APPURTENANCES SHALL BE TEMPORARY �,d o o PROPOSED CONSTRUCTION ENTRANCE ,d R: � - - --- � NUMB Q96 NOTE 1 � INSTALLED IN PERMANENT PIPELINE EASEMENT. WORKSPACE FUTURE RAN BY NCDOT d 210 r FUTURE RAN BY NCDOT ct7 z � z LD JOINT Uj CL cn Ji LUCL t5 t5 O J CC� N N 0 0 210 210 NOTE: LU II 205 I — LU orf < Of 1. GATED FACILITY ACCESS DRIVE OWNED BY 205 EXISTING GRADE PROPOSED 8" PIPELINE o _ < o z OTHERS. CONTRACTOR SHALL COORDINATE IN -,ten N N w 0� o w ADVANCE FOR ACCESS. J 200 _ _co - oN - co U aoN � z � N¢ 200 2. CONTRACTOR SHALL MAT WHEN WORKING OVER 6'cn rn ¢ "' z --- Q ~ O U J � cn Z cn U cn Z -- Q � LIVE LINES. 0 195 Lfi � ---- ---------- N � —t— ---- 0_ -- - -PROPOSED 195 J x RECEIVING PIT J -�_-- o 190 --- _ -- — 190 0 C4 SEE PNG-M-472-0001001 185 185 STA: 80+67 STA: 81 +28 o 180 -- —_ PROPOSED EXISTING 18" RCP EXISTING 18" RCP 180 BORE PIT INV = 192.30 INV = 192.11 cn STA: 81 +31 PNG 8" STEEL LINE 117 175 — — EXISTING WATER _ TRANSMISSION 175 PROPOSED JACK AND BORE STA: 81+17 i STA: 81+27 > 170 SEE PNG-C-472-0001012 UNKNOWN UTILITY i I I EXISTING WATER 170 77+00 78+00 79+00 80+00 81+00 82+00 83+00 0 MATERIAL 410' 115' 85' O 10 0 10 000 CONST. METHOD OPEN CUT OPEN CUT BORE CLASS / MAOP CLASS 3 11000 PSIG BURNS&McDONNELLCONSULTANTS, INC. PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY REF. DWG(S): PNG-C-472-0001013 STATE LICENSE#G1435 ,,,,, ,, PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PNG-C-472-0001014 ' .,,Ca , ,t��� OFfcSS►O ��'�'; �1. NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS SHEET(S) 14 OF 35 ��_ ��_ DWG SCALE H: 1 -50, V: 1 -10 - SEA LINE 472 TRANSMISSION 0 07-31-2020 ISSUED FOR CONSTRUCTION MJD CNS CAM AREA CODE 1853 DATE INITIALS REGIONAL 047 N/A N/A ENGINEER rj�DUKE Piedmont '� ALIGNMENT PLAN & PROFILE — 8" PIPELINE DWG DATE 07/31/2020 SUPERSEDED ACCOUNT NUMBER PROJECT NUMBER 0228178 DATE INITIALS MGR TECH DRAWING NUMBER REVISION •••Nc E.� w�': N/A NIA REC&STD ENERGY �i Natural Gas :,EAiM��,�,.,.. DRAWING BY MJD GARNER, NC PNG —C-472-0001011 0 STATION ID DATE INITIALS PRINCIPAL 'fossil 112020 PROFESSIONAL ENG/ARCHSTAMP 07/31 /2020 CAM ENGINEER COPYRIGHT 2018 GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA CHECKER INITIALS CNS DISCIPLINE / RESOURCE CENTER / LINE NUMBER GENERAL NOTES: PROPOSED PIPELINE SHALL BE CONSTRUCTED AND INSTALLED IN ACCORDANCE WITH PIEDMONT NATURAL GAS' DESIGN AND CONSTRUCTION MANUALS, LATEST EDITION. ALL EQUIPMENT MUST ACCESS THE SITE ALONG THE CONSTRUCTION RIGHT-OF-WAY OR FROM APPROVED ACCESS ROADS. CONTRACTOR SHALL SUBMIT ANY REQUESTS FOR DEVIATION FROM THIS DESIGN FOR REVIEW PRIOR TO CONSTRUCTION. CONTRACTOR SHALL DISPOSE OF EXCESS DRILLING FLUID AS DIRECTED BY THE COMPANY REPRESENTATIVE IN ACCORDANCE WITH PERMIT CONDITIONS, UNDER NO CIRCUMSTANCES SHALL DRILLING FLUID BE DISPOSED OF IN WATER BODIES OR WETLANDS. THE ENTRY AND EXIT POINTS SHALL BE CONTAINED AND COLLECTED TO THE EXTENT PRACTICAL AND DISPOSED OF AS DIRECTED BY THE COMPANY REPRESENTATIVE IN ACCORDANCE WITH PERMIT CONDITIONS. EXISTING UNDERGROUND UTILITIES SHOWN ARE APPROXIMATE AND ARE TO BE FIELD VERIFIED BY CONTRACTOR PRIOR TO CONSTRUCTION. CONTRACTOR SHALL VERIFY ALL COORDINATES AND DIMENSIONAL INFORMATION PRIOR TO CONSTRUCTION. BRING ANY DISCREPANCIES WITH LAYOUT TO ATTENTION OF COMPANY PRIOR TO STARTING CONSTRUCTION. ACCESS ROAD PROPOSED 100' DEEP BORE °'�°°°°°°°°�°• LOCATION, TREMMIE GROUT FROM BOTTOM UP UPON COMPLETION I STA: 57+50, OFF: 25 L ' � \°1.2001 \ • 163700-27-2782 P PIGGING NOTES 1. MFL TOOL SHALL BE RUN PRIOR TO PULLBACK. PRELIMINARY REPORT SHALL BE MADE AVAILABLE TO PNG FOR REVIEW PRIOR TO PULLBACK. 2. MFL TOOL SHALL BE RUN PRIOR TO PIPELINE COMMISSIONING. 3. VENDOR SHALL COMPARE PRE- AND POST -PULL REPORTS. 4. MFL VENDOR SHALL BE APPROVED IN ADVANCE BY PNG. w J LL 0 CONTRACTOR IS RESPONSIBLE FOR KNOWING LOCATION OF ALL ENVIRONMENTALLY SENSITIVE AREA RESTRICTIONS PERTAINING TO THIS PROJECT. GEOTECHNICAL NOTES: GEOTECHNICAL DATA PROVIDED BY ATC GROUP SERVICES, LLC. REFER TO THE PROJECT GEOTECHNICAL BORING LOGS ON SHEET PNG-C-472-001014 FOR MORE DETAILED SUBSURFACE INFORMATION. THE GEOTECHNICAL DATA IS ONLY DESCRIPTIVE OF THE LOCATIONS ACTUALLY SAMPLED. EXTENSION OF THE DATA OUTSIDE OF THE ORIGINAL BORINGS MAY BE DONE TO CHARACTERIZE THE SOIL CONDITIONS. HOWEVER, COMPANY DOES NOT GUARANTEE THESE CHARACTERISTICS TO BE ACCURATE. CONTRACTOR MUST USE HIS OWN EXPERIENCE AND JUDGEMENT IN INTERPRETING THIS DATA. DRILL PATH NOTES: DRILL PATH STATIONING IS IN FEET BY HORIZONTAL MEASUREMENT AND IS REFERENCED TO CONTROL ESTABLISHED FOR THE DRILLED SEGMENT. DRILL PATH COORDINATES REFER TO THE CENTERLINE OF PILOT HOLE AS OPPOSED TO TOP OF INSTALLED PIPE. HORIZONTAL DIRECTIONAL DRILL PATH DEPICTS MINIMUM REQUIREMENTS ONLY. FINAL PATH TO BE DETERMINED BY CONTRACTOR AT TIME OF CONSTRUCTION. PILOT HOLE TOLERANCES: THE PILOT HOLE SHALL BE DRILLED TO THE TOLERANCES LISTED BELOW. TOPOGRAPHIC SURVEY NOTES: HOWEVER IN ALL CASES, RIGHT-OF-WAY RESTRICTIONS AND CONCERN FOR ADJACENT FACILITIES SHALL TAKE PRECEDENCE OVER THESE TOLERANCES. TOPOGRAPHIC SURVEY DATA PROVIDED BY MASER CONSULTING P.A. 1. ENTRY POINT: NO MODIFICATIONS SHALL BE MADE WITHOUT APPROVAL FROM NORTHINGS AND EASTINGS ARE IN U.S. SURVEY FEET REFERENCED TO THE COMPANY ENGINEER. NORTH CAROLINA STATE PLANE COORDINATES. 2. ENTRY ANGLE: UP TO 1' INCREASE FROM THE DESIGNED ENTRY ANGLE; NO ELEVATIONS ARE IN FEET REFERENCED TO NAVD 88. DECREASE IN ENTRY ANGLE WILL BE ALLOWED. 34, 3. EXIT POINT: UP TO 20 FEET LONGER OR 10 FEET SHORTER FROM THE EXIT POINT; UP TO 5 FEET RIGHT OR LEFT OF THE DESIGNED ALIGNMENT. xz //J!/ 1 ���111 r�Z \�\\�\\�\ \���_ I1 Ill JJ1I I I I'll �� jl J I I III \ PROPOSED 50 PERMANENT EASEMENT EXISTING 50' WIDE = ' COLONIAL PIPELINE EASEMENT � CC3R&v�� 163700-36-6576 � ' 163700-35-2989 ;� 55+00 '56 ��\ \ 56+00 57+00 58+00 59+00 60+0 \ M 61 +00 62+00 \ 63+00 64+00 r HDD ENTRY POINT STA: 57+50 — START HORIZONTAL CURVE 1200' RADIUS END HORIZONTAL CURVE ELEV: 205.9' - - - STA = 63+48 STA = 67+45 225 220 215 210 205 200 195 190 185 180 175 170 165 160 155 150 145 140 135 130 125 120 115 110 105 100 HORIZONTAL LENGTH = 1478' TRUE DRILLED LENGTH = 1491' 4. EXIT ANGLE: NO INCREASE FROM THE DESIGNED EXIT ANGLE; UP TO 2' DECREASE IN EXIT ANGLE WILL BE ALLOWED. 5. ELEVATION: UP TO 2 FEET ABOVE AND 10 FEET BELOW DESIGNED PROFILE. 6. ALIGNMENT: UP TO 5 FEET RIGHT OR LEFT OF THE DESIGNED ALIGNMENT. 7. CURVE RADIUS: NO LESS THAN 1,000 FEET BASED ON A 3 JOINT AVERAGE. PROTECTION OF EXISTING FACILITIES: CONTRACTOR SHALL UNDERTAKE THE FOLLOWING STEPS PRIOR TO COMMENCING DRILLING OPERATIONS: 1. CONTACT THE UTILITY LOCATION IDENTIFICATION SERVICE FOR THE CONSTRUCTION AREA. 2. POSITIVELY LOCATE AND STAKE ALL EXISTING UNDERGROUND FACILITIES. ANY FACILITIES LOCATED WITHIN 10 FEET OF THE DESIGNED PATH SHALL BE EXPOSED. 3. MODIFY DRILLING PRACTICES AND DOWNHOLE ASSEMBLIES AS NECESSARY TO PREVENT DAMAGE TO EXISTING FACILITIES. 4. DRILLING MUD SHALL BE BENTONITE ONLY. HDD EXIT POINT STA: 72+28 ELEV: 184.7' 0- 1 J PER PB 6P PG 3, - - 6a 5,6< P�=� � � <YuYY1 �� PROPOSED 80' DEEP BORE LOCATION, TREMMIE GROUT FROM BOTTOM UP UPON COMPLETION STA: 68+30, OFF: 70' R NOTE: IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROTECT ALL EXISTING UTILITIES AND OTHER STRUCTURES. CONTRACTOR SHALL BE RESPONSIBLE FOR LOSSES AND REPAIRS OCCASIONED BY DAMAGE TO FACILITIES RESULTING FROM DRILLING OPERATIONS. CONTRACTOR SHALL TAKE STEPS TO PROTECT EXISTING FACILITIES, INCLUDING, BUT NOT LIMITED TO, SETTING SURFACE CASING AS NECESSARY TO PREVENT SETTLEMENT AND DISPLACEMENT. NOTE: STRATIFICATION LINES AND SUBSURFACE MATERIAL DESCRIPTIONS SHOWN ON THIS DRAWING HAVE BEEN SIMPLIFIED FOR PRESENTATION PURPOSES. REFER TO THE PROJECT GEOTECHNICAL BORING LOGS AND REPORT FOR MORE DETAILED SUBSURFACE INFORMATION. NOTE: CONTRACTOR SHALL ACTIVELY MONITOR THE DRILLED ALIGNMENT FOR IMPACTS THAT COULD OCCUR AS A RESULT OF HDD OPERATIONS (I.E. SETTLEMENT, HEAVE, AND DRILLING FLUID FLOW). CONTRACTOR'S MONITORING PROCEDURES AND ASSOCIATED EMERGENCY RESPONSE PLANS SHALL BE APPROPRIATE TO ENSURE THAT PUBLIC SAFETY IS NOT COMPROMISED. HDD PULL STRING 2 PULL STRINGS L=760 ...�...- 163700-27-6098 ,�,•,�,�°_°.°.,°����6A* i°i°i0°•�' " �� 200 3oPER �'Rfi'PPG�y�6 oe X� v ib °ja a PROPOSED 80' DEEP BORE LOCATION, TREMMIE GROUT FROM BOTTOM UP UPON COMPLETION STA: 71 +50, OFF: 125' R M 700-37-4905 HDD - 8" PIPELINE PLAN SCALE: 1 "=50' 0 100 200 0009 11N =100FT HDD ENTRY AT 16' STA:57+50 EL:205.9' HORIZONTAL CURVE LIMITS GRADE - - EXISTING EXIT TANGENT STA:71+97 EL:179.3' HDD EXIT AT 10' STA:72+28 EL:184.7' ENTRY TANGENT STA:57+73 EL:199.4' 8" STA: COLONIAL 66+32 STA: 8" COLONIAL 66+45 - P.C. / ENTRY CURVE STA:58+58 EL:174.9' -25 STA:66+62 16" COLONIAL P.T. / EXIT CURVE STA:70+99 EL:161.9' �Nd -25 -25 -5o R=1200' 0 R=1200' EXIT CURVE STA:68+04 EL: 128.4' - P.C. / P.T. / ENTRY CURVE STA:61 +8S EL:128.4' -50 -50 -75 PROPOSED GEOTECH BORINGS (TYP) 615' DESIGNED DRILLED PROFILE 8.625" 0.322" W.T. API 5L X52 STEEL LINE PIPE FUSION BONDED EPDXY WITH POWERCRETE AND DOUBLE COAT SCARGUARD WRAP 1 -75 -75 - _80 -80 #1 56+00 57+00 58+00 59+00 60+00 61+00 62+00 63+00 64+00 65+00 66+00 67+00 68+00 69+00 70+00 71+00 72+00 73+00 74+00 75+00 76+00 77+00 78+00 HDD - 8" PIPELINE PROFILE 1°° 200 20 00119 40 11N = 10OFT I IN = 20FT BURNS&McDONNELLCONSULTANTS, INC. PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY STATE LICENSE # C-1435 tiky14lpp" PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 P ���40FfcSS►O'��'�� % NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS DATE INITIALS SEA LINE 472 TRANSMISSION 047 ACCOUNT NUMBER N/A NIA ENGINEER :Z PROJECT NUMBER 0228178 DATE INITIALS MGR TECH rj�DUKE Piedmont HDD PLAN AND PROFILE •.NG �: '� ENERGY,: �i Natural Gas �IyEE. �`ti.`; N/A NIA DRAWING BY MJD REC &STD GARNER N 'fossil1 '�/31/2020 STATION ID DATE INITIALS PRINCIPAL PROFESSIONALENG/ARCH STAMP CHECKER INITIALS CNS 07/31/2020 CAM ENGINEER COPYRIGHT 2018 GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA 225 220 215 210 205 200 195 190 185 180 175 170 165 160 155 150 145 140 135 130 125 120 115 110 105 100 79+00 79+50 z d w J LL 0 a REF. DWG(S): PNG-C-472-0001010 PNG-C-472-0001014 PNG-C-472-0001009 SHEET(S) 16 OF 35 DWG SCALE H: 1"=50', V: 1"=10' DWG DATE 07/31/2020 SUPERSEDED DRAWING NUMBER REVISION PNG -C-472-0001013 0 DISCIPLINE / RESOURCE CENTER / LINE NUMBER OF�vU/O�y �Tcy PIPE LOCATION DEPTH OF COVER (A) NORMAL 5'-0" STREAM/WETLAND CROSSING 5'-0" ROAD CROSSING 5'-0" DETAIL SCALE: NTS N_.� PIPELINE DEPTH OF COVER NOTES: 1. ALL MATERIALS SHALL BE SUPPLIED BY CONTRACTOR. 2. WIDTH SHALL BE INCREASED PROPORTIONAL TO SPACING INCREASE IF REQUIRED. 3. SPACING SHALL BE IN ACCORDANCE WITH PIEDMONT NATURAL GAS STANDARD CM-ST-2060. 4. SUPPORT PILLOWS TO BE OF SUFFICIENT SIZE TO MAINTAIN 6" OF CLEARANCE BETWEEN THE PIPE AND TRENCH BOTTOM. DETAIL 2 SCALE: NTS N_.� TYPICAL PIPELINE SUPPORT PILLOWS NOTES: 1. PIPELINE MARKERS SHALL BE PLACED AT: - IN LINE -OF -SIGHT INTERVALS AND TURNING POINTS - ALL PUBLIC ROAD CROSSINGS - ALL RAILROAD CROSSINGS - RIVER, STREAM, CREEK, DITCH AND CANAL CROSSINGS - UTILITY CROSSINGS (PER DUKE DISCRETION) - SWAMPS OR WETLANDS (ENTRY AND EXIT) - ROAD MEDIANS - ABOVE GROUND FACILITIES SUCH AS VALVE SETTINGS, BORDER STATIONS, REGULATOR STATIONS, AND PIPELINE INTERCONNECTS - UNDERGROUND VALVES - HDD ENTRY AND EXIT POINTS 2. PIPELINE MARKERS SHALL BE PLACES DIRECTLY ON TOP OR WITHIN 24 INCHES OF THE PIPELINE. 3. SET MARKERS AS SOON AS PRACTICAL AFTER THE INSTALLATION OF THE PIPELINE. MAKE EVERY EFFORT TO PROVIDE MARKERS BEFORE VEGETATION IS RE-ESTABLISHED AFTER CONSTRUCTION. DETAIL 3 SCALE: NTS �� PIPELINE MARKER LOCATIONS ABOVE GRADE PIPELINE MARKER UNPAVED SURFACE NOTE: 1. ABOVE GRADE PIPELINE MARKERS TO BE INSTALLED IN GRASS OR UNPAVED AREAS WHEN PIPELINE MARKER IS REQUIRED. 2 LAYEI TIED BF 2" X 2" WOODEN STAKE (TYP.) v I I v\ V V ✓/ \LL\J INSTALL GEOTEXTILE FABRIC BENEATH ENTIRE DEWATERING STRUCTURE TO PREVENT SCOURING 900 le =D kLES. 1. STAKES SECURING "HIGH EFFICIENCY AIR FILTER MEDIA" AND CHICKEN WIRE FENCE ARE NOT SHOWN FOR CLARITY PROPOSES. SECTION rA NOT TO SCALE 111,_j C-T 1I= 1kwAr tar 7 10 1_ v�i�v vwv SECTION B NOT TO SCALE NOTES: 1. STRUCTURE SHALL BE PLACED ON A SUITABLE, WELL VEGETATED SITE SUCH THAT WATER WILL FLOW AWAY FROM STRUCTURE AND ANY WORK AREAS. 2. FLOW RATES THROUGH DISCHARGE AND DIVERTER PIPES SHALL BE SUCH THAT STRUCTURE WILL NOT OVERFLOW OR AT A RATE NOT GREATER THAN SPECIFIED BY ANY AGENCY PERMIT IF APPLICABLE. 3. WHERE CONDITIONS WARRANTED, A 30" X 30" RECTANGULAR STRUCTURE MAY BE SUBSTITUTED FOR THE CIRCULAR CONFIGURATION SHOWN. 