Loading...
HomeMy WebLinkAbout20110023_Information Letter_20100616 2N, STATE OF NORTH CAROLINA DEPARTNIENT OF TRANSPORTATION BEVERLY EAVES PERDUE GOVERNOR June 14, 2010 MEMORANDUM TO: Secretary Gene Conti FROM: Jamille Robbins Senior Public Hea g Officer Human Environment Unit JUN 6 ?D 'E44'66 W4 EUGENE A- O TI.JR SFCRETARY RE: Notice of Pre-Hearing Workshops and Public hearings for the Replacement of The Herbert C. Bonner Bridge on NC 12 Dare County The following Notice is furnished for your information: B-2500 This project proposes to replace the Herbert C. Bonner Bridge on NC 12. JAR/dnh Attachment cc: Mr. Stan M. White, Board of Transportation Member - Division 1 Mr. Jon Nance, P.E. Ms. Deborah M. Barbour, P.E. Mr. C.W. Leggett, P.E. Mr. Majed Al-Ghandour, P.E. Mr. Terry Gibson, P.E. Mr. Greg Thorpe, Ph.D. Mr. Rob Hanson, P.E. Ms. Teresa Hart, P.E. Mr. Eric Midkiff, P.E. Mr. Art McMillan, P.E. Mr. Jay Bennett, P.E. Mr. J.Victor Barbour, P.E. Mr. Kevin Lacy, P.E. Ms. Sharon Lipscomb Ms. Tammy Denning MAILING ADDRESS: TELEPHONE: 919-431-2000 LOCATION: NC DEPARTMENT OF TRANSPORTATION FAx: 919-431-2001 PROJECT DEVELOPMENT & HUMAN ENVIRONMENT UNIT ENVIRONMENTAL ANALYSIS BRANCH - 1598 MAIL SERVICE CENTER WEBSITEI WNNLNCOOT.ORG RALEIGH NC, 27699-1598 ENVIRONMENTAL RESOURCE CENTER 4701-116 ATLANTIC AVENUE RALEIGH NC, 27604 Mr. Everett Ward Mr. Mike Bruff. P.E. Mr. John Hennessv Mr. Charles Brown, P.E., PLS Mr. Mike Kinlaw, Right of Way Agent - Division 1 FHWA a" NOTICE OF PRE-HEARING WORKSHOPS AND PUBLIC HEARINGS FOR THE REPLACEMENT OF THE HERBERT C. BONNER BRIDGE ON NC 12 TIP Project No. B-2500 Dare County The North Carolina Department of Transportation (NCDOT) will hold pre-hearing workshops and public hearings at the following times and places: Tuesday, July 6, 2010: Pre-Hearing Open House - 4:00 p.m. to 6:30 p.m. Manteo High School, 829 Wingina Avenue, Manteo • Wednesday, July 7, 2010: Pre-Hearing Open House - 3:00 p.m. to 7:00 p.m. Rodanthe-Waves-Salvo Community Center, 23186 Myrna Peters Road, Rodanthe • Thursday, July 8, 2010: Pre-Hearing Open House - 4:00 p.m. to 6:30 p.m. Cape Hatteras Elementary School, 47500 Middle Ridge, Buxton Department of Transportation representatives will be available in an informal setting during the hours indicated above to answer questions and receive comments relative to the proposed project. The opportunity to submit written comments or questions also will be provided. Interested citizens may attend at any time during the above mentioned hours on the days indicated above. The formal public hearings will be held on Tuesday, July 6, 2010 in the Manteo High School Auditorium and on Thursday, July 8, 2010 in the Cape Hatteras Elementary School Cafeteria. Both hearings will begin at 7:00 p.m. The presentation will consist of an explanation of the proposed design, right of way and relocation requirements/procedures. The hearing will be open to those present for statements, questions and/or comments. Additional comments will be accepted until August 6, 2010. Anyone wishing to speak at the formal hearings may register to do so at the pre-hearing workshops, immediately prior to the formal hearings or by calling 1-866-803-0529. Speakers will be called in the order they signed up. A three-minute time limit will be imposed for speaking in order to allow a fair opportunity for all those wishing to do so. Additional spoken comments will be received after those who registered have finished their comments. This project proposes proposed to replace the Herbert C. Bonner Bridge on NC 12. An additional alternative (Parallel Bridge Corridor with NC 12 Transportation Management Plan) was evaluated and selected as the Preferred Alternative in an Environmental Assessment, published in May 2010. This alternative is being considered for the replacement along with refinements made to the detailed study alternatives since the release of the September 2008 Final Environmental Impact Statement (FEIS). The proposed project will require additional right of way and the purchase of homes and businesses. A map displaying the location and design of the project and a copy of the Environmental Assessment are available for public review at the Dare County Planning and Inspections Satellite Office, 49815 NC HWY 12, Buxton and at the NCDOT Resident Engineer's Office, 349 Waterplant Road, Unit B, Manteo. Copies of the Environmental Assessment are also available for review at the Dare County Libraries in Manteo at 700 HWY 64/264, in Hatteras at 56658 NC HWY 12, and in Kill Devil Hills at 400 Mustian Street and the Fessenden Recreation Center, 46830 NC HWY 12, Buxton. Anyone desiring additional information may contact Drew Joyner, P.E., NCDOT-Human Environment Unit, at 1598 Mail Service Center, Raleigh, NC 27699-1598, phone (919) 431- 6700, or e-mail: dioyner(a.ncdot.oov. Additional written comments may be submitted to Mr. Joyner until August 6, 2010. NCDOT will provide auxiliary aids and services under the Americans with Disabilities Act for disabled persons who wish to participate in this workshop. Anyone requiring special services should contact Mr. Joyner at the contact information above as early as possible so that arrangements can be made.