4. DIMENSIONS SHOWN ARE THE MINIMUM ACCEPTABLE VALUES AND MAY VARY DEPENDING ON SPECIFIC LOCATION. 5. CONTRACTOR SHALL PROPERLY REMOVE AND DISPOSE OF DEWATERING STRUCTURE IMMEDIATELY UPON COMPLETION OF DEWATERING PROCEDURE. UNDER NO CIRCUMSTANCES SHALL USED DEWATERING STRUCTURES BE LEFT IN PLACE FOR ANY PERIOD OF TIME GREATER THAN 48 HOURS AFTER TO COMPLETION OF DEWATERING PROCEDURE. D ETAI L 4 SCALE: NTS DEWATER DETAIL BURNS& McDONNELL CONSULTANTS, INC. PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY STATE LICENSE # C-1435 `,�y1 k1 kI I,+Itr PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 ,.0 1► cA a'q0''�, �ts.Orf�5s�0 • e4 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS 0 07-31-2020 ISSUED FOR CONSTRUCTION MJD CNS CAM AREA CODE 1853 DATE INITIALS LINE 472 TRANSMISSION SHEET(S) 29 OF 35 DWG SCALE AS SHOWN SEA N/A NIA REGIONAL DWG DATE 07/31/2020 SUPERSEDED 047 ` ACCOUNT NUMBER ENGINEER — :••� PROJECT NUMBER 0228178 DATE INITIALS MGR TECH p/r�DUKE Piedmont CONSTRUCTION DETAILS DRAWING NUMBER REVISION .NINE• �yti�: N/A NIA VC ENERGY,: Natural Gas DRAWING BY MJD REC &STD GARNER, NC P N G -C-472-0001034 0 f E MGM s,��1 STATION ID DATE INITIALS PRINCIPAL , r i r + 15 5' /l31/2020 PROFESSIOI ALENG/ARCHSTAMP CHECKER INITIALS I CNS 07/31/2020 CAM ENGINEER COPYRIGHT 2018 GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA DISCIPLINE / RESOURCE CENTER / LINE NUMBER TEMP. R.O.W. BOUNDARY TRENCH, SPOIL AND /OR TRAVEL LANE - TEMPORARY FILL 12" MAXIMUM (SEE NOTE 3) q TRENCH 05 (AS REQUIRED SEE NOTE 3) TEMP. R.O.W. BOUNDARY WORKING SIDE TOPSOIL SALVAGE LIMIT 15' 60' SPOIL SIDE WORKING SIDE 50' 25' PERMANENT EASEMENT TEMPORARY (SEE NOTE 2) WORKSPACE 75' CONSTRUCTION RIGHT-OF-WAY (SEE NOTE 2) TEMP ESMT IBOUNDARY R/W BOUNDARY SILT FENCE I AS REQUIRED TRENCH SPOIL TEMPORARY SEE NOTE 7 CUT TOPSOIL a O —1 I I-1 I I-1 I I-1 I —1 I =-11 I =-11 I =-11 I OPTIONAL / ADDITIONAL TOPSOIL STORAGE +/- 32' NOTES: 1. SIDE HILL CONSTRUCTION CUT AND FILL SHALL BE ALLOWED WHENEVER, IN THE OPINION OF THE CONTRACTOR, STEEP SIDE HILL CONSTRUCTION IS WARRANTED FOR PERSONNEL AND/ OR EQUIPMENT SAFETY CONSIDERATIONS. 2. CONSTRUCTION RIGHT-OF-WAY WILL TYPICALLY BE 80 FEET WIDE CONSISTING OF 50 FEET OF PERMANENT EASEMENT AND 25 FEET OF TEMPORARY WORKSPACE. 3. THIS DRAWING REFLECTS "TRENCH, SPOIL, AND WORKING SIDE" TOPSOIL STRIPPING PROCEDURES AS NEEDED FOR HILL SIDE LEVELING. SALVAGE TOPSOIL OVER TRENCH UNDER THE SPOIL PILE AND FROM TEMPORARY CUT AND FILL AREAS AT LOCATIONS IDENTIFIED ON THE CONSTRUCTION ALIGNMENT SHEETS OR AS DIRECTED BY THE COMPANY'S INSPECTOR. 4. STOCKPILE TOPSOIL AS SHOWN OR IN ANY CONFIGURATION APPROVED BY THE COMPANY'S REPRESENTATIVE. KEEP TOPSOIL CLEAN OF ALL CONSTRUCTION DEBRIS. 5. LEAVE GAPS IN TOPSOIL AND SPOIL POLES AT OBVIOUS DRAINAGES. DO NOT PUSH TOPSOIL INTO CREEKS OR WETLANDS. DO NOT USE TOPSOIL FOR PADDING. AVOID SCALPING VEGETATED GROUND SURFACE WHEN BACKFILLING TOPSOIL PILE. 6. TEMPORARY SUSPEND TOPSOIL HANDLING OPERATIONS DURING INORDINATELY WINDY CONDITIONS UNTIL MITIGATIVE MEASURES TO MINIMIZE WIND EROSION CAN BE IMPLEMENTED. 7. EROSION AND SEDIMENT CONTROL PROVIDED ON SEPARATE DETAILS. 8. ALL DIMENSIONS INDICATED SHALL BE DETERMINED BY ACTUAL CONSTRUCTION CONDITIONS. DETAIL SCALE: NTS TYPICAL FULL TOPSOIL SEPARATION SIDE HILL +/- 57' WORKING SIDE B rUw IS ap L+,,a+d Io' Lrx soIN 01KIIIIII &aw C/L R/W - TRENCH BOUNDARY _ IT G SILT FENCE AS REQUIRED I .-,-7 ' '4 Nr �F +/-12' +/- 18' SPOIL SIDE +/-25' MIN. / VARIES I +/- 50' TEMPORARY WORKSPACE PERMANENT EASEMENT +/- 75' CONSTRUCTION RIGHT-OF-WAY NOTES: 1. CONSTRUCTION RIGHT-OF-WAY WILL TYPICALLY BE 100 FEET WIDE CONSISTING OF 70 FEET OF PERMANENT EASEMENT AND 30 FEET OF TEMPORARY WORKSPACE. EXTRA TEMPORARY WORK SPACE MAY BE NECESSARY AT MAJOR ROAD AND OTHER SPECIAL CIRCUMSTANCES, AS REQUIRED. CERTAIN SITUATIONS MAY REQUIRE A NARROWER WIDTH. 2. STOCKPILE TOPSOIL AS SHOWN OR IN ANY CONFIGURATION APPROVED BY THE COMPANY'S INSPECTOR. KEEP TOPSOIL CLEAN OF ALL CONSTRUCTION DEBRIS. 3. LEAVE GAPS IN TOPSOIL AND SPOIL PILES AT OBVIOUS DRAINAGE LOCATIONS. DO NOT PUSH TOPSOIL INTO CREEKS OR WETLANDS. DO NOT USE TOPSOIL FOR PADDING. 4. AVOID SCALPING VEGETATED GROUND SURFACE WHEN BACKFILLING SPOIL AND TOPSOIL PILES. 5. SAME LAYOUT APPLIES WHERE CONSTRUCTION R/W DOES NOT ABUT EXISTING R/W. 6. TEMPORARILY SUSPEND TOPSOIL HANDLING OPERATIONS DURING INORDINATELY WINDY CONDITIONS UNTIL MITIGATIVE MEASURES TO MINIMIZE WIND EROSION CAN BE IMPLEMENTED. 7. TOPSOIL AND TRENCH SPOIL RELATIVE POSITIONS CAN, AS DIRECTED BY THE COMPANY'S INSPECTOR, BE REVERSED. DETAIL 2 SCALE: NTS TYPICAL WORKSPACE p!I!FaR! Ek%r'trodr C OWKkM Itr �40 V VA .W lips,* Ii IV, M � # -w or * ' ,r ; a, *em s mop - or a* 4F �r - �� a 400 + # 00 - 1 A Itt� w � it I* ■ ■ d ap, AV 16j;ft .11.4 4p 4w if, '-� . r v*.8 a we dw 0 Ono � a � �J0 " 00 90 A' 4.7.j 4 a' � d 0' '" jp �94;1 0 1111hpe'sWo on 4111 *& .0 + in -00 do- qp % w ft 41 0.0% 0 do % & 0 IP % .2, 0,%t 19 6% i i% i .i i i 3 i i. i i i. i %doi i +i .R. i i i is DETAIL 3 SCALE: NTS TYPICAL CP TEST STATION BURNS&McDONNELLCONSULTANTS, INC. PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY STATE LICENSE # C-1435 ,,k,,,�� PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 • •,•• I VA CAR ty�OF�SS�Oij;(fy APPROVALS NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION DATE INITIALS LINE 472 TRANSMISSION SEA - 0 07-31-2020 ISSUED FOR CONSTRUCTION MJD CNS CAM AREA CODE 1853 REGIONAL a N/A NIA 047 ACCOUNT NUMBER ENGINEER PROJECT NUMBER 0228178 DATE INITIALS MGR TECH APDUKE Piedmont CONSTRUCTION DETAILS z ••.N E .•�' Q•ti N/A N/A ENERGY. I Natural Gas �,F t M��'�V•` DRAWING BY MJD REC &STD • GARNER NC STATION ID DATE INITIALS PRINCIPAL PROFESSIONALENG/ARCH STAMP CHECKER INITIALS CNS 07/31/2020 CAM ENGINEER COPYRIGHT2018 GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA SHEET(S) 30 OF 35 DWG SCALE AS SHOWN DWG DATE 07/31/2020 SUPERSEDED DRAWING NUMBER REVISION P N G-C-472-0001035 0 DISCIPLINE / RESOURCE CENTER / LINE NUMBER CONSTRUCTION R.O.W. WIDTH TRENC EXTRA TEMPORARY WORKSPACE (TYP.) SPOIL PILE � TOPSOIL SEDIMENT o ":, SEDIMENT BARRIER BARRIER IN -STREAM SPOIL a ° e 25' (TYP.) 101 z I � �cn J o SOFT PLUG FLOW (SEE NOTE 10) Q No SEE o o WATERBODY NOTE 7 0_z a-!�iw Owl �r 10' (TYP.) IN -STREAM a ;° SPOIL SEDIMENT SEDIMENT BARRIER o y BARRIER TOPSOIL SPOIL PILE Ld Lcll*,". -,- F ____j PIPE WELDED, COATED AND WEIGHTED PLAN VIEW (IF NECESSARY) NOTES: 1. METHOD APPLIES TO WATERBODIES THAT ARE NOT STATE -DESIGNATED FISHERIES WHERE FLUME CROSSINGS ARE NOT REQUIRED. 1.1. IF TOPOGRAPHY PERMITS TEMPORARY EQUIPMENT BRIDGE INSTALLATION, THE CONTRACTOR SHALL TRENCH, STRING, WELD, COAT, WEIGHT (IF NECESSARY), LOWER IN AND BACKFILL UTILIZING THE MAIN LINE CREW TRAVELING OVER THE BRIDGE. 1.2. IF TOPOGRAPHY PROHIBITS INSTALLATION OF A TEMPORARY EQUIPMENT BRIDGE, CONTRACTOR SHALL TRENCH UP TO BOTH SIDES OF CROSSING; STRING, WELD, COAT AND WEIGHT (IF NECESSARY) USING THE MAINLINE CREW. IN STREAM EXCAVATION, LOWER IN, AND BACKFILL WILL UTILIZES A CLAM OR HOES WORKING FROM THE BANKS. 2. SCHEDULE CROSSING DURING LOW FLOW PERIOD IF POSSIBLE. 3. COMPLETE ALL IN -STREAM ACTIVITIES WITHIN 24 HOURS IF FEASIBLE. 4. NO REFUELING OF MOBILE EQUIPMENT WITHIN 100 FEET OF WATERBODY. REFUEL STATIONARY EQUIPMENT AS PER THE SPCC PLAN. 5. INSTALLATION OF TEMPORARY EQUIPMENT CROSSING IS REQUIRED AT ALL STATE -DESIGNATED FISHERIES AND IS OPTIONAL AT THE DISCRETION OF THE COMPANY'S INSPECTOR AT ALL OTHER CROSSINGS. IF A TEMPORARY EQUIPMENT CROSSING IS INSTALLED, IT MUST BE BUILT IN ACCORD WITH SECTION PERMITS. 6. IN AGRICULTURAL LAND, STRIP TOPSOIL FROM SPOIL STORAGE AREA. 7. CONSTRUCT SEDIMENT BARRIERS ALONG THE SIDES OF STOCKPILES AND ACROSS THE ENTIRE CONSTRUCTION R.O.W. TO PREVENT SILT LADEN WATER AND SPOIL FROM FLOWING BACK INTO WATERBODY. BARRIERS MAY BE TEMPORARILY REMOVE TO ALLOW CONSTRUCTION ACTIVITIES BUT MUST BE REPLACED BY THE END OF EACH WORK DAY. 8. IN -STREAM SPOIL TO BE STORED OUT OF THE STREAM CHANNEL A MINIMUM OF 10 FEET FROM THE WATER EDGE AND WITHIN THE CONSTRUCTION R.O.W. UNLESS DEPICTED OTHERWISE IN SITE SPECIFIC CROSSING PLANS. TEMPORARY WORKSPACE MUST BE A MINIMUM OF 25FROM THE WATERS EDGE. 9. TRENCH THROUGH WATERCOURSE USING MAINLINE EXCAVATION EQUIPMENT WHERE PRACTICAL. 10. INSTALL SOFT PLUGS AT THE EDGE OF STREAM BANKS UNTIL JUST PRIOR TO PIPE INSTALLATION TO CONTROL WATER FLOW & TRENCH SLOUGHING. 11. MAINTAIN STREAM FLOW THROUGHOUT CROSSING CONSTRUCTION. 12. BACKFILL WITH NATIVE MATERIAL. 13. RESTORE WATERBODY CHANNEL TO APPROXIMATE PRE -CONSTRUCTION PROFILE AND SUBSTRATE. 14. RESTORE STREAM BANKS TO APPROXIMATE ORIGINAL CONDITION AND STABILIZE, AS REQUIRED. 15. ALL DIMENSIONS INDICATED SHALL BE DETERMINED BY ACTUAL CONSTRUCTION CONDITIONS. DETAIL SCALE: NTS �� TYPICAL FLOWING WATERBODY CROSSING OPEN CUT TRENCHING CONSTRUCTION R.O.W. WIDTH TREE SPOIL PILE CHANNEL SPOIL EXTRA TEMPORARY WORKSPACE (TYP.) U) ago z< LD o w � DRY CHANNEL SEE z 0_ Lu NOTE 6 w 10' (TYP.) ... CHANNEL SPOIL TOPSOIL SPOIL PILE PIPE WELDED COATED AND WEIGHTED (IF NECESSARY) DI A AI WI MA1 NOTES: 1. METHOD APPLIES TO CROSSINGS WHERE NO FLOWING WATER IS PRESENT AT THE TIME OF CROSSING. 2. CONTRACTOR MAY "MAINLINE THROUGH" THE CROSSING OR UP TO BOTH SIDES OF THE CROSSING; STRING, WELD, COAT, AND WEIGHT (IF NECESSARY), USING THE MAINLINE CREW WITH THE PIPE SKIDDED OVER THE CROSSING. 3. NO REFUELING OF MOBILE EQUIPMENT WITHIN 100 FEET OF DRY CHANNEL. REFUEL STATIONARY EQUIPMENT AS PER THE SPCC PLAN. 4. INSTALLATION OF TEMPORARY EQUIPMENT CROSSING IS OPTIONAL AT THE DISCRETION OF THE COMPANY'S REPRESENTATIVE. 5. IN AGRICULTURAL LAND, STRIP TOPSOIL FROM SPOIL STORAGE AREA. STOCKPILE TOPSOIL AND SPOIL SEPARATELY. TOPSOIL AND SPOIL WILL NOT BE STOCKPILED IN THE CROSSING CHANNEL AND WILL BE PLACED A MINIMUM OF 10 FEET FROM CROSSING BANKS WITHIN THE CONSTRUCTION R.O.W. 6. CONSTRUCT SEDIMENT BARRIERS ACROSS THE ENTIRE CONSTRUCTION R.O.W. FOLLOWING CLEARING AND GRADING AND MAINTAIN UNTIL CONSTRUCTION OF THE CROSSING. EROSION CONTROL MEASURES SHALL BE REINSTALLED IMMEDIATELY FOLLOWING BACKFILLING OF TRENCH AND STABILIZATION OF BANKS. BARRIERS MAY BE TEMPORARILY REMOVED TO ALLOW CONSTRUCTION ACTIVITIES BUT MUST BE REPLACED BY THE END OF EACH WORK DAY. 7. IN -STREAM SPOIL TO BE STORED OUT OF THE STREAM CHANNEL A MINIMUM OF 10 FEET FROM HIGH BANK AND WITHIN THE CONSTRUCTION R.O.W. UNLESS DEPICTED OTHERWISE IN SITE SPECIFIC CROSSING PLANS. 8. BACKFILL WITH NATIVE MATERIAL. 9. RESTORE CROSSING CHANNEL TO APPROXIMATE PRE -CONSTRUCTION PROFILE AND SUBSTRATE. 10. RESTORE CROSSING BANKS TO APPROXIMATE ORIGINAL CONDITION AND STABILIZE, AS REQUIRED. 11. ALL DIMENSIONS INDICATED SHALL BE DETERMINED BY ACTUAL CONSTRUCTION CONDITIONS. DETAIL 2 SCALE: NTS �� TYPICAL NON- FLOWING WATERBODY CROSSING OPEN CUT TRENCHING BURNS& McDONNELL CONSULTANTS, INC. PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY STATE LICENSE # C-1435 ,,%IIkI kI I Itl PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 ,.0 1► cAq�''l. �ts0'.Orf�5s�0 • �fif� NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS 0 07-31-2020 ISSUED FOR CONSTRUCTION MJD CNS CAM AREA CODE 1853 DATE INITIALS LINE 472 TRANSMISSION SHEET(S) 31 OF 35 DWG SCALE AS SHOWN SEA N/A NIA REGIONAL DWG DATE 07/31/2020 SUPERSEDED 047 ACCOUNT NUMBER ENGINEER — :•°� PROJECT NUMBER 0228178 DATE INITIALS MGR TECH p/r�DUKE Piedmont CONSTRUCTION DETAILS DRAWING NUMBER REVISION ,�O .NINE• �yti�: N/A NIA �C ENERGY,: Natural Gas DRAWING BY MJD REC &STD GARNER, N C P N G -C-472-0001036 0 MCI •11 STATION ID DATE INITIALS PRINCIPAL f r r i r+ i 5 5� �'�/31/2020 PROFESSIOI ALENG/ARCH STA I I ICHECKER INITIALS I CNS 07/31/2020 CAM ENGINEER COPYRIGHT 2018 GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA DISCIPLINE / RESOURCE CENTER / LINE NUMBER SEE NOTE 3 & 6 WATERBODY PLAN \\� �� \\\ PROFILE 1. CONSTRUCTION RIGHT-OF-WAY WILL TYPICALLY BE 75 FEET WIDE CONSISTING OF 50 FEET OF PERMANENT EASEMENT AND UP TO 25 FEET OF TEMPORARY WORKSPACE. 2. THE SAME LAYOUT APPLIES WHETHER CONSTRUCTION R.O.W. DOES OR DOES NOT ABUT A FOREIGN R.O.W. 3. LOCATE ANY EXTRA TEMPORARY WORK SPACE AREAS AT LEAST 25 FEET FROM EDGE OF WETLAND AND WITHIN THE APPLICABLE FULL WIDTH CONSTRUCTION R.O.W. TEMP ESMT R/W C/L R/W BOUNDARY BOUNDARY TRENCH BOUNDARY 4. CLEARING OF VEGETATION AND TREES IS PROHIBITED BETWEEN TEMPORARY EXTRA WORK SPACE AND THE EDGE OF THE WETLAND SILT FENCE I I AS REQUIRED 5. CUT VEGETATION AND TREES OFF AT GROUND LEVEL, LEAVING EXISTING ROOT SYSTEMS IN PLACE WHEREVER PRACTICABLE, AND REMOVE CUTTINGS TRENCH SPOIL FROM THE WETLAND FOR DISPOSAL. SEE NOTE 4 I SILT FENCE SEE NOTE 7 I AS REQUIRED 1 6. LIMIT CONSTRUCTION EQUIPMENT TO ONE PASS THROUGH WETLANDS TO THE TOPSOIL I I EXTENT PRACTICABLE. o a 7. NO REFUELING OF EQUIPMENT WITHIN 100 FEET OF WETLAND EXCEPT IN ' rt' 111 1 1 11 +' ' ' 1 �-1 I I-1 I I-1 I I-1 11= ACCORDANCE WITH THE SPCC PLAN. -- 1 I I-1 I I-1 I I-1 11= I 1 8. IF SATURATED AT TIME OF CONSTRUCTION, REDUCE SOIL COMPACTION BY 1 OPTIONAL / ADDITIONAL 1 UTILIZING WIDE -TRACK OR BALLOON TIRE CONSTRUCTION EQUIPMENT OR TOPSOIL STORAGE +/_4� NORMAL EQUIPMENT OPERATED ON TIMBER RIPRAP OR EQUIPMENT MATS. 9. AVOID ADJACENT WETLANDS. INSTALL SEDIMENT BARRIERS IMMEDIATELY +/- 32' +/-6' +/-12' AFTER INITIAL GROUND DISTURBANCE AND AT THE EDGE OF THE I CONSTRUCTION R.O.W. ALONG THE WETLAND AS DIRECTED BY THE +/- 57' WORKING SIDE +/- 18' SPOIL SIDE COMPANY'S INSPECTOR. 1. THIS TYPE OF BRIDGE IS GENERALLY USED ON NARROW CROSSINGS, LESS THAN 20 FEET WIDE WITH APPROPRIATE BANK CONFIGURATION. MULTIPLE MATS MAY BE LAYERED FOR HEAVIER EQUIPMENT CROSSINGS. 2. BRIDGE IS ANCHORED AND/OR TIED OFF TO ANCHOR BLOCKS FOR STABILITY. BRIDGE SHOULD BE TEMPORARILY REMOVED IF HIGH WATER RENDERS IT UNSAFE TO USE. 3. IF REQUIRED, UTILIZE APPROACH FILLS OF CLEAN GRANULAR MATERIAL, SWAMP MATS, SKIDS OR OTHER SUITABLE MATERIALS TO AVOID CUTTING THE BANKS WHEREVER FEASIBLE. ENSURE ADEQUATE FREEBOARD. AS REQUIRED, ENSURE THAT FILL MATERIAL IF USED DOES NOT SPILL INTO WATERCOURSE INCLUDING REMOVAL OF DIRT FROM DECK DURING OPERATION. 4. CONSTRUCT SEDIMENT BARRIERS ACROSS THE ENTIRE CONSTRUCTION R.O.W. TO PREVENT SILT LADEN WATER AND SPOIL FROM FLOWING BACK INTO WATERBODY. BARRIERS MAY BE TEMPORARILY REMOVED TO ALLOW CONSTRUCTION ACTIVITIES BUT MUST BE REPLACED BY THE END OF EACH WORK DAY. SILT FENCE OR SANDBAGS MAY BE USED INTERCHANGEABLY. 5. REMOVE BRIDGES AS SOON AS POSSIBLE AFTER PERMANENT SEEDING UNLESS OTHERWISE DIRECTED BY COMPANY REPRESENTATIVE. THE STRUCTURE IS TO BE REMOVED IF THERE IS MORE THAN ONE MONTH BETWEEN FINAL GRADING AND SEEDING, AND ALTERNATIVE ACCESS TO THE CONSTRUCTION R.O.W. IS AVAILABLE. 6. DISPOSE OF ANY ROCK AS DIRECTED BY COMPANY REPRESENTATIVE. 7. RESTORE AND STABILIZE BED AND BANKS TO APPROXIMATE PRE -CONSTRUCTION CONDITIONS. DETAIL SCALE: NTS TYPICAL TIMBER MAT WATERBODY BRIDGE +/-25' MIN. / VARIES TEMPORARY WORKSPACE +/- 50' PERMANENT EASEMENT +/- 75' CONSTRUCTION RIGHT-OF-WAY 10. THIS DRAWING REFLECTS "TRENCH ONLY" TOPSOIL STRIPPING PROCEDURE FOR AREAS WHERE STANDING WATER OR SATURATED SOIL ARE NOT PRESENT. 11. SALVAGE UP TO 12" OF TOPSOIL OVER TRENCH AT LOCATIONS IDENTIFIED ON THE CONSTRUCTION DRAWINGS OR AS DIRECTED BY THE COMPANY'S INSPECTOR. MAINTAIN SEPARATION BETWEEN TOPSOIL AND TRENCH SPOIL. SEDIMENT BARRIER TIMBER RIPRAP OR ALTERNATIVE PROFILE AS REQUIRED EQUIPMENT MATS TOPSOIL 12. LEAVE GAPS IN TOPSOIL AND SPOIL PILES AT OBVIOUS DRAINAGES. DO NOT (SEE NOTE 9) AS REQUIRED STORAGE AREA USE TOPSOIL FOR PADDING. AVOID SCALPING VEGETATED GROUND SURFACE WHEN BACKFILLING SPOIL PILE. I I I Ea M I W W W W W 13. IN UNSATURATED CONDITIONS, SPOIL MAY BE USED TO STABILIZE THE W W W W W WORKING SIDE. TOPSOIL=-= 14. IF SATURATED AT TIME OF CONSTRUCTION, LEAVE HARD PLUGS AT THE EDGE W WETLAND OF WETLAND UNTIL JUST PRIOR TO TRENCHING. WETLAND 4j::i ®®®®®�� F <=:� I . . � ' 15. TRENCH THROUGH WETLANDS. I r'= i . . . . . . 16. LOWER -IN PIPE, INSTALL TRENCH BREAKERS AT WETLAND EDGES AS DIRECTED BY THE COMPANY'S INSPECTOR TO PREVENT DRAINAGE. BACKFILL w w I � I UPON COMPLETION OF CONSTRUCTION. 17. REMOVE ALL TIMBER, RIPRAP OR EQUIPMENT MATS FROM WETLANDS UPON SPOIL COMPLETION OF CONSTRUCTION. SEDIMENT BARRIER AS REQUIRED 18. RESTORE GRADE TO NEAR PRE -CONSTRUCTION TOPOGRAPHY AND REPLACE PLAN VIEW (SEE NOTE 10) TOPSOIL, WHERE SALVAGED, WITHOUT A CROWN OVER THE TRENCH. 19. IF STANDING WATER IS NOT PRESENT, SEED AS SPECIFIED. 20. TOPSOIL AND TRENCH SPOIL RELATIVE POSITIONS CAN, AS DIRECTED BY THE COMPANY'S INSPECTOR, BE REVERSED. DETAIL 2 SCALE: NTS TYPICAL WETLAND CROSSING BURNS& McDONNELL CONSULTANTS, INC. PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY STATE LICENSE # C-1435 ,,%IIkI kI I Itl PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 ,.0 1► cAq�''l. �ts0'•Orf�5s�0 • �fif� NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS 0 07-31-2020 ISSUED FOR CONSTRUCTION MJD CNREGIONAL S CAM AREA CODE 1853 DATE INITIALS LINE 472 TRANSMISSION SHEET(S) 32 OF 35 DWG SCALE AS SHOWN SEA 047 - ACCOUNT NUMBER N/A NIA ENGINEER DWG DATE 07/31/2020 SUPERSEDED :••� PROJECT NUMBER 0228178 DATE INITIALS MGR TECH pDUKE Piedmont CONSTRUCTION DETAILS DRAWING NUMBER REVISION N/A N/A V ENERGY,: Natural Gas - Ct '•NGINEE •'• REC &STD DRAWING BY MJD GARNER, NC P N G -C-472-0001037 0 lf,f,•`,arirG'l31/2020 STATION ID DATE INITIALS PRINCIPAL PROFESSIONALENG/ARCH STAMP CHECKER INITIALS CNS 07/31/2020 CAM ENGINEER COPYRIGHT 2018 GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA DISCIPLINE / RESOURCE CENTER / LINE NUMBER GENERAL EROSION AND SEDIMENT CONTROL NOTES 1. THIS PROJECT IS LOCATED IN THE NEUSE RIVER BASIN. RECEIVING WATERS: SWIFT CREEK CLASSIFICATION: C;NSW 2. CONSTRUCTION ACTIVITY POLLUTION PREVENTION IS REQUIRED FOR THIS PROJECT. PREVENTION OF POLLUTION RESULTING FROM CONSTRUCTION ACTIVITIES SHALL BE ACCOMPLISHED BY CONTROLLING SOIL EROSION, WATERWAY SEDIMENTATION, AND AIRBORNE DUST GENERATION. CONTRACTOR SHALL ENSURE THAT NO SEDIMENT RESULTING FROM CONSTRUCTION ACTIVITIES INFRINGES ONTO ADJACENT PROPERTIES. CONTRACTOR SHALL COORDINATE EROSION AND SEDIMENT CONTROL WITH OTHER CONSTRUCTION ENTITIES PERFORMING WORK ON ADJACENT PROPERTIES. 3. SOIL EROSION AND SEDIMENT CONTROLS ARE MEASURES USED TO REDUCE THE AMOUNT OF SOIL PARTICLES THAT ARE CARRIED OFF AN AREA AND DEPOSITED INTO A DRAINAGE COLLECTION SYSTEM OR INTO A BODY OF WATER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT EROSION AND SEDIMENTATION ARE CONTROLLED TO THE EXTENT PRACTICABLE. ALL APPLICABLE SOIL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED AND MAINTAINED THROUGHOUT THE DURATION OF CONSTRUCTION ACTIVITIES. PRIOR TO INITIATING CONSTRUCTION IN AN AREA, ALL TEMPORARY EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE IN PLACE. UPON PROJECT COMPLETION AND PERMANENT STABILIZATION, ALL TEMPORARY SOIL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED. 4. TEMPORARY EROSION CONTROL SHALL BE THE CONTRACTOR'S RESPONSIBILITY, WHO SHALL UTILIZE APPROPRIATE BEST MANAGEMENT PRACTICES (BMPS). THOSE BMPS SHALL CONSIST OF SILT FENCE, WATTLES OR OTHER MEANS TO CONTROL EROSION AS NEEDED. 5. CONTRACTOR SHALL PLACE SILT FENCE PRIOR TO BEGINNING WORK. THE DEVICES SHALL BE PLACED DOWN -SLOPE OF DISTURBED AREAS WHERE SHEET EROSION WOULD OCCUR. SILT FENCE SHALL BE CLEANED AND REPAIRED WHEN SEDIMENT BUILDUP REACHES ONE-THIRD OF SILT FENCE HEIGHT. AFTER SIGNIFICANT RUNOFF EVENTS (1" OF RAINFALL OR MORE) AND ON A WEEKLY BASIS, THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL STRUCTURES FOR SILT BUILD-UP THAT INTERFERES WITH THE PERFORMANCE OF THE EROSION CONTROL STRUCTURE AND REPAIR OR REPLACE THOSE STRUCTURES, AS NECESSARY. 6. ALL STORM DRAIN INLETS SHALL BE PROTECTED BY APPROPRIATE BMPS DURING CONSTRUCTION, UNTIL ALL SOURCES WITH POTENTIAL FOR DISCHARGE TO THE INLETS HAVE BEEN STABILIZED. CONSTRUCTION SEQUENCE (SITE) (PHASE 1) 1. CONTACT THE DEMLR RALEIGH REGIONAL OFFICE AT LEAST 48 HOURS PRIOR TO COMMENCING THE LAND -DISTURBING ACTIVITY. THE CONTACT NUMBER IS (919) 791-4200. 2. INSTALL CONSTRUCTION ENTRANCE(S) AS SHOWN ON PLAN SHEETS WHERE EQUIPMENT WILL ENTER AND LEAVE THE PROJECT SITE. 3. INSTALL EROSION CONTROL DEVICES. 4. STABILIZE DISTURBED AREAS WITH EROSION CONTROL DEVICES. UTILIZE TEMPORARY SEEDING AS NECESSARY. 5. CONTACT INSPECTOR FOR ONSITE INSPECTION OF INSTALLED EROSION CONTROL DEVICES. 6. MAINTAIN DEVICES AS NEEDED PER NCDEQ MAINTENANCE INSTRUCTIONS. 7. ALL BARE SOILS ARE TO BE STABILIZED UNDER CONDITIONS OUTLINED IN THE CURRENT NPDES PERMIT OR, IF IT IS IN A CRITICAL AREA, BY THE END OF THE DAY. 8. SELF -INSPECTIONS FOR EROSION AND SEDIMENTATION CONTROL MEASURES ARE TO BE PERFORMED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF EVERY RAIN EVENT OF GREATER THAN 1 INCH. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY TO MAINTAIN MEASURES AS DESIGNED. ALL ESC MEASURES SHALL BE MAINTAINED AS SPECIFIED IN THE CONSTRUCTION DETAILS ON THIS PLAN. A RAIN GAUGE SHALL BE INSTALLED AT THE PROJECT SITE FOR MONITORING. (PHASE 2 & 3) 1. BEGIN ACCESS ROAD INSTALLATION ON THE SITE AND SITE EXPANSION. 2. MAINTAIN ALL EROSION CONTROL DEVICES PER NCDEQ MAINTENANCE INSTRUCTIONS. 3. STABILIZE SITE AS AREAS ARE BROUGHT UP TO FINISH GRADE WITH VEGETATION, GRAVEL, ETC. 4. ALL EROSION CONTROL DEVICES SHALL REMAIN IN PLACE AS SHOWN ON THE DRAWINGS UNTIL THE ENTIRE SITE IS PERMANENTLY STABILIZED AND APPROVED BY THE NCDEQ INSPECTOR. 5 7. ALL EXISTING DRAIN INLETS SHALL HAVE INLET PROTECTION INSTALLED IN ACCORDANCE WITH NORTH CAROLINA MANUAL FOR EROSION CONTROL. EROSION PROTECTION MAY BE REMOVED WHEN VEGETATION IS 6 ESTABLISHED. 8. IN ACCORDANCE WITH SECTION II.B.2 OF THE NPDES GENERAL PERMIT, ANY DISTURBED AREA LEFT EXPOSED SHALL BE STABILIZED WITH TEMPORARY SEEDING WITHIN 7 TO 14 DAYS IN ACCORDANCE WITH NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL SECTION 6.11. PERMANENT STABILIZATION SHALL BE ACHIEVED THROUGH PERMANENT SEEDING FOR ALL DISTURBED AREAS. SEE SEEDING SCHEDULE IN NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL SECTION 6.11. 9. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED AND APPROVED BY NCDEQ, TEMPORARY EROSION AND SEDIMENTATION CONTROLS MUST BE REMOVED. AREAS DISTURBED DURING REMOVAL OF THE CONTROLS MUST BE STABILIZED WITH PERMANENT SEEDING AS SOON AS POSSIBLE WITHIN 14 CALENDAR DAYS. 10. PER NPDES REQUIREMENTS, A RAIN GAUGE, SELF -INSPECTIONS RECORDS, PERMIT, CERTIFICATE OF COVERAGE, AND S&E PLAN ARE REQUIRED TO BE MAINTAINED ON SITE AND ACCESSIBLE DURING INSPECTION. IT IS RECOMMENDED THAT THESE ITEMS BE PLACED IN A PERMITS BOX AT THE BEGINNING OR ENTRANCE OF PROJECT. 11. THE CONTRACTOR SHALL CONDUCT SELF -INSPECTIONS OF THE EROSION AND SEDIMENTATION CONTROL MEASURES AND COMPLETE THE DUKE ENERGY PROVIDED SELF -INSPECTION FORM. TWELVE MONTHS OF COMPLETE INSPECTION FORMS SHALL BE KEPT ON -SITE AND AVAILABLE FOR INSPECTION AT ALL TIMES. IT IS RECOMMENDED A COPY BE KEPT IN A PERMITS BOX. BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # G1435 PROFESSIONAL ENG/ARCH STAMP GROUNDCOVER SHALL BE ESTABLISHED IN 90 CALENDAR DAYS. HOWEVER, NPDES GROUNDCOVER REQUIREMENTS TAKE PRECEDENCE. WHEN CONSTRUCTION IS COMPLETE AND ALL AREAS ARE STABILIZED COMPLETELY, ARRANGE FOR FINAL INSPECTION WITH THE NCDEQ INSPECTOR. 7. WHEN THE PROJECT IS COMPLETE, THE PERMITTEE SHALL CONTACT DEMLR TO CLOSE OUT THE E&SC PLAN. AFTER DEMLR INFORMS THE PERMITTEE OF THE PROJECT CLOSE OUT, VIA INSPECTION REPORT, THE PERMITTEE SHALL VISIT DEQ.NC.GOV/NCG01 TO SUBMIT AN ELECTRONIC NOTICE OF TERMINATION (E-NOT). A $100 ANNUAL GENERAL PERMIT FEE WILL BE CHARGED UNTIL THE E-NOT HAS BEEN FILLED OUT. 8. IF SITE IS APPROVED, REMOVE EROSION CONTROL MEASURES AND STABILIZE RESULTING BARE AREAS IMMEDIATELY. SELF -INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY NCGS 113A54.1 (E) (EFFECTIVE OCTOBER 1, 2010; READOPTED EFFECTIVE APRIL 1, 2020) 15A NCAC 04B .0131 SELF -INSPECTIONS ALL LAND -DISTURBING ACTIVITIES REQUIRED TO HAVE AN APPROVED EROSION AND SEDIMENTATION CONTROL PLAN UNDER G.S. 113A54.1(E) SHALL CONDUCT SELF -INSPECTIONS FOR INITIAL INSTALLATION OR MODIFICATION OF ANY EROSION AND SEDIMENTATION CONTROL DEVICES AND PRACTICES DESCRIBED IN AN APPROVED PLAN. IN ADDITION, WEEKLY AND RAIN -EVENT SELF -INSPECTIONS ARE REQUIRED BY FEDERAL REGULATIONS, THAT ARE IMPLEMENTED THROUGH THE NPDES CONSTRUCTION GENERAL PERMIT NO. NCG 010000. 1. FOR SELF -INSPECTIONS REQUIRED PURSUANT TO G.S. 113A-54.1(E), THE INSPECTION SHALL BE PERFORMED DURING OR AFTER EACH OF THE FOLLOWING PHASES OF THE PLAN; a. INITIAL INSTALLATION OF EROSION AND SEDIMENT CONTROL MEASURES; b. CLEARING AND GRUBBING OF EXISTING GROUND COVER; c. COMPLETION OF ANY GRADING THAT REQUIRES GROUND COVER; d. COMPLETION OF ALL LAND -DISTURBING ACTIVITY, CONSTRUCTION, OR DEVELOPMENT, INCLUDING PERMANENT GROUND COVER ESTABLISHMENT AND REMOVAL OF ALL TEMPORARY MEASURES; AND e. TRANSFER OF OWNERSHIP OR CONTROL OF THE TRACT OF LAND WHERE THE EROSION AND SEDIMENTATION CONTROL PLAN HAS BEEN APPROVED AND WORK HAS BEGUN. THE NEW OWNER OR PERSON IN CONTROL SHALL CONDUCT AND DOCUMENT INSPECTIONS UNTIL THE PROJECT IS PERMANENTLY STABILIZED AS SET FORTH IN SUB -ITEM (C) OF THIS ITEM. 2. DOCUMENTATION OF SELF -INSPECTIONS PERFORMED UNDER ITEM (1) OF THIS RULE SHALL INCLUDE: a. VISUAL VERIFICATION OF GROUND STABILIZATION AND OTHER EROSION CONTROL MEASURES AND PRACTICES AS CALLED FOR IN THE APPROVED PLAN; b. VERIFICATION BY MEASUREMENT OF SETTLING BASINS, TEMPORARY CONSTRUCTION ENTRANCES, ENERGY DISSIPATORS, AND TRAPS. c. THE NAME, ADDRESS, ORGANIZATION AFFILIATION, TELEPHONE NUMBER, AND SIGNATURE OF THE PERSON CONDUCTING THE INSPECTION AND THE DATE OF THE INSPECTION SHALL BE INCLUDED, WHETHER ON A COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR AN INSPECTION REPORT. A TEMPLATE FOR AN EXAMPLE OF AN INSPECTION AND MONITORING REPORT IS PROVIDED ON THE DEMLR WEBSITE AT: HTTPS:I/DEQ.NC.GOV/ABOUT/DIVISIONS/ENERGY-MINERAL- LANDRESOURCES/EROSION-SEDIMENT-CONTROL/FORMS. ANY RELEVANT LICENSES AND CERTIFICATIONS MAY ALSO BE INCLUDED. ANY DOCUMENTATION OF INSPECTIONS THAT OCCUR ON A COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN SHALL OCCUR ON A SINGLE COPY OF THE PLAN AND THAT PLAN SHALL BE MADE AVAILABLE ON THE SITE. d. A RECORD OF ANY SIGNIFICANT DEVIATION FROM ANY EROSION OR SEDIMENTATION CONTROL MEASURE FROM THAT ON THE APPROVED PLAN. FOR THE PURPOSE OF THIS RULE, A "SIGNIFICANT DEVIATION" MEANS AN OMISSION, ALTERNATION, OR RELOCATION OF AN EROSION OR SEDIMENTATION CONTROL MEASURE THAT PREVENTS IT FROM PERFORMING AS INTENDED. THE RECORD SHALL INCLUDE MEASURES REQUIRED TO CORRECT THE SIGNIFICANT DEVIATION, ALONG WITH DOCUMENTATION OF WHEN THOSE MEASURES WERE TAKEN. DEVIATIONS FROM THE APPROVED PLAN MAY ALSO BE RECOMMENDED TO ENHANCE THE INTENDED PERFORMANCE OF THE SEDIMENTATION AND EROSION CONTROL MEASURES. 35' 37 4: N 3:' �5 3:r •V Soil Map -Johnston County, North Carolina 71w. 0 7AT[ki 72W ?XftU rrvii i_�a]r; r'LW1: r"aSiKAI r71xL` T'A606 P Mz�• Scale: 1770,5M ff Printed arA larxbcape (11" x 8.5") meat Me�ar< fJ n lm Epp 1200 1Am 0 �.p 1ppq appo 3ppp Map pqe. on, Vk-b Motor Curncr cDwdnata5: 1vG.- 4 lxs; L'rM Zcne 17N 4UC. MAP SYMBOL SOIL TYPE AAA ALTAVISTA FINE SANDY LOAM, 0 TO 2 PERCENT SLOPES, OCCASIONALLY FLOODED ASA AUGUSTA SANDY LOAM, 0 TO 2 PERCENT SLOPES, OCCASIONALLY FLOODED BB BIBB SANDY LOAM, 0 TO 2 PERCENT SLOPES, FREQUENTLY FLOODED BNA BLANTON SAND, 0 TO 3 PERCENT SLOPES CEC CECIL LOAM, 6 TO 10 PERCENT SLOPES COB COWARTS LOAMY SAND, 2 TO 6 PERCENT SLOPES COC COWARTS LOAMY SAND, 6 TO 10 PERCENT SLOPES FUA FUQUAY SAND, 0 TO 3 PERCENT SLOPES GED GILEAD SANDY LOAM, 8 TO 15 PERCENT SLOPES GOA GOLDSBORO SANDY LOAM, 0 TO 2 PERCENT SLOPES NKB NANKIN FINE SANDY LOAM, 2 TO 6 PERCENT SLOPES NOB NORFOLK LOAMY SAND, 2 TO 6 PERCENT SLOPES RA RAINS SANDY LOAM, 0 TO 2 PERCENT SLOPES RNF RION SANDY LOAM, 15 TO 40 PERCENT SLOPES TO TOMOTLEY SANDY LOAM, 0 TO 2 PERCENT SLOPES, RARELY FLOODED UCB UCHEE LOAMY COARSE SAND, 2 TO 6 PERCENT SLOPES UCC UCHEE LOAMY COARSE SAND, 6 TO 12 PERCENT SLOPES W WATER WAB WAGRAM LOAMY SAND, 0 TO 6 PERCENT SLOPES WOB WEDOWEE SANDY LOAM, 2 TO 8 PERCENT SLOPES WOD WEDOWEE SANDY LOAM, 8 TO 15 PERCENT SLOPES WT WEHADKEE LOAM, 0 TO 2 PERCENT SLOPES, FREQUENTLY FLOODED N RCS SOIL SURVEY MAP NOT TO SCALE PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 VWN IS' 353TN NO. DATE REVISION(S) DESCRIPTION BY CHK APPD I DESCRIPTION APPROVALS Piedmont j DUKEr6111 ENERGY Natural Gas COPYRIGHT 2018 LINE 472 TRANSMISSION ES & PC NOTES AND DETAILS GARNER NC 7 GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA SHEET(S) 22 OF 35 DWG SCALE 0 07-31-2020 ISSUED FOR CONSTRUCTION JTG CNS CAM AREA CODE 1853 DATE NIA NI N/A REGIONAL ENGINEER DWG DATE 0713112020 SUPERSEDED ACCOUNT NUMBER PROJECT NUMBER 0228178 DATE NIA INITIALS N/A MGR TECH REC & STD DRAWING NUMBER P N G - C- 472-0001021 DRAWING BY MJD STATION ID I DATE 07/31/2020 INITIALS CAM PRINCIPAL ENGINEER CHECKER INITIALS CNS DISCIPLINE / RESOURCE CENTER / LINE NUMBER NONE REVISION 0 aIBURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # C-1435 PROFESSIONAL ENG/ARCH STAMP J IN x x�� // / / / 163700-13-3191 X /x \ \ \ x X_x / %-318� �� ���_ 315- \ \\ \ — 318 319------ \\ \ / \v v — - �� -- 1 �-- / inA — o / LO 1.14 �,� / \ / o / xx / I / 1 1 /0 _ / .,'� Lu \ .`� / z 2+00 ✓' 3+00 .4+00 r� 5 00 + ~ \ / / _ _ 6 00 7+00 / 321 8+00 / / 9+00, C) x x- x x — / Q / X / / / . / I X x - -"- - - - - - 2 END STA 82+53 LIMITS OF DISTURBED AREA BEGIN STA 0+00 SITE LOCATION MAP SCALE: 1 " = 2000' O" I / / I % " NOTES: / / � -� I / I 1. CONTRACTOR SHALL INSTALL CONSTRUCTION EXIT U 0 ( X AT ALL SITE ACCESS POINTS. p \ /0 1 _ - /� �/ 1o2. ALL TREES TO REMAIN SHALL BE PROTECTED WITH I PROPOSED 8 PIPELINE / / U-) / / o TREE PROTECTION FENCING. TREE PROTECTION 1 / / J >- 1 I / oo / N FENCING SHALL BE 4' ORANGE MESH FENCE PLACED / I � m � I I / � % w ALONG THE LIMITS OF DISTURBANCE (LOD) �7- LOD— � — L D z J. ANY DISTURBED AREA LEFT IDLE FOR A PERIOD OF 14 PROPOSED PERMANENT = DAYS OR LONGER SHALL BE STABILIZED WITH O // FLARE EASEMENT I / U / i / I-_ MULCHING AND TEMPORARY SEEDING WITH THE /o/ < EXCEPTION OF AGRICULTURAL FIELDS WHICH ONLY / > , NEED STABILIZATION TO THE EXTENT REQUIRED TO X / / o AVOID TOP SOIL WASHING AWAY. o / /� �/ 4. ALL NON -GRAVELED AREAS SHALL BE MULCHED AND / / \ I P / / ti20+C TEMPORARILY SEEDED IN ACCORDANCE WITH NORTH CAROLINA EROSION AND SEDIMENT CONTROL / I o71Z p / o0 163700-27-2782 PLANNING AND DESIGN MANUAL SECTIONS 6.10 AND 163700-13-31911 X / � \ - 6.14. 5. ALL DISTURBED AREAS SHALL BE PERMANENTLY o — - 0 �� SEEDED BEFORE PROJECT CLOSEOUT. PERMANENT 1 / /V � o — — — — � � � � SEEDING SHALL BE SEEDED IN ACCORDANCE WITH NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL SECTION 6.11. STATION ACCESS ROAD 6. REFER TO PNG-C-472-0001022 & PNG-C-472-0001023 oo / / / FOR ES&PC DETAILS. \ \ CONSTRUCTION PROPOSED CLEVELAND ROAD / — / os/ 7. REFER TO PNG-C-472-0001021 FOR SOIL TYPES. \ EXIT, SEE NOTE 1 y� REGULATOR STATION SITE PLAN / � �// � � � //8. INSTALL CONSTRUCTION ENTRANCE, SILT FENCE, X_ REFER TO PNG PROJECT 0228138 X � m' x x x�x u— ., , .. Z CHECK DAMS AND SILT FENCE OUTLETS PRIOR TO 43 �O p. 0O�) G GO SOP _ _ �// / •« SFWB 9�, /J / oS4 -40 LAND DISTURBING ACTIVITY. ALL BMPS MUST BE MAINTAINED AND REMAIN IN PLACE UNTIL END OF CONSTRUCTION ACTIVITIES AND SITE IS STABILIZED WITH PERMANENT SEEDING. 4Q � 9. ADJUST RIGHT-OF-WAY DIVERSIONS AND S ASSOCIATED SILT FENCE WATTLE BREAKS AS � \ /'v // ^x� NECESSARY TO DIVERT WATER DOWNSTREAM OF °s SECTION OF TRENCH THAT IS OPEN. MAINTAIN SPACING AS SHOWN. 0 I Js, N 0 SFWB � / os LIMITS OF DISTURBED AREA: 20.74 AC / <v Z� S 0 POINT OF CONTACT (MAINTENANCE): LEGEND: SHAWN EVERETTE (910)-334-9034 TEMPORARY SILT FENCE I/ I oz o C-472 01 022 LOD— — LIMITS OF DISTURBANCE 1 a 3 1 SFWB - — — — — — — — - EXISTING CONTOUR 0 1 \ I 1` TEMPORARY GRAVEL 1 j CIO�oo�� o�� CONSTRUCTION ENTRANCE C-472 J 022 PROPOSED TEMPORARY EASEMENT FOR FLARING \I \ 163700-13-3191 \\ \� \\ \\ \\ \\ /0 \\ \ o�� 0� �•» RIGHT-OF-WAY DIVERSIONS 1 (SEE NOTE 9) C-472 J 023 — SFWB - — SFWB -\ — — SFWB \ *% \ o \\ \ I\ \ \\ \ \ \ \\ \ q, o �o SFWB S<v Z� SFWB SILT FENCE WATTLE BREAK 4 o C-472-0001023 \ Of \\ I 11+0TYP 0\ 12 0 \\ \\ \ 13+00\\ \\ \ \\ n x\ \ — — \ �� 0 50 100 0009 i I // I / i V4 1 - \ \ i I I I / \ . \ / / o 11N = 50FT 1�� DISTRIBUTION WORK BY PNG DISTRIBUTION o \ \� L rn \ W LLI \ _ z_ J \ \ _ U .10+00 \ /\ \ PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD I DESCRIPTION APPROVALS `(tjDUKE Piedmont 'r ENERGY r6Natural Gas COPYRIGHT 2018 LINE 472 TRANSMISSION ES&PC PLAN GARNER NC 7 GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA 0 07-31-2020 ISSUED FOR CONSTRUCTION JTS CNS CAM AREA CODE 1853 DATE NIA INITIALS N/A REGIONAL ENGINEER ACCOUNT NUMBER PROJECT NUMBER 0228178 DATE NIA INITIALS N/A MGR TECH REC & STD DRAWING BY JTG STATION ID DATE 07/31/2020 INITIALS CAM PRINCIPAL ENGINEER CHECKER INITIALS CNS REF. DWG(S) SHEET(S) 18 OF 35 1 DWG SCALE H: V=50', V: V=10' DWG DATE 07/31/2020 SUPERSEDED DRAWING NUMBER REVISION PNG -C-472-0001017 0 DISCIPLINE / RESOURCE CENTER / LINE NUMBER Aa o\ 10LQ \ �'�q /'g)+00 __ 39+00.'Q xoo -242 � / / / / / I 1 I I I I I \ \ \ \ \ \ I \ \ \ / o JURISDICTIONAL \ / \ o WATERBODY CROSSING SEE \ \ \ 2x 36 / / / / / o SHEET PNG-C-472-0001041 k / / / / �C'a' 2 /'� SFWB°o PR P ED 8" PIPELINE o, O OS c 7�� 163700-27-2782 SFWB \ / /SFWB \ SFWB A- c////�/ 0 / SFWB /X7n <v X/ / _(-1 63700-27-2782 S� /'/' / pS p/ —285 i� l �o0 / C) _� rn y �, /� / / / �i / // / _— ----- // Z p LODE — \ I p ----//� — 'LOD— I l j� '6/// —LOD c� 61 /OD—� —�/ / /' /� /' /' /'// / �� 1� LOO �k / / LC}8 —��— —� LOD--- / o Z / / �/ / / / / / — T / _ A � 279 — � / / / / / / / / / / / / / / / / / / / / / / / / —�- / / i / // / / // / / / / / f llp --� / // / / /r� / / SFWB —� z�'i .2�' t27+00 - 8+00' IU— /�/ —o°/ / / /' / 2$ / / /' /' / - 25+OOp / _ -- — — SFWB — / / / / — — —25 .i1+00 Q '21+00 / / / �i 1'A. / / 2s2 / / �a — — — _ — — _ — — - SFWB / 2 00 / / 23+00 / ' / / / , // _ 24+00 2 SFWB I , � - _ - - SFWB - SFWB , � SFWB SFWB = -uu I - � SFWB - - u Y, I /- SFWB - SFWB D SFWB SFWB /// / R - - p D PROPOSED 8" PIPELINE 1\\ N. /�o // `L 30 p / .94/ vo N I I N I II 1 O w \ \ I I a° 1 N III II \d' -` \ 10.86%I \\\ SFWB \ \I aj \ 44+00 / 2 SFWB 207 cn NON JURISDICTI61 ONAL \ / - �'�/ // �/ // i /// s 1�°I°\ \ 1 1 1 1 1 I 1 `/__� --__ --__-- -----_---__- / / / / WATERBODY CROSSING SEE 205 \ '�\ \ \ \I 1 1 1 \ \\ �22,v/' /----------------- \/ SHEET PNG-C-472-0001041 - // / c�Q---217- \ I \\ \ \ \ 1.0 Yo 1 \\ \ \\ // /-- -\ / l / / / - -' // //� _ I\\ \ - 6''// N ;/ //SFWB \ N \ 27 \ I \ \N \ \ \ SFWB \ \`_ \ I \V \ o - (� 33�° \ \ LODE-\ ////� /'/ - ---- \ NON -JURISDICTIONAL PROPOSED 8 WATERBODY CROSSING SEE / l / /in- --_ -- �/ / s I(-- 5- // . _ � / �\�- // � PIPELINE _ - _ SFWB �6 / �' �_� _ \ \ SHEET PNG-C-472-0001041 SFWB 76� \ \ 211— o // >\r--�——,LOB//i'/� \ cow — — 47+ 48 0 — \ \ \ �\------- ti-- / '� -i 00 SFWB — --- 204� h^ 4 SFWB , - - -- - \ \ \ \ ------ / / SFWB SFWB \ \ \ \ \ \ 0 SFWB / SFWB END STA 82+53 LIMITS OF DISTURBED AREA BEGIN STA 0+00 SITE LOCATION MAP SCALE: 1" = 2000' O" NOTES: 1. CONTRACTOR SHALL INSTALL CONSTRUCTION EXIT AT ALL SITE ACCESS POINTS. 2. ALL TREES TO REMAIN SHALL BE PROTECTED WITH TREE PROTECTION FENCING. TREE PROTECTION FENCING SHALL BE 4' ORANGE MESH FENCE PLACED ALONG THE LIMITS OF DISTURBANCE (LOD) 3. ANY DISTURBED AREA LEFT IDLE FOR A PERIOD OF 14 DAYS OR LONGER SHALL BE STABILIZED WITH MULCHING AND TEMPORARY SEEDING WITH THE EXCEPTION OF AGRICULTURAL FIELDS WHICH ONLY NEED STABILIZATION TO THE EXTENT REQUIRED TO AVOID TOP SOIL WASHING AWAY. 4. ALL NON -GRAVELED AREAS SHALL BE MULCHED AND TEMPORARILY SEEDED IN ACCORDANCE WITH NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL SECTIONS 6.10 AND 6.14. 5. ALL DISTURBED AREAS SHALL BE PERMANENTLY SEEDED BEFORE PROJECT CLOSEOUT. PERMANENT SEEDING SHALL BE SEEDED IN ACCORDANCE WITH NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL SECTION 6.11. 6. REFER TO PNG-C-472-0001022 & PNG-C-472-0001023 FOR ES&PC DETAILS. 7. REFER TO PNG-C-472-0001021 FOR SOIL TYPES. 8. INSTALL CONSTRUCTION ENTRANCE, SILT FENCE, CHECK DAMS, AND SILT FENCE OUTLETS PRIOR TO LAND DISTURBING ACTIVITY. ALL BMPS MUST BE MAINTAINED AND REMAIN IN PLACE UNTIL END OF CONSTRUCTION ACTIVITIES AND SITE IS STABILIZED WITH PERMANENT SEEDING. 9. ADJUST RIGHT-OF-WAY DIVERSIONS AND ASSOCIATED SILT FENCE WATTLE BREAKS AS NECESSARY TO DIVERT WATER DOWNSTREAM OF SECTION OF TRENCH THAT IS OPEN. MAINTAIN SPACING AS SHOWN. LIMITS OF DISTURBED AREA: 20.74 AC POINT OF CONTACT (MAINTENANCE): SHAWN EVERETTE (910)-334-9034 LEGEND: TEMPORARY SILT FENCE 2 C-472-0001040 — - - LOD- - — LIMITS OF DISTURBANCE - - - - - - - - - EXISTING CONTOUR WETLANDS TIMBER MATTING C-472-0001024 Nii 1 RIGHT-OF-WAY DIVERSIONS C-472-0001023 (SEE NOTE 9) N_-� SILT FENCE WATTLE BREAK 4 SFWB C-472-0001023 lift, lift WATTLE BARRIER C-472-0001023 N_.� BURNS& McDONNELL CONSULTANTS, INC. I PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY STATE LICENSE # C-1435 PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PROFESSIONAL ENG/ARCHSTAMP NO.1 DATE REVISION(S) DESCRIPTION BY CHK APPD I DESCRIPTION APPROVALS tf'DUKE Piedmont `t ENERGY:: Natural Gas COPYRIGHT 2018 LINE 472 TRANSMISSION ES&PC PLAN GARNER N � GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA 0 07-31-2020 ISSUED FOR CONSTRUCTION JTS CNS CAM AREA CODE 1853 DATE NIA INITIALS N/A REGIONAL ENGINEER ACCOUNT NUMBER PROJECT NUMBER 0228178 DATE NIA INITIALS N/A MGR TECH REC &STD DRAWING BY MJD STATION ID DATE 07/31 /2020 INITIALS CAM PRINCIPAL ENGINEER CHECKER INITIALS CNS 0 50 100 1IN = 50FT REF. DWG(S) SHEET(S) 19 OF 35 1 DWG SCALE H: 1"=50', V: 1"=10' DWG DATE 07/31/2020 SUPERSEDED DRAWING NUMBER REVISION PNG -C-472-0001018 0 DISCIPLINE / RESOURCE CENTER / LINE NUMBER CLEARING SHALL BE LIMITED TO 10' EACH SIDE OF PIPELINE CENTERLINE IN HDD BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # C-1435 PROFESSIONAL ENG/ARCH STAMP 01 m 0 \ _ 163700-27-2782' — — — — — — / / ACCESS ROAD, SEE - _�/i/��_�ii�/���� �\-------\ SHEET PNG-C-472-0001002 !'/ // /i i///��` \_�//%/ //� FOR CONTINUATION -5 / / / / / / I I I \\ _�----- CLEARING HALL BE LIMITED TO 10' EACH SIDE OF PIPELINE CENTERLINE IN HDD / / I/ _ --- M,-- LO CD —LODY- 1. / / / // / 6��+001 \ / o •^31+00 / / // / 62+00 63+00 64+00 /Q O201 J / 7I -rI —I 401 201L-a0' / �00-1 — — — — — ao- —ao1 —ao-1 ------------ _194—_// PROPOSED 8" PIPELINE / --------------�� �\ I�, 1 163700-36-6576 � -_- _ / � �' -- / _ PLOD- -- LOD----- LOD--- LOD / `V ---- - / - LOD- - - -OD - `'-,COD- - - - - LOD- LOD- / j Z 65+0 — + 6 2 66 00 / '67+ 0 �- , —a _ 7/1 -1II Il31tIl 71 1l o- 163700-27-6098 PROPOSED 8" PIPELINE - — — — \ Y Y Y Y r I . I I . . . ---- / Z: 71+00 70+00 70 — ao� 40�� — — _ _ 00_1 - J PROPOSED 8 PIPELINE II II 63700-27-6098 \I j 44 LAT: N035° 36' 46" LON: W078 33' 05" / CONSTRUCTION EXIT,T SEE NOTE 1OD � 81+00 / CONSTRUCTION EXIT, SEE NOTE 1 . \-g / LAT: N035' 36' 46" / LON: W078° 33' 05" / I i \ / / LAT: NOW 36' 46" \ LON: W078 33' 05"' / 63VOID / 0 / Rio, / S S 82+00 82+1 ov / LAT: N035o 36' 46" LON: W078° 33' 05"I I,� / / / / r n s END STA 82+53 I LIMITS OF DISTURBED AREA BEGIN STA 0+00 SITE LOCATION MAP SCALE: 1" = 2000' O" NOTES: 1. CONTRACTOR SHALL INSTALL CONSTRUCTION EXIT AT ALL SITE ACCESS POINTS. 2. ALL TREES TO REMAIN SHALL BE PROTECTED WITH TREE PROTECTION FENCING. TREE PROTECTION FENCING SHALL BE 4' ORANGE MESH FENCE PLACED ALONG THE LIMITS OF DISTURBANCE (LOD) 3. ANY DISTURBED AREA LEFT IDLE FOR A PERIOD OF 14 DAYS OR LONGER SHALL BE STABILIZED WITH MULCHING AND TEMPORARY SEEDING WITH THE EXCEPTION OF AGRICULTURAL FIELDS WHICH ONLY NEED STABILIZATION TO THE EXTENT REQUIRED TO AVOID TOP SOIL WASHING AWAY. 4. ALL NON -GRAVELED AREAS SHALL BE MULCHED AND TEMPORARILY SEEDED IN ACCORDANCE WITH NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL SECTIONS 6.10 AND 6.14. 5. ALL DISTURBED AREAS SHALL BE PERMANENTLY SEEDED BEFORE PROJECT CLOSEOUT. PERMANENT SEEDING SHALL BE SEEDED IN ACCORDANCE WITH NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL SECTION 6.11. 6. REFER TO PNG-C-472-0001022 & PNG-C-472-0001023 FOR ES&PC DETAILS. 7. REFER TO PNG-C-472-0001021 FOR SOIL TYPES. 8. INSTALL CONSTRUCTION ENTRANCE, SILT FENCE, CHECK DAMS, AND SILT FENCE OUTLETS PRIOR TO LAND DISTURBING ACTIVITY. ALL BMPS MUST BE MAINTAINED AND REMAIN IN PLACE UNTIL END OF CONSTRUCTION ACTIVITIES AND SITE IS STABILIZED WITH PERMANENT SEEDING. LIMITS OF DISTURBED AREA: POINT OF CONTACT (MAINTENANCE): SHAWN EVERETTE (910)-334-9034 20.74 AC LEGEND: TEMPORARY SILT FENCE 2 C-472-0001022 �� — — — LOD— — — LIMITS OF DISTURBANCE - — — — — — — — - EXISTING CONTOUR TEMPORARY GRAVEL 1 C-472-0001022 CONSTRUCTION ENTRANCE N_-� WETLANDS TIMBER MATTING (2) C-472-0001040 WATTLE BARRIER C-472-0001023 N�� SILT FENCE WATTLE BREAK 4 SFWB C-472-0001023 0 50 100 00119 1IN = 50FT PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY REF. DWG(S) PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD I DESCRIPTION APPROVALS DUKE Piedmont ENALS V' ENERGNatural Gas Y:: � COPYRIGHT 2018 LINE 472 TRANSMISSION ES&PC PLAN GARNER NC GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA SHEET(S) 20 OF 35 DWG SCALE H: 1"=50', V: 1"=10' 0 07-31-2020 ISSUED FOR CONSTRUCTION MJD CNS CAM AREA CODE 1853 DATE NIA NI N/A REGIONAL ENGINEER DWG DATE 0713112020 SUPERSEDED — ACCOUNT NUMBER PROJECT NUMBER 0228178 DATE NIA N/NI /A MGR TECH REC &STD DRAWING NUMBER PNG -C-472-0001019 REVISION 0 DRAWING BY MJD STATION ID DATE 07/31 /2020 INITIALS CAM PRINCIPAL ENGINEER CHECKER INITIALS CNS DISCIPLINE / RESOURCE CENTER / LINE NUMBER INSTALLATION NOTES: -AGGREGATE SIZE: 2-3" DIAMETER WASHED STONE. -PAD THICKNESS: 6" MINIMUM. -PAD WIDTH: 24' MINIMUM. -PAD LENGTH: 100' MINIMUM. -PAD LOCATION: LOCATE CONSTRUCTION ENTRANCES AND EXITS TO LIMIT SEDIMENT FROM LEAVING THE SITE AND TO PROVIDE MAXIMUM UTILITY BY ALL CONSTRUCTION VEHICLES. AVOID STEEP GRADES AND ENTRANCES AT CURVES IN PUBLIC ROADS. O � o � 00 a o 0 00 0 FILTRATION GEOTEXTILE TO STABILIZE FOUNDATION (ESPECIALLY IMPORTANT WHERE SOFT SOIL IS ANTICIPATED) 2-3" DIAMETER WASHED STONE, 6" DEEP PERSPECTIVE VIEW DETAIL SCALE: NTS GRAVEL CONSTRUCTION ENTRANCE SANDBAGS (TYP.) OR STAPLES CLEARLY MARKED SIGNAGE CONCRETE NOTING DEVICE (18"X24" WASHOUT MIN.) MAINTENANCE NOTES: -MONITOR DAILY TO SUPPLEMENT STONE TO ENSURE ENTRANCE FUNCTIONS PROPERLY. -CLEAN ANY MATERIAL TRACKED ONTO PUBLIC ROADWAY IMMEDIATELY. -SCHEDULE ROUTINE SWEEPING AT THE END OF EACH WORK DAY. -WASHING: IF CONDITIONS AT THE SITE ARE SUCH THAT MOST OF THE MUD AND SEDIMENT ARE NOT REMOVED BY VEHICLES TRAVELING OVER THE GRAVEL, THE TIRES SHOULD BE WASHED. WASHING SHOULD BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT DRAINS INTO A SEDIMENT TRAP OR OTHER SUITABLE DISPOSAL AREA. A WASH RACK MAY BE USED TO MAKE WASHING STONE MORE CONVENIENT AND EFFECTIVE. 10 MIL 1:1 PLASTIC SANDBAGS (TYP.) SIDE SLOPE LINING rOR STAPLES (TYP.) / SECTION A —A INSTALLATION NOTES: —ACTUAL LOCATION DETERMINED IN FIELD. —CLEARLY MARK THE CONCRETE WASHOUT STRUCTURE WITH SIGNAGE NOTING DEVICE. MAINTENANCE NOTES: —MAINTAIN DEVICE WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE CAPACITY. PLAN BELOW GRADE WASHOUT STRUCTURE NOT TO SCALE 10' — 0" MIN. HIGH COHESIVE & B LOW FILTRATION SOIL BERM 0� CD Z 0 0 0 0 0 0 0 0 7� o 0 B SANDBAGS (TYP.) OR STAPLES CLEARLY MARKED SIGNAGE CONCRETE NOTING DEVICE (18"X24" WASHOUT MIN.) 10 MIL PLASTIC LINING —1:1 SIDE SLOPE 1 (TYP.) 2'-0" SECTION B-B SANDBAGS (TYP.) OR STAPLES HIGH COHESIVE & LOW FILTRATION SOIL BERM. HAY BALES MAY BE SUBSTITUTED FOR SOIL BERM. INSTALLATION NOTES: —ACTUAL LOCATION DETERMINED IN FIELD. —CLEARLY MARK THE CONCRETE WASHOUT STRUCTURE WITH SIGNAGE NOTING DEVICE. MAINTENANCE NOTES: —MAINTAIN DEVICE WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE CAPACITY. PLAN DETAIL 4 SCALE: NTS CONCRETE WASHOUT STRUCTURE WITH LINER 24' MIN. MACHINE CLEARING ONLY AREA TOP AND BOTTOM STRAND SHALL BE 10 GAUGE MIN. WIRE m — 6' MAX. WITH WIRE - 4' MAX FOR TROUT WATERS MIDDLE AND VERTICAL WIRES SHALT Pc ana /� rwicc siN. FILTRATION GEOTEXTILE FILTR FINISH GRADE AND ELEVATION PER PI Atli PLASTIC CAP OVER POST INSTALLATION NOTES -USE FILTRATION GEOTEXTILE A MINIMUM OF 36" IN WIDTH AND FASTEN ADEQUATELY TO THE I? POSTS AND WIRE AS DIRECTED. N -USE WIRE A MINIMUM OF 32" IN WIDTH AND WITH A MINIMUM OF 6 LINE WIRES WITH 12" STAY SPACING. -PROVIDE 5'-0" STEEL POST OF THE SELF -FASTENER ANGLE - STEEL TYPE. -FOR MECHANICAL SLICING METHOD INSTALLATION, GEOTEXTILE SHALL BE A MAXIMUM OF 18" ABOVE GROUND SURFACE. IT24-MAX. 8" MIN.) "^ ---'Atli- - - MAINTENANCE NOTES: -REMOVE AND DISPOSE OF SILT ACCUMULATIONS WHEN THE DEPTH REACHES ONE-HALF OF THE HEIGHT OF THE GEOTEXTILE. -REMOVE AND REPLACE DETERIORATED OR CLOGGED GEOTEXTILE. EXTENSION OF GEOTEXTILE AND WIRE INTO TRENCH DETAIL 2 SCALE NTS TEMPORARY SILT FENCE 30' - 0" DISTURBED AREA FOR ACCESS ROAD EXISTING GRADE CLEARING AND GRUBBING AREA 16 - 0" PERMANENT ACCESS ROAD • • MAINTENANCE NOTES: MONITOR TO SUPPLEMENT STONE OR BLADE TO MAINTAIN UNIFORM RIDING SURFACE DETAIL 5 SCALE: NTS PERMANENT ACCESS ROAD DETAIL 1/4" INCH PER FOOT (2%) SIDE SLOPE (TYPICAL) COMPACTED SOIL FILTRATION GEOTEXTILE TO STABILIZE FOUNDATION (ESPECIALLY IMPORTANT WHERE SOFT SOIL IS ANTICIPATED) MACHINE CLEARING ONLY AREA ""—zS #57 STONE TOP COURSE -r-v ii,-, L-ZS THICK NCDOT ABC BASE COURSE DETAIL 3 SCALE: NTS GRAVEL SURFACE COURSE 9" min Plan View cuter GIaT11 1.5' min. 12" of NCDOT #5 or #57 washed stone \ 1.5' Class B Riprap �� I 4 2 max. at - Alf ` center Filter Cloth w34i } 4' to 6' Cross -Section View L = The distance such that points A and B are of equal elevation Figure 6.83a Space check dams in a channel so that the crest of downstream dam is at elevation of the toe of upstream dam. CHECK DAM MAINTENANCE NOTES: 1. Place stone to the lines and dimensions shown in the plan on a filter fabric foundation. 2. Keep the center stone section at least 9 inches below natural ground level where the dam abuts the channel banks. 3. Extend stone at least 1.5 feet beyond the ditch bank (Figure 6.83b) to keep water from cutting around the ends of the check dam. 4. Set spacing between dams to assure that the elevation at the top of the lower dam is the same as the toe elevation of the upper dam. 5. Protect the channel after the lowest check dam from heavy flow that could cause erosion. 6. Make sure that the channel reach above the most upstream dam is stable. 7. Ensure that other areas of the channel, such as culvert entrances below the check dams, are not subject to damage or blockage from displaced stones. CHECK DAM CONSTRUCTION SPECIFICATIONS: Inspect check dams and channels at least weekly and after each significant (1/2 inch or greater) rainfall event and repair immediately. Clean out sediment, straw, limbs, or other debris that could clog the channel when needed. Anticipate submergence and deposition above the check dam and erosion from high flows around the edges of the dam. Correct all damage immediately. If significant erosion occurs between dams, additional measures can be taken such as, installing a protective riprap liner in that portion of the channel (Practice 6.31, Riprap-line and Paved Channels). Remove sediment accumulated behind the dams as needed to prevent damage to channel vegetation, allow the channel to drain through the stone check dam, and prevent large flows from carrying sediment over the dam. Add stones to dams as needed to maintain design height and cross section. DETAIL 6 SCALE: NTS CHECK DAM BURNS& McDONNELL CONSULTANTS, INC. I PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY STATE LICENSE # C-1435 PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) *DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PROFESSIONAL ENGIARCH STAMP NO.1 DATE REVISION(S) DESCRIPTION BY I CHK APPD I DESCRIPTION APPROVALS Piedmont `:fj DUKEr6111 'r ENERGY Natural Gas COPYRIGHT 2018 LINE 472 TRANSMISSION ES & PC DETAILS - 2 GARNER NC GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA SHEET(S) 23 OF 34 DWG SCALE 0 07-31-2020 ISSUED FOR CONSTRUCTION JTG CNS CAM AREA CODE 1853 DATE NIA INITIALS N/A REGIONAL ENGINEER DWG DATE 04/05/2019 SUPERSEDED - ACCOUNT NUMBER PROJECT NUMBER 0228178 DATE N/A INITIALS N/A MGR TECH REC & STD DRAWING NUMBER - - - P N G C 472 0001022 DRAWING BY ABR STATION ID DATE 07/31 /2020 INITIALS CAM PRINCIPAL ENGINEER CHECKER INITIALS CNS DISCIPLINE /RESOURCE CENTER /LINE NUMBER NONE REVISION 0 �1 Up' �vl •w11� p�<\�111� �IIIUw- 0`6�11 - ail . <'�;� -_.:: � �-• —^ i l.. y1fl.rr 1 � ` `�,,�,•, h I � aat . hallltiy '• 11j��• a la.� �. 1••ti ilaa la t /: 1, "'�:"Qrl,a ;•G�1 i.. .. � ,. �. • ,y4 ,1,w• ,�16L•IYIyY dt,411,wt' � �� I j ,1f?�r4u11�M wl(111 �1'1bKr �I'14. `h,, 'a11 A,f uub 11/!r u� �'llll�,ll,ly lfa Itu V �N,fl�tul,l„ pp Y, 1 11t11Ug11iltu� YUh/ql� 1 1 ill tlNly`1. In• Vol, 411,I1'• I'411 h11,1 �• 4�1 ufli•P'/yJrld4i � �I.Id I� Il,..pllh I1iI'I �I,1 I,�f�J 11� 41 . , ll'l Y� Il MI'llla ill I 41'4t 11,1 " lat. �, r I 1 1'/ 1 �1 �Illlil YllIItlllrn.4,.r.,,.l,r �,. , ..l�,�tsr►��► III IY�UI ley.... .,' ul;l:/ir'•- I �,,,. �. ... � lull- • �� >t ,,i�itll,lU�'�1 III PERSPECTIVE VIEW I.,4 6 ft Earthen ridge Slope rrs� ; • rr fg(111 —f Illlt—_�IF—'+I PROFILE VIEW CONSTRUCTION SPECIFICATIONS 1. INSTALL THE DIVERSION AS SOON AS THE RIGHT-OF-WAY HAS BEEN CLEARED AND GRADED. 2. DISK THE BASE FOR THE CONSTRUCTED RIDGE BEFORE PLACING FILL. 3. TRACK THE RIDGE TO COMPACT IT TO THE DESIGN CROSS SECTION. 4. LOCATE THE OUTLET ON AN UNDISTURBED AREA. ADJUST FIELD SPACING OF THE DIVERSION TO USE THE MOST STABLE OUTLET AREAS. WHEN NATURAL AREAS ARE NOT DEEMED SATISFACTORY, PROVIDE OUTLET PROTECTION. 5. IMMEDIATELY SEED AND MULCH THE PORTIONS OF THE DIVERSIONS NOT SUBJECT TO CONSTRUCTION TRAFFIC. STABILIZE WITH GRAVEL AREAS TO BE CROSSED BY VEHICLES. MAINTENANCE PERIODICALLY INSPECT RIGHT-OF-WAY DIVERSIONS FOR WEAR AND AFTER EVERY HEAVY RAINFALL FOR EROSION DAMAGE. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA, AND REPAIR THE DIKE. CHECK OUTLET AREAS, AND MAKE TIMELY REPAIRS AS NEEDED. WHEN PERMANENT ROAD DRAINAGE IS ESTABLISHED AND THE AREA ABOVE THE TEMPORARY RIGHT-OF-WAY DIVERSIONS IS PERMANENTLY STABILIZED, REMOVE THE DIKE, AND FILL THE CHANNEL TO BLEND WITH THE NATURAL GROUND, AND APPROPRIATELY STABILIZE THE DISTURBED AREA. DETAIL SCALE: NTS RIGHT-OF-WAY DIVERSION ISOMETRIC VIEW FRONT VIEW ISOMETRIC VIEW VIEW FROM SLOPE INSTALLATION NOTES: —USE MINIMUM 18 IN. NOMINAL DIAMETER EXCELSIOR WATTLE AND LENGTH OF 10 FT. —EXCAVATE A 2 TO 3 INCH TRENCH FOR WATTLE TO BE PLACED. —DO NOT PLACE WATTLES ON TOE OF SLOPE. —USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL CROSS SECTION. —INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE STAKES AT AN ANGLE TO WEDGE WATTLE TO GROUND. —PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE FORMED INTO A U SHAPE NOT LESS THAN 12" IN LENGTH. —INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON BOTH SIDES OF WATTLE AND AT EACH END TO SECURE IT TO THE SOIL. —FOR BREAKS ALONG LARGE SLOPES (HEIGHT OF 15' OR MORE MEASURED ALONG THE SLOPE), USE MAXIMUM SPACING OF 25 FT SEE INSET A FI LL INSET A TOE OF FILL STAKE 18" WATTLE J \—DOWNSLOPE STAKE TOP VIEW DETAIL 2 SCALE: NTS WATTLE BARRIER INSTALLATION NOTES: —USE MINIMUM 12 IN. DIAMETER EXCELSIOR WATTLE AND LENGTH OF 10 FT. —EXCAVATE A 1 TO 2 INCH TRENCH FOR WATTLE TO BE PLACED. —DO NOT PLACE WATTLE ON TOE OF SLOPE. —OFFSET SLIGHTLY OFF TOE. —USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL CROSS SECTION. —INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE STAKES AT AN ANGLE TO WEDGE WATTLE TO GROUND. —PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE FORMED INTO A U SHAPE NOT LESS THAN 12" IN LENGTH. —INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON BOTH SIDES OF WATTLE AND AT EACH END TO SECURE IT TO THE SOIL. INSET A FILL SLOPE DETAIL 4 SCALE: NTS SILT FENCE WATTLE BREAKS MAINTENANCE NOTES: —REMOVE AND DISPOSE OF SILT ACCUMULATIONS WHEN THE DEPTH REACHES ONE—HALF OF THE HEIGHT OF THE WATTLE. —REPLACE OR CLEAN THE WATTLE AS NEEDED TO ALLOW RUNOFF TO SLOWLY DEWATER THROUGH THE DEVICE BETWEEN RAIN EVENTS. —MONITOR THE WOODEN STAKES AND STAPLES TO ENSURE THAT THE WATTLE REMAINS SECURELY ANCHORED AFTER RAIN EVENTS. 1"-2" TRENCH SIDE VIEW MAINTENANCE NOTES: —REMOVE AND DISPOSE OF SILT ACCUMULATIONS WHEN THE DEPTH REACHES ONE—HALF OF THE HEIGHT OF THE WATTLE. —REPLACE OR CLEAN THE WATTLE AS NEEDED TO ALLOW RUNOFF TO SLOWLY DEWATER THROUGH THE DEVICE BETWEEN RAIN EVENTS. —MONITOR THE WOODEN STAKES AND STAPLES TO ENSURE THAT THE WATTLE REMAINS SECURELY ANCHORED AFTER RAIN EVENTS. —MONITOR THE WATTLE/SILT FENCE OVERLAP TO ENSURE THIS INTERFACE REMAINS SECURELY SEALED AFTER RAIN EVENTS. SILT FENCE POST SEE INSET A DOWNSLOPE STAKE In channels, roll out strips of netting parallel to the direction of flow and over the protective mulch. Anchor netting in a 12-inch trench Figure 6.14a Installation of netting and matting (modified from Va. Div. of Forestry). MATTING CONSTRUCTION NOTES: 12-inch 71 overlap Join strips by anchoring and overlapping. 1. APPLY LIME, FERTILIZER, AND SEED BEFORE LAYING THE NET OR MAT. 2. START LAYING THE NET FROM THE TOP OF THE CHANNEL OR SLOPE, AND UNROLL IT DOWN THE GRADE. ALLOW NETTING TO LAY LOOSELY ON THE SOIL OR MULCH COVER BUT WITHOUT WRINKLES - DO NOT STRETCH. 3. TO SECURE THE NET, BURY THE UPSLOPE END IN A SLOT OR TRENCH NO LESS THAN 6 INCHES DEEP, COVER WITH SOIL, AND TAMP FRMLY AS SHOWN. STAPLE THE NET EVERY 12 INCHES ACROSS THE TOP END AND EVERY 3 FT AROUND THE EDGES AND BOTTOM. WHERE 2 STRIPS OF NET ARE LAID SIDE BY SIDE, THE ADJACENT EDGES SHOULD BE OVERLAPPED 3 INCHES AND STAPLED TOGETHER. EACH STRIP OF NETTING SHOULD ALSO BE STAPLED DOWN THE CENTER, EVERY 3 FT. DO NOT STRETCH THE NET WHEN APPLYING STAPLES. 4. TO JOIN TWO STRIPS, CUT A TRENCH TO ANCHOR THE END OF THE NEW NET. OVERLAP THE END OF THE PREVIOUS ROLL 18 INCHES, AS SHOWN IN FIGURE 6.14A, AND STAPLE EVERY 12 INCHES JUST BELOW THE ANCHOR SLOT. MATTING MAINTENANCE NOTES: 1. INSPECT ALL MULCHES PERIODICALLY, AND AFTER RAINSTORMS TO CHECK FOR RILL EROSION, DISLOCATION OR FAILURE. WHERE EROSION IS OBSERVED, APPLY ADDITIONAL MULCH. IF WASHOUT OCCURS, REPAIR THE SLOPE GRADE, RESEED AND REINSTALL MULCH. CONTINUE INSPECTIONS UNTIL VEGETATION IS FIRMLY ESTABLISHED. DETAIL 3 SCALE: NTS CHANNEL MULCHING Compacted soil 2' i< min >l ;:. F`ow 18" min — =l I •�llli�.�l �—.�. ll�l"=llll ilk -��I- ��l F— 6' typical LINE CHANNELS WITH UV RESISTANT POLYPROPYLENE SEE BELOW FOR CHANNEL TURF REINFORCEMENT MATS. MATS SHALL BE NON DIMENSIONS BIODEGRADABLE. 2' MIN. 3"1 3:1 EXISTING GRADE EXISTING GRADE TEMPORARY DIVERSION CONSTRUCTION NOTES: 1. REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONABLE MATERIAL. 2. ENSURE THAT THE MINIMUM CONSTRUCTED CROSS SECTION MEETS ALL DESIGN REQUIREMENTS. 3. ENSURE THAT THE TOP OF THE DIKE IS NOT LOWER AT ANY POINT THAN THE DESIGN ELEVATION PLUS THE SPECIFED SETTLEMENT. 4. PROVIDE SUFFICIENT ROOM AROUND DIVERSIONS TO PERMIT MACHINE REGRADING AND CLEANOUT. 5. VEGETATE THE RIDGE IMMEDIATELY AFTER CONSTRUCTION, UNLESS IT WILL REMAIN IN PLACE LESS THAN 30 WORKING DAYS. TEMPORARY DIVERSION MAINTENANCE NOTES: 1. INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE IT. DETAIL 5 SCALE: NTS TEMPORARY DIVERSION BURNS& McDONNELL CONSULTANTS, INC. I PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY STATE LICENSE # C-1435 PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PROFESSIONAL ENG/ARCHSTAMP NO.1 DATE REVISION(S) DESCRIPTION BY CHK APPD I DESCRIPTION APPROVALS Piedmont �,&, DUKE r6111 VO'ENERGY Natural Gas COPYRIGHT 2018 LINE 472 TRANSMISSION ES & PC DETAILS — 2 GARNER NC 7 GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA SHEET(S) 24 OF 35 1 DWG SCALE 0 07-31-2020 ISSUED FOR CONSTRUCTION JTS CNS CAM AREA CODE 1853 DATE NIA INITIALS N/A REGIONAL ENGINEER DWG DATE 09/27/2019 SUPERSEDED - ACCOUNT NUMBER PROJECT NUMBER 0228178 DATE N/A INITIALS N/A MGR TECH REC & STD DRAWING NUMBER P N G - C- 472-0001023 DRAWING BY ABR STATION ID I DATE 07/31/2020 INITIALS CAM PRINCIPAL ENGINEER CHECKER INITIALS CNS DISCIPLINE / RESOURCE CENTER / LINE NUMBER NONE REVISION 0 MAINTENANCE NOTES: seeding mixture species Rate (lb/acre) Rye (grain) 120 Annual lespedeza (Kobe in Piedmont and Coastal Plain, Korean in Mountains) 50 Omit annual lespedeza when duration of temporary cover is not to extend beyond June. seeding dates Below 2500 feet: Feb. 1- May 1 soil amendments Follow recommendations of soil tests or apply 2,000 lb/acre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer. mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, nettin , or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. seeding mixture species Rate (lb/acre) German millet 40 In the Piedmont and Mountains, a small -stemmed Sudangrass may be substituted at a rate of 50 lb/acre. seeding dates soil amendments Follow recommendations of soil tests or apply 2,000 lb/acre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer. mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, nettin , or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. seeding mixture species Rate (lb/acre) Rye (grain) 120 seeding dates soil amendments Follow soil tests or apply 2,000 lb/acre ground agricultural limestone and 1,000 lb/acre 10-10-10 fertilizer. mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, nettin , or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. maintenance Repair and refertilize damaged areas immediately. Topdress with 50 lb/acre of nitrogen in March. If it is necessary to extent temporary cover beyond June 15, overseed with 50 lb/acre Kobe (Piedmont and Coastal Plain) or Korean (Mountains) lespedeza in late February or early March. TEMPORARY SEEDING NOTES: 1. COMPLETE GRADING BEFORE PREPARING SEEDBEDS, AND INSTALL ALL NECESSARY EROSION CONTROL PRACTICES SUCH AS, DIKES, WATERWAYS, AND BASINS. MINIMIZE STEEP SLOPES BECAUSE THEY MAKE SEEDBED PREPARATION DIFFICULT AND INCREASE THE EROSION HAZARD. IF SOILS BECOME COMPACTED DURING GRADING, LOOSEN THEM TO A DEPTH OF 6-8 INCHES USING A RIPPER, HARROW, OR CHISEL PLOW. SEEDBED PREPARATION 2. GOOD SEEDBED PREPARATION IS ESSENTIAL TO SUCCESSFUL PLANT ESTABLISHMENT. A GOOD SEEDBED IS WELL -PULVERIZED, LOOSE, AND UNIFORM. WHERE HYDROSEEDING METHODS ARE USED, THE SURFACE MAY BE LEFT WITH A MORE IRREGULAR SURFACE OF LARGE CLODS AND STONES. 3. LIMING -APPLY LIME ACCORDING TO SOIL TEST RECOMMENDATIONS. IF THE PH (ACIDITY) OF THE SOIt•IS NOTi<NOWN, AN APPLICATION OF GROUND AGRICULTURAL LIMESTONE AT THE RATE OF 1 TO 1 1/2 TONS/ACRE ON COARSE -TEXTURED SOILS AND 2-3 TONS/ACRE ON FINE -TEXTURED SOILS IS USUALLY SUFFICIENT. APPLY LIMESTONE UNIFORMLY AND INCORPORATE INTO THE TOP 4-6 INCHES OF SOIL. SOILS WITH A PH OF 6 OR HIGHER NEED NOT BE LIMED. 4. FERTILIZER -BASE APPLICATION RATES ON SOIL TESTS. WHEN THESE ARE NOT POSSIBLE, APPLY A 10-10-10 GRADE FERTILIZER AT 700-1,000 LB/ACRE. BOTH FERTILIZER AND LIME SHOULD BE INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. IF A HYDRAULIC SEEDER IS USED, DO NOT MIX SEED AND FERTILIZER MORE THAN 30 MINUTES BEFORE APPLICATION. 5. SURFACE ROUGHENING -IF RECENT TILLAGE OPERATIONS HAVE RESULTED IN A LOOSE SURFACE, ADDITIONAL ROUGHENING MAY NOT BE REQUIRED, EXCEPT TO BREAK UP LARGE CLODS. IF RAINFALL CAUSES THE SURFACE TO BECOME SEALED OR CRUSTED, LOOSEN IT JUST PRIOR TO SEEDING BY DISKING, RAKING, HARROWING, OR OTHER SUITABLE METHODS. GROOVE OR FURROW SLOPES STEEPER THAN 3:1 ON THE CONTOUR BEFORE SEEDING (PRACTICE 6.03, SURFACE ROUGHENING). PLANT SELECTION 6. SELECT AN APPROPRIATE SPECIES OR SPECIES MIXTURE FROM TABLE 6.10A FOR SEEDING IN LATE WINTER AND EARLY SPRING, TABLE 6.10B FOR SUMMER, AND TABLE 6.10C FOR FALL. 7. IN THE MOUNTAINS, DECEMBER AND JANUARY SEEDINGS HAVE POOR CHANCES OF SUCCESS. WHEN IT IS NECESSARY TO PLANT AT THESE TIMES, USE RECOMMENDATIONS FOR FALL AND A SECURELY TACKED MULCH. SEEDING 8. EVENLY APPLY SEED USING A CYCLONE SEEDER (BROADCAST), DRILL, CULTIPACKER SEEDER, OR HYDROSEEDER. USE SEEDING RATES GIVEN IN TABLES 6.10A-6.10C. BROADCAST SEEDING AND HYDROSEEDING ARE APPROPRIATE FOR STEEP SLOPES WHERE EQUIPMENT CANNOT BE DRIVEN. HAND BROADCASTING IS NOT RECOMMENDED BECAUSE OF THE DIFFICULTY IN ACHIEVING A UNIFORM DISTRIBUTION. 9. SMALL GRAINS SHOULD BE PLANTED NO MORE THAN 1 INCH DEEP, AND GRASSES AND LEGUMES NO MORE THAN 1/2 INCH. BROADCAST SEED MUST BE COVERED BY RAKING OR CHAIN DRAGGING, AND THEN LIGHTLY FIRMED WITH A ROLLER OR CULTIPACKER. HYDROSEEDED MIXTURES SHOULD INCLUDE A WOOD FIBER (CELLULOSE) MULCH. MULCHING 10. THE USE OF AN APPROPRIATE MULCH WILL HELP ENSURE ESTABLISHMENT UNDER NORMAL CONDITIONS, AND IS ESSENTIAL TO SEEDING SUCCESS UNDER HARSH SITE CONDITIONS (PRACTICE 6.14, MULCHING). HARSH SITE CONDITIONS INCLUDE: • SEEDING IN FALL FOR WINTER COVER (WOOD FIBER MULCHES ARE NOT CONSIDERED ADEQUATE FOR THIS USE), • SLOPES STEEPER THAN 3:1, • EXCESSIVELY HOT OR DRY WEATHER, • ADVERSE SOILS (SHALLOW, ROCKY, OR HIGH IN CLAY OR SAND), AND • AREAS RECEIVING CONCENTRATED FLOW. 11. IF THE AREA TO BE MULCHED IS SUBJECT TO CONCENTRATED WATER FLOW, AS IN CHANNELS, ANCHOR MULCH WITH NETTING (PRACTICE 6.14, MULCHING). • • • • • • • • • • • TEMPORARY SEEDING MAINTENANCE NOTES: 1. RESEED AND MULCH AREAS WHERE SEEDLING EMERGENCE IS POOR, OR WHERE EROSION OCCURS, AS SOON AS POSSIBLE. DO NOT MOW. PROTECT FROM TRAFFIC AS MUCH AS POSSIBLE. DETAIL SCALE: NTS TEMPORARY SEEDING PERMANENT SEEDING SCHEDULE: THE KINDS OF SEED AND FERTILIZER, AND THE RATES OF APPLICATION OF SEED, FERTILIZER, AND LIMESTONE BE AS STATED BELOW. DURING PERIODS OF OVERLAPPING DATES, THE KIND OF SEED TO BE USED SE DETERMINED. ALL RATES ARE IN POUNDS PER ACRE. MARCH 1 -AUGUST 31 50# TALL FESCUE 104 CENTIPEDE 25# BERMUDAGRASS (HULLED) 500# FERTILIZER 4000# LIMESTONE SEPTEMBER 1 - FEBRUARY 28 50# TALL FESCUE 10# CENTIPEDE 35# BERMUDAGRASS (UNHULLED) 500# FERTILIZER 4000# LIMESTONE Wetland Permanent Seeding Schedule Common Name Botanical /Cultivar Seeding Rate (Ibs/ac) Optimal Planting Dates Switchgrass Panicum vi rgatum / Carthage 3.5 Ibs 12/1- 4/1 Sweet Woodreed Cinna arundinacea 2.51bs 12/1-4/1 Rice Cutgrass Leersia orzyoides 6.0 Ibs 12/1- 4/1 Soft Rush Juncus effusus 2.5 Ibs 12/1- 5/1 PERMANENT SEEDING NOTES: SOIL PREPARATION 1. PROPER SOIL PREPARATION IS NECESSARY FOR SUCCESSFUL SEED GERMINATION AND ROOT ESTABLISHMENT. IT IS ALSO NECESSARY FOR ESTABLISHMENT OF ROOTED SPRIGS, SOD AND WOODY PLANTS. HEAVILY COMPACTED SOILS PREVENT AIR, NUTRIENTS AND MOISTURE FROM REACHING ROOTS THEREBY RETARDING OR PREVENTING PLANT GROWTH. THE SUCCESS OF SITE STABILIZATION AND REDUCTION OF FUTURE MAINTENANCE ARE DEPENDENT ON AN ADEQUATELY PREPARED SOIL BED. FOLLOWING ARE THE REQUIREMENTS FOR PREPARATION OF AREAS TO BE VEGETATED BY GRASSING, SPRIGGING, SODDING, AND/OR PLANTING OF WOODY PLANTS: GENERAL REQUIREMENTS: 2. PREPARATION FOR PRIMARY/PERMANENT STABILIZATION SHALL NOT BEGIN UNTIL ALL CONSTRUCTION AND UTILITY WORK WITHIN THE PREPARATION AREA IS COMPLETE. HOWEVER, IT MAY BE NECESSARY TO PREPARE FOR NURSE CROPS PRIOR TO COMPLETION OF CONSTRUCTION AND INSTALLATION OF UTILITIES. 3. A NORTH CAROLINA DEPARTMENT OF AGRICULTURE SOILS TEST (OR EQUAL) SHALL BE OBTAINED FOR ALL AREAS TO BE SEEDED, SPRIGGED, SODDED OR PLANTED. RECOMMENDED FERTILIZER AND PH ADJUSTING PRODUCTS SHALL BE INCORPORATED INTO THE PREPARED AREAS AND BACKFILL MATERIAL PER THE TEST. 4. ALL AREAS TO BE SEEDED OR PLANTED SHALL BE TILLED OR RIPPED TO A DEPTH SPECIFIED ON THE APPROVED PLANS, CONSTRUCTION SEQUENCE AND/OR CONSTRUCTION BID LIST. RIPPING CONSISTS OF CREATING FISSURES IN A CRISS-CROSS PATTERN OVER THE ENTIRE SURFACE AREA, UTILIZING AN IMPLEMENT THAT WILL NOT GLAZE THE SIDE WALLS OF THE FISSURES. SITE PREPARATION THAT DOES NOT COMPLY WITH THESE DOCUMENTS SHALL NOT BE ACCEPTABLE. THE DEPTH OF SOIL PREPARATION MAY BE ESTABLISHED AS A RANGE BASED ON THE APPROVAL OF THE REVIEWING STATE OR LOCAL AGENCY. ONCE TILLED OR RIPPED ACCORDING TO THE APPROVED PLAN, ALL AREAS ARE TO BE RETURNED TO THE APPROVED FINAL GRADE. PH MODIFIERS AND/OR OTHER SOIL AMENDMENTS SPECIFIED IN THE SOIL TESTS CAN BE ADDED DURING THE SOIL PREPARATION PROCEDURE OR AS DESCRIBED BELOW. 5. ALL STONES LARGER THAN THREE (3) INCHES ON ANY SIDE, STICKS, ROOTS, AND OTHER EXTRANEOUS MATERIALS THAT SURFACE DURING THE BED PREPARATION SHALL BE REMOVED. AREAS TO BE SEEDED: 6. TILL OR DISC THE PREPARED AREAS TO BE SEEDED TO A MINIMUM DEPTH OF FOUR (4) INCHES. REMOVE STONES LARGER THAN THREE (3) INCHES ON ANY SIDE, STICKS, ROOTS AND OTHER EXTRANEOUS MATERIALS THAT SURFACE. IF NOT INCORPORATED DURING THE SOIL PREPARATION PROCESS, ADD PH MODIFIER AND FERTILIZERS AT THE RATE SPECIFIED IN THE SOIL TEST REPORT. 7. RE -COMPACT THE AREA UTILIZING A CULTIPACKER ROLLER. THE FINISHED GRADE SHALL BE A SMOOTH EVEN SOIL SURFACE WITH A LOOSE, UNIFORMLY FINE TEXTURE. ALL RIDGES AND DEPRESSIONS SHALL BE REMOVED AND FILLED TO PROVIDE THE APPROVED SURFACE DRAINAGE. SEEDING OF GRADED AREAS IS TO BE DONE IMMEDIATELY AFTER FINISHED GRADES ARE OBTAINED AND SEEDBED PREPARATION IS COMPLETED. AREAS TO BE SPRIGGED, SODDED, AND/OR PLANTED: 8. AT THE TIME OF PLANTING TILL OR DISC THE PREPARED AREAS TO A DEPTH OF FOUR (4) TO SIX (6) INCHES BELOW THE APPROVED FNISHED GRADE. REMOVE ALL STONES LARGER THAN THREE (3) INCHES ON ANY SIDE, STICKS, ROOTS AND OTHER EXTRANEOUS MATERIALS THAT SURFACE. IF NOT INCORPORATED IN THE RIPPING PROCESS, ADD PH MODIFIER, FERTILIZER, AND OTHER RECOMMENDED SOIL AMENDMENTS. 9. RE -COMPACT THE AREA UTILIZING A CULTIPACKER ROLLER AND PREPARE FNAL GRADES AS DESCRIBED ABOVE. INSTALL SPRIGS, SOD AND PLANTS AS DIRECTED IMMEDIATELY AFTER FINE GRADING IS COMPLETE. MULCH, MAT AND/OR TACK AS SPECIFIED. DETAIL 2 SCALE: NTS PERMANENT SEEDING Silt Fence r Top of Silt- Fen Be at Least 1' the Top of the Stone %AIATTI CC -rn ADI IT V VlII I LL%.J I V lILJV I I IIVILJLI\ IVIlII V. V%JL I I %JV I OVERLAP ON ADJOINING WATTES Steel Fence P Wire Fer Hardware Clc Filter of 1" Diameter Washed Stone Steel Fence Post Set Max. 2' Apart 1. REMOVE AND DISPOSE OF SILT ACCUMULATIONS WHEN THE DEPTH REACHES ONE-HALF OF THE HEIGHT OF THE PERIMETER WATTLES. 2. REPLACE OR CLEAN THE WATTLES AS NEEDED TO ALLOW RUNOFF TO SLOWLY DEWATER THROUGH THE DEVICE BETWEEN RAIN EVENTS. 3. MONITOR THE WOODEN STAKES AND STAPLES TO ENSURE THAT THE WATTLES REMAIN SECURELY ANCHORED AFTER RAIN EVENTS. 4. MONITOR DAILY TO SUPPLEMENT / REFURBISH / REPLACE MATS TO ENSURE PROPER FUNCTIONALITY. 5. CLEAN ANY ERODIBLE MATERIAL OR POLLUTANT TRACKED ONTO THE MATS IMMEDIATELY. 6. TIMBER MATS AND ALL OTHER MATERIALS SHALL BE COMPLETELY REMOVED DURING FINAL CLEAN-UP. REMOVAL OF THIS STRUCTURE IS NOT CONTINGENT UPON ESTABLISHMENT OF PERMANENT VEGETATION. 7. ATTEMPT TO USE NO MORE THAN TWO (2) LAYERS OF TIMBER MATS IN WETLANDS. 8. TIMBER MATS SHALL EXTEND A MINIMUM OF 15 FEET OUTSIDE OF WETLAND BOUNDARIES. 9. INSTALL EARTHEN RAMP APPROACHES TO TIMBER MATS. EARTHEN RAMPS TO BE CONSTRUCTED OF UPLAND MATERIAL. TOP SOIL SHALL NOT BE USED. 10. INSTALL TIMBER MATS IN WORK AREA AS NEEDED. POSITION A SERIES OF TIMBER MATS AS NEEDED TO CREATE A SAFE, FLAT, WORK AREA. MATS SHALL BE POSITIONED TO BUTT UP AGAINST EACH OTHER AND INTERLOCK OR ATTACH TO EACH OTHER. 11. EROSION CONTROL DEVICES SHALL BE INSTALLED ADJACENT TO TIMBER MATS AS SHOWN ON THE PLAN DRAWINGS. 12. CONTRACTOR SHALL PREVENT THE INTRODUCTION OF UPLAND SOILS OR OTHER MATERIALS INTO WETLANDS. DETAIL 3 SCALE: NTS 4' Min. TIMBER MATS Fabric ound CONSTRUCTION NOTES: 1. USE HARDWARE CLOTH 24 GAUGE WIRE MESH WITH 1/4 INCH MESH OPENINGS. 2. INSTALL 5 FT SELF FASTENER ANGLE STEEL POST 2 FT DEEP MINIMUM. 3. ATTACH HARDWARE CLOTH TO POSTS WITH WIRE STAPLE OR OTHER ACCEPTABLE METHODS. 4. SPACE POSTS A MAXIMUM OF 2 FT. MAINTENANCE NOTES: PLAN i��r►six►.►� u y "ii c i of ii. , Filter Fabric and Hardware Cloth in Trench DETAIL 4 SCALE: NTS SILT FENCE OUTLET BURNS& McDONNELL CONSULTANTS, Ill I PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY STATE LICENSE # C-1435 PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PROFESSIONALENG/ARCHSTAMPI NO.1 DATE REVISION(S) DESCRIPTION BY CHK APPD I DESCRIPTION APPROVALS pjl'iiiN DUKE Piedmont V ENERGY r6ljl� Natural Gas COPYRIGHT2018 LINE 472 TRANSMISSION ES & PC DETAILS - 2 GARNER N GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA 0 07-31-2020 ISSUED FOR CONSTRUCTION JTS CNS CAM AREA CODE 1853 DATE NIA INITIALS N/A REGIONAL ENGINEER ACCOUNT NUMBER PROJECT NUMBER 0228178 DATE NIA INITIALS N/A MGR TECH REC &STD DRAWING BY ABR STATION ID DATE 07/31/2020 INITIALS CAM PRINCIPAL ENGINEER I I ICHECKER INITIALS I CNS 1. INSPECT OUTLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT RAINFALL EVENT (1 INCH OR GREATER). CLEAR THE MESH WIRE OF ANY DEBRIS OR OTHER OBJECTS TO PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS. TAKE CARE NOT TO DAMAGE OR UNDERCUT THE WIRE MESH DURING SEDIMENT REMOVAL. REPLACE STONE AS NEEDED. SHEET(S) 33 OF 35 DWG SCALE NONE DWG DATE 03/20/2020 SUPERSEDED DRAWING NUMBER REVISION P N G -C-472-0001040 0 DISCIPLINE / RESOURCE CENTER / LINE NUMBER CONSTRUCTION R.O.W. WIDTH TREN SPOIL PILE SEDIMENT BARRIER - IN -STREAM SPOIL I10- I I FLOW SOFT PLUG (SEE NOTE 10) COIR WATTLE IN -STREAM SPOIL SEDIMENT BARRIER - SPOIL PILE EXTRA TEMPORARY WORKSPACE (TYP.) TOPSOIL SPOIL PILE SEDIMENT BARRIER NOTES: 1. METHOD APPLIES TO WATERBODIES THAT ARE NOT STATE -DESIGNATED FISHERIES WHERE FLUME CROSSINGS ARE NOT REQUIRED. 1.1. IF TOPOGRAPHY PERMITS TEMPORARY EQUIPMENT BRIDGE INSTALLATION, THE CONTRACTOR SHALL TRENCH, STRING, WELD, COAT, WEIGHT (IF NECESSARY), LOWER IN AND BACKFILL UTILIZING THE MAIN LINE CREW TRAVELING OVER THE BRIDGE. 1.2. IF TOPOGRAPHY PROHIBITS INSTALLATION OF A TEMPORARY EQUIPMENT BRIDGE, CONTRACTOR SHALL TRENCH UP TO BOTH SIDES OF CROSSING; STRING, WELD, COAT AND WEIGHT (IF NECESSARY) USING THE MAINLINE CREW. IN STREAM EXCAVATION, LOWER IN, AND BACKFILL WILL UTILIZES A CLAM OR HOES WORKING FROM THE BANKS. 2. SCHEDULE CROSSING DURING LOW FLOW PERIOD IF POSSIBLE. 3. COMPLETE ALL IN -STREAM ACTIVITIES WITHIN 24 HOURS IF FEASIBLE. 4. NO REFUELING OF MOBILE EQUIPMENT WITHIN 125 FEET OF WATERBODY. REFUEL STATIONARY EQUIPMENT AS PER THE ES&PC PLAN. 5. INSTALLATION OF TEMPORARY EQUIPMENT CROSSING IS REQUIRED AT ALL STATE -DESIGNATED FISHERIES AND IS OPTIONAL AT THE DISCRETION OF THE COMPANY'S INSPECTOR AT ALL OTHER CROSSINGS. IF A TEMPORARY EQUIPMENT CROSSING IS INSTALLED, IT MUST BE BUILT IN ACCORD WITH SECTION PERMITS. 6. IN AGRICULTURAL LAND, STRIP TOPSOIL FROM SPOIL STORAGE AREA. 7. CONSTRUCT SEDIMENT BARRIERS ALONG THE SIDES OF STOCKPILES AND ACROSS THE ENTIRE CONSTRUCTION R.O.W. TO PREVENT SILT LADEN WATER AND SPOIL FROM FLOWING BACK INTO WATERBODY. BARRIERS MAY BE TEMPORARILY REMOVE TO ALLOW CONSTRUCTION ACTIVITIES BUT MUST BE REPLACED BY THE END OF EACH WORK DAY. 8. IN -STREAM SPOIL TO BE STORED OUT OF THE STREAM CHANNEL A MINIMUM OF 10 FEET FROM THE WATERS EDGE AND WITHIN THE CONSTRUCTION R.O.W. UNLESS DEPICTED OTHERWISE IN SITE SPECIFIC CROSSING PLANS. TEMPORARY WORKSPACE MUST BE A MINIMUM OF 25' FROM THE WATERS EDGE. 9. TRENCH THROUGH WATERCOURSE USING MAINLINE EXCAVATION EQUIPMENT WHERE PRACTICAL. 10. INSTALL SOFT PLUGS AT THE EDGE OF STREAM BANKS UNTIL JUST PRIOR TO PIPE INSTALLATION TO CONTROL. WATER FLOW & TRENCH SLOUGHING. 11. MAINTAIN STREAM FLOW THROUGHOUT CROSSING CONSTRUCTION. 12. BACKFILL WITH NATIVE MATERIAL. 13. RESTORE WATERBODY CHANNEL TO APPROXIMATE PRE -CONSTRUCTION PROFILE AND SUBSTRATE. 14. RESTORE STREAM BANKS TO APPROXIMATE ORIGINAL CONDITION AND STABILIZE, AS REQUIRED. 15. ALL DIMENSIONS INDICATED SHALL BE DETERMINED BY ACTUAL CONSTRUCTION CONDITIONS. 16. COFFERDAMS ARE REQUIRED FOR ALL JURISDICTIONAL CROSSINGS. DETAIL SCALE: NTS TYPICAL FLOWING WATERBODY CROSSING OPEN CUT TRENCHING CONSTRUCTION R.O.W. WIDTH TRENC IN EXTRA TEMPORARY WORKSPACE (TYP.) Z cn 0 1� >- cn ; ;Qof0 ; :p0 z ;Oww ; wC� 10' (TYP.) DRY CHANNEL TOPSOIL PIPE WELDED, COATED AND WEIGHTED (IF NECESSARY) NOTES: 1. METHOD APPLIES TO CROSSINGS WHERE NO FLOWING WATER IS PRESENT AT THE TIME OF CROSSING. 2. CONTRACTOR MAY "MAINLINE THROUGH" THE CROSSING OR UP TO BOTH SIDES OF THE CROSSING; STRING, WELD, COAT, AND WEIGHT (IF NECESSARY), USING THE MAINLINE CREW WITH THE PIPE SKIDDED OVER THE CROSSING. 3. NO REFUELING OF MOBILE EQUIPMENT WITHIN 125 FEET OF DRY CHANNEL. REFUEL STATIONARY EQUIPMENT AS PER THE SPCC PLAN. 4. INSTALLATION OF TEMPORARY EQUIPMENT CROSSING IS OPTIONAL AT THE DISCRETION OF THE COMPANY'S REPRESENTATIVE. IF A TEMPORARY EQUIPMENT CROSSING IS INSTALLED, IT MUST BE BUILT IN ACCORDANCE WITH DETAIL CST-P-1000-A335, A340, A345, A350, A355. 5. IN AGRICULTURAL LAND, STRIP TOPSOIL FROM SPOIL STORAGE AREA. STOCKPILE TOPSOIL AND SPOIL SEPARATELY. TOPSOIL AND SPOIL WILL NOT BE STOCKPILED IN THE CROSSING CHANNEL AND WILL BE PLACED A MINIMUM OF 50 FEET FROM CROSSING BANKS WITHIN THE CONSTRUCTION R.O.W. 6. CONSTRUCT SEDIMENT BARRIERS ACROSS THE ENTIRE CONSTRUCTION R.O.W. FOLLOWING CLEARING AND GRADING AND MAINTAIN UNTIL CONSTRUCTION OF THE CROSSING. EROSION CONTROL MEASURES SHALL BE REINSTALLED IMMEDIATELY FOLLOWING BACKFILLING OF TRENCH AND STABILIZATION OF BANKS. BARRIERS MAY BE TEMPORARILY REMOVED TO ALLOW CONSTRUCTION ACTIVITIES BUT MUST BE REPLACED BY THE END OF EACH WORK DAY. 7. IN -STREAM SPOIL TO BE STORED OUT OF THE STREAM CHANNEL A MINIMUM OF 10 FEET FROM HIGH BANK AND WITHIN THE CONSTRUCTION R.O.W. UNLESS DEPICTED OTHERWISE IN SITE SPECIFIC CROSSING PLANS. 8. BACKFILL WITH NATIVE MATERIAL. 9. RESTORE CROSSING CHANNEL TO APPROXIMATE PRE -CONSTRUCTION PROFILE AND SUBSTRATE. 10. RESTORE CROSSING BANKS TO APPROXIMATE ORIGINAL CONDITION AND STABILIZE, AS REQUIRED. 11. ALL DIMENSIONS INDICATED SHALL BE DETERMINED BY ACTUAL CONSTRUCTION CONDITIONS. DETAIL 2 SCALE: NTS TYPICAL NON -FLOWING WATERBODY CROSSING OPEN CUT TRENCHING EXISTING STREAM WIDTH W 1/2 W (MIN. RIPRAP OR OTHER A MATERIAL ERODIBLE A Q * w (D) TRENCHLINE o W m AGGREGATE OR v' FLOW SAND o FILTER CLOTH _x PLAN DEWATERING DEVICE PEF Col � gyp) MINIMUM DISTANCE TO BE 25% OF TOTAL WIDTH (w) OF THE STREAM. CONSTRUCTION NOTES: nrnuiLS I TRENCHLINE L------------------------------- SECTION A -A 1. PREPARE THE CHANNEL AND OVERBANKS FOR INSTALLATION. 1.1. REMOVE ALL BRANCHES AND DEBRIS FROM LOCATION OF THE STONE DIKE. 1.2. MAKE SURE THAT THERE ARE NO SHARP ROCKS OR ROOTS THAT CAN PUNCTURE THE FABRIC. 1.3. DO NOT EXCAVATE THE EXISTING CHANNEL OR BANKS. 2. PLACE THE HIGH TENSILE IMPERVIOUS FABRIC WITH THE CENTER OVER THE CENTER OF THE PROPOSED DIKE. UTILIZE A SMALL AMOUNT OF STONE TO HOLD DOWN THE FABRIC WHILE ADJUSTMENTS ARE BEING MADE. ENSURE THERE IS ENOUGH EXTRA FABRIC ON EACH SIDE OF THE DIKE TO WRAP UP AND OVER THE STONE DIKE TO MAKE IT IMPERVIOUS. 3. PILE STONE ON TOP OF THE FABRIC TO CREATE DIKE. 4. ROLL FABRIC UP OVER THE STONE TO FORM AN IMPERVIOUS DIKE. MAKE SURE THE TOP LAYER IS ROLLED FROM THE UPSTREAM TO DOWNSTREAM DIRECTION. SECURE FABRIC WITH METAL FENCE STAKES OR OTHER SUITABLE MATERIAL. MAINTENANCE NOTES: 1. INSPECT THE DIKE REGULARLY FOR DAMAGE AND LEAKAGE. 2. REMOVE IMPOUNDED TRASH AND SEDIMENT DAILY. DETAIL 3 SCALE: NTS COFFERDAM CROSSING BURNS& McDONNELL CONSULTANTS, INC. PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY STATE LICENSE # C-1435 PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS LINE 472 TRANSMISSION 0 07-31-2020 ISSUED FOR CONSTRUCTION JTS CNS CAM AREA CODE 1853 DATE INITIALS REGIONAL NIA N/A ENGINEER p DUKE Piedmont ES & PC DETAILS -2 ACCOUNT NUMBER DATE INITIALS PROJECT NUMBER 0228178 NIA N/A MGR TECH j � ENERGY Natural Gas DRAWING BY ABR REC &STD GARNER N /\/-�, , v STATION ID DATE INITIALS PRINCIPAL PROFESSIONAL ENG/ARCHSTAMP 07/31/2020 CAM ENGINEER COPYRIGHT2018 GOLDSBORO RESOURCE CENTER, DUDLEY, NORTH CAROLINA CHECKER INITIALS CNS SHEET(S) 34 OF 35 1 DWG SCALE DWG DATE 03/20/2020 ISUPERSEDED DRAWING NUMBER P N G -C-472-0001041 DISCIPLINE / RESOURCE CENTER / LINE NUMBER NONE REVISION 0 NEUSE RIVER BUFFER - NO PRATICAL ALTERNATIVE Piedmont Natural Gas (PNG) Line 472 Project — No Practical Alternatives for Impacts to Protected Riparian Buffers All route alternatives are considered and designed to reduce environmental impacts and keep land disturbance to a minimum. Elimination and/or reducing impacts to protected riparian buffers was considered during route analysis for the Line 472 Project. Alternate pipeline routes would either conflict with the NC DOT Interstate 42 interchange project design, landowner condemnation proceedings, construction schedule, or cause additional environmental impacts. The direction and location of the proposed pipeline and the direction, location, and meandering nature of the only stream crossing (unnamed tributary to Swift Creek) within the Project area does not allow a route for complete avoidance of protected riparian buffers. There are no other viable alternatives to the Proposed Project area that would completely avoid impacts to protected riparian buffers. The Project has been reduced in size to the extent possible so the purpose of the Project can be practically accomplished while minimizing disturbance, preserve aquatic life and habitat and protect water quality to the extent possible. Impacts to protected riparian buffers are avoided and minimized to the greatest extent possible. Environmental impact minimization began during the siting process when determining the pipeline location in agricultural fields and along the eastern most area of the wetlands and at the toe slope of the hill to avoid direct impacts to Swift Creek, which provides habitat for federally protected species, and to reduces impacts to the surrounding wetlands. Best management practices will be used to minimize disturbance, preserve aquatic life, and protect water quality. However, due to the steep terrain and sandy soil conditions, the pipeline will be installed using conventional open cut construction at the stream crossing within a 75-foot construction corridor. Additional temporary workspace of 100-feet-wide to 225-feet-wide is needed within Zone 1 and Zone 2 of the protected riparian buffers for safety concerns as open cut of anticipated loose flowing sands on steep terrain may require large excavations. The maintained operational corridor within the stream and riparian areas will be 50 feet. The Zone 1 impact calculations at the stream crossing are 4,785 square feet and Zone 2 impacts are 3,813 square feet. Both square footages include the total construction impacts. Please refer to the attached figure illustrating the pipeline installation with both temporary workspace and the permanent easement. •r r ■ 3- *r `t _J. _ e r •. Y V 7 - • N O d _ LU v • _ 1 f W J � � N• ^ M J UN AV i J a O X at � Temporary Workspace N _ .4 P rY 07 w Q Permanent Easement Stream Buffer Figure h Stream ♦ BURNS Line 472 v stream Width 3� 60 `MMONNELL_ Piedmont Natural Gas Zone 1 Buffer Johnston County, North Carolina a N Zone 2 Buffer Feet Source: Esri; Burns & McDonnell Consulting, Inc Kent, Sara S From: laserfiche@ncdenr.gov Sent: Friday, November 6, 2020 12:01 AM To: Kent, Sara S Cc: stephanie.goss@ncdenr.gov Subject: Pre -Filing Meeting is not needed for Line 472 Replacement Project - 20201401 Ver 1 The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Line 472 Replacement Project that you submitted on 10/6/2020 9:43 AM. The ID number for that project is 20201401, Version 1. It has been decided that no meeting is needed for this project. Project file link: https://edocs.deq.nc.gov/WaterResources/Browse.aspx?dbid=0&startid=1316552 When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. Strickland, Bev From: laserfiche@ncdenr.gov Sent: Tuesday, October 13, 2020 9:13 AM To: sskent@burnsmcd.com Subject: Pre -Filing Meeting Request Acknowledgement - Line 472 Replacement Project - 20201401 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Line 472 Replacement Project that you submitted on 10/6/2020. The ID number for that project is 20201401, Version 1. Reviewer Contact Information: Reviewer: Stephanie Goss Email: stephanie.goss@ncdenr.gov Reviewing Office: Raleigh Regional Office - (919) 791-4200 You will either be contacted by staff to set up a meeting or notified by email that the 30 calendar day clock has been reached and you are allowed to submit your application. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. ID#* 20201401 Version* 1 Regional Office* Raleigh Regional Office - (919) 791-4200 Reviewer List* Stephanie Goss Pre -Filing Meeting Request submitted 10/6/2020 Contact Name* Sara Kent Contact Email Address* sskent@burnsmcd.com Project Name* Line 472 Replacement Project Project Owner* Piedmont Natural Gas Project County* Johnston Owner Address: Street Address 4720 Piedmont Row Address Line 2 oty State / Frovince / Region Charlotte NC Fbstal / Zip Code Country 28210 United States Is this a transportation project?* C Yes c: No Type(s) of approval sought from the DWR: I;W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express • Individual Permit F Modification • Shoreline Stabilization Does this project have an existing project ID#?* C Yes (-- No Do you know the name of the staff member you would like to request a meeting with? Stephanie Goss Please give a brief project description below.* The Project includes the construction and operation of the Line 472 (8-inch steel) high pressure natural gas pipeline. The pipeline will be installed along an approximately 1.5-mile-long corridor. The beginning and ending coordinates are as follows: Beginning: (35.596568°,-78.561528°) and Ending: (35.612868°,-78.551433°). The pipeline will be installed between a new regulator station located approximately 350 feet east of Cleveland Road and approximately 1,000 feet south of the Interstate 40 overpass, and the Line 117 tie-in immediately north of Highway 42 and approximately 0.75-miles east of the current Interstate 40 interchange. The new regulator station is 0.4-acres and will be graveled and fenced in. A 1,000-foot long and 20-foot wide gravel permanent access road will be constructed from the Cleveland Crossing Drive cul-de-sac to the pipeline corridor. The Line 472 pipeline is being constructed to replace the portion of Line 117 that extends along Highway 42 across the current Interstate 40 overpass, along Commerce Parkway, and south along Cleveland Road before terminating at an existing station. This portion of Line 117 will be decommissioned and removed to allow for the new Interstate 40/Highway 42 interchange NC DOT project. Please give a couple of dates you are available for a meeting. 10/13/2020 10/14/2020 10/20/2020 10/21 /2020 Please attach the documentation you would like to have the meeting about. 02_Figures.pdf 1.34MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. 1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. 1 also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 10/6/2020 ID#* 20201401 Version* 1 Regional Office* Raleigh Regional Office - (919) 791-4200 Reviewer List* Stephanie Goss Pre -Filing Meeting Request submitted 10/6/2020 Contact Name* Sara Kent Contact Email Address* sskent@burnsmcd.com Project Name* Line 472 Replacement Project Project Owner* Piedmont Natural Gas Project County* Johnston Owner Address: Street Address 4720 Piedmont Row Address Line 2 oty State / Frovince / Region Charlotte NC Fbstal / Zip Code Country 28210 United States Is this a transportation project?* C Yes c: No Type(s) of approval sought from the DWR: I;W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express • Individual Permit F Modification • Shoreline Stabilization Does this project have an existing project ID#?* C Yes (-- No Do you know the name of the staff member you would like to request a meeting with? Stephanie Goss Please give a brief project description below.* The Project includes the construction and operation of the Line 472 (8-inch steel) high pressure natural gas pipeline. The pipeline will be installed along an approximately 1.5-mile-long corridor. The beginning and ending coordinates are as follows: Beginning: (35.596568°,-78.561528°) and Ending: (35.612868°,-78.551433°). The pipeline will be installed between a new regulator station located approximately 350 feet east of Cleveland Road and approximately 1,000 feet south of the Interstate 40 overpass, and the Line 117 tie-in immediately north of Highway 42 and approximately 0.75-miles east of the current Interstate 40 interchange. The new regulator station is 0.4-acres and will be graveled and fenced in. A 1,000-foot long and 20-foot wide gravel permanent access road will be constructed from the Cleveland Crossing Drive cul-de-sac to the pipeline corridor. The Line 472 pipeline is being constructed to replace the portion of Line 117 that extends along Highway 42 across the current Interstate 40 overpass, along Commerce Parkway, and south along Cleveland Road before terminating at an existing station. This portion of Line 117 will be decommissioned and removed to allow for the new Interstate 40/Highway 42 interchange NC DOT project. Please give a couple of dates you are available for a meeting. 10/13/2020 10/14/2020 10/20/2020 10/21 /2020 Please attach the documentation you would like to have the meeting about. 02_Figures.pdf 1.34MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. 1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. 1 also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 10/6/2020 Reviewer Meeting Request Decision Has a meeting been scheduled?* r Yes r No FIGURES «0 us 70 U"" ', 3f lu+ncr of wie ea Nc 50 312 3'11 e> Penny Roaa �,ai a� HaM1h ��� NL 43 d 3' a R y NC 42 4 �1 d N[ tS2s ScruflrrNs 77e`psr+rtf �q We. o d s � Sh•K,y, AO+C c y 140 NC 15-15 . • CnnnyeffyR� Q C1erN��dd 1 FII L )` iy`\�� •^I � _Lf � _ t 1 _- HDD Centerline General Location Map Pipeline Centerline NORTH4, BURNS Line 472 Replacement Project Permanent Easement \MSDONNELL' Duke Energy / Piedmont 0 2,000 4,000 Natural Gas Temporary Workspace Johnston County, North Carolina Feet Source: Esri, Duke Energy / Piedmont Natural Gas, Burns & McDonnell Consultinq, Inc. Issued: 8/6/2020 r _- z ItIM ti R WE i i 1plA Ad HDD Centerline NWI Wetland Type Pipeline Centerline Riverine NWI, NHD, and Topographic Map NORTH Line 472 Replacement Project Permanent Easement PSS � BURNS ' �\M�pOMNEl.L' Duke Energy/ Piedmont Temporary PFO Natural Gas i.� Workspace PUB o 400 $o Johnston County, North Carolina J NHD Stream Feet Source: Esri, FWS NWI, USGS NHD, Duke Enerqv / Piedmont Natural Gas, Burns & McDonnell Consultinq, Inc. Issued: 8/6/2020 z AaA - Altavista fine sandy loam, 0 to 2 percent slopes, occasionally flooded AsA - Augusta sandy loam, 0 to 2 percent slopes, occasionally flooded WN NkB - Nankin fine sandy loam, 2 to 6 percent slopes , PRO t►��, RnF - Rion sandy loam, 15 to 40 percent slopes To - Tomotley sandy loam, 0 to 2 percent slopes, rarely flooded �+.•r$E UcC - Uchee loamy coarse sand, 6 to 12 percent slopes WaB - Wagram loamy sand, 0 to 6 percent slopes WoD - Wedowee sandy loam, 8 to 15 percent slopes Wt - Wehadkee loam, 0 to 2 percent slopes, frequently flooded W� Va " a 1�►+ .4 f law . e +} M,c. .������♦ WaB � � �s+� ♦����cs HDD Centerline Pipeline Centerline Permanent Easement Temporary I!" . Workspace WoB NkB RnF nr�;F�q-w RnF Hydric Soil NORTH Non-Hydric Soil SSURGO Soil Unit Map �4, BURNS Line 472 Replacement Project �\MSDONNELL"' Duke Energy / Piedmont 0 400 800 Natural Gas Feet Johnston County, North Carolina & McDonnell Consultinq, Inc. Issued: 8/6/2020 O 0 E z U r 1 $P ow Ale r 010> C. HDD Centerline FEMA 100-Year —Pipeline Centerline Floodway NORTH Floodplain Map Permanent ® � BUFEMA 100-Year Line 472 Replacement Project Easement 1\M_Floodplain �RNSpOMNELL- Duke Energy / Piedmont Temporary 0 400 800 Natural Gas I#A Workspace Johnston County, North Carolina JFeet Source: Esri, FWS NWI, USGS NHD, Duke Energy 7 Piedmont Natural Gas, Burns & McDonnell Consulting, Inc. Issued: 8/6/2